0% found this document useful (0 votes)
31 views2 pages

1998 Edition

1031-98

Uploaded by

siva anand
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views2 pages

1998 Edition

1031-98

Uploaded by

siva anand
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

INDEX 1031–33

Index

1998 National Fire Protection Association. All Rights Reserved.


The copyright in this index is separate and distinct from the copyright in the document which it indexes. The licensing provisions set forth for the
document are not applicable to this index. This index may not be reproduced in whole or in part by any means without the express written per-
mission of the National Fire Protection Association, Inc.

-A- Evaluation
Code compliance . . . . . . 4-3.6, 5-3.7 to 5-3.8, 7-3.3 to 7-3.4, A-4-3.6,
Access, emergency. . . . . . . . . . . . . 3-3.11, 4-3.12, 5-3.12, 6-3.7, A-3-3.10 A-7-3.3 to A-7-3.4
Addition or remodeling project . . . . . . . . . . . . . . . . 3-3.4, 5-3.3, A-3-3.4 Construction types . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-3.3
Administrative skills . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Table E-1 Design concept . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-3.1, A-7-3.1
Fire Inspector I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2 Emergency planning/preparedness. . . . . . . . . . . . . . . . . . . . . . 4-3.7
Fire Inspector II . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2 Fire protection systems . . . . . . . . 4-3.4, 5-3.4 to 5-3.5, 7-3.2, A-4-3.4
Fire Inspector III. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2 Fire protection/life safety system integration . . . . . . . . . . . . . . 7-3.7
Air conditioning systems. . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3.9, 6-3.10 Job performance requirements . . . . . . . . . . . . . . 1-3.4, A-1-3.4, C-4
Alarms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-5-3.10 Means of egress . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-3.2
Amusement structures, special. . . . . . . . . . . . . . . . . . . . . . . 6-3.1, 6-3.5 Plans, of . . . . . . . . . . . . . . . . . . . . . . 7-3.2 to 7-3.5, A-7-3.3 to A-7-3.4
Applicable codes and standards . . . . . . . . . . see Codes and standards Process or operation, plans for . . . . . . . . . . . . . . . . . . . 7-3.3, A-7-3.3
Approved (definition). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1, A-2-1 Exhibits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-3.1, 6-3.5
Authority having jurisdiction Explosives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-4-3.6
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1,
. A-2-1
Extinguishers, portable fire. . . . . . . . . . . . . . . . . . . . . . . .3-3.7, A-3-3.7
JPRs defined by . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.2
Protective clothing and equipment provided by . . . . . . . . . . 1-3.11 -F-
-B- Field inspection skills. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Table E-1
Fire Inspector I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3
Budgets, preparation of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2.9 Fire Inspector II . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3
Building service equipment/operations . . . . . . . . . . . . . . 5-3.9, 6-3.10 Fire Inspector III . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3
File maintenance . . . . . . . . . . . . . . . . . . . . . . .3-2.6, 5-2.11, 6-2.6, 7-2.3
-C-
Fire alarms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-3.6, A-3-3.6
Candidate (definition) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1 Fire detection systems . . . . . . . . . . . . . . . . . . . . 3-3.6, A-3-3.6, A-5-3.10
Certification requirements . . . . . . . 1-3.5 to 1-3.7, 3-1, 4-1, 5-1, 6-1, 7-1, Fire drills . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-3-3.10
A-1-3.7, A-3-1 Fire flows . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-3.8, 6-3.6
Checklists and forms . . . . . . . . . . . . . . . . . . . . . . . . 4-2.2, 5-2.10, 7-2.1 Fire growth potential
Codes and standards. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Table E-1 Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
Adoption and modification process . . . . . . . . . . 4-2.7, 5-2.2 to 5-2.3 Determination of . . . . . . . . . . . . . . . . . . . 3-3.14, 4-3.11, 5-3.5, 5-3.11
Alternative plans for compliance with. . . . . . . . . . . . . .7-3.6, A-7-3.6 Fire Inspector I. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Chap. 3, A-3
Applicable . . . . . 3-2.1 to 3-2.2, 3-3.1 to 3-3.2, 4-2.1 to 4-2.2, 5-2.6 to Administrative skills. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2, A-3-2.7
5-2.7, 6-2.7, 7-2.1, 7-3.1, A-6-2.5 Certification requirements . . . . . . . . . . . . . . . . . . . . 1-3.5, 3-1, A-3-1
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1 Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
Identification of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2.7, A-3-2.7 Field inspection skills . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-3, A-3-3
For reference use . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.12, A-1-3.12 Overview of JPRs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Table E-1
Compliance . . . . . 3-3.3 to 3-3.4, 3-3.11, 4-2.3 to 4-2.4, 4-3.1 to 4-3.4, Plan review skills . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2.4, 3-3.9, 3-4
4-3.7, 4-3.11 to 4-3.12, 4-4.1 to 4-4.3, 4-4.5, 5-2.6 to 5-2.7, 5-3.2, Requisite knowledge/skills . . . . . . . . . . . . . . . . . 1-3.1, A-1-3.1, D-1.4
5-3.4 to 5-3.12, 6-3.1 to 6-3.4, 6-3.6 to 6-3.7, 6-3.10, 7-3.7 to Sample job description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .D-1
7-3.9; see also Evaluation, Code compliance; Flammable and Fire Inspector II . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Chap. 4, A-4
combustible liquids/gases, code compliance; Hazardous mate- Administrative skills. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2
rials, code compliance; Processes and operations Certification requirements . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.6, 4-1
Alternative plans for . . . . . . . . . . . . . . . . . . . . . . . . . . 7-3.6, A-7-3.6 Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
Combustible liquids . . . . . . . . . . . . . see Flammable and combustible Field inspection skills . . . . . . . . . . . . . . . . . . . . .4-3, A-4-3.4, A-4-3.6
liquids/gases, code compliance Overview of JPRs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Table E-1
Complaints, investigation of . . . . . . . . . . . . . . . . . . . . . . . . 3-2.5, 4-2.6 Plan review skills . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4
Construction documents (definition) . . . . . . . . . . . . . . . . . . . . . . . . 2-1 Requisite knowledge/skills . . . . . . . . . . . . . . . . . . . . . . . . . . . . D-2.4
Construction types Sample job description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .D-2
Addition or remodeling project . . . . . . . . . . . . .3-3.4, 5-3.3, A-3-3.4 Fire Inspector III . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Chap. 5, A-5
Categorization of plans . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4.5 Administrative skills. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2
Classification of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3.3, 6-3.3 Certification requirements . . . . . . . . . . . . . . . . . . . 1-3.7, 5-1, A-1-3.7
Correspondence, written . . . . . . . . . 3-2.1, 4-2.1, 5-2.1, 6-2.1, Table E-1 Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
Field inspection skills . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3, A-5-3.10
-D- Overview of JPRs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Table E-1
Requisite knowledge/skills . . . . . . . . . . . . . . . . . . . . . . . . . . . . D-3.4
Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Chap. 2, A-2 Sample job description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .D-3
Design concept, evaluation of . . . . . . . . . . . . . . . . . . . . . . 7-3.1, A-7-3.1
Fire protection plans . . . . . . . . . . . . . . . . 3-3.9, 4-4.3, 5-3.5, 7-3.2, 7-3.5
-E- Fire protection systems
Acceptance test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3.10, A-5-3.10
Egress, means of . . . . . . . . . . . . . . . . . . . . . . . . . . see Means of egress Appropriateness of . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-3.4, A-4-3.4
Emergency planning/preparedness Comparison with plan for . . . . . . . . . . . . . . . . . . . . . . . . .3-3.9, 4-4.3
Development of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3.6 Correction of deficiencies . . . . . . . . . . . . . . . . . . 4-3.4, 5-3.4, A-4-3.4
Evaluation of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3.7 Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
Verification of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3.10, A-3-3.10 Installation, verification of . . . . . . . . . . . . . . . . . 4-3.4, 4-4.3, A-4-3.4
Equipment, fire inspection. . . . . . . . . . . . . . . . . . . . . . . . 1-3.11, A-1-3.2 Life safety systems, integration with . . . . . . . . . . . . . . . . . . . . . . 7-3.7

1998 Edition
1031–34 PROFESSIONAL QUALIFICATIONS FOR FIRE INSPECTOR AND PLAN EXAMINER

Operational readiness . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3.5, A-3-3.5 Plan review skills . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-3


Fixed fire suppression systems, operational readiness of . . . . . . 3-3.5, Requisite knowledge/skills . . . . . . . . . . . . . . . . . . . . . . . 1-3.1, D-4.4
A-3-3.5 Sample job description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .D-4
Flammable and combustible liquids/gases, code Plan Examiner II . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Chap. 7, A-7
compliance. . . . . . . . 3-3.12, 4-3.9, 5-3.8, 7-3.4, A-3-3.12, A-7-3.4 Administrative skills. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-2
Certification requirements . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.9, 7-1
-H- Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
Hazardous conditions, processes and operations . . . . . . see Processes Plan review skills . . . . . . . . . . . . . . . . . 7-3, A-7-3.1 to A-7-3.4, A-7-3.6
and operations Requisite knowledge/skills . . . . . . . . . . . . . . . . . . . . . . . . . . . . D-5.4
Hazardous materials, code compliance. . . . 3-3.13, 4-3.10, 5-3.7, 7-3.8, Sample job description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .D-5
A-3-3.13 Plan review skills . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Table E-1
Heating systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3.9, 6-3.10 Fire Inspector I . . . . . . . . . . . . . . . . . . . . . . . . 3-2.4, 3-3.4, 3-3.9, 3-4
Hydrant location and spacing . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-3.6 Fire Inspector II . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4
Plan Examiner I. . . . . . . . . . . . . . . . . . . . . . . . . . . .6-2.5, 6-3, A-6-2.5
-I- Plan Examiner II . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-3, A-7-3
Industrial/commercial processes and operations . . . . . . see Processes Plan reviews
and operations Checklists and forms for . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7-2.1
Inspection services Enforcement of regulations . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-2.7
Policies and procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2.4 Policies and procedures . . . . . . . . . . . . . . . . . . . . . . . . . .6-3.8, 7-2.2
Inspection services, policies and procedures for . . . . . . . . . . . . . 4-2.8 Submission and review process . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2.3
Plans
-J- Deficiencies, resolution of . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-2.4
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
Job description, sample . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . App. D
Job performance requirements (JPRs) . . . . . . . . . . . . . App. C; see also Processes and operations . . . . . . see also Flammable and combustible
Administrative skills; Codes and standards; Field inspection liquids/gases, code compliance; Hazardous materials, code
skills; Plan review skills compliance
Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-2 Code compliance . . . . . . . . . . . . . 3-3.8, 4-3.6, 4-4.3, A-3-3.8, A-4-3.6
Curriculum development/training design . . . . . . . . . . . . . . . . . C-4 Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
Fire protection systems . . . . . . . . . . . . . . . . . . . . 4-4.3, 5-3.4 to 5-3.5
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-1
Plans for, evaluation of . . . . . . . . . . . . . . . . . . . . . . . . . 7-3.3, A-7-3.3
Evaluation of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-3.4, A-1-3.4, C-4
Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A
. pp. E Purpose of standard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2, A-1-2
Potential uses of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-3, C-5
-R-
Standard and concepts of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1
Referenced publications . . . . . . . . . . . . . . . . . . . . . . . .Chap. 8, App. B
-L- Reports
Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3-2.2
Labeled (definition) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1 Plan review . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-2.2
Legal proceedings . . . . . . . . . . . . . . . . . . . . . . . 3-2.8, 4-2.5, 5-2.8, 6-3.9
Requisite knowledge/skills . . . . . C-2, D-1.4, D-2.4, D-3.4, D-4.4, D-5.4
Life safety systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-3.7 Basic . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.1, A-1-3.1
Listed (definition). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-1, A-2-1 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
Resource materials. . . . . . . . . . . . . . . . . . . . . . . . 1-3.12, 5-2.5, A-1-3.12
-M-
Management responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2, A-1-2 -S-
Means of egress Safety requirement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-3.11
Correction of deficiencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3.2 Sample job description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .App. D
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-1 Scope of standard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1
Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3.3, 4-3.5, A-3-3 Shall (definition) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
Plan review . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4.4, 6-3.5, 7-3.9 Shop drawings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4-4.3, 7-3.5
Mixed use occupancies . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3.1 to 4-3.2 Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
Should (definition) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
-O- Single use occupancies . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3.1 to 3-3.2
Occupancy classifications. . . . . . . . . . . . . . . . . 3-3.1, 4-3.2, 4-4.1, 6-3.2 Smoke removal systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-5-3.10
Occupant load Sprinkler systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-3-3.5
Adjustment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3.1 Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . see Codes and standards
Calculation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3.2, 4-3.1, 4-4.2
Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-3.4 -T-
Task (definition) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
-P- Temporary structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6-3.1, 6-3.5
Permits Tent or membrane structures . . . . . . . . . . . . . . . . . . . . . . . .6-3.1, 6-3.5
Application process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2.4 Time, efficient use of . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-3.13
Enforcement of regulations . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2.6 Trade shows . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-3.1, 6-3.5
Issuance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2.3, 4-2.3 Training . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-3.3
Personal protective clothing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.11 Continuing education . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1-3.10
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-1 By Fire Inspector III . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1-3.7
Requisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.1, A-1-3.1
Plan Examiner I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Chap. 6, A-6-2.5
Administrative skills . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2, A-6-2.5
Certification requirements . . . . . . . . . . . . . . . . . . . . . . . . . 1-3.8, 6-1
-V-
Definition . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2-1 Ventilation systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5-3.9, 6-3.10

1998 Edition C-E

You might also like