Conference Center Project 2/28/2017 2/23/2017 3 Days $1,543,680.00
The document outlines a project plan to update a conference center by February 28, 2017 for a baseline cost of $1,543,680. It involves remodeling spaces by January 31st for $385,600 and updating the center's technology by February 28th for $532,080. The technology update includes specifying requirements, contracting with a vendor, designing the update, installing equipment and cabling, and testing the system. The actual cost of the project was $465,680, $18,400 under budget.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
31 views
Conference Center Project 2/28/2017 2/23/2017 3 Days $1,543,680.00
The document outlines a project plan to update a conference center by February 28, 2017 for a baseline cost of $1,543,680. It involves remodeling spaces by January 31st for $385,600 and updating the center's technology by February 28th for $532,080. The technology update includes specifying requirements, contracting with a vendor, designing the update, installing equipment and cabling, and testing the system. The actual cost of the project was $465,680, $18,400 under budget.