Conference Center Project 2/28/2017 2/23/2017 3 Days $1,543,680.00

The document outlines a project plan to update a conference center by February 28, 2017 for a baseline cost of $1,543,680. It involves remodeling spaces by January 31st for $385,600 and updating the center's technology by February 28th for $532,080. The technology update includes specifying requirements, contracting with a vendor, designing the update, installing equipment and cabling, and testing the system. The actual cost of the project was $465,680, $18,400 under budget.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views

Conference Center Project 2/28/2017 2/23/2017 3 Days $1,543,680.00

The document outlines a project plan to update a conference center by February 28, 2017 for a baseline cost of $1,543,680. It involves remodeling spaces by January 31st for $385,600 and updating the center's technology by February 28th for $532,080. The technology update includes specifying requirements, contracting with a vendor, designing the update, installing equipment and cabling, and testing the system. The actual cost of the project was $465,680, $18,400 under budget.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Baseline

Task Name Finish Finish Var. Baseline Cost


Finish
Conference Center Project 2/28/2017 2/23/2017 3 days $1,543,680.00
Start project 10/3/2016 10/3/2016 0 days $0.00
Update conference center 2/28/2017 2/23/2017 3 days $917,680.00
Update conference ctr. technology 2/28/2017 2/23/2017 3 days $532,080.00
Specify requirements 10/14/2016 10/14/2016 0 days $2,000.00
Contract with vendor 11/11/2016 11/3/2016 6 days $1,080.00
Obtain proposals 10/21/2016 10/21/2016 0 days $300.00
Select vendor 10/28/2016 10/26/2016 2 days $180.00
Negotiate 11/10/2016 11/2/2016 6 days $600.00
Sign contracts 11/11/2016 11/3/2016 6 days $0.00
Design update 11/18/2016 11/10/2016 6 days $3,000.00
Conference center design complete 11/18/2016 11/10/2016 6 days $0.00
Install technology 2/28/2017 2/23/2017 3 days $526,000.00
Run cables 2/6/2017 1/30/2017 5 days $20,000.00
Set up equipment racks 2/8/2017 2/3/2017 3 days $46,000.00
Place equipment 2/13/2017 2/8/2017 3 days $412,000.00
Configure equipment 2/16/2017 2/13/2017 3 days $12,000.00
Connect to network 2/21/2017 2/16/2017 3 days $12,000.00
Test 2/28/2017 2/23/2017 3 days $24,000.00
Technology installed 2/28/2017 2/23/2017 3 days $0.00
Remodel spaces 1/31/2017 1/23/2017 6 days $385,600.00
Design spaces 12/16/2016 12/8/2016 6 days $18,000.00
Construct 1/27/2017 1/19/2017 6 days $365,200.00
Complete walk-through 1/31/2017 1/23/2017 6 days $2,400.00
Actual Cost Cost Variance
$465,680.00 ($18,400.00)
$0.00 $0.00
$465,680.00 ($18,400.00)
$465,680.00 ($18,400.00)
$2,000.00 $0.00
$1,680.00 $600.00
$300.00 $0.00
$300.00 $120.00
$1,080.00 $480.00
$0.00 $0.00
$3,000.00 $0.00
$0.00 $0.00
$459,000.00 ($19,000.00)
$16,000.00 ($4,000.00)
$33,000.00 ($13,000.00)
$410,000.00 ($2,000.00)
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00
$0.00 $0.00