Etap Project: 12.6.0H Date: 06-07-2017 Location: SN: Contract: Revision: Base Engineer: Study Case: BS-IEEE-484 Config.: Normal
Etap Project: 12.6.0H Date: 06-07-2017 Location: SN: Contract: Revision: Base Engineer: Study Case: BS-IEEE-484 Config.: Normal
Battery1
1200
1000
800
I (Ampere)
600
400
200
0
0 50 100 150 200 250
Time (Min.)