0% found this document useful (0 votes)
40 views

Appendix: Appendix About This Module

This document provides an overview and summary of several special planning strategies in SAP, including make-to-stock production, gross requirements planning, planning without final assembly, phantom assembly, planning with planning materials, quota arrangement, discontinuation control, subcontracting, and various assembly planning strategies. It includes descriptions of the processes, master data settings, and examples for implementing these different production planning approaches in SAP.

Uploaded by

Amy Brady
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views

Appendix: Appendix About This Module

This document provides an overview and summary of several special planning strategies in SAP, including make-to-stock production, gross requirements planning, planning without final assembly, phantom assembly, planning with planning materials, quota arrangement, discontinuation control, subcontracting, and various assembly planning strategies. It includes descriptions of the processes, master data settings, and examples for implementing these different production planning approaches in SAP.

Uploaded by

Amy Brady
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Appendix

About This Module


Introduction

Appendix
About This Topic
Overview of Several Sepcial Planning Strategies
Overview of Several Sepcial Planning Strategies (1)
Make-to-Stock-Production
Process of Gross Requirments Planning(11)
Settings for Gross Requirments Planning(11)
Overview of Several Special Planning Strategies (2)
Planning without Final Assembly (50/52)
Planning without Final Assembly (52)
Overview of Several Special Planning Strategies (3)
Phantom Assembly
Phantom Assembly Planning (59)
Phantom Assembly Planning Settings (59)
Overview of Several Special Planning Strategies
Assembly Planning without Final Assembly (74) (1)
Assembly Planning without Final Assembly (74) (2)
Assembly Planning without Final Assembly (74) (3)
Assembly Planning without Final Assembly (74) (4)
Overview of Several Special Planning Strategies
Planning with the Planning Material (60)
Planning with the Planning Material (60) II
Planning Material (60): Master Data
Planning Material Example (60) I
Planning Material Example (60) II
Quota Arrangement
Setting Up the Quota Arrangement
Quota Rating and Source Determination
Quota Arrangement in Manufacturing
Requirment Splitting in the Quota Arrangement
Maximum Lot Size in the Quota Arrangement
Discontinuation Control
Discontinuation control (Simple Discontinuation)
Discontinuation control (Parallel Discontinuation)
Subcontracting (1)
Subcontracting (2)
Subcontracting (3)
Planning Strategies - Part 1
Planning Strategies - Part 2
Summary

Module Summary
Summary

You might also like