Basement-3 Preliminary Finishing Masonry: WBS Activity Name Actual % Complete
This document provides a work breakdown structure (WBS) and progress updates for various construction activities of a multi-level basement and ground floor project. Many masonry, plastering and preliminary finishing works are 100% complete for the basement levels and ground floor. Final finishing activities like false ceilings, flooring and painting are still in progress or 0% complete across all levels. Staircase finishing works and general finishing from B3 to B1 are approximately 45% complete overall.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
48 views10 pages
Basement-3 Preliminary Finishing Masonry: WBS Activity Name Actual % Complete
This document provides a work breakdown structure (WBS) and progress updates for various construction activities of a multi-level basement and ground floor project. Many masonry, plastering and preliminary finishing works are 100% complete for the basement levels and ground floor. Final finishing activities like false ceilings, flooring and painting are still in progress or 0% complete across all levels. Staircase finishing works and general finishing from B3 to B1 are approximately 45% complete overall.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 10
Actual %
WBS Activity Name
Complete Basement-3 Preliminary Finishing Masonry B3 Block works (Cleaning ,Survey and Setting out Work ) 100% B3 Inspection and Appoval Block works 100% B3 Installation Of Sub -Frames Of Doors 100% Architectural works Plaster Works B3 Plaster Works 100% B3 Inspection and Approval @ Plaster Works 100% Painting Works B3 Surface Preparation and Vetonite 100% B3 Sanding and Primer & Putty 100% B3 Paint First Coat 100% Final Finishing Architectural Works False Ceiling Works B3 Suspended Ceiling Works 0% Flooring Works B3 Curb Stones and Paving 83% B3 Cement Tiles 0% B3 Ceramic Tiles @ Floor 0% Doors and Windows B3 Doors Shutters/Architrave / Hardware 0% Painting Work B3 Paint 2nd Coat 0% B3 Paint Final coat 0% Plyurethane Paint +Band +Acrylic Paint B3 Plyurethane Paint +Band +Acrylic Paint 0% Actual % WBS Activity Name Complete Basement-2 Preliminary Finishing Masonry B2 Block works (Cleaning ,Survey and Setting out Work ) 100% B2 Inspection and Approval Block works 100% B2 Installation Of Sub -Frames Of Doors 100% Architectural works Plaster Works B2 Plaster Works 100% B2 Inspection and Approval @ Plaster Works 100% Painting Works B2 Surface Preparation and Vetonite 100% B2 Sanding and Primer & Putty 85% B2 Paint First Coat 75% Final Finishing Architectural Works False Ceiling Works B2 Suspended Ceiling Works Flooring Works B2 Curb Stones and Paving 88% B2 Cement Tiles B2 Ceramic Tiles @ Floor 55% Doors and Windows B2 Doors Shutters/Architrave / Hardware Painting Work B2 Paint 2nd Coat B2 Paint Final coat Plyurethane Paint +Band +Acrylic Paint B2 Prepare Surface & apply Expoxy Painting 20% Actual % WBS Activity Name Complete Basement-1 Preliminary Finishing Masonry B1 Block works (Cleaning ,Survey and Setting out Work ) 100% B1 Inspection and Approval @ Block Works 100% B1 Installation Of Sub -Frames Of Doors 100% Architectural works Plaster Works B1 Plaster Works 96% B1 Inspection and Approval @ Plaster Works 95% Painting Works B1 Surface Preparation and Vetonite 100% B1 Sanding and Primer & Putty 85% B1 Paint First Coat 30% Final Finishing Architectural Works False Ceiling Works B1 Suspended Ceiling Works Flooring Works B1 Ceramic Tiles @ Floor 55% B1 Curb Stones and Paving 85% B1 Cement Tiles 70% Waterproofing @ Wet Area B1 Waterproofing @ Wet Area Ceramic Tiles @ Walls and Floor B1 Ceramic Tiles @ Walls and Floor Doors and Windows B1 Doors Shutters/Architrave / Hardware Painting Work B1 Paint 2nd Coat B1 Paint Final coat Plyurethane Paint +Band +Acrylic Paint B1 Prepare Surface & apply Expoxy Painting 30% Actual % WBS Activity Name Complete Stairscase Finishing Works B3-B1 Heavy Duty Epoxy Paint To Landing,Treads and risers (115+438 Sq.m) B3-B1 Non Slippery Terrazo to Landing,trads and risers (33+161 Sq.m) and Threshold 200mm wide B3-B1 Installation of Handrail General Finishing - Level B3 to B1 Silica Sand Finish (412 Sq.m) B3-B1 Silica Sand Finish (412 Sq.m) Heavy Duty Epoxy Paint ( 838 Sq.m) B3-B1 Heavy Duty Epoxy Paint ( 838 Sq.m) 45% Antistatic raised Floor B3-B1 Antistatic raised Floor Local Natural Stone ( 60 Sq.m) B3-B1 Local Natural Stone ( 60 Sq.m) Anti Slippery & Heavy Duty Ceramic Tiles (120 Sq.m) B3-B1 Anti Slippery & Heavy Duty Ceramic Tiles (120 Sq.m) Actual % WBS Activity Name Complete Level GF (Ground Floor) Preliminary Finishing Masonry GF Block works (Cleaning ,Survey and Setting out Work ) 100% GF Inspection and Approval @ Block Works 100% GF Installation Of Sub -Frames Of Doors 100% Architectural works Plaster Works GF Plaster Works (Splash, Dots and Accessories) 100% GF Plaster Works (Rooms and Corridor) 98% GF Inspection and Approval @ Plaster Works 85% GF Plaster Works (Bath Rooms) 80% Painting Works GF Putty 2 Coats 88% GF Sanding and Primer 88% GF Paint First Coat 75% Final Finishing Architectural Works Floor Finishing Marble @ Prefunction,Reception, Lift Lobby and Main Lobby GF Marble @ Prefunction ,Reception ,Lift Lobby and Main Lobby Floor Tiles @ Banquent Hall , Main Lobby and Blue Grill GF Floor Tiles @ Banquent Hall, Main Lobby and Blue Grill 100% False Ceiling Works @ All day dinning ,lift lobby , Meeting room GF False Ceiling Suspension -First Fix (False Ceiling Grid Work) GF False Ceiling Work-Final GF Primer ,Putty and First Coat @ Gypsum Board Ceiling Tilling Work @ Banquent and Lobby Toilets GF Marble Works at wet areas @Walls GF Waterproofing & Test at wet areas and Protection screed GF Composite Stone at wet areas (Floor Tilling) False Ceiling Works @ Bathroom GF Moisture Resistant Gypsum Borad Ceiling @ wet Area Countertop GF Installation Of Countertops General Finishing GF Installation of Windows 60% GF Wood Veneer and Wood Fins @ Banquet Hall,Reception, Lift Lobby, Main Lobby and Blue Grill GF MDF Board with Acrylic Panel and Stained MDF @ Banquet Hall and Lobby Toilets GF Vinyle on plastered wall and Plywood backing @ Banquet Hall GF Vinyle Printed Imagery GF Paint 2nd Coat GF Polished Stainless Seperator GF Green Wall @ Prefunction (28 Sq.m) GF Back Printed Glass @ Reception , Lift Lobby and Lobby Toilets GF Doors Installation and Hardware GF Paint Final coat Actual % WBS Activity Name Complete Level 1 (First Floor) Preliminary Finishing Masonry F1 Block works (Cleaning ,Survey and Setting out Work ) 100% F1 Inspection and Approval @ Block Works 100% F1 Installation Of Sub -Frames Of Doors 100% Architectural works Plaster Works F1 Plaster Works (Splash, Dots and Accessories) 100% F1 Plaster Works (Rooms and Corridor) 98% F1 Plaster Works (Bath Rooms) 95% F1 Inspection and Approval @ Plaster Works 95% Painting Works F1 Putty 2 Coats 86% F1 Sanding and Primer 86% F1 Paint First Coat 73% Final Finishing Architectural Works Floor Finishing F1 Floor Finishing 95% False Ceiling Works F1 False Ceiling Suspension -First Fix (False Ceiling Grid Work) F1 False Ceiling Work-Final F1 Primer ,Putty and First Coat @ Gypsum Board Ceiling Tilling Work @ Toilet F1 Ceramic tiles Works at wet areas @Walls 100% F1 Waterproofing & Test at wet areas and Protection screed 100% F1 Marble Works at wet areas (Floor Tilling) 100% False Ceiling Works @ Bathroom F1 Moisture Resistant Gypsum Borad Ceiling @ wet Area 10% Countertop F1 Installation Of Countertops General Finishing F1 Paint 2nd Coat F1 Doors Installation and Hardware F1 Paint Final coat Actual % WBS Activity Name Complete Level 2 (2nd Floor) Preliminary Finishing Masonry F2 Block works (Cleaning ,Survey and Setting out Work ) 100% F2 Inspection and Approval @ Block Works 100% F2 Installation Of Sub -Frames Of Doors 100% Architectural works Plaster Works F2 Plaster Works (Splash, Dots and Accessories) 96% F2 Plaster Works (Rooms and Corridor) 100% F2 Plaster Works (Bath Rooms) 20% F2 Inspection and Approval @ Plaster Works 95% Painting Works F2 Putty 2 Coats 86% F2 Sanding and Primer 86% F2 Paint First Coat 65% Final Finishing Architectural Works Wall and Floor Finishing Wall-Marble @ All day dinning and Meeting room F2 Wall-Marble @ All day dinning and Meeting room Floor-Composite Stone @ All day dinning ,lift lobby , Meeting room F2 Composite Stone @ All day dinning Lift lobby , Meeting room 30% Floor Tiles @ Meeting room F2 Floor Tiles @ Meeting room 100% False Ceiling Works @ All day dinning ,lift lobby , Meeting room F2 False Ceiling Suspension -First Fix (False Ceiling Grid Work) F2 False Ceiling Work-Final F2 Primer ,Putty and First Coat @ Gypsum Board Ceiling Tilling Work @ All day dinning and Meeting room Toilets F2 Marble Works at wet areas @Walls F2 Waterproofing & Test at wet areas and Protection screed F2 Composite Stone at wet areas (Floor Tilling) False Ceiling Works @ All day dinning and Meeting room Toilets F2 Moisture Resistant Gypsum Borad Ceiling @ wet Area Countertop F2 Installation Of Countertops General Finishing F2 Installation of Windows F2 Paint 2nd Coat F2 Doors Installation and Hardware F2 Wood Finish and Wood Veneer Finish @ All day dinning and Meeting room & All Day Dinning & Meeting Toilets F2 Shimmer Screen @ All Day Dinning (12metre Sq.) F2 Vinyle @ All day dinning and Meeting room & All Day Dinning & Meeting Toilets F2 Mirror F2 Paint Final coat Actual % WBS Activity Name Complete Level 3 (3rd Floor) Preliminary Finishing Masonry F3 Block works (Cleaning ,Survey and Setting out Work ) 100% F3 Inspection and Approval @ Block Works 100% F3 Installation Of Sub -Frames Of Doors 100% Architectural works Plaster Works F3 Plaster Works (Splash, Dots and Accessories) 95% F3 Plaster Works (Rooms and Corridor) 95% F3 Inspection and Approval @ Plaster Works 85% F3 Plaster Works (Bath Rooms) Painting Works F3 Putty 2 Coats 79% F3 Sanding and Primer 75% F3 Paint First Coat 20% Final Finishing Architectural Works Floor Finishing Floor Tiles @ Gym and Massage Room, Guest Rooms ,Corridor & Lift Lobby F3 Floor Tiles @ Gym and Massage Room, Guest Rooms ,Corridor & Lift Lobby 100% Composite Stone @ Corridor , Lift Lobby , Health Club ,Reception F3 Composite Stone @ Corridor , Lift Lobby , Health Club ,Reception 40% False Ceiling Works @ Gym ,Massage Room, Guest Rooms ,Corridor ,Lift Lobby,Health Club F3 False Ceiling Suspension -First Fix (False Ceiling Grid Work) F3 False Ceiling Work-Final F3 Primer ,Putty and First Coat @ Gypsum Board Ceiling Tilling Work @ All day dinning and Meeting room Toilets F3 Marble Works at wet areas @Walls F3 Waterproofing & Test at wet areas and Protection screed 65% F3 Composite Stone at wet areas (Floor Tilling) 35% False Ceiling Works @ Hotel Guest Rooms Toilets F3 Moisture Resistant Gypsum Borad Ceiling @ wet Area Countertop F3 Installation Of Countertops General Finishing F3 Installation of Windows F3 Wood Flooring glued on Terrazzo Base @ massage Room ( 28 Sq.m) F3 Paint 2nd Coat F3 Doors Installation and Hardware F3 Wood Veneer @ Hotel Guest Rooms & Hotel Corridor & Lift Lobby F3 Vinyle @ GYM, Lift Lobby , Corridor , Health Club , Male & Female Changing Room F3 Stained MDF @ Hotel Cooridor & Lift Lobby F3 Mirror F3 Back Painted Glass F3 Paint Final coat Actual % WBS Activity Name Complete Level 4 (Technical Floor) Preliminary Finishing Masonry F4 Block works (Cleaning ,Survey and Setting out Work ) 100% F4 Inspection and Approval @ Block Works 100% F4 Installation Of Sub -Frames Of Doors 100% Architectural works Plaster Works F4 Plaster Works (Splash, Dots and Accessories) 95% F4 Plaster Works (Rooms and Corridor) 95% F4 Plaster Works (Bath Rooms) 95% F4 Inspection and Approval @ Plaster Works 95% Painting Works F4 Sanding and Primer 55% F4 Putty 2 Coats F4 Paint First Coat Final Finishing Architectural Works False Ceiling Works @ Hotel Guest Rooms Toilets F4 Moisture Resistant Gypsum Borad Ceiling @ wet Area Countertop F4 Installation Of Countertops General Finishing F4 Installation of Windows 20% F4 Paint 2nd Coat F4 Doors Installation and Hardware F4 Paint Final coat Actual % WBS Activity Name Complete General Finishing -Level GL to L4 GL-L4 Heavy Duty Ceramic Tiles (2+88+231 Sq.m) 55% GL-L4 Terrazzo Tiles (277 Sq.m) 85% GL-L4 Local Natural Stone ( 24 Sq.m) GL-L4 Ucrete ( Durable Polyurethane Flooring Surface) (195 Sq.m.) GL-L4 Heavy Duty Epoxy Paint ( 141 Sq.m) 30% Staircase Finishing Works GL-L4 Chipping and Surface Preparation to receive Plaster 95% GL-L4 Plaster Works 95% GL-L4 Surface Preparation to receive Heavy Duty Epoxy Paint 40% GL-L4 Heavy Duty Epoxy Paint To Landing,Treads and risers (127+638 Sq.m) GL-L4 Non Slippery Terrazo to Landing,trads and risers (40+298 Sq.m) and Treshold GL-L4 Installation of Handrail