Bill of Materials/Estimate Sheet: Date 2 28 2018
Bill of Materials/Estimate Sheet: Date 2 28 2018
PROJECT : STEEL CHAIRS FABRICATION (50 UNITS) G.I. PIPE SHEET NO.:
LOCATION : SAN FRANCISCO, AGUSAN DEL SUR 1 OF 1
MATERIAL EQUIPT.
ITEM NO.: ITEM DESCRIPTION UNIT QTY. UNIT COST LABOR COST TOTAL
COST COST
C CONTINGENCIES 12,495.00
CONTINGENCIES LOT 1.00 12,495.00
D LABOR 41,650.00
LABOR COST LOT 1.00 41,650.00
Approved:
ROSELYN P. CARLOS
President