Bill of Materials/Estimate Sheet: Date 2 28 2018

This document is a bill of materials and estimate sheet for fabricating 50 steel chair units using G.I. pipe. It includes the costs of framing materials like G.I. pipe and angle bars, finishing materials like plywood and formica, contingencies, and labor. The total estimated cost is 158,270 pesos.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views

Bill of Materials/Estimate Sheet: Date 2 28 2018

This document is a bill of materials and estimate sheet for fabricating 50 steel chair units using G.I. pipe. It includes the costs of framing materials like G.I. pipe and angle bars, finishing materials like plywood and formica, contingencies, and labor. The total estimated cost is 158,270 pesos.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

DATE 2 28 2018

BILL OF MATERIALS/ESTIMATE SHEET

PROJECT : STEEL CHAIRS FABRICATION (50 UNITS) G.I. PIPE SHEET NO.:
LOCATION : SAN FRANCISCO, AGUSAN DEL SUR 1 OF 1

MATERIAL EQUIPT.
ITEM NO.: ITEM DESCRIPTION UNIT QTY. UNIT COST LABOR COST TOTAL
COST COST

A FRAMING MATERIALS 32,640.00


1" X 2.0mm G.I. PIPE LNGTH 37.00 700.00 25,900.00
2mm X 3/4" X 3/4" ANGLE BAR LNGTH 22.00 220.00 4,840.00
WELDING ROD BOX 1.00 1,900.00 1,900.00

B FINISHING MATERIALS 71,485.00


3/4 MARINE PLYWOOD SHT 9.00 900.00 8,100.00
1" FLATHEAD SCREW (METAL) PC 750.00 0.50 375.00
COLORED FORMICA SHT 9.00 990.00 8,910.00
RUBBER EDGING MTR 260.00 195.00 50,700.00
RUBBER STOPPER (FOR 25mm PIPE) PC 300.00 10.00 3,000.00
METAL PRIMER GAL 1.00 400.00 400.00

C CONTINGENCIES 12,495.00
CONTINGENCIES LOT 1.00 12,495.00

D LABOR 41,650.00
LABOR COST LOT 1.00 41,650.00

TOTAL COST 158,270.00

Prepared by: Recommended by:

ALDRENE ROBERT S. BADILLA JENNY C. ABUCEJO


Project Base Architect Executive Vice-President

Approved:

ROSELYN P. CARLOS
President