Basement-3 Preliminary Finishing Masonry: WBS Activity Name Actual % Complete

This document provides a work breakdown structure (WBS) and progress updates for various construction activities of a multi-level basement and ground floor project. Many masonry, plastering and preliminary finishing works are 100% complete for the basement levels and ground floor. Final finishing activities like false ceilings, flooring and painting are still in progress or 0% complete across all levels. Staircase finishing works and general finishing from B3 to B1 are approximately 45% complete overall.

Uploaded by

Moath Alhajiri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views10 pages

Basement-3 Preliminary Finishing Masonry: WBS Activity Name Actual % Complete

This document provides a work breakdown structure (WBS) and progress updates for various construction activities of a multi-level basement and ground floor project. Many masonry, plastering and preliminary finishing works are 100% complete for the basement levels and ground floor. Final finishing activities like false ceilings, flooring and painting are still in progress or 0% complete across all levels. Staircase finishing works and general finishing from B3 to B1 are approximately 45% complete overall.

Uploaded by

Moath Alhajiri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10

Actual %

WBS Activity Name


Complete
Basement-3
Preliminary Finishing
Masonry
B3 Block works (Cleaning ,Survey and Setting out Work ) 100%
B3 Inspection and Appoval Block works 100%
B3 Installation Of Sub -Frames Of Doors 100%
Architectural works
Plaster Works
B3 Plaster Works 100%
B3 Inspection and Approval @ Plaster Works 100%
Painting Works
B3 Surface Preparation and Vetonite 100%
B3 Sanding and Primer & Putty 100%
B3 Paint First Coat 100%
Final Finishing
Architectural Works
False Ceiling Works
B3 Suspended Ceiling Works 0%
Flooring Works
B3 Curb Stones and Paving 83%
B3 Cement Tiles 0%
B3 Ceramic Tiles @ Floor 0%
Doors and Windows
B3 Doors Shutters/Architrave / Hardware 0%
Painting Work
B3 Paint 2nd Coat 0%
B3 Paint Final coat 0%
Plyurethane Paint +Band +Acrylic Paint
B3 Plyurethane Paint +Band +Acrylic Paint 0%
Actual %
WBS Activity Name
Complete
Basement-2
Preliminary Finishing
Masonry
B2 Block works (Cleaning ,Survey and Setting out Work ) 100%
B2 Inspection and Approval Block works 100%
B2 Installation Of Sub -Frames Of Doors 100%
Architectural works
Plaster Works
B2 Plaster Works 100%
B2 Inspection and Approval @ Plaster Works 100%
Painting Works
B2 Surface Preparation and Vetonite 100%
B2 Sanding and Primer & Putty 85%
B2 Paint First Coat 75%
Final Finishing
Architectural Works
False Ceiling Works
B2 Suspended Ceiling Works
Flooring Works
B2 Curb Stones and Paving 88%
B2 Cement Tiles
B2 Ceramic Tiles @ Floor 55%
Doors and Windows
B2 Doors Shutters/Architrave / Hardware
Painting Work
B2 Paint 2nd Coat
B2 Paint Final coat
Plyurethane Paint +Band +Acrylic Paint
B2 Prepare Surface & apply Expoxy Painting 20%
Actual %
WBS Activity Name
Complete
Basement-1
Preliminary Finishing
Masonry
B1 Block works (Cleaning ,Survey and Setting out Work ) 100%
B1 Inspection and Approval @ Block Works 100%
B1 Installation Of Sub -Frames Of Doors 100%
Architectural works
Plaster Works
B1 Plaster Works 96%
B1 Inspection and Approval @ Plaster Works 95%
Painting Works
B1 Surface Preparation and Vetonite 100%
B1 Sanding and Primer & Putty 85%
B1 Paint First Coat 30%
Final Finishing
Architectural Works
False Ceiling Works
B1 Suspended Ceiling Works
Flooring Works
B1 Ceramic Tiles @ Floor 55%
B1 Curb Stones and Paving 85%
B1 Cement Tiles 70%
Waterproofing @ Wet Area
B1 Waterproofing @ Wet Area
Ceramic Tiles @ Walls and Floor
B1 Ceramic Tiles @ Walls and Floor
Doors and Windows
B1 Doors Shutters/Architrave / Hardware
Painting Work
B1 Paint 2nd Coat
B1 Paint Final coat
Plyurethane Paint +Band +Acrylic Paint
B1 Prepare Surface & apply Expoxy Painting 30%
Actual %
WBS Activity Name
Complete
Stairscase Finishing Works
B3-B1 Heavy Duty Epoxy Paint To Landing,Treads and risers (115+438 Sq.m)
B3-B1 Non Slippery Terrazo to Landing,trads and risers (33+161 Sq.m) and Threshold 200mm wide
B3-B1 Installation of Handrail
General Finishing - Level B3 to B1
Silica Sand Finish (412 Sq.m)
B3-B1 Silica Sand Finish (412 Sq.m)
Heavy Duty Epoxy Paint ( 838 Sq.m)
B3-B1 Heavy Duty Epoxy Paint ( 838 Sq.m) 45%
Antistatic raised Floor
B3-B1 Antistatic raised Floor
Local Natural Stone ( 60 Sq.m)
B3-B1 Local Natural Stone ( 60 Sq.m)
Anti Slippery & Heavy Duty Ceramic Tiles (120 Sq.m)
B3-B1 Anti Slippery & Heavy Duty Ceramic Tiles (120 Sq.m)
Actual %
WBS Activity Name
Complete
Level GF (Ground Floor)
Preliminary Finishing
Masonry
GF Block works (Cleaning ,Survey and Setting out Work ) 100%
GF Inspection and Approval @ Block Works 100%
GF Installation Of Sub -Frames Of Doors 100%
Architectural works
Plaster Works
GF Plaster Works (Splash, Dots and Accessories) 100%
GF Plaster Works (Rooms and Corridor) 98%
GF Inspection and Approval @ Plaster Works 85%
GF Plaster Works (Bath Rooms) 80%
Painting Works
GF Putty 2 Coats 88%
GF Sanding and Primer 88%
GF Paint First Coat 75%
Final Finishing
Architectural Works
Floor Finishing
Marble @ Prefunction,Reception, Lift Lobby and Main Lobby
GF Marble @ Prefunction ,Reception ,Lift Lobby and Main Lobby
Floor Tiles @ Banquent Hall , Main Lobby and Blue Grill
GF Floor Tiles @ Banquent Hall, Main Lobby and Blue Grill 100%
False Ceiling Works @ All day dinning ,lift lobby , Meeting room
GF False Ceiling Suspension -First Fix (False Ceiling Grid Work)
GF False Ceiling Work-Final
GF Primer ,Putty and First Coat @ Gypsum Board Ceiling
Tilling Work @ Banquent and Lobby Toilets
GF Marble Works at wet areas @Walls
GF Waterproofing & Test at wet areas and Protection screed
GF Composite Stone at wet areas (Floor Tilling)
False Ceiling Works @ Bathroom
GF Moisture Resistant Gypsum Borad Ceiling @ wet Area
Countertop
GF Installation Of Countertops
General Finishing
GF Installation of Windows 60%
GF Wood Veneer and Wood Fins @ Banquet Hall,Reception, Lift Lobby, Main Lobby and Blue Grill
GF MDF Board with Acrylic Panel and Stained MDF @ Banquet Hall and Lobby Toilets
GF Vinyle on plastered wall and Plywood backing @ Banquet Hall
GF Vinyle Printed Imagery
GF Paint 2nd Coat
GF Polished Stainless Seperator
GF Green Wall @ Prefunction (28 Sq.m)
GF Back Printed Glass @ Reception , Lift Lobby and Lobby Toilets
GF Doors Installation and Hardware
GF Paint Final coat
Actual %
WBS Activity Name
Complete
Level 1 (First Floor)
Preliminary Finishing
Masonry
F1 Block works (Cleaning ,Survey and Setting out Work ) 100%
F1 Inspection and Approval @ Block Works 100%
F1 Installation Of Sub -Frames Of Doors 100%
Architectural works
Plaster Works
F1 Plaster Works (Splash, Dots and Accessories) 100%
F1 Plaster Works (Rooms and Corridor) 98%
F1 Plaster Works (Bath Rooms) 95%
F1 Inspection and Approval @ Plaster Works 95%
Painting Works
F1 Putty 2 Coats 86%
F1 Sanding and Primer 86%
F1 Paint First Coat 73%
Final Finishing
Architectural Works
Floor Finishing
F1 Floor Finishing 95%
False Ceiling Works
F1 False Ceiling Suspension -First Fix (False Ceiling Grid Work)
F1 False Ceiling Work-Final
F1 Primer ,Putty and First Coat @ Gypsum Board Ceiling
Tilling Work @ Toilet
F1 Ceramic tiles Works at wet areas @Walls 100%
F1 Waterproofing & Test at wet areas and Protection screed 100%
F1 Marble Works at wet areas (Floor Tilling) 100%
False Ceiling Works @ Bathroom
F1 Moisture Resistant Gypsum Borad Ceiling @ wet Area 10%
Countertop
F1 Installation Of Countertops
General Finishing
F1 Paint 2nd Coat
F1 Doors Installation and Hardware
F1 Paint Final coat
Actual %
WBS Activity Name
Complete
Level 2 (2nd Floor)
Preliminary Finishing
Masonry
F2 Block works (Cleaning ,Survey and Setting out Work ) 100%
F2 Inspection and Approval @ Block Works 100%
F2 Installation Of Sub -Frames Of Doors 100%
Architectural works
Plaster Works
F2 Plaster Works (Splash, Dots and Accessories) 96%
F2 Plaster Works (Rooms and Corridor) 100%
F2 Plaster Works (Bath Rooms) 20%
F2 Inspection and Approval @ Plaster Works 95%
Painting Works
F2 Putty 2 Coats 86%
F2 Sanding and Primer 86%
F2 Paint First Coat 65%
Final Finishing
Architectural Works
Wall and Floor Finishing
Wall-Marble @ All day dinning and Meeting room
F2 Wall-Marble @ All day dinning and Meeting room
Floor-Composite Stone @ All day dinning ,lift lobby , Meeting room
F2 Composite Stone @ All day dinning Lift lobby , Meeting room 30%
Floor Tiles @ Meeting room
F2 Floor Tiles @ Meeting room 100%
False Ceiling Works @ All day dinning ,lift lobby , Meeting room
F2 False Ceiling Suspension -First Fix (False Ceiling Grid Work)
F2 False Ceiling Work-Final
F2 Primer ,Putty and First Coat @ Gypsum Board Ceiling
Tilling Work @ All day dinning and Meeting room Toilets
F2 Marble Works at wet areas @Walls
F2 Waterproofing & Test at wet areas and Protection screed
F2 Composite Stone at wet areas (Floor Tilling)
False Ceiling Works @ All day dinning and Meeting room Toilets
F2 Moisture Resistant Gypsum Borad Ceiling @ wet Area
Countertop
F2 Installation Of Countertops
General Finishing
F2 Installation of Windows
F2 Paint 2nd Coat
F2 Doors Installation and Hardware
F2 Wood Finish and Wood Veneer Finish @ All day dinning and Meeting room & All Day Dinning & Meeting Toilets
F2 Shimmer Screen @ All Day Dinning (12metre Sq.)
F2 Vinyle @ All day dinning and Meeting room & All Day Dinning & Meeting Toilets
F2 Mirror
F2 Paint Final coat
Actual %
WBS Activity Name
Complete
Level 3 (3rd Floor)
Preliminary Finishing
Masonry
F3 Block works (Cleaning ,Survey and Setting out Work ) 100%
F3 Inspection and Approval @ Block Works 100%
F3 Installation Of Sub -Frames Of Doors 100%
Architectural works
Plaster Works
F3 Plaster Works (Splash, Dots and Accessories) 95%
F3 Plaster Works (Rooms and Corridor) 95%
F3 Inspection and Approval @ Plaster Works 85%
F3 Plaster Works (Bath Rooms)
Painting Works
F3 Putty 2 Coats 79%
F3 Sanding and Primer 75%
F3 Paint First Coat 20%
Final Finishing
Architectural Works
Floor Finishing
Floor Tiles @ Gym and Massage Room, Guest Rooms ,Corridor & Lift Lobby
F3 Floor Tiles @ Gym and Massage Room, Guest Rooms ,Corridor & Lift Lobby 100%
Composite Stone @ Corridor , Lift Lobby , Health Club ,Reception
F3 Composite Stone @ Corridor , Lift Lobby , Health Club ,Reception 40%
False Ceiling Works @ Gym ,Massage Room, Guest Rooms ,Corridor ,Lift Lobby,Health Club
F3 False Ceiling Suspension -First Fix (False Ceiling Grid Work)
F3 False Ceiling Work-Final
F3 Primer ,Putty and First Coat @ Gypsum Board Ceiling
Tilling Work @ All day dinning and Meeting room Toilets
F3 Marble Works at wet areas @Walls
F3 Waterproofing & Test at wet areas and Protection screed 65%
F3 Composite Stone at wet areas (Floor Tilling) 35%
False Ceiling Works @ Hotel Guest Rooms Toilets
F3 Moisture Resistant Gypsum Borad Ceiling @ wet Area
Countertop
F3 Installation Of Countertops
General Finishing
F3 Installation of Windows
F3 Wood Flooring glued on Terrazzo Base @ massage Room ( 28 Sq.m)
F3 Paint 2nd Coat
F3 Doors Installation and Hardware
F3 Wood Veneer @ Hotel Guest Rooms & Hotel Corridor & Lift Lobby
F3 Vinyle @ GYM, Lift Lobby , Corridor , Health Club , Male & Female Changing Room
F3 Stained MDF @ Hotel Cooridor & Lift Lobby
F3 Mirror
F3 Back Painted Glass
F3 Paint Final coat
Actual %
WBS Activity Name
Complete
Level 4 (Technical Floor)
Preliminary Finishing
Masonry
F4 Block works (Cleaning ,Survey and Setting out Work ) 100%
F4 Inspection and Approval @ Block Works 100%
F4 Installation Of Sub -Frames Of Doors 100%
Architectural works
Plaster Works
F4 Plaster Works (Splash, Dots and Accessories) 95%
F4 Plaster Works (Rooms and Corridor) 95%
F4 Plaster Works (Bath Rooms) 95%
F4 Inspection and Approval @ Plaster Works 95%
Painting Works
F4 Sanding and Primer 55%
F4 Putty 2 Coats
F4 Paint First Coat
Final Finishing
Architectural Works
False Ceiling Works @ Hotel Guest Rooms Toilets
F4 Moisture Resistant Gypsum Borad Ceiling @ wet Area
Countertop
F4 Installation Of Countertops
General Finishing
F4 Installation of Windows 20%
F4 Paint 2nd Coat
F4 Doors Installation and Hardware
F4 Paint Final coat
Actual %
WBS Activity Name
Complete
General Finishing -Level GL to L4
GL-L4 Heavy Duty Ceramic Tiles (2+88+231 Sq.m) 55%
GL-L4 Terrazzo Tiles (277 Sq.m) 85%
GL-L4 Local Natural Stone ( 24 Sq.m)
GL-L4 Ucrete ( Durable Polyurethane Flooring Surface) (195 Sq.m.)
GL-L4 Heavy Duty Epoxy Paint ( 141 Sq.m) 30%
Staircase Finishing Works
GL-L4 Chipping and Surface Preparation to receive Plaster 95%
GL-L4 Plaster Works 95%
GL-L4 Surface Preparation to receive Heavy Duty Epoxy Paint 40%
GL-L4 Heavy Duty Epoxy Paint To Landing,Treads and risers (127+638 Sq.m)
GL-L4 Non Slippery Terrazo to Landing,trads and risers (40+298 Sq.m) and Treshold
GL-L4 Installation of Handrail