0% found this document useful (0 votes)
20 views

Etap Project: 12.6.0H Date: 06-07-2017 Location: SN: Contract: Revision: Base Engineer: Study Case: BS-IEEE-484 Config.: Normal

This document is a 3-sentence summary of a graph showing the duty cycle of Battery1 over 250 minutes as part of an ETAP project file for a 220 DC system located on the right bank. The graph shows the current drawn from Battery1 peaks around 1000 amps initially and periodically over the 250 minute period, dropping to near 0 amps between peaks. The document provides high-level information on the project name, location, date, and that the graph depicts the combined load duty cycle for Battery1.

Uploaded by

AbduBuser
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views

Etap Project: 12.6.0H Date: 06-07-2017 Location: SN: Contract: Revision: Base Engineer: Study Case: BS-IEEE-484 Config.: Normal

This document is a 3-sentence summary of a graph showing the duty cycle of Battery1 over 250 minutes as part of an ETAP project file for a 220 DC system located on the right bank. The graph shows the current drawn from Battery1 peaks around 1000 amps initially and periodically over the 250 minute period, dropping to near 0 amps between peaks. The document provides high-level information on the project name, location, date, and that the graph depicts the combined load duty cycle for Battery1.

Uploaded by

AbduBuser
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ETAP

Project: 12.6.0H Date: 06-07-2017


Location: SN:
Contract: Revision: Base
Engineer: Study Case: BS-IEEE-484 Config.: Normal

Project File: RIGHT BANK 220 DC SYSTEM


Output Report: Untitled

Battery DutyCycle (Combined Load)

Battery1

1200

1000

800
I (Ampere)

600

400

200

0
0 50 100 150 200 250
Time (Min.)

You might also like