Paint Inspection:: Daily Coating Inspection Report

This daily coating inspection report summarizes inspection of a painting project. It documents inspections of surface preparation, coating application, ambient conditions, and dry film thickness. The report found the surface to be properly cleaned and profiled. Coating application met specifications for wet and dry film thickness. Ambient conditions were suitable. The inspection approved the work.

Uploaded by

Ehsan Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views

Paint Inspection:: Daily Coating Inspection Report

This daily coating inspection report summarizes inspection of a painting project. It documents inspections of surface preparation, coating application, ambient conditions, and dry film thickness. The report found the surface to be properly cleaned and profiled. Coating application met specifications for wet and dry film thickness. Ambient conditions were suitable. The inspection approved the work.

Uploaded by

Ehsan Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Date: / / M T W Th F S Su Pg.

Of
Paint Inspection: Project #: COPY To:
Daily Coating Inspection Report Inspector:
QC Mgr Owner

Contr
Project/Client:
Location: Attachments:
DFT Sheet NCR/CAR
Description:
Requirements:
Contractor: Spec # Revision #
Description of Areas & Work Performed Hold Point Inspections Performed
1 Pre Surface Pep/Condition & Cleanliness
2 Surface Preparation Monitoring
3 Post Surface Preparation/Cleanliness & Profile
4 Pre Application Prep/Surface Cleanliness
5 Application Monitoring/Wet Film Thickness (WFT)
6 Post Application/Application Defects
7 Post Cure/Dry Film Thickness (DFT)
8 Nonconformance/Corrective Actions Follow-up
9 Final Inspection
Approved By:
Surface Conditions Ambient Conditions
New Maint Primer/Paint Age/Dry/Cure Time (Indicate AM or PM) : : : :
Steel Galvanize Concrete Other Dry Bulb Temp (C/F)0 o o o o
Hazard Sample Report # Wet Bulb Temp (C/F) 0 o o o o
Degree of contamination: % Relative Humidity % % % %
Test: Cl µg/cm2 / ppm Fe ppm pH Surface Temp0 (C/F) Min/Max / o / o / o / o
Degree of Corrosion: Dew Point Temp (C/F) 0 o o o o
Scale Pitting/Holes Crevices Sharp Edges Wind Direction/Speed
Weld Moisture Oils Other Weather Conditions:
Painted Surface Condition: Application
Dry to: Touch Handle Recoat Start Time : Finish Time : Est. Sq/ft.
Dry/Over Spray Runs/Sags Pinholes Holidays Primer Intermediate Topcoat Touch-up
Abrasion Fall Out Other Generic Type: Qty Mixed:
Surface Preparation Manuf.: Mix Ratio:
Start Time: Finish Time: Est Sq/ft: Prod Name: Mix Method:
Solvent Clean Hand Tool Power Tool Prod #: Strain/Screen:
HP Wash PSI Other Color: Material Temp: oF
Abrasive Blast Abrasive Type Sample Kit Sz/Cond.: Sweat-in Time: Min/Hrs

Blast Hose Size Nozzle Size / PSI Shelf Life: Pot Life: Min/Hrs

Air Supply CFM Air Supply Cleanliness Batch #'s Reducer #:


Water/Oil Trap Check Equipment Condition Check (A) Qty Added: Pt/Qt/Gal

(B) % by Vol: %
Surface Cleanliness & Profile Measurement (C) Specified WFT Avg: Mils

Job Specification SSPC/NACE - SP- Reducer: Achieved WFT Avg: Mils

SSPC/NACE Spec / Visual Stds Airless/Conv. Spray Brush Roller Other


Profile Check: Disc Tape Gauge Pump Pot Hose Dia. Air Check
Specified mils avg. / Achieved mils Ratio/Size Hose Lng. SEP/Trap
Surface effect on DFT Gauge/BMR mils GPM/CFM Spray Gun Filter
Dry Film Thickness PSI Tip Sz. Agitator
Gage Gage Calib. Spec Avg. Total Avg DFT Last DFT This
Gage Type / Coat
Model Serial # Verified DFT DFT Coat

Inspector's Signature Date