0% found this document useful (0 votes)
25 views1 page

Lifting Plan: Lifting and Installation of Diaphragm Wall Cage (Cage Length 24M) KOBELCO 7250S and K7100 Rivision No: 01

This document provides a lifting plan for installing a 24-meter long diaphragm wall cage using Kobelco 7250S and K7100 cranes at the KVMRT Project Line 2 HKL Crossover IVS-1 site. The plan was prepared by Keller (M) Sdn Bhd and approved by the project manager Kung Wei Khim.

Uploaded by

Mohd Fadli
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views1 page

Lifting Plan: Lifting and Installation of Diaphragm Wall Cage (Cage Length 24M) KOBELCO 7250S and K7100 Rivision No: 01

This document provides a lifting plan for installing a 24-meter long diaphragm wall cage using Kobelco 7250S and K7100 cranes at the KVMRT Project Line 2 HKL Crossover IVS-1 site. The plan was prepared by Keller (M) Sdn Bhd and approved by the project manager Kung Wei Khim.

Uploaded by

Mohd Fadli
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

LIFTING PLAN

HKL CROSSOVER IVS-1


(KVMRT PROJECT LINE 2)

KELLER (M) SDN. BHD.(24057-T)


B5-10 B, Plaza Dwitasik, Bandar Sri Permaisuri, off Jalan Tasik
Permaisuri 1, 56000 Kuala Lumpur

LIFTING AND INSTALLATION OF DIAPHRAGM


WALL CAGE (CAGE LENGTH 24m)
KOBELCO 7250S and K7100
RIVISION NO: 01

Prepared by: Approved by:

………………………. ………………................
Kung Wei Khim
Project Manager

You might also like