0% found this document useful (0 votes)
14 views2 pages

1998 Edition

1982-98

Uploaded by

siva anand
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views2 pages

1998 Edition

1982-98

Uploaded by

siva anand
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

INDEX 1982–29

Index

1998 National Fire Protection Association. All Rights Reserved.

The copyright in this index is separate and distinct from the copyright in the document that it indexes. The licensing provision s set forth for the
document are not applicable to this index. This index may not be reproduced in whole or in part by any means without the express written per-
mission of the National Fire Protection Association, Inc.

-A- Test requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-12, A-6-12.2


Follow-up program
Accessories Certification and . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-2.7, A-2-2.7
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
.
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
Design requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-5
Alarm (definition) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
Alarm signal. . . . . . . . . . . . . . . . . . . . . . .1-2.1; see also Pre-alarm signal -H-
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
. Heat resistance
Design requirements . . . . . . . . . . . . . . . . . . . . . . . 4-1.7, 4-2.1, 4-3.3 Performance requirements. . . . . . . . . . . . . . . . . . . . . . . 5-11 to 5-12
Performance requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1.2 Test requirements . . . . . . . . . . . . . . . . . . . . . . 6-11 to 6-12, A-6-12.2
Test requirements . . . . . . . . . . . 6-1.5, 6-12.13.1, 6-12.16.2 to 6-12.21 Holding boxes
Annunciator (definition) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3 PASS/SCBA devices. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-8.2
Approved (definition). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3, A-1-3 Stand-alone PASS devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-8.3
Authority having jurisdiction (definition) . . . . . . . . . . . . . . . . 1-3, A-1-3
-I-
-B-
Immersion/leakage resistance
Batteries . . . . . . . . . . . . . . . . . . . . see also Low battery warning signal Performance requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5
Compartment for . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4.4, A-4-4.4 Test requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-4, A-6-4
Test requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3.14, A-2-3.14
Impact-acceleration resistance
Performance requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-8.1
-C- Test requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-7
Case integrity Impact-vibration resistance
Performance requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-6 Performance requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-8.2
Test requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-5 Test requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-8, A-6-8.4.1
Certification organization Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Chap. 3, A-3-1.5
Contract with manufacturers . . . . . . . . . . . . . . . . . . . . . . . . . A-2-2.3 Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . see Test requirements
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
. Intrinsic safety, performance requirements . . . . . . . . . . . . . . . . . . 5-13
Responsibilities of . . . . . . . . 2-2.1 to 2-2.11, A-2-2.1, A-2-2.4, A-2-2.7 ISO registration for manufacturers . . . . . . . . . . . . . . . . . . . . . . . . . 2-5
Certification/certified . . . . . . . . . . . . . . . . . . . . . . . . . . . . Chap. 2, A-2
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
. -L-
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-1, A-2-1.4
Manufacturer’s quality assurance program. . . . . . . . . . . . . 2-2.5, 2-4 Labeled/labeling . . . . . . . . . . . Chap. 3, A-3-1.5; see also Product labels
Product labeling requirements . . . . . . . . . . . . . . . . . . . . . . . . . 3-1.5 Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
Program. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2. -2 Leakage resistance . . . . . . . . . . . . . see Immersion/leakage resistance
Sample testing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3, A-2-3.8 Listing/listed
User information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2 Certification and . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-1.3, A-2-2.3
Compliance/compliant (definition) . . . . . . . . . . . . . . . . . . . . . . . . . 1-3 Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-3, A-1-3
Corrosion resistance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4, 6-3 Low battery warning signal
Design requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-3.4
Cylinder, surrogate (definition) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
Performance requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1.3
-D- Test requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-1.6, 6-1.7

Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1. -3, A-1-3


-M-
Design requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Chap. 4, A-4
Accessory . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-5. Manufacturers
Battery compartment . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4.4, A-4-4.4 Contract with certification organization . . . . . . . . . . . 2-2.3, A-2-2.3
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4. -4 Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
Mode selection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1, A-4-1.2 ISO registration for . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-5
Motion detector . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2 Quality assurance program . . . . . . . . . . . . . . . . . . . . . . . . . 2-2.5, 2-4
Retention system. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4.3, A-4-4.3 User information provided by . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2
Signals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4. -3 Measurement, units of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4
Drip (definition) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3 Melt (definition) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
Mode selection devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1, A-4-1.2
-E- Model (definition) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
Motion detectors
Electronic temperature stress Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
Performance requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3 Design requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2
Test requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2
-N-
-F-
Nonremovable SCBA-integrated PASS
Flame resistance Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
Performance requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-12 Test matrix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Table 2-3.9(b)

1998 Edition
1982–30 PERSONAL ALERT SAFETY SYSTEMS (PASS)

-O- SCBA. . . . . . . . . . . . . see Self-contained breathing apparatus (SCBA)


Off (definition). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
. -3 Scope of standard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-1, A-1.1.1
Self-contained breathing apparatus (SCBA)
Operational signal Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
Design requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3.1
PASS/SCBA device (definition) . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
Performance requirements . . . . . . . . . . . . . . . . 5-12.2(a), 5-12.3(a)
SCBA-integrated PASS
Test requirements . . . . . . . . . . . . . . . . . . . . . . . . 6-12.14.1, 6-12.15.1
Definition. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
-P- Nonremovable (definition) . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
Removable (definition) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
PASS . . . . . . . . . . . . . . . . . . . . see Personal alert safety systems (PASS)
Performance requirements . . . . . . . . . . . . . 1-1.1, 1-1.3, 1-2.1, Chap. 5 Sensing (definition) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
Alarm signal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1.2 Shall (definition) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
Shock sensitivity
Case integrity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 . -6 Performance requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7
Corrosion resistance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4 Test requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6
Electronic temperature stress . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3 Should (definition) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
Heat and flame resistance . . . . . . . . . . . . . . . . . . . . . . . . . 5-11, 5-12 Signals. . . . . . . . . . . . . . . . . see also Alarm signal; Low battery warning
Immersion/leakage resistance . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5 signal;Operational signal; Pre-alarm signal
Impact-acceleration resistance. . . . . . . . . . . . . . . . . . . . . . . . . . 5-8.1 Design requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3
Impact-vibration resistance . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-8.2 Frequency testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-13
Intrinsic safety. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-13 Performance requirements
Pre-alarm signal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1.1 Frequency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2
Product label durability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-14 Heat and flame resistance . . . . . . . . . . . . . . . . . . . . . 5-11 to 5-12
Retention system. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-9 Sound pressure levels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1
Shock sensitivity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7 Test requirements
Signal frequency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2
Heat and flame testing . . . . . . . . . . . . . . . . 6-11 to 6-12, A-6-12.2
Sound pressure level . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1
Water drainage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-10 Sound pressure levels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1
Personal alert safety systems (PASS) Sound pressure level
Abuse of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A. -1-2.2 Performance requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-3 Test requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1
PASS/SCBA device (definition) . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3 Specimen (definition) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
SCBA-integrated PASS Stand-alone PASS
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-3 Test matrix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Table 2-3.9(a)
Test matrix . . . . . . . . . . . . . . . . . . . . . . . .Tables 2-3.9(a) and (b) Test requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-1.4, 6-1.7
Test requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1.4, 6-1.7 Surrogate cylinders
Stand-alone PASS Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-3 Test requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-8.4, A-6-8.4.1
Test matrix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . T . able 2-3.9(a)
Test requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1.4, 6-1.7 -T-
Use of . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1.1 to 1-1.2, 1-2.1, A-1.1.1 Temperature stress, electronic . . . . . see Electronic temperature stress
Pre-alarm signal Test requirements . . . . . . . . . . . . . . . . . . . . . . . . . .1-1.1, 1-2.2, A-1-2.2,
Design requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2.1, 4-3.2 Chap. 6; see also Performance requirements
Performance requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1.1 Alarm signal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-1.5
Test requirements . . 5-2.1, 6-1.3 to 6-1.4, 6-12.19 to 6-12.21, A-5-2.1 Case integrity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-5
Primary pre-alarm signal . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1.1, 5-2.1 Certification and . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2.4, A-2-2.4
Product labels Certification organization. . . . . . . . . . . . . . . . . . . . . . . . . . . . A-2-3.8
Certification requirements . . . . . . 2-1.1, 2-1.3, 2-2.3, 2-2.11, A-3-1.5 Corrosion testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-3
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-3 Electronic temperature stress . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2
Durability Follow-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2.7, A-2-2.7
Performance requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-14 Heat and flame testing . . . . . . . . . . . . . . . . . . . . . . . . .6-12, A-6-12.2
Testing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-14 Heat resistance testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-11
Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 . -1 Immersion/leakage testing. . . . . . . . . . . . . . . . . . . . . . . . . 6-4, A-6-4
Purpose of standard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2, A-1-2.2 Impact-acceleration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-7
Impact-vibration resistance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-8
-Q- Low battery warning signal . . . . . . . . . . . . . . . . . . . . . . . .6-1.6, 6-1.7
Quality assurance program . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2.5, 2-4 Product label durability testing . . . . . . . . . . . . . . . . . . . . . . . . . 6-14
Quality assurance program . . . . . . . . . . . . . . . . . . . . . . . . . 2-2.5, 2-4
-R- Retention system testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-9
Sample . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3
Referenced publications . . . . . . . . . . . . . . . . . . . . . . . Chap. 7, App. B
Removable SCBA-integrated PASS Shock sensitivity testing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-3 Signal frequency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-13
Test matrix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Table 2-3.9(a) Sound pressure level tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1
Test requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1.4, 6-1.7 Water drainage testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-10
Retention system
Design requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4.3, A-4-4.3 -U-
Performance requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-9 Units of measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4
Test requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-9, A-6-9.1 User information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2

-S- -W-
Sample Water drainage
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-3 Performance requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-10
Test requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3 Test requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-10

1998 Edition C-E

You might also like