The document outlines contingency plans for various potential issues including: 1. Assembly operator and customer end manpower shortages due to absenteeism or turnover which will be addressed by keeping extra trained operators, hiring local contractors, and multi-skilling employees. 2. Public bandhs or strikes which will be planned for through advance production and inventory management. 3. Material shortages due to supplier issues or transport strikes which will be addressed by maintaining fixed days of inventory.

Uploaded by

trikjoh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
492 views

Contingency Plan R

The document outlines contingency plans for various potential issues including: 1. Assembly operator and customer end manpower shortages due to absenteeism or turnover which will be addressed by keeping extra trained operators, hiring local contractors, and multi-skilling employees. 2. Public bandhs or strikes which will be planned for through advance production and inventory management. 3. Material shortages due to supplier issues or transport strikes which will be addressed by maintaining fixed days of inventory.

Uploaded by

trikjoh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 6

Contingency Plan

S.No CONTINGENCY DEPARTMENT NATURE

Abnormal absenteeism

1 Assembly Operator shortage Assembly Indent increase

High employee turnover

Abnormal absenteeism

Indent increase
2 Customer End ManpowerShortage Customer Line

High employee turnover

On a month's advance information of bandh / strike

3 Public Bandh All Department


On a week's advance information of banth / strike

Flash strike

Shortage of raw material &


bought out parts.

4 Material shortage Materials

Doc.No: KASAI/HR/D03 Rev.no/Date: 01/10.12.2015

KASAI INDIA (CHENNAI) PVT LTD.,


Contingency Plan

S.No CONTINGENCY DEPARTMENT NATURE

4 Material shortage Materials


Failure of delivery by supplier

Bandh / strike of transportation

5 Transportation All
Strike / Natural calamities at Warehouse

Dispatch of goods to customer Bandh / strick of transportation


6 P&A
Accident / failure of facility

7 Key process equipment Assembly Line stoppage due to major equipment breakdown/failure

8 Field Returns QA Customer line stoppage due to heavy rejection

Failure of Telephones

9 Communication All department

Tally

Failure of TNEB power

10 Utilities failure Complete plant Genset failure

Doc.No: KASAI/HR/D03 Rev.no/Date: 01/10.12.2015

KASAI INDIA (CHENNAI) PVT LTD.,


Contingency Plan

S.No CONTINGENCY DEPARTMENT NATURE


10 Utilities failure Complete plant

Air compressor

11 Labour Dispute All Department

Labour - Unrest / Strike / Slowdown / Tool Down / Stay in Strike / Lockout

Prepared By

Doc.No: KASAI/HR/D03 Rev.no/Date: 01/10.12.2015

KASAI INDIA (CHENNAI) PVT LTD.,


ontingency Plan 1.12.2017

ACTION PLAN Validation

* 10% assembly operators always kept under training who will be used in the assembly area
* Contractor has hired a house near the plant where he will always have 5 persons extra to support us in emergency situation
Employee Master Data
* Extra hours to be employed on the same day / weekend to meet the production target. Extra hour form
* Multi-skilling of operators Skill Matrix
* Call short listed operators. Employee database
* Manpower is arranged through Human Resource Consultants and Contractors/Recruitment portal Naukri Portal contract

* Customer Line Quality and Delivery Staff have back up support at our plant. In case of Absenteeism respective department
staff as a basis of job rotation is sent to the Customer End.
Nissan Gate Pass
* Employee works for Extra hours as per customer requirement . Skill Matrix
* Additional manpower is deployed. New position form
Replacement Form & New
* Experienced staff from inhouse is sent to customer line and inhouse staff replaced through new staff.
position form

* Manpower is arranged through Human Resource Consultants and Contractors Contract Agreement
Naukri Portal Agreement

* Monthly production plan will be prepared considering the days of bandh / strike as per the input given by HR department.
Circular
* Product will be produced in advance on weekly off or extra time will be employed. Extra hours form
* Call emergency meeting of Kasai India Management Committee and decide the course of action. Circular

*As per the management's decision fixed days inventory for raw materials component and finished goods is maintained.
Store Procedure

Doc.No: KASAI/HR/D03 Rev.no/Date: 01/10.12.2015

KASAI INDIA (CHENNAI) PVT LTD.,


ontingency Plan 1.12.2017

ACTION PLAN Validation

* If situation is abnormal purchase/quality/Sales department of Kasai India to speak to the concerned personnel of supplier Supplier Devlivery
Company to speed up delivery performance Rating

* Lift the tool from that supplier & give it to another approved source.
Process Change Request

* Send Kasai India employee to supplier end analyse, support and put things in place.
Analysis Report

* Company and employees owned vehicles are used to bring employees to the office. Agreement with Transport
providers
* Kasai India vehicles will be sent to pick the material at warehouse. Security Outward Register

* If not possible to collect material from warehouse, additional material will be air lifted from suppliers directly to Kasai India.
Purchase Order

* As per the managements decision fixed days inventory for raw materials, component and finished goods is maintained.
Inventory Report
* Kasai India own transport is employed for this job. Security Outward Register
* Kasai India car / taxi on hire will be used. Security Outward Register

* Production Department does the planning including the buffer stock, which will be used in these types of emergencies.
Inventory Report
* The Mock up facility & testers are used for inspection of products in case of key inspection equipment failure. Inspection Report

* 3 days stock is maintained at factory


Daily Stock Register
* Finished goods stock of 1.5 days is in transit Daily Stock Register

* PRI line is the main source of communication. In case of failure instrument phone with sim is availablefor long distance calls
* all critical employees are provided with sim cards or mobiles based on their eligibility.
Mobile bills

* If all the telephone lines going dead, use mobile phone


Mobile bills
* In the failure of Tally system invoice can be generated manually. Excel Sheet
* For purchase order, Manual purchase order is issued. Excel Sheet

* In the failure of TNEB power, the entire plant is run through generator
DG report

* In the complete failure of generator, generators are hired through some external agencies.
External Agency Report

Doc.No: KASAI/HR/D03 Rev.no/Date: 01/10.12.2015

KASAI INDIA (CHENNAI) PVT LTD.,


ontingency Plan 1.12.2017

ACTION PLAN Validation

* In the complete failure of Air Compressor, it is hired through some external agencies.
External Agency Report
Precautionary measures Based on condition
* HRM will take utmost care to build healthy & harmonious relations to avoid such unpleasant event. Incase such situation
arises; the same will be solved urgently by mutual discussion with associates & Top Management. MOM
* Necessary help can be obtained from Government Officials if required. Loabour Office report

* Contract has been signed with Human Resource consultants (as mentioned below) for sourcing the required manpower in
Contract Agreement
the stipulated time.

1. G R Industries

2. Aathini Enterprises

The following responsibility has been framed to face such situations.

* HRM - Communication to all the relevant members in the Company Circular


* HRM - Will assess and segregate the supporters and non-supporters of the situation. MOM
* HRM - Will Assess the required Government officials help and shall organize for the same. Approval note

* HRM - Shall arrange the required Boarding, conveyance, food and other required facilities for the persons who are staying in
the factory permises through out this situation. Bills
* HRM - Mobilization of manpower through manpower contractors Manpower Agreement
Portal & Recruitment Agency
* HRM - Arrangement of Manpower from the Human Resource consultants. Agreement

Approved By

Doc.No: KASAI/HR/D03 Rev.no/Date: 01/10.12.2015

KASAI INDIA (CHENNAI) PVT LTD.,

You might also like