Syphon Well Drop: Indent For Structural Design To Idrb

This document outlines the required details for a structural design indent for a syphon well drop project. It requests: 1) Location details of the project site and names of officials involved; 2) Approved hydraulic particulars, site plans, bore hole details, and soil investigation report recommending a suitable foundation type; 3) Details of any road or stream crossings.

Uploaded by

Riya Sree
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
1K views

Syphon Well Drop: Indent For Structural Design To Idrb

This document outlines the required details for a structural design indent for a syphon well drop project. It requests: 1) Location details of the project site and names of officials involved; 2) Approved hydraulic particulars, site plans, bore hole details, and soil investigation report recommending a suitable foundation type; 3) Details of any road or stream crossings.

Uploaded by

Riya Sree
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

INDENT FOR STRUCTURAL DESIGN TO IDRB

SYPHON WELL DROP


1* Name of work
2* Date
3* IP address
A General Details and Location of Work
1* Location
2* Latitude
3* Longitude
4* Name of river/stream
5* Altitude from mean sea level
6* District
7* Taluk
8* Assembly constituency
9* Village
10* Panchayath/Muncipality/Corporation
B Details of Officials Furnishing the Indent
1* Assistant Engineer Office
Name
2* Assistant Executive Office
Engineer Name
3* Executive Engineer Office
Name
4* Superintending Engineer Office
Name
5* Chief Engineer Office
Name
C Details Required
1* Approved hydraulic particulars
covering upstream and down stream
of the proposed structure
2* Site plan showing alignment of the
proposed structure
3* General view of the syphon well
drop marked in the longitudinal
section
4* Bore hole details with N value and
bearing capacity of each layer of
strata specifying all soil parameters
via cohesion c,angle of internal
friction and unit weight of the soil.The
soil investigation report should
contain specific recommendation
regarding the type of foundation
suitable for the site and foundation
level of inlet well,outlet well and
syphon
5 If the syphon crosses a road,type of
loading,road level,width of road
6 If the syphon crosses a Stream,width
of the stream,HFL>LWL of the
stream and bed level of the stream
7* Scheme report giving details of
scope of work,As etc
(*) Indicated fields are mandatory