Report
Report
Special thanks to my mother Madam K.Maliga, family members, friends and staffs of
Radicare (M) SDN.BHD Temerloh Pahang branch. They guided me well all through my
industrial training for 10 weeks. All their guidance and lessons helped me a lot during my
training and increase my understanding in the field of practical working.
ACKNOWLEDGEMENTS
I would also like to thank permanent staffs of Radibems, Radicare who guided me all
through my training by giving advices, exposing me to management and technical
approaches. Hereby I would like to mention their names. Special thanks to Mr.Nur
Azuan, Mrs.Siti Azwani, Mrs.Zuraimah, Mr Kamarul Anuar, Mr Faisal Anuar, Mr Mohd
Fazrul, Mr. Mohd Amiro Naim,Mr Mohd Hidayat, Mr.Mohd Azhar,Mr Muhd
Sarulnazam,Mr Mohd Faizul, and Mr Nazri. With their guidance and lessons I manage to
finish my training successfully.
Thank you,
Sargunan
Contents
DEDICATION .................................................................................................................................... 1
ACKNOWLEDGEMENTS ................................................................................................................... 2
1.0 INTRODUCTION ................................................................................................................... 5
1.1 OBJECTIVE OF INDUSTRIAL TRAINING ............................................................................ 6
1.2 COMPANY BACKGROUND ..................................................................................................... 7
1.3 MISSION ................................................................................................................................. 8
1.4 VISION .................................................................................................................................... 8
1.5 ORGANIZATION CHART OF RADIBEMS ( RADICARE ) ........................................................... 9
1.6 SERVICES PROVIDED BY RADICARE (M) SDN BHD.............................................................. 10
2.0 RADICARE MANAGEMENT DOCUMENTS ......................................................................... 11
2.1 Work Order Slip ............................................................................................................. 11
2.2 Complaint Form ............................................................................................................. 12
2.3 Purchasing Spare parts documents .............................................................................. 13
2.4 Equipment Acceptance Register ( E.A.R ) ..................................................................... 16
2.5 Beyond Economic Repair certificate ................................................................................... 17
3.0 RADIBEMS................................................................................................................................ 18
3.1 PLAN PREVENTIVE MAINTENANCE ( PPM ) ........................................................................ 20
3.2 SUMMARIZATION OF PPM ROUTINE ............................................................................. 21
Infants Incubators ATOM model v-85............................................................................... 21
3.3 SIEMENS Ultrasound Machine ........................................................................................ 27
3.4 Electrical Surgical Unit ( Diathermy ) .............................................................................. 29
3.5 Defibrillator Schiller DEFIGUARD 3002 ........................................................................... 32
3.6 Computerized Tomography ............................................................................................ 33
3.7 Metron Interferential Theraphy ( IFT ) ........................................................................... 34
3.8 Syringe Pump / Driver B.Braun ....................................................................................... 36
Post-PPM Documentations ....................................................................................................... 38
4.0 BREAKDOWN MAINTENANCE ............................................................................................. 39
4.1 SUMMARIZATION OF BREAKDOWN ROUTINE ............................................................... 41
Syringe Driver/Pump ............................................................................................................. 41
4.2 Kodak DryView 8900, Laser Dry Imager ......................................................................... 42
4.3 Infusion Pump, Drip ( Infusomat Fms B.Braun ) ............................................................. 43
4.4 Phototheraphy Unit ........................................................................................................ 44
4.5 Physical Monitor.............................................................................................................. 45
4.6 Ripple Mattress ............................................................................................................... 46
4.7 Radiant Warmer Open Care Unit .................................................................................... 47
4.8 Electrocardiography ( ECG )Unit ..................................................................................... 48
4.9 Analyzer of Blood Gaseous ( ABG Machine ) .................................................................. 50
4.10 CPU of Mammography Unit .......................................................................................... 52
4.11 Ion Selective Electrode Analyzer ( ISE 900 ) ................................................................. 54
4.12 TERUMO Blood Bag Sealer ............................................................................................ 58
4.13 OLYMPUS Microscope ................................................................................................... 59
4.14 Endoscopy Set , Pentax ( Gastroscope ) ....................................................................... 60
5.0 Equipment Acceptance Procedure ( E.A.P )........................................................................ 62
5.1 Documentation of E.A.P .................................................................................................. 64
6.0 Beyond Economic Repair ( B.E R ) ....................................................................................... 65
7.0 Comments and Suggestions .................................................................................................... 68
8.0 Conclusion ............................................................................................................................... 69
9.0 Reference................................................................................................................................. 70
10.0 Appendices ........................................................................................................................ 71
10.1 Formal Documentation Sample of Radicare .................................................................... 71
10.2 Encyclopedia of Medical Instrumentations and Devices World Health Organization .... 72
1.0 INTRODUCTION
Every student allowed to choose their own company and send their curricular vitae to
respective choice of company that they wanted to do their industrial training. Students of
FKEE UTHM are required to carry out their industrial training from 23 of June 2014
until 29 of August 2014 as it is decided by management of FKEE UTHM.
It is vital for every student to go through their industrial training because it create a
platform for every student to apply their theoretical knowledge in industrial field.
1.1 OBJECTIVE OF INDUSTRIAL TRAINING
There are few objectives need to be achieved through industrial training which are ;
II. Create awareness among student regarding the importance of practicing their
theoretical knowledge
IV. Students able to relate their theoretical knowledge with the working platform.
1.3 MISSION
To become an active organization which provide a high quality services in
health sector by giving high commitment and being more responsive
towards customer needs.
1.4 VISION
to project in the front line as an effective company in health supportive
services organization
1.5 ORGANIZATION CHART OF RADIBEMS ( RADICARE )
1.6 SERVICES PROVIDED BY RADICARE (M) SDN BHD
Radicare provide few services under their sub-concession which are biomedical
engineering maintenance services, facility engineering maintenance services, clinical
waste management and cleansing and linen.
RADIBEMS
CLINICAL WASTE
BIOMEDICAL ENGINEERING MANAGEMENT
MAINTENANCE SERVICES
TYPE OF
SERVICES
FEMS
CLEANSING AND LINEN FACILITY ENGINEERING
MAINTENANCE
2.0 RADICARE MANAGEMENT DOCUMENTS
Work order slip was filled in as soon as complaint was lodge by user at Help Desk.
Usually necessary information will be filled in by Help Desk staffs such as asset number,
asset description, locations and request details. Work order is a proving document that
task had been done and verified by user himself. Signature and designation stamp of user
are required during responding the complaint and after accomplished the task. Usually
used for PPM and Breakdown.
Complaint form usually attached along with Work Order Slip where by the details of
breakdown will be written on it. The details include asset number, asset description, user
location, user designation, and request details.
During breakdown or corrective maintenance replacing parts are necessary to increase the
efficiency of medical devices. In case when the spare parts are no longer available, it is
necessary to buy the parts either from sole agent, or other vendors in the market. Before
purchasing any spare parts there are certain procedures need to be followed.
Before a device undergoes PPM, a notice will be issued to user in order to inform them
about the particular device with specific asset number will be check on a specific date
and request the user to keep the device in-free and allow them to perform PPM on the
devices. In case the devices need to be used due to emergency cases PPM can be
rescheduled. The significant objectives of performing PPM are the devices are functional
and safe to be used on patient. Steps of PPM are as follow :
Pain relief
Muscle stimulation
Increased local blood flow
Reduction of oedema
Procedure First ensure the power plug and the cord are safe to
be used. No expose area or opening along the cord.
Second, clean up blood stain or medicines stain on
syringe pump using alcohol swab.
Third, check the set up button by verifying the
functionality of power button, display switch, and
stop/silence button to direct the syringe pump about
the size of syringe used.
Forth , Infusion test with 60mL/h and Occlusion test
with 30mL/h
Electrical Safety test performed with IEC60601
class 1
Lastly , stick on the PPM sticker.
Figure 3.8.1 Syringe Pump flowchart
The analyzers used for EST are Metron Bender and Fluke EST Analyzer.
4.0 BREAKDOWN MAINTENANCE
Breakdown maintenance or known as B.D is an unscheduled procedure that
implemented when medical devices faces error or becomes faulty during it service or
emergency. It is Radibems responsible for attend the case and find a solution for the
breakdown in order to prolonged the service of the medical devices. Certain breakdown
can be fixed in a short period of time while others have to pass by certain procedures that
require vendors or specialist service to handle the breakdown such Magnetic Resonance
Imaging machine ( MRI ).
During industrial training students are explained about their working environment and
field of works in their daily routine and it create awareness among the students to be
more precaution about the biohazards around the hospital environment.