RT Request Log: Hail Surface Facilities Eps Project

This document contains a log of radiographic testing (RT) requests for welds on the Hail Surface Facilities EPS Project. It lists 9 RT requests with details like the number of welders, joints, and joints passed for each request. The status and target review for each RT is also included. The log is signed off on by the contractor's QA/QC inspector and includes spaces for further reviews by the contractor, third party inspector, and project management consultant.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views

RT Request Log: Hail Surface Facilities Eps Project

This document contains a log of radiographic testing (RT) requests for welds on the Hail Surface Facilities EPS Project. It lists 9 RT requests with details like the number of welders, joints, and joints passed for each request. The status and target review for each RT is also included. The log is signed off on by the contractor's QA/QC inspector and includes spaces for further reviews by the contractor, third party inspector, and project management consultant.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

HAIL SURFACE FACILITIES EPS PROJECT

Project Number: 8598

RT REQUEST LOG

No. of RT No. of Joints


Sr. No. RT Request No. Descrption No. of Welders Joints Passed RT Request date RT status Target Review

1 HSF-001

2 HSF-002
Shutdown Work by Sievert
3 HSF-003

4 HSF-004

5 HSF-005 WQT 8 8 8 30-Nov-16 OK Pass

6 HSF-006 WQT 4 4 4 22-Dec-16 OK Pass

7 HSF-007 WQT 10 5 5 22-Dec-16 OK Pass

Page 1 of 4
8 HSF-008 WQT 8 7 9 22-Dec-16 OK Pass

9 HSF-009 WQT 3 9 9 22-Dec-16 OK Pass

QA/QC Inspector/Engineer
(Contractor)

Name
Signature
Date

Page 2 of 4
get Review Contractor/TPI Review PMC review

Pass OK Pending

Pass Pending Pending

Pass Pending Pending

Page 3 of 4
Pass Pending Pending

Pass Pending Pending

Engineer QA/QC Inspector/Engineer


r) (Company)

Page 4 of 4