Answer: Product Daily Quantity Daily unit per cycle Units short (3 cylces)
A 21 21/3= 7 0
B 12 12/3=4 0
C 3 3/3=1 0
D 15 15/3= 3 0
Cycle 1 2 3
Pattern CBDA ABCD ADBA
Extra unit(s)
uction quantity per
ce A-B-C-D.
Determine the number of cycles per day and a production quantity per
6 fairly level production:
Answer: Product
F
G
H
K
Row
Truck A B C D E minimun
1 4 5 9 8 7 4
2 6 4 8 3 5 3
3 7 3 10 4 6 3
4 5 2 5 5 8 2
5 6 5 3 4 9 3
Subtract
Substract row column
minimun Truck A B C D E minimun
1 0 1 5 4 3
2 3 1 5 0 2
3 4 0 7 1 3
4 3 0 3 3 6
5 3 2 0 1 6
Colum minimun 0 0 0 0 2
Truck A B C D E
1 0 1 5 4 1
2 3 1 5 0 0
3 4 0 7 1 1
4 3 0 3 3 4
5 3 2 0 1 4 small uncovered
Truck A B C D E
1 0 2 5 3 0
2 4 2 6 0 0
3 4 0 7 0 0
4 3 0 3 2 3
5 3 3 0 0 3
Using the information presented in the following table, identify the processing sequence that would result u
job tardiness, and (3) average number of jobs in the system. Jobs are listed in order of arrival. (Hint: First dete
7 setup time. All times an
4) EDD
Sequence= a-e-c-b-d
Average flow time= 92/5= 18.4
Average job tardiness=31/5= 6.2
Average jobs in the system=92/32= 2.88
entify the processing sequence that would result using (1) FCFS, (2) SPT, (3) EDD, and (4) CR. For each method, determine (1) average job fl
. Jobs are listed in order of arrival. (Hint: First determine the total job time for each job by computing the total processing time for the job a
setup time. All times and due dates are in hours.)
Operation time
A=45*.14+.7=7hrs
B=14*.25+.5=4hrs
C=18*.10+.2=2hrs
D=40*.25+1=11hrs
E=75*.10+.5=8hrs
1) FCFS
Sequence= a-b-c-d-e
Average flow time= 87/5= 17.4
Average job tardiness=26/5= 5.2
Average jobs in the system=87/32= 2.72
2) SPT
Sequence= c-b-a-e-d
Average flow time= 74/5= 14.8
Average job tardiness=27/5= 5.40
Average jobs in the system=74/32= 2.31
3) EDD
Sequence= a-b-c-e-d
Average flow time= 84/5= 16.8
Average job tardiness=23/5= 4.6
Average jobs in the system=84/32= 2.63
92/5= 18.4
ss=31/5= 6.2
system=92/32= 2.88
od, determine (1) average job flow time, (2) average
tal processing time for the job and then adding in the
8 The following table shows orders to be processed at a machine shop as of 8:00 a.m. Monday. The jobs have differen
a. Determine the processing sequence at the first work center using each of these rules: (1) FCFS, (2) S/O.
b. Compute the effectiveness of each rule using each of these measures: (1) average completion time, (2) average num
Monday. The jobs have different operations they must go through. Processing times are in days. Jobs are listed in order of arrival.
s: (1) FCFS, (2) S/O.