Tvi Operations Report: Shift Team: Shift Duty: Date: Time
Tvi Operations Report: Shift Team: Shift Duty: Date: Time
SHIFT TEAM:
DELTA
SHIFT DUTY:DAY
DATE: January 30, 2018
TIME: 0700H-1900H
SAFETY CONCERNS:
UNIT 1 - ACTIVITIES
Date
Status as of today
Reported
4) Observed foaming on PAF, SAF and IDF return oil sight glass. 29-Jan-18
Date
New Issues Status as of today
Reported
> SWAS
- Unit 1 SWAS Online from CEP discharge to feedwater ECO inlet line; Amine Dosing at Remote-Auto Mode
Chemical Tank Levels (1100H/1530H)
Amine : 450/450 mm
Phosphate: 590/590 mm
Hydrazine : 610/610 mm
- Unit 2 Offline; No dosing pumps running
Chemical Tank Levels (1100H/1530H)
Amine : 210/210 mm
Phosphate: 690/690 mm
Hydrazine : 670/670 mm
INVENTORY:
LIMITS
As of: 1800H ACTUAL LEVEL
LL (mm) HH (mm)
LIGHT FUEL OIL LEVEL: 3,941 mm 58.26 % 1,120 5,770
DEMI WATER TANK LEVEL: 8,021 mm 82.62 % 853 8,553
U1-CONDENSATE TANK LEVEL: 6,243 mm 70.11 % 1,181 7,950
U2- CONDENSATE TANK LEVEL: 7,791 mm 87.52 % 1,181 7,950
POTABLE WATER TANK LEVEL: 3,901 mm 79.59 % 1,040 4,070
SERVICE WATER TANK LEVEL: 9,677 mm 80.64 % 1,194 11,183
Unit #1 Bed Ash Silo Conditioner Load Test Result