This document contains 20 questions regarding quality assurance and control during a construction project. It asks about potential quality issues arising from manpower or equipment, reviewing drawings and specifications, checking material quality, maintaining quality assurance, how the quality assurance plan affects the schedule, contingencies planning, quality assurance technician staffing, plan changes, material testing, review meetings, quality analysis tools, checking materials during handover, handover timing, additional client requests, handling changes to quality standards, defect findings, design verification, and rework frequency.

Uploaded by

Kiran Basu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
356 views

QAP Questionnaire

This document contains 20 questions regarding quality assurance and control during a construction project. It asks about potential quality issues arising from manpower or equipment, reviewing drawings and specifications, checking material quality, maintaining quality assurance, how the quality assurance plan affects the schedule, contingencies planning, quality assurance technician staffing, plan changes, material testing, review meetings, quality analysis tools, checking materials during handover, handover timing, additional client requests, handling changes to quality standards, defect findings, design verification, and rework frequency.

Uploaded by

Kiran Basu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

1. Is there any kind of quality problem arise due to manpower in site?

2. Is there any kind of quality problem arise due to equipment used in site?
3. Have you seen all the drawings and specifications before construction?
4. Have you checked quality of materials during construction?
5. Is quality of material used during construction is as per specification?
6. What aspects are most important for maintaining quality assurance at construction projects?
7. How QAP do affects the construction schedule during construction?
8. Does your QAP include the contingencies planning?
9. What are the sizes of quality assurance technician in your construction?
10. Is there drastic changes or accountable in plans and specifications during QAP?
11. What types of tested is done for quality of materials?
12. How much review meeting with staff done?
13. What are the quality tools for the analysis of performance of construction?
14. Have you checked quality of materials used during possession?
15. Have you got possession in time as given by builder?
16. Are there any additional changes requested by you for your client?
17. After your request for changes, is builder done it as per quality standards?
18. Have you found any defect during construction regarding quality of construction?
19. Have you verify design performance capability for construction?
20. How frequent is happen in reworks during construction?

You might also like