TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60ºF TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.
1C Nil 0 Nil 0 0 0
2C 15.22 14.983 1,021 6,420 18.002 17.751 47.41 298 6,122 31.6 88.9 44.6 0.98558 6,033 15.083 6,018 0.12544
3C 6.35 6.118 4,728 29,738 Nil 29,738 31.0 87.8 44.6 0.98613 29,325 73.313 29,252 0.12544
4C 17.94 17.692 78 492 Nil 492 30.6 87.1 44.6 0.98648 485 1.213 484 0.12544
5C Nil 0 Nil 0 0 0
6C 11.24 11.014 2,771 17,427 17.933 17.705 73.92 465 16,962 31.3 88.3 44.6 0.98588 16,722 41.81 16,680 0.12544
7C 3.90 3.672 5,728 36,027 Nil 36,027 30.3 86.5 44.5 0.98680 35,552 88.879 35,463 0.12551
8C 3.78 3.554 5,152 32,405 17.640 17.412 210 1,321 31,084 30.2 86.4 44.6 0.98683 30,675 76.686 30,598 0.12544
SL.P 8.89 8.614 308 1,940 9.200 8.929 298 1,876 64 36.0 96.8 44.6 0.98159 63 0.156 62 0.12544
SL.S 8.87 8.577 306 1,924 11.220 10.932 231 1,451 473 36.0 96.8 44.6 0.98159 464 1.161 463 0.12544
TOTAL
TOTAL 20,092 126,372 860 5,411 120,961 119,319 119,021
REMARKS: 892 52 840 827 825
PRODUCTION LOADING IN TO 2C
08.00 - 16.00 : Heating cargo oil
Gross Volume :(T.O.V.) 126,372 Oil Volume @ 60 F :(N.S.V.) 119,021 DRAFT FWD 7.80 m AFT
Less Free Water : 5,411 Less OBQ/ROB :
Oil Volume :(G.O.V.) 120,961 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 119,319 Long tons/Metric tons :
Long Tons/Metric Tons : 14,970 15,210 Vessel Experience Factor :
API 60 F : 44.6 Adjusted Volum @ 60 F : Capt. Juanda Pardede
B.S & W. % Vol :. 0.25 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 10-Apr-17
0 0
757 0.12745 768.940
3,678.535 0.12745 3737.478
60.866 0.12745 61.841
0 0
2,097.628 0.12745 2131.240
4,462.102 0.12752 4533.561
3,847.822 0.12745 3909.478
7.845 0.12745 7.971
58.255 0.12745 59.189
14,970 15,210
Staff
Surya Putra Jaya Master Capt. Boy Richard Togas Santos Rep. Capt. Juanda Parde
Water Offtake
PFW PH 0
Note: : PRODUCTION LOADING INTO COT 2C
OIW Average (mg/I) 10 Continue free Gas COT 1 C & 5 C
08.00 - 16.00 : Heating cargo oil
OIW Peak (mg/I) 0
Regulated Waste
Category Vol (m3) Kg Comments
Biological Waste 0 0
Note :
OYONG OPERATORS DAILY REPORT
Fuel
FSO-MFO FSO-MDO Service Vessel
MDO
Meetings
Incidents
Drills
Type Time Comment
S.T.O.P. Audit program
19-Dec-16
141,460
deg C
deg C
NTO COT 2C
&5C
6118 / 119039
e Vessel
Comment
ss
monitor valve
k
m with spare
O pressure A/E No.1
pt. activity
ss
A
Comment
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT
Mooring/Unmooring :
04.50 : KST. 51 Cast off
Bunkering/Debunkering :
ENGINE :
1. Maintenance RO No.1
2. Firing up auxiliary boiler for heating cargo oil
3. Transferred tellus hydraulic 46 from deck to storage tank in steering gear
4. Renewed all unlit lamp at engine room with spare
5. Replaced pressure limit switch for lube oil pressure auxiliary engine No.1
5. Running up A/E No. 2 & 3 :
08.00 - 16.00 : - Heating cargo oil
9. EHS AUDIT/INSPECTION
TOTAL
4015
4013
TRANS ROB
0 196.77
0 30.03
ROB `
81
252
ROB
200
POB
39
28-Nov-13
NIL
NIL
NIL
NIL
NIL
FUEL STATUS REPORT
MDO
11
12
13
14
15
16
17
18
19
Date
20
21
22
23
24
25
26
27
28
29
30
FUEL STATUS REPORT
MFO
Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Kl ) ( Kl ) ( Kl ) ( Kl ) ( Kl ) ( Kl )
01 203.77 0 0 0 0 203.77
02 203.77 0 0 0 0 203.77
03 203.77 0 0 3.50 0 200.27 Tank Cleaning COT 5C
04 200.27 0 0 0 0 200.27
05 200.27 0 0 0 0 200.27
06 200.27 0 0 0 0 200.27
07 200.27 0 0 0 0 200.27
08 200.27 0 0 0 0 200.27
09 200.27 0 0 0 0 200.27
10 200.27 0 0 3.50 0 196.77 Heating cargo oil
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
LOG SHEET DOMESTIC & SANITARY WASTE WATER
Average/
Day 4,970 4,973 4,966 1,658 0 0 0 0 0 0 0 0
LOG SHEET RESERVOIR OSMOSIS WASTE WATER
2 IYYANG C/O CCR All in charged heating cargo oil Done Positive 1
3 ANDI AHMAD UNIT 2/O Bridge House keeping Nav/GMDSS room Done Positive 1
4 INDRA 3/O Port Quarter Final coating renewed fire hydrant valve Done Positive 1
5 JULY MANGIRI C/E Engine room Replaced unlit lamp with spare at engine room Done Positive 1
8 LILIK WAHYUWANTO 4/E Engine room Preparing boiler for heating cargo oil Done Positive 1
16 NUR ALI MTM RO room Cleaned fine filter RO for spare Done Positive 1
22 RANGGUN JAWI STWD Laudry room House keeping in laundry room Done Positive 1
23 BOBBY MANGONTO STWD CCR House keeping in cargo control room Done Positive 1
TOTAL 23
FSO.SURYA PUTRA JAYA
TANK CLEANING AND GAS FREE SEQUENCE
EQUIPMENT :
1. CARGO PUMP 4 SET
2. STRIPPING PUMP 1 SET
3. CARGO HEATER 1 SET
4. BUTTERWORTH 4 UNIT
5. TANK CLEANING HOSE 5 SET ( 25 MTRS)
6. FIX TANK CLEANING MACHINE IN COT
7. I.G.S FAN 2 SETS
8. PNEUMATIC DRIVEN FAN 4 SETS HEATING & INNERTING COT 1 C & 5 C
TIME
N0 ACTIIVITY DATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 HEATING CARGO
COT 1C 13/Mar/17 RESULT O² : 6%
COT 5C 13/Mar/17 RESULT TEMPERATURE : 45°C
COT 1 C
3 Tank Pressure Released 14/Mar/17
4 BUTTERWORTHING COT 1C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 14/Mar/17
2ND STAGE ( 8 MTRS ) 14/Mar/17
1ST STAGE ( 12 MTRS ) 14/Mar/17
1ST STAGE ( 16 MTRS ) 14/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 1C TO SLOP P/S DURING BUTTERWORTHING
5 BUTTERWORTHING COT 1C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 15/Mar/17
2ND STAGE ( 8 MTRS ) 15/Mar/17
1ST STAGE ( 12 MTRS ) 15/Mar/17
1ST STAGE ( 16 MTRS ) 15/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 1C TO SLOP P/S DURING BUTTERWORTHING
12
10
10
40
OUTH AREA
11
11
61
22
22
22
22
22
22
193
FSO.SURYA PUTRA JAYA
TANK CLEANING AND GAS FREE SEQUENCE
EQUIPMENT :
1. CARGO PUMP 4 SET
2. STRIPPING PUMP 1 SET
3. CARGO HEATER 1 SET
4. BUTTERWORTH 4 PCS
5. TANK CLEANING HOSE 5 SET ( 25 MTRS)
6. MACHINE TANK CLEANING IN USE
7. FIX BLOWER FAN IG 2 SET
8. PORTABLE AIR DRIVE FAN 4 SET HEATING & INNERTING COT 1 C & 5 C : 9 HRS
TIME
N0 ACTIIVITY DATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 HEATING CARGO
COT 1C 13/Mar/17 1 1 RESULT O² : 6%
COT 5C 13/Mar/17 1 1 RESULT TEMPERATURE : 45°C
COT 5 C
3 Tank Pressure Released 21/Mar/17
4 BUTTERWORTHING COT 5C ( COP NO. 2 ) 21/Mar/17
1ST STAGE ( 4 MTRS ) 21/Mar/17
2ND STAGE ( 8 MTRS ) 21/Mar/17
1ST STAGE ( 12 MTRS ) 21/Mar/17
1ST STAGE ( 16 MTRS ) 21/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 5C TO SLOP P/S DURING BUTTERWORTHING
5 BUTTERWORTHING COT 5C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 22/Mar/17
2ND STAGE ( 8 MTRS ) 22/Mar/17
1ST STAGE ( 12 MTRS ) 22/Mar/17
1ST STAGE ( 16 MTRS ) 22/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 5C TO SLOP P/S DURING BUTTERWORTHING
6 BUTTERWORTHING COT 5C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 23/Mar/17
2ND STAGE ( 8 MTRS ) 23/Mar/17
1ST STAGE ( 12 MTRS ) 23/Mar/17
1ST STAGE ( 16 MTRS ) 23/Mar/17
NOTE : 27TH MARCH 2017 COMPLETED I.G.S FAN AND CONTINUED GAS FREE BY PNEUMATIC AIR DRIVEN FAN
GAS FREE IN CARGO TANK WILL BE MAINTAINED ONLY BY USED PNEUMATIC AIR DRIVEN FANOPERATED ALL THE TIMES,
DUE TO REMAINING SLUDGE IN TANKS.
TTL HRS
24
10
10
10
46
UTH
5
8
59
8
4
%
21
0
8
5
%
21
15
15
15
112