0% found this document useful (0 votes)
19 views

10 Apr 2017

This midnight ullage report summarizes the oil volumes and levels in 8 cargo tanks of the FSO Surya Putra Jaya. Tank 2C contained 6,033 bbls of oil. Tank 3C contained the most at 29,325 bbls. In total, there was 119,021 bbls of oil onboard stored across the 8 tanks. Loading of oil into Tank 2C was occurring between 8-16 hours to heat the cargo oil.

Uploaded by

Ihwan Asrul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views

10 Apr 2017

This midnight ullage report summarizes the oil volumes and levels in 8 cargo tanks of the FSO Surya Putra Jaya. Tank 2C contained 6,033 bbls of oil. Tank 3C contained the most at 29,325 bbls. In total, there was 119,021 bbls of oil onboard stored across the 8 tanks. Loading of oil into Tank 2C was occurring between 8-16 hours to heat the cargo oil.

Uploaded by

Ihwan Asrul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 38

VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL: FSO SURYA PUTRA JAYA


PRODUCT: OYONG CRUDE OIL

TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60ºF TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.

1C Nil 0 Nil 0 0 0
2C 15.22 14.983 1,021 6,420 18.002 17.751 47.41 298 6,122 31.6 88.9 44.6 0.98558 6,033 15.083 6,018 0.12544
3C 6.35 6.118 4,728 29,738 Nil 29,738 31.0 87.8 44.6 0.98613 29,325 73.313 29,252 0.12544
4C 17.94 17.692 78 492 Nil 492 30.6 87.1 44.6 0.98648 485 1.213 484 0.12544
5C Nil 0 Nil 0 0 0
6C 11.24 11.014 2,771 17,427 17.933 17.705 73.92 465 16,962 31.3 88.3 44.6 0.98588 16,722 41.81 16,680 0.12544
7C 3.90 3.672 5,728 36,027 Nil 36,027 30.3 86.5 44.5 0.98680 35,552 88.879 35,463 0.12551
8C 3.78 3.554 5,152 32,405 17.640 17.412 210 1,321 31,084 30.2 86.4 44.6 0.98683 30,675 76.686 30,598 0.12544
SL.P 8.89 8.614 308 1,940 9.200 8.929 298 1,876 64 36.0 96.8 44.6 0.98159 63 0.156 62 0.12544
SL.S 8.87 8.577 306 1,924 11.220 10.932 231 1,451 473 36.0 96.8 44.6 0.98159 464 1.161 463 0.12544
TOTAL
TOTAL 20,092 126,372 860 5,411 120,961 119,319 119,021
REMARKS: 892 52 840 827 825

PRODUCTION LOADING IN TO 2C
08.00 - 16.00 : Heating cargo oil

Gross Volume :(T.O.V.) 126,372 Oil Volume @ 60 F :(N.S.V.) 119,021 DRAFT FWD 7.80 m AFT
Less Free Water : 5,411 Less OBQ/ROB :
Oil Volume :(G.O.V.) 120,961 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 119,319 Long tons/Metric tons :
Long Tons/Metric Tons : 14,970 15,210 Vessel Experience Factor :
API 60 F : 44.6 Adjusted Volum @ 60 F : Capt. Juanda Pardede
B.S & W. % Vol :. 0.25 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 10-Apr-17

WEIGHT W.C.F. WEIGHT


TABLE 13
LT M/T

0 0
757 0.12745 768.940
3,678.535 0.12745 3737.478
60.866 0.12745 61.841
0 0
2,097.628 0.12745 2131.240
4,462.102 0.12752 4533.561
3,847.822 0.12745 3909.478
7.845 0.12745 7.971
58.255 0.12745 59.189

14,970 15,210

10.80 m TRIM 3.00 m


LIST NIL

Capt. Boy R. Togas


MASTER
OYONG OPERATORS DAILY REPORT
FSO SURYA PUTRA JAYA 10-Apr-17 @ 2400 HRS

Staff

Surya Putra Jaya Master Capt. Boy Richard Togas Santos Rep. Capt. Juanda Parde

Crude Storage Lifting

24 Hours Total (bbls) 892 Last Lifting 19-Dec

BS and W % 0.25 Lifting Vol (bbls) 141,46

Storage Gross (bbls) Next Lifting


120,961 -

Storage Net / G.S.V (Nbbls) 119,319 Next Lifting Vol (bbls) -

Storage Net / N.S.V (Nbbls) 119,021

Days to Tank Tops 225 Vessel ETA -

Total Crude This Month (Nbbls) 119,319

Water Offtake

Water Received 24hrs (bbls) 52 Offtake 24 Hours (bbls) -

Total Water in Cargo (bbls) 5,411 Note :

Total P/W Received (bbls) 9,783

Water Drawn off (bbls) 0 Loading/Incoming Temp 40.0

Specific Gravity 0 Storage tanks's temperature 31.6

PFW PH 0
Note: : PRODUCTION LOADING INTO COT 2C
OIW Average (mg/I) 10 Continue free Gas COT 1 C & 5 C
08.00 - 16.00 : Heating cargo oil
OIW Peak (mg/I) 0

Non Regulated Waste

Category Vol (m3) Kg Comments

Soft Waste 0.00 0

Non Metal Waste 0.00 0

Metal Waste 0.00 0

Regulated Waste
Category Vol (m3) Kg Comments

Solid Hazardous Waste 0.00 0

Solid Hazardous From Process 0 0

Liquid Chemical Waste 0 0

Biological Waste 0 0

Liquid Hazardous Waste (Oil) 0 0

SMF (Synthetic Mineral Fibre) 0 0

Note :
OYONG OPERATORS DAILY REPORT

Fuel
FSO-MFO FSO-MDO Service Vessel
MDO

Opening (m3) 200.27 ### 31.64 0

Received / Bunkered (m3) 0 0 0


###
Consumption (m3) 3.50 1.61

Closing (m3) 196.77 30.03 0

Supply Remaining (days)

Remarks : DO Consumption for Boiler (Burning n Before stop 0.2 KL )

Meetings

Type Time Comment

1. Reviewed previous day works


2. Gas free in COT 1C & 5C in progress
3. Final coating fire hydran and foam monitor valve
4. Heating Cargo oil
5. Maintenance RO no.1
Tool box meeting 06.30
6. Transfer hydraulic oil to storage tank
7. Renew all unlit lamp at engine room with spare
8. Replace pressure limit switch for LO pressure A/E No.1

1. Review deck, engine and galley dept. activity


2. Gas free in COT 1C & 5C in progress
3. Check and maintenance LSA & FFA
Supervisory Meeting 16.30 4. Final Coating Deck Wing Stbd Side
5. Internal transfer
6. Collecting garbage in to container
7. House keeping

Incidents

Type Reference Comments


NIL

Drills
Type Time Comment
S.T.O.P. Audit program

Observation Card Report : 23


The details see SPKK sheet *)
###
Capt. Juanda Pardede

19-Dec-16

141,460

deg C

deg C

NTO COT 2C
&5C

6118 / 119039
e Vessel

Comment

ss
monitor valve

k
m with spare
O pressure A/E No.1

pt. activity
ss
A

Comment
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT

1. LOG OF EVENT 24 HOURS


1.1 Operations
Cargo operations :
PRODUCTION LOADING INTO COT 2C
11,20-11,45 lt : Checked O2 Content and LEL in COT 1C
Free Gas COT 1 C & 5C In Progress
08.00 - 16.00 : Heating cargo oil

Mooring/Unmooring :
04.50 : KST. 51 Cast off

Bunkering/Debunkering :

Personnel & Material Transfer :


04.50 : 1 Person Santos rep by KST. 51 ( out )
05.30 : 14 Persons PKP & 2 person Mafhindo by KST. 51 ( out )
15.00 : 14 Persons PKP & 2 person Mafhindo by KST. 51 ( in )

1.2 Planned/Unplanned Maintenance


DECK :
1. Assisted transfer Santos rep & contractor personnel
2. Continued free gas by portable fan in COT 1C & 5C
3. Final coating renewed fire hydrant & foam monitor valve
4. Heating cargo oil
5. House keeping

ENGINE :
1. Maintenance RO No.1
2. Firing up auxiliary boiler for heating cargo oil
3. Transferred tellus hydraulic 46 from deck to storage tank in steering gear
4. Renewed all unlit lamp at engine room with spare
5. Replaced pressure limit switch for lube oil pressure auxiliary engine No.1
5. Running up A/E No. 2 & 3 :
08.00 - 16.00 : - Heating cargo oil

2. PERMIT TO WORK PW MW HW CSE IP VAL


471 1880 384 181 8 1091
2.1 J HA 471 1880 384 181 6 1091
3. BUNKERS(M3) CONS RCVD
M.F.O 3.50 0
M.D.O 1.61 0
4. FRESH WATER (MT) CONS RCV TRNSF PROD
BLR 0 0 0 0
DOM 10 0 0 16
5. DISPERSANT, FOAM, CHEMICALS (LTRS) OSD REC CONS
REASON FOR USE 200 0 0
6. POB IN OUT
16 17
MAN HOURS ( POB X 12 HRS )
Previous man hours 235776 Days W/O LTI 1229 Since 28-Nov-13
Man hours today 276
Total man hours 236052
Safe man hours 236052
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings `
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES

9. EHS AUDIT/INSPECTION

10. ISSUES WITH LOCAL COMMUNITY

11. VESSEL ARRIVAL/DEPARTURE

12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS


10-Apr-17 @2400 HRS

TOTAL
4015
4013
TRANS ROB
0 196.77
0 30.03
ROB `
81
252
ROB
200
POB
39

28-Nov-13

Previous Today Total


0 0 0
0 0 0
0 0 0
0 0 0
1794 2 1796
3719 23 3742
3 0 3
0 0 0
196 0 196

NIL

NIL

NIL

NIL

NIL
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Apr-17

MDO

Opening A/E A/E A/E Closing


Receive Transfer Cons. Adj.
Date Balance No.1 No.2 No.3 Balance Remarks
( KL ) ( KL ) ( KL ) ( KL ) ( KL ) (Hrs) (Hrs) (Hrs) ( Ltr )
01 43.77 0 0 1.30 0 0.0 0.0 24.0 42.47
02 42.47 0 0 1.30 0 0.0 0.0 24.0 41.17
DO Consumption for Boiler
03 41.17 0 0 1.61 0 8.0 0.0 16.0 39.56 (Burning n Before stop 0.2
KL )

04 39.56 0 0 1.37 0 5.5 0.0 18.5 38.19 Free gas COT 5C


05 38.19 0 0 1.30 0 0.0 24.0 0.0 36.89
06 36.89 0 0 1.31 0 1.0 23.0 0.0 35.58 Transferred materials
07 35.58 0 0 1.32 0 0.0 22.0 2.0 34.26 Transferred materials
Opened & closed garbage
34.26 0 0 1.31 0 0.0 23.0 1.0 32.95 container
08
09 32.95 0 0 1.31 0 0.0 23.0 1.0 31.64 Transferred materials
DO Consumption for Boiler
10 31.64 0 0 1.61 0 0.0 16.0 8.0 30.03 (Burning n Before stop 0.2
KL )

11
12
13
14
15
16
17
18

19

Date

20
21

22

23

24

25

26
27
28

29

30
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Apr-17

MFO

Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Kl ) ( Kl ) ( Kl ) ( Kl ) ( Kl ) ( Kl )
01 203.77 0 0 0 0 203.77
02 203.77 0 0 0 0 203.77
03 203.77 0 0 3.50 0 200.27 Tank Cleaning COT 5C
04 200.27 0 0 0 0 200.27
05 200.27 0 0 0 0 200.27
06 200.27 0 0 0 0 200.27
07 200.27 0 0 0 0 200.27
08 200.27 0 0 0 0 200.27
09 200.27 0 0 0 0 200.27
10 200.27 0 0 3.50 0 196.77 Heating cargo oil
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Domestic Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 12 14 12 13
2 13 12 13 14
3 11 14 14 13
4 12 14 13 14
5 12 13 14 12
6 14 13 14 13
7 13 12 13 14
8 12 13 12 13
9 13 14 13 12
10 13 14 13 12
11 14 12 14
12 12 12 13
13 13 13 13
14 11 13 12
15 13 12 12
16 14 13 13
17 12 14 13
18 13 14 12
19 11 12 13
20 12 12 14
21 12 13 12
22 13 14 12
23 12 14 13
24 14 13 14
25 12 13 14
26 12 14 13
27 14 12 14
28 14 12 13
29 13 14
30 14 13
31 13 13

TOTAL 393 365 405 130 0 0 0 0 0 0 0 0


LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Sanitary Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 8 7 8 8
2 7 8 8 7
3 7 8 8 7
4 8 8 7 8
5 8 7 8 8
6 7 8 8 7
7 8 8 7 8
8 8 8 7 7
9 8 8 8 7
10 7 8 8 8
11 8 7 8
12 7 8 7
13 7 8 8
14 8 8 8
15 8 8 7
16 8 7 8
17 8 8 7
18 7 8 8
19 7 8 8
20 8 8 7
21 8 7 8
22 8 8 7
23 7 8 8
24 8 8 8
25 8 8 8
26 7 8 7
27 7 7 8
28 8 8 8
29 8 7
30 8 7
31 8 7

TOTAL 237 218 236 75 0 0 0 0 0 0 0 0


LOG SHEET COOLING WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Cooling Water Discharge ( M3 )


Date
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
1 4,964 4,970 4,975 4,983
2 4,951 4,968 4,971 4,991
3 4,971 4,971 4,973 4,982
4 4,954 4,970 4,972 4,965
5 4,980 4,975 4,973 4,970
6 4,969 4,969 4,974 4,952
7 4,972 4,974 4,973 4,977
8 4,957 4,972 4,930 4,984
9 4,960 4,977 4,945 4,948
10 4,987 4,978 4,961 4,984
11 4,991 4,975 4,952
12 4,984 4,971 4,960
13 4,966 4,977 4,981
14 4,958 4,975 4,972
15 4,963 4,973 4,981
16 4,974 4,969 4,941
17 4,988 4,972 4,959
18 4,964 4,974 4,981
19 4,978 4,976 4,985
20 4,971 4,971 4,994
21 4,973 4,974 4,963
22 4,970 4,975 4,952
23 4,966 4,972 4,958
24 4,960 4,977 4,949
25 4,969 4,970 4,961
26 4,972 4,969 4,983
27 4,974 4,973 4,978
28 4,975 4,970 4,966
29 4,970 4,960
30 4,973 4,959
31 4,978 4,958

TOTAL 154,082 139,237 153,940 49,736 0 0 0 0 0 0 0 0

Average/
Day 4,970 4,973 4,966 1,658 0 0 0 0 0 0 0 0
LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity R.O Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 80 135 55 160
2 70 120 40 155
3 135 110 95 135
4 80 90 30 140
5 120 120 95 125
6 125 90 145 110
7 130 95 135 90
8 60 110 145 95
9 40 115 145 95
10 110 110 140 80
11 100 100 150
12 105 110 130
13 100 100 50
14 55 110 65
15 85 70 140
16 90 110 60
17 90 85 80
18 95 95 70
19 55 95 70
20 75 80 125
21 90 155 115
22 80 165 145
23 80 165 120
24 80 165 140
25 95 150 130
26 150 165 135
27 110 140 90
28 150 40 65
29 125 40
30 140 100
31 90 160

TOTAL 2,990 3,195 3,205 1,185 0 0 0 0 0 0 0 0


DATA PERSONNEL ON BOARD

VESSEL : FSO SURYA PUTRA JAYA


MONTH OF : Apr 2017

DATE CREW SPJ SANTOS VISITOR/KONTRAKTOR DAILY TOTAL REMARKS


1-Apr-2017 24 1 21 46
2-Apr-2017 24 1 21 46
3-Apr-2017 24 1 21 46
4-Apr-2017 24 0 21 45
5-Apr-2017 24 1 13 38
6-Apr-2017 24 0 13 37
7-Apr-2017 23 0 15 38
8-Apr-2017 23 1 16 40
9-Apr-2017 23 1 16 40
10-Apr-2017 23 0 16 39

TOTAL 236 6 173 415


SIKLUS PENGAMATAN KESELAMATAN KERJA
Vessel Name : FSO. SURYA PUTRA JAYA
Date : 10/Apr/17
Positive /
Reported by Rank Location Description Action/Comment Negative Total

Discussed about cargo heting safety


1 BOY RICHARD TOGAS Master Deck Office
procedures.
Done Positive 1

2 IYYANG C/O CCR All in charged heating cargo oil Done Positive 1

3 ANDI AHMAD UNIT 2/O Bridge House keeping Nav/GMDSS room Done Positive 1

4 INDRA 3/O Port Quarter Final coating renewed fire hydrant valve Done Positive 1

5 JULY MANGIRI C/E Engine room Replaced unlit lamp with spare at engine room Done Positive 1

6 ACO AKBAR 2/E RO room Maintenance RO no.1 Done Positive 1

Transferred hydraulic oil from lay down to


7 RATNO SITUMORANG 3/E Lay down
storage tank
Done Positive 1

8 LILIK WAHYUWANTO 4/E Engine room Preparing boiler for heating cargo oil Done Positive 1

Replaced pressure limit switch for lube oil


9 NIKO ARIYO E/E Engine room
pressure auxiliary engine No.1
Done Positive 1

Prepared/Line up heating cargo line at pump


10 AANG Bosun Pump room
room
Done Positive 1

Assisted C/O heating cargo oil by standby on


11 UDIYANTO AB Main deck
deck
Done Positive 1

Assisted C/O heating cargo oil by check


12 BAYU SEGARA AB Main deck
continuously cargo oil ullage
Done Positive 1

Assisted C/O heating cargo oil by standby in


13 MOHAMMAD ANSORI AB Pump room
pump room & check temperature of heater
Done Positive 1

Assisted C/O heating cargo oil by standby on


14 DEDI BIN WARNA OS Main deck
deck
Done Positive 1

Assisted transferred hydraulic oil from lay down


15 ELIK BUDIANTO FTR Lay down
to storage tank
Done Positive 1

16 NUR ALI MTM RO room Cleaned fine filter RO for spare Done Positive 1

Assisted 4/E preparing boiler for heating cargo


17 SUAIB MTM Boiler
oil
Done Positive 1

House keeping at 3rd floor engine room floor


18 UMAR SAID MTM Engine room
around main air compressor
Done Positive 1

19 SUMARDI WIPER Workshop House keeping in workshop area Done Positive 1

20 HASAN C/Cook Galley House keeping in galley area Done Positive 1

21 ROHIM 2ND/Cook Provision store Checked provision condition Done Positive 1

22 RANGGUN JAWI STWD Laudry room House keeping in laundry room Done Positive 1

23 BOBBY MANGONTO STWD CCR House keeping in cargo control room Done Positive 1

TOTAL 23
FSO.SURYA PUTRA JAYA
TANK CLEANING AND GAS FREE SEQUENCE

EQUIPMENT :
1. CARGO PUMP 4 SET
2. STRIPPING PUMP 1 SET
3. CARGO HEATER 1 SET
4. BUTTERWORTH 4 UNIT
5. TANK CLEANING HOSE 5 SET ( 25 MTRS)
6. FIX TANK CLEANING MACHINE IN COT
7. I.G.S FAN 2 SETS
8. PNEUMATIC DRIVEN FAN 4 SETS HEATING & INNERTING COT 1 C & 5 C
TIME
N0 ACTIIVITY DATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 HEATING CARGO
COT 1C 13/Mar/17 RESULT O² : 6%
COT 5C 13/Mar/17 RESULT TEMPERATURE : 45°C

2 INNERT GAS OPERATION


COT 1C 13/Mar/17 RESULT O² : 5%
COT 5C 13/Mar/17 RESULT O² : 6%

COT 1 C
3 Tank Pressure Released 14/Mar/17
4 BUTTERWORTHING COT 1C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 14/Mar/17
2ND STAGE ( 8 MTRS ) 14/Mar/17
1ST STAGE ( 12 MTRS ) 14/Mar/17
1ST STAGE ( 16 MTRS ) 14/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 1C TO SLOP P/S DURING BUTTERWORTHING
5 BUTTERWORTHING COT 1C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 15/Mar/17
2ND STAGE ( 8 MTRS ) 15/Mar/17
1ST STAGE ( 12 MTRS ) 15/Mar/17
1ST STAGE ( 16 MTRS ) 15/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 1C TO SLOP P/S DURING BUTTERWORTHING

6 BUTTERWORTHING COT 1C ( COP NO. 2 )


1ST STAGE ( 4 MTRS ) 17/Mar/17
2ND STAGE ( 8 MTRS ) 17/Mar/17
1ST STAGE ( 12 MTRS ) 17/Mar/17
1ST STAGE ( 16 MTRS ) 17/Mar/17

STRIPPING PUMP OPERATED, TRANSFER OILY WATER


FROM COT 1C TO SLOP P/S DURRING BUTTERWORTHING

TANK CLEANING TOTAL 40 HRS


CHECK ULLAGE BY MMC : NIL, CHECK SOUNDING BY SAMPLING HOLE BY OIL GAUGING TAPE : 2 CM ( SLUDGE ) ONLY AT BELLMOUTH AREA
7 GAS FREE BY USING I.G.S FIX FAN 18/Mar/17
20/Mar/17
TOTAL TANK CLEANING AND GAS FREE : 61 HRS
8 GAS FREE BY USING 2 SETS PNEUMATIC AIR 21/Mar/17
DRIVEN FAN 22/Mar/17
23/Mar/17
24/Mar/17
25/Mar/17
26/Mar/17
COT ATM RESULTS : O²/ 21.00% - LEL/NIL - CO/NIL - HC/NIL
FREE GAS BY PORTABLE FAN : 5 Days
TANK CLEANING AND GAS FREE COMPLETED FOR COT 1 C : 8 Days
REMARKS :
GAS FREE IN CARGO TANK WILL BE MAINTAINED ONLY BY USED PNEUMATIC AIR DRIVEN FANOPERATED ALL THE TIMES,
DUE TO REMAINING SLUDGE IN TANKS.
TTL HRS
24

12
10

10

40

OUTH AREA
11
11
61
22
22
22
22
22
22
193
FSO.SURYA PUTRA JAYA
TANK CLEANING AND GAS FREE SEQUENCE

EQUIPMENT :
1. CARGO PUMP 4 SET
2. STRIPPING PUMP 1 SET
3. CARGO HEATER 1 SET
4. BUTTERWORTH 4 PCS
5. TANK CLEANING HOSE 5 SET ( 25 MTRS)
6. MACHINE TANK CLEANING IN USE
7. FIX BLOWER FAN IG 2 SET
8. PORTABLE AIR DRIVE FAN 4 SET HEATING & INNERTING COT 1 C & 5 C : 9 HRS
TIME
N0 ACTIIVITY DATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 HEATING CARGO
COT 1C 13/Mar/17 1 1 RESULT O² : 6%
COT 5C 13/Mar/17 1 1 RESULT TEMPERATURE : 45°C

2 INNERT GAS OPERATION


COT 1C 13/Mar/17 RESULT O² : 5%
COT 5C 13/Mar/17 RESULT O² : 6%

COT 5 C
3 Tank Pressure Released 21/Mar/17
4 BUTTERWORTHING COT 5C ( COP NO. 2 ) 21/Mar/17
1ST STAGE ( 4 MTRS ) 21/Mar/17
2ND STAGE ( 8 MTRS ) 21/Mar/17
1ST STAGE ( 12 MTRS ) 21/Mar/17
1ST STAGE ( 16 MTRS ) 21/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 5C TO SLOP P/S DURING BUTTERWORTHING
5 BUTTERWORTHING COT 5C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 22/Mar/17
2ND STAGE ( 8 MTRS ) 22/Mar/17
1ST STAGE ( 12 MTRS ) 22/Mar/17
1ST STAGE ( 16 MTRS ) 22/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 5C TO SLOP P/S DURING BUTTERWORTHING
6 BUTTERWORTHING COT 5C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 23/Mar/17
2ND STAGE ( 8 MTRS ) 23/Mar/17
1ST STAGE ( 12 MTRS ) 23/Mar/17
1ST STAGE ( 16 MTRS ) 23/Mar/17

STRIPPING PUMP OPERATED, TRANSFER OILY WATER


FROM COT 5C TO SLOP P/S DURRING BUTTERWORTHING

7 BUTTERWORTHING COT 5C ( COP NO. 2 )


1ST STAGE ( 12 MTRS ) 25/Mar/17
1ST STAGE ( 16 MTRS ) 25/Mar/17

STRIPPING PUMP OPERATED, TRANSFER OILY WATER


FROM COT 5C TO SLOP P/S DURRING BUTTERWORTHING

TANK CLEANING CLEANING TOTAL 46 HRS


CHECK ULLAGE BY MMC : NIL, CHECK SOUNDING SAMPLING HOLD BY OIL GAOUGING TAPE : 5 CM SLUDGE AREA BELLMOUTH
7 FREE GAS BY USING I.G.S FIX FAN 25/Mar/17
27/Mar/17

TOTAL TANK CLEANING AND GAS FREE : 59 HRS


27/Mar/17 18.00 pm O2 Content : 18 %, LEL : 29 %, CO : %, H2S : 5 %

ESTIMATE COMPLETED 31 MARCH 2017


8 FREE GAS BY USING I.G.S FIX FAN 28/Mar/17
17.00 pm O2 Content : 18 %, LEL : 12 %, CO : %, H2S : %
29/Mar/17
17.00 pm O2 Content : 18,5 %, LEL : 6 %, CO : 0 %, H2S : 0 %
GAS FREE BY USING 2 SETS PNEUMATIC AIR 30/Mar/17
DRIVEN FAN 17.20 pm O2 Content : 20, %, LEL : 3 %, CO : 0 %, H2S : 0 %
Will be done again Cleaning for Cargo tank 5 C
Tank cleaning COT 5 C 3/Apr/17
FREE GAS BY USING I.G.S FIX FAN 4/Apr/17
15,00 pm O2 Content : 20, 9 %, LEL : 20 %, CO : 0 %, H2S : 0 %
GAS FREE BY USING 2 SETS PNEUMATIC AIR 5/Apr/17
DRIVEN FAN 11,30 pm O2 Content : 20 %, LEL : 11 %, CO : 0 %, H2S : 0 %
6/Apr/17
11,30 pm O2 Content : 20 %, LEL : 10 %, CO : 0 %, H2S : 0 %
7/Apr/17
11,40 pm O2 Content : 20 %, LEL : 0 %, CO : 0 %, H2S : 0 %
8/Apr/17
11,45 pm O2 Content : 20 %, LEL : 0 %, CO : 0 %, H2S : 0 %
9/Apr/17 TANK CLEANING AND GAS FREE COMPLETED

NOTE : 27TH MARCH 2017 COMPLETED I.G.S FAN AND CONTINUED GAS FREE BY PNEUMATIC AIR DRIVEN FAN
GAS FREE IN CARGO TANK WILL BE MAINTAINED ONLY BY USED PNEUMATIC AIR DRIVEN FANOPERATED ALL THE TIMES,
DUE TO REMAINING SLUDGE IN TANKS.
TTL HRS
24

10
10

10

46

UTH
5
8

59

8
4
%
21

0
8
5
%
21

15

15

15

112

You might also like