Project Structure Document Title: Design of Wall Footing

The document describes the design of wall footings for flocculator walls in a water supply project. It details the size of the footing and wall, footing reactions from structural analysis, pressure calculations, moment and shear force calculations, and reinforcement requirements to resist ultimate limit state forces. The design provides T12 bars at 150mm spacing at the bottom and T10 bars at the top to meet reinforcement requirements for moment and shear.

Uploaded by

risriz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views

Project Structure Document Title: Design of Wall Footing

The document describes the design of wall footings for flocculator walls in a water supply project. It details the size of the footing and wall, footing reactions from structural analysis, pressure calculations, moment and shear force calculations, and reinforcement requirements to resist ultimate limit state forces. The design provides T12 bars at 150mm spacing at the bottom and T10 bars at the top to meet reinforcement requirements for moment and shear.

Uploaded by

risriz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Project DEDURUOYA WATER SUPPLY PROJECT

Structure FLASH MIXER,FLOCCULATION TANK & LAMELLA CLARIFIER


Document Title DESIGN OF WALL FOOTING FOR FLOCCULATOR WALLS

DESIGN OF WALL FOOTING

Conside the critical strip along grid 6


Size of Footing = 15.6 x 1.80 x 0.45
Size of wall = 13.8 x 0.3

FOOTING REACTION (SAP 2000 OUTPUT)


Footing reactions were obtained at nodes of the strip and summed up to obtain the total footing reaction.

Total SLS force under the strip = 3176 kN


Total ULS force under the strip = 4743 kN
2
Area of the strip base = 28.08 m
SLS Pressure at bottom of footing = 113.11 kN/m2
2
ULS Pressure at bottom of footing -(W) = 168.91 kN/m

Thereore, SLS pressure is well below the allowable soil bearing capacity

2
Moment - ULS = WL / 2 = 47.5 kNm/m
Shear Force - ULS = = WL = 126.7 kN/m

Reinforcement-ULS
Moment-ULS Mu 47.51
Bredth of Section B 1000
Depth of Section h 450
Main Bar dia T 12
Cover to main rebar C 40
Eff. Depth d 392
2
K = M/fcu bd 0.0124
Hence, z / d 0.950
Lever arm z 372.4
As reqd, M = M / 0.87 fy z 319
Bar dia T 12 @
Bar Spacing 150
As Provided 754

Amin 585
Shear Check
Shear Force - ULS Vu 126.7
Shear Stress = Vu/b.d v 0.32
As provided As 754
Shear Capacity, vc
/ γm
1/3 1/4 1/3
0.79{100As/(bvd)} [400/d] [fcu/25] 0.37

Shear Check OK

Provide T12 @ 150 both ways - bottom. Provide T10 @ 150 both ways - top