Expedation Demo

This document appears to be the introduction or preface section of an electronic engineering book. It discusses the author's passion for civil engineering and their efforts over many years to establish online communities and groups to share knowledge through electronic books. However, they found that many older engineers did not appreciate electronic books and many new engineers did not utilize technology to develop themselves or their communities. The author hopes that after reading this book, the reader will provide constructive feedback to help improve it.

Uploaded by

Mahmoud Omara
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
90 views

Expedation Demo

This document appears to be the introduction or preface section of an electronic engineering book. It discusses the author's passion for civil engineering and their efforts over many years to establish online communities and groups to share knowledge through electronic books. However, they found that many older engineers did not appreciate electronic books and many new engineers did not utilize technology to develop themselves or their communities. The author hopes that after reading this book, the reader will provide constructive feedback to help improve it.

Uploaded by

Mahmoud Omara
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 94

‫ﻏـﻴـﺮ‬

‫ﻣﺴﻤﻮح‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬
‫ﻟﻠﻌﺮض‬
‫ﻓﻘﻂ‬
‫אﻏـﻴאـﺮ‬
‫ﻣﺴﻤﻮح‬
‫‪Primavera‬‬ ‫‪Expedition‬‬
‫ﻣﻬﻨﺪس ‪ /‬ﻋﻤﺎد ﺣﺎﻣﺪ ﺣﺴﺎن‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫اﻹﺻﺪار اﻷول ﻟﻌﺎم ‪٢٠٠٦‬م‬

‫ﻧﺴﺨﺔ‬
‫ﻟﻠﻌﺮض‬
‫ﻓﻘﻂ‬
‫ﻧﺤﻮ إﻧﺘﺎج ﻣﻮﺳﻮﻋﺔ هﻨﺪﺳﻴﺔ إﻧﺸﺎﺋﻴﺔ إﻟﻜﺘﺮوﻧﻴﺔ‬
‫ﻏـﻴـﺮ‬
‫ﺇﱃ ﺍﻟﻨﺴﻤﺔ ﺍﻟﺮﻗﻴﻘﺔ ﰲ ﺣﻴﺎﺗﻲ‬

‫ﺯﻭﺟﺘﻲ ﺍﳊﺒﻴﺒﺔ‬
‫ﻣﺴﻤﻮح‬
‫ﺇﱃ ﺍﻟﺒﺴﻤﺔ ﺍﳉﻤﻴﻠﺔ ﰲ ﺣﻴﺎﺗﻲ‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﺃﺧﺘﻲ ﺍﻟﺼﻐﲑﺓ‬
‫ﻧﺴﺨﺔ‬
‫ﺍﳊﻴﺎﺓ‬ ‫ﺇﱃ ﻗﺮﺓ ﻋﻴﻨﻲ ﰲ‬

‫ﺍﺑﻨﻲ " ﺣﺎﻣﺪ "‬


‫ﻟﻠﻌﺮض‬
‫ﻓﻘﻂ ﻋﻤﺎﺩﺣﺎﻣﺪ‬
‫ﻏـﻴـﺮ‬
‫اﻟﻤﺤﺘﻮﻳﺎت‬

‫اﻟﻤﻘﺪﻣﺔ ‪٤ ................................................................................‬‬
‫ﻋﻠﻰ ﺳﺒﻴﻞ اﻟﺘﻌﺮﻳﻒ‪٥ ...................................................................‬‬
‫آﻴﻒ ﺗﺴﺘﺨﺪم اﻟﻜﺘﺎب ‪٧ ................................................................‬‬

‫ﻣﺴﻤﻮح‬
‫اﻟﺒﺎب اﻷول ‪ :‬ﻣﺎهﻮ ‪١٠ .................................................Expedition‬‬
‫اﻟﺒﺎب اﻟﺜﺎﻧﻲ ‪:‬اﻟﻘﻮاﻣﻴﺲ ‪٤٣ ..............................................................‬‬
‫اﻟﺒﺎب اﻟﺜﺎﻟﺚ ‪:‬اﻟﺘﻘﺪﻳﻤﺎت ‪٦١..............................................................‬‬
‫اﻟﺒﺎب اﻟﺮاﺑﻊ ‪:‬ﻣﺘﺎﺑﻌﺔ اﻟﺮﺳﻮﻣﺎت‪٨٢......................................................‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬
‫ﻟﻠﻌﺮض‬
‫ﻓﻘﻂ‬
‫ﻏـﻴـﺮ‬
‫א‬

‫إن آﺘﺎﺑﺔ آﺘ ﺎب اﻟﻜﺘﺮوﻧ ﻲ ﻣ ﻦ اﻷﻣ ﻮر اﻟ ﺸﻴﻘﺔ ﺟ ﺪا وﺧﺎﺻ ﺔ إذا ﻣ ﺎ آ ﺎن ه ﺬا اﻟﻜﺘ ﺎب‬

‫ﻣﺴﻤﻮح‬
‫ﻳﻌﺎﻟﺞ ﻣﻮﺿﻮﻋﺎت ﺗﺤﺒﻬﺎ وﺗﻌﺸﻘﻬﺎ ‪ ،‬وﻟﻄﺎﻟﻤﺎ آﺎﻧ ﺖ اهﺘﻤﺎﻣ ﺎﺗﻲ ﻃ ﻮال ﻋ ﺸﺮ ﺳ ﻨﻮات ﻣ ﻦ‬
‫ﺗﺨﺮﺟﻲ ﻣﻦ آﻠﻴﺔ اﻟﻬﻨﺪﺳﺔ وﺣﺘﻰ اﻟﻴﻮم ﺗﺪور ﻓﻲ ﻣﺤﻴﻂ هﺬﻩ اﻟﻤﻬﻨﺔ اﻟﻌﻈﻴﻤﺔ اﻟﺘ ﻲ أﻋﺘ ﺰ‬
‫ﺑﺎﻻﻧﺘﻤﺎء إﻟﻴﻬﺎ " ﻣﻬﻨﺔ اﻟﻬﻨﺪﺳﺔ اﻟﻤﺪﻧﻴﺔ " ‪.‬‬

‫وﻟﻘﺪ ﺑﺪأت اﻟﻤﺸﻮار ﻣﻨﺬ ﺳﻨﻮات ﺑﺎﻟﻜﺘﺎﺑﺔ ﻓﻲ اﻟﻤﻨﺘﺪﻳﺎت واﻟﻤﺠﻤﻮﻋﺎت اﻟﺒﺮﻳﺪﻳﺔ ﻋﻠﻰ ﺷﺒﻜﺔ‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫اﻟﻤﻌﻠﻮﻣ ﺎت اﻟﻌﺎﻟﻤﻴ ﺔ " اﻻﻧﺘﺮﻧ ﺖ " وﺣﺎوﻟ ﺖ ﻣ ﺮارا وﺗﻜ ﺮارا ﺗﻜ ﻮﻳﻦ ﻣﺠﻤﻮﻋ ﺎت ﻋﻤ ﻞ‬
‫ﻟﻨﺸﺮ ﺛﻘﺎﻓﺔ اﻟﻜﺘﺎب اﻹﻟﻜﺘﺮوﻧ ﻲ ﻓ ﻲ اﻟﻤﺠ ﺎل اﻟﻬﻨﺪﺳ ﻲ وﻟﻜﻨﻨ ﻲ ﺻ ﺪﻣﺖ ﻋﻨ ﺪﻣﺎ وﺟ ﺪت أن‬
‫ﻣﻌﻈ ﻢ اﻟﻤﻬﻨﺪﺳ ﻴﻦ اﻟﻘ ﺪاﻣﻰ ﻻ ﻳﺘ ﺬوﻗﻮن ﺛﻘﺎﻓ ﺔ اﻟﻜﺘ ﺐ اﻹﻟﻜﺘﺮوﻧﻴ ﺔ وﻓ ﻲ اﻟﻄ ﺮف اﻵﺧ ﺮ‬
‫وﺟﺪت ﻧﺴﺒﺔ ﻋﺎﻟﻴ ﺔ ﺟ ﺪا ﻣ ﻦ اﻟﻤﻬﻨﺪﺳ ﻴﻦ ﺣ ﺪﻳﺜﻲ اﻟﺘﺨ ﺮج ﻻ ﻳﻔﻜ ﺮون ﻓ ﻲ ﺗﻄﻮﻳ ﻊ اﻟﺘﻘﻨﻴ ﺔ‬
‫اﻟﺤﺪﻳﺜﺔ ﻟﺨﺪﻣﺔ ﻣﺠﺘﻤﻌﺎﺗﻬﻢ ‪.‬‬

‫ﻧﺴﺨﺔ‬
‫وآﻢ آﺎن ﻳﺆﻟﻤﻨﻲ ﻣﻨﻈﺮ اﻟﺸﺒﺎب اﻟﻤﺴﻠﻢ وهﻮ ﻳﻬ ﺪر وﻗﺘ ﻪ وﻃﺎﻗﺎﺗ ﻪ أﻣ ﺎم ﺷﺎﺷ ﺎت اﻟﺤﺎﺳ ﺐ‬
‫اﻵﻟﻲ ﻓﻲ ﻣﻘﺎهﻲ اﻻﻧﺘﺮﻧﺖ ﻓﻲ اﻟﺪردﺷﺔ وأﻟﻌﺎب اﻟﺸﺒﻜﺔ دون اﻟﺘﻔﻜﻴﺮ وﻟ ﻮ ﻓ ﻲ ﻟﺤﻈ ﺔ ﻣ ﻦ‬
‫اﻟﻠﺤﻈﺎت ﻓﻲ آﻴﻔﻴﺔ اﻻﺳﺘﻔﺎدة ﻣﻦ ﺗﻠﻚ اﻟﺜﻮرة اﻟﺮﻗﻤﻴﺔ ﻓﻲ ﺗﻄﻮﻳﺮ اﻟﺬات وﺗﻄﻮﻳﺮ اﻟﻤﺠﺘﻤﻊ‬

‫وأرﺟﻮ ﻣﻨﻚ أﺧﻲ اﻟﻜﺮﻳﻢ ﺑﻌﺪ ﻗﺮاءﺗﻚ ﻟﻬﺬا اﻟﻜﺘﺎب ان ﺗﻌﻤﻞ ﻋﻠﻰ ﻣﺴﺎﻋﺪﺗﻲ ﻋﻠﻰ ﺗﻄﻮﻳﺮﻩ‬

‫ﻟﻠﻌﺮض‬
‫ﻣﻦ ﺧﻼل ارﺳﺎل ﻣﻼﺣﻈﺎﺗﻚ وﻧﻘﺪك اﻟﺒﻨﺎء اﻟﻰ ﺑﺮﻳﺪي اﻹﻟﻜﺘﺮوﻧﻲ ﻓﻲ أي وﻗﺖ‬

‫ورﺟﺎﺋﻲ اﻷﺧﻴﺮ هﻮ أﻻ ﺗﺤﺬف أﺳﻤﻲ ﻣﻦ ﻋﻤﻞ أﺧﺬ اﻟﻜﺜﻴﺮ ﻣﻦ وﻗﺘﻲ ‪،،،‬‬

‫م ‪ /‬ﻋﻤﺎد ﺣﺎﻣﺪ ﺣﺴﺎن‬


‫‪١٤٢٧‬هـ ‪ ٢٠٠٦ -‬م‬ ‫ﻓﻘﻂ‬
‫ﻏـﻴـﺮ‬
‫א‬

‫ﻣﻦ هﻮ اﻟﻜﺎﺗﺐ ؟‬

‫ﻣﺴﻤﻮح‬
‫هﻮ اﻟﻤﻬﻨﺪس ‪ /‬ﻋﻤ ﺎد ﺣﺎﻣ ﺪ ﺣ ﺴﺎن ﻣ ﻦ أﺑﻨ ﺎء ﺟﻤﻬﻮرﻳ ﺔ ﻣ ﺼﺮ اﻟﻌﺮﺑﻴ ﺔ – ﺣﺎﺻ ﻞ ﻋﻠ ﻰ‬
‫ﺑﻜﺎﻟﻮرﻳﻮس اﻟﻬﻨﺪﺳ ﺔ اﻟﻤﺪﻧﻴ ﺔ ﻟﻌ ﺎم ‪١٩٩٧‬م ‪ ،‬ﻋﻤ ﻞ ﺑﺎﻟﻌﺪﻳ ﺪ ﻣ ﻦ اﻟﻤ ﺸﺎرﻳﻊ اﻟﻬﻨﺪﺳ ﻴﺔ ﻣﻨ ﺬ‬
‫ﺗﺎرﻳﺦ ﺗﺨﺮﺟ ﻪ وﺣﺘ ﻰ ﺗ ﺎرﻳﺦ ﺗﺠﻤﻴ ﻊ ه ﺬا اﻟﻜﺘ ﺎب اﻹﻟﻜﺘﺮوﻧ ﻲ وه ﻮ ﻣ ﻦ ﻋ ﺸﺎق اﻟﺤﺎﺳ ﺐ‬
‫اﻵﻟﻲ وﻳﻌﻤﻞ ﻓﻲ ﻣﺠ ﺎل اﻟﺘ ﺪرﻳﺐ ﻋﻠ ﻰ ﻋﻠﻮﻣ ﻪ ﺑﺠ ﻮار وﻇﻴﻔﺘ ﻪ اﻟﻬﻨﺪﺳ ﻴﺔ ‪ ،‬وه ﻮ ﻣﺆﺳ ﺲ‬
‫ﻣﻮﻗﻊ اﻹﻧﺸﺎﺋﻲ اﻟﻌﺮﺑﻲ ‪ www.arab-soft.com/civil‬وﻳﻘﻮم ﺑﺎﻟﻤﺸﺎرآﺔ ﻓﻲ اﻟﻌﺪﻳ ﺪ‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻣﻦ اﻟﻤﻨﺘﺪﻳﺎت اﻟﻬﻨﺪﺳﻴﺔ اﻟﻌﺮﺑﻴﺔ ‪.‬‬

‫ﻣﺎ هﻲ رﺧﺼﺔ هﺬا اﻟﻜﺘﺎب ؟‬

‫ﻧﺴﺨﺔ‬
‫هﺬا اﻟﻜﺘﺎب هﻮ ﻧﺴﺨﺔ ﻣﺠﺎﻧﻴﺔ ﻋﻠﻰ ﺳﺒﻴﻞ اﻟﻌﺮض ﻓﻘ ﻂ ) ‪ ( Demo Version‬وﻏﻴ ﺮ‬
‫ﻣ ﺴﻤﻮح ﺑﻄﺒﺎﻋﺘﻬ ﺎ ورﻗﻴ ﺎ أو آ ﺴﺮ ﺣﻤﺎﻳﺘﻬ ﺎ ﺑﻄ ﺮق اﻟﻬﻨﺪﺳ ﺔ اﻟﻌﻜ ﺴﻴﺔ ‪ ،‬وﻟﻠ ﺮاﻏﺒﻴﻦ ﻓ ﻲ‬
‫ﻣﺴﺎﻋﺪﺗﻨﺎ ﻟﻨﺸﺮ هﺬﻩ اﻟﻜﺘﺐ وﺗﻮﻓﻴﺮهﺎ ﻋﻠﻰ ﺳﻴﺮﻓﺮات ﺧﺎﺻﺔ اﻻﺗﺼﺎل ﺑﻨﺎ ﻋﻠﻰ‬

‫ت ‪+٩٦٦٥٦٩٥٤٥٠٨٣ /‬‬

‫ﻟﻠﻌﺮض‬
‫‪E-Mail : [email protected]‬‬
‫‪www.arab-soft.com/civil‬‬

‫ﻓﻘﻂ‬
‫ﻟﻤﻦ هﺬا اﻟﻜﺘﺎب ؟‬
‫هﺬا اﻟﻜﺘﺎب ﻳﺨﺎﻃﺐ اﻟﻤﻬﻨﺪﺳﻴﻦ اﻟﻌﺎﻣﻠﻴﻦ ﻓﻲ ﺷﺮآﺎت اﻟﻤﻘﺎوﻻت واﻟﺬﻳﻦ ﻟﺪﻳﻬﻢ ﺧﺒﺮة‬
‫ﺑﺒﺮاﻣﺞ إدارة اﻟﻤﺸﺮوﻋﺎت اﻹﻧﺸﺎﺋﻴﺔ‬
‫ﻏـﻴـﺮ‬
‫א‬ ‫א‬

Primavera Expedition

‫ﻣﺴﻤﻮح‬
Primavera Enterprise
Primavera Project Planner P3
‫هﻲ ﻋﻼﻣﺎت ﺗﺠﺎرﻳﺔ ﻣﺴﺠﻠﺔ ﻟﺸﺮآﺔ‬
Primavera System Inc
http://www.primavera.com

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬
Microsoft Windows
Microsoft Office
Microsoft Excel
‫هﻲ ﻋﻼﻣﺎت ﺗﺠﺎرﻳﺔ ﻣﺴﺠﻠﺔ ﻟﺸﺮآﺔ‬
Microsoft Corporation

‫ﻟﻠﻌﺮض‬
http://www.microsoft.com

‫ﺑﻘﻴﺔ اﻟﺒﺮاﻣﺞ واﻟﻤﺮاﺟﻊ اﻟﺘﻲ ﻟﻢ ﺗﺬآﺮ هﻨﺎ هﻲ ﻣﻠﻜﻴﺎت ﻓﻜﺮﻳﺔ‬

‫ﻓﻘﻂ‬
‫ﻷﺻﺤﺎﺑﻬﺎ وﻧﺤﻦ ﻧﺤﺘﺮم آﺎﻓﺔ ﺣﻘﻮﻗﻬﻢ ﻟﺬا وﺟﺐ اﻟﺘﻨﻮﻳﻪ‬
‫ﻏـﻴـﺮ‬
‫מא‬

‫هﺬا اﻟﻜﺘﺎب ﻣﻜﺘﻮب ﺑﻄﺮﻳﻘﺔ اﻟﺸﺮح ﺧﻄﻮة ﺑﺨﻄﻮة ﻓﻠﺬا ﻻﺑﺪ ﻣﻦ ﻗﺮاءة اﻷﺑ ﻮاب ﺑﺎﻟﺘﺮﺗﻴ ﺐ‬
‫وﺳﺘﺠﺪ أﻧﻨﺎ ﻗﻤﻨﺎ ﺑﻮﺿﻊ ﺻﻮر ﺗﻮﺿﻴﺤﻴﺔ ﻏﻴﺮ ﻣﻠﻮﻧﺔ ﻟﺘﻘﻠﻴﻞ ﺣﺠﻢ اﻟﻤﻠﻒ اﻻﻟﻜﺘﺮوﻧﻲ‬

‫ﻣﺴﻤﻮح‬
‫وﻟﻸﺳﺘﻔﺎدة اﻟﻘﺼﻮى ﻣﻦ اﻟﻜﺘﺎب ﻳﺠﺐ ان ﻳﻜﻮن ﻟﺪﻳﻚ ﻧﺴﺨﺔ ﻣﻦ اﻟﺒﺮﻧﺎﻣﺞ‬
‫‪Primavera Expedition Version 8.5‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﺳﺘﺠﺪ هﺬا اﻟﺮﻣﺰ ﻋﻨﺪ وﺟﻮد ﻣﻼﺣﻈﺔ ﺟﺎﻧﺒﻴﺔ أو ﺗﻨﺒﻴﻪ‬
‫اﻟﺮﻣﻮز اﻟﻤﺴﺘﺨﺪﻣﺔ‬

‫ﻧﺴﺨﺔ‬
‫هﺬﻩ اﻷﺳﻬﻢ ﻟﺸﺮح ﺧﻄﻮات ﺗﻨﻔﻴﺬ اﻷواﻣﺮ ﻣﻦ اﻟﻘﻮاﺋﻢ‬

‫هﺬا اﻟﻤﺸﺒﻚ ﻳﻔﻴﺪ ﺑﻮﺟﻮد ﻣﻠﻒ ﻣﺮﻓﻖ ﻣﻊ اﻟﺼﻔﺤﺔ‬


‫وﺑﺎﻟﻨﻘﺮ اﻟﻤﺰدوج ﻋﻠﻴﻪ ﻳﺘﻢ ﻓﺘﺢ اﻟﻤﺮﻓﻖ‬
‫‪Æ‬‬ ‫‪Æ‬‬

‫ﻟﻠﻌﺮض‬
‫ﻓﻘﻂ‬
‫א ﻏـﻴـﺮ‬ ‫א‬
‫ﻣﺴﻤﻮح‬
‫‪Expedition‬‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬
‫ﻟﻠﻌﺮض‬
‫ﻓﻘﻂ‬
‫اﻟﺒﺎب اﻷول‬

‫‬
‫ﻏـﻴـﺮ‬ ‫‪ Expedition }%‬‬

‫ﻣﺴﻤﻮح‬
‫ﺑﺮﻧﺎﻣﺞ ‪ Expedition‬هﻮ اﺣﺪ ﺑﺮاﻣﺞ ﺷ ﺮآﺔ ‪ Primavera‬اﻟﻌﺎﻟﻤﻴ ﺔ اﻟﻤﺘﺨﺼ ﺼﺔ‬
‫ﻓ ﻲ ﺑ ﺮاﻣﺞ إدارة اﻟﻤ ﺸﺮوﻋﺎت ‪ ،‬وﻳﺨ ﺘﺺ ه ﺬا اﻟﺒﺮﻧ ﺎﻣﺞ ﺑﻌﻤﻠﻴ ﺔ ﺗﻨﻈ ﻴﻢ اﻟﻌﻤ ﻞ داﺧ ﻞ‬
‫اﻟ ﺸﺮآﺎت ﺳ ﻮاء آﺎﻧ ﺖ ﺷ ﺮآﺎت ﻣﻘ ﺎوﻻت او ﻣﻜﺎﺗ ﺐ اﺳﺘ ﺸﺎرﻳﺔ او ﻣﻘ ﺎوﻟﻲ ﺑ ﺎﻃﻦ وﻣ ﻦ‬
‫اﻣﺜﻠﺘﻬ ﺎ ﺗﻨﻈ ﻴﻢ اﻋﻤ ﺎل اﻟﺘﻘ ﺪﻳﻤﺎت ﻟﻠﻤ ﻮاد واﻟﺮﺳ ﻮﻣﺎت اﻟﺘﻨﻔﻴﺬﻳ ﺔ وأواﻣ ﺮ اﻟﺘﻐﻴﻴ ﺮ‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫واﻟﻤﺴﺘﺨﻠﺼﺎت وﻏﻴﺮهﺎ ‪.‬‬

‫ﺗﻨﺼﻴﺐ اﻟﺒﺮﻧﺎﻣﺞ‬

‫ﻧﺴﺨﺔ‬
‫ﻣﺜﻞ أي ﺑﺮﻧﺎﻣﺞ ﻓﻲ ﺑﻴﺌﺔ وﻳﻨﺪوز ﻳﺄﺗﻲ ﺑﺮﻧﺎﻣﺞ ‪ Expedition‬ﻓﻲ ﻗﺮﺻﻲ ﻟﻴﺰر ﻓﻲ‬
‫اﻟﻘﺮص اﻷول ﺳﻨﺠﺪ ﺑﺮﻧﺎﻣﺞ اﻟﺘﻨﺼﻴﺐ ‪ Setup‬واﻟﺬي ﺳﻴﻌﻤﻞ ﺗﻠﻘﺎﺋﻴﺎ ﺑﻤﺠﺮد وﺿﻊ‬
‫اﻟﻘﺮص اﻟﻀﻮﺋﻲ ﺑﻤﺤﺮك اﻷﻗﺮاص اﻟﻀﻮﺋﻴﺔ ‪ -‬ﺷﻜﻞ ) ‪( ١ -١‬‬

‫ﻟﻠﻌﺮض‬
‫ﻓﻘﻂ‬
‫ﺷﻜﻞ )‪(١-١‬‬

‫‪١٠‬‬
‫ﻣﺎهﻮ ‪Expedition‬‬

‫ﻧﻘﻮم ﺑﻌﺪ ذﻟﻚ ﺑﺎﺧﺘﻴﺎر اﻻﺧﺘﻴﺎر اﻷول وهﻮ ‪Install Expedition Applications‬‬

‫ﻏـﻴـﺮ‬
‫ﻓﺘﻈﻬﺮ اﻟﻘﺎﺋﻤﺔ اﻟﺜﺎﻧﻴﺔ – ﺷﻜﻞ ) ‪(٢ -١‬‬

‫ﻣﺴﻤﻮح‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬ ‫ﺷﻜﻞ )‪( ٢ -١‬‬

‫وﻓﻲ هﺬﻩ اﻟﺸﺎﺷﺔ ﻧﺤﺪد اﻟﻨﻮع اﻟﻤﻄﻠﻮب ﺗﺸﻐﻴﻠﻪ ﻋﻠﻰ اﻟﺠﻬﺎز ﻣﻦ اﻟﺒﺮﻧﺎﻣﺞ ﺣﻴﺚ اﻧﻪ‪:‬‬
‫• ﻓ ﻲ ﺣﺎﻟ ﺔ اﻟﺮﻏﺒ ﺔ ﺗ ﺸﻐﻴﻞ اﻟﺒﺮﻧ ﺎﻣﺞ ﻋﻠ ﻰ ﺟﻬ ﺎز ﻃﺮﻓ ﻲ واﺣ ﺪ ﺳﻨ ﺴﺘﺨﺪم‬

‫ﻟﻠﻌﺮض‬ ‫‪Expedition Workstation‬‬


‫• ﻓ ﻲ ﺣﺎﻟ ﺔ اﻟﺮﻏﺒ ﺔ ﻓ ﻲ وﺿ ﻊ ﻗﺎﻋ ﺪة اﻟﺒﻴﺎﻧ ﺎت ﻋﻠ ﻰ ﺳ ﻴﺮﻓﺮ اﻟ ﺸﺮآﺔ ﺳﻨ ﺴﺘﺨﺪم‬
‫‪Database Server‬‬
‫• ﻓ ﻲ ﺣﺎﻟ ﺔ وﺟ ﻮد ‪ Novell‬ﻋﻠ ﻰ ﺳ ﻴﺮﻓﺮ اﻟ ﺸﺮآﺔ ﺳﻨ ﺴﺘﺨﺪم اﻟﺨﻴ ﺎر‬

‫ﻓﻘﻂ‬
‫‪Novell Database Server‬‬
‫• ﻓ ﻲ ﺣﺎﻟ ﺔ اﻟﺮﻏﺒ ﺔ ﻓ ﻲ ﺗ ﺸﻐﻴﻞ ﺧ ﺪﻣﺎت اﻟﺒﺮﻧ ﺎﻣﺞ ﻋ ﻦ ﻃﺮﻳ ﻖ اﻟﻮﻳ ﺐ ﺳﻨ ﺴﺘﺨﺪم‬
‫‪Web Server‬‬
‫• ﻓﻲ ﺣﺎﻟﺔ اﻟﺮﻏﺒﺔ ﻓﻲ ﺗﺸﻐﻴﻞ اﻟﺒﺮﻧﺎﻣﺞ ﻋﻠﻰ اﻷﺟﻬﺰة اﻟﻜﻔﻴﺔ اﻟﻤﺤﻤﻮﻟ ﺔ ) اﻟﻜﻤﺒﻴ ﻮﺗﺮ‬
‫اﻟﻜﻔﻲ ( ﺳﻨﺨﺘﺎر ‪Expedition Mobile‬‬
‫• اﻟﺨﻴﺎر اﻷﺧﻴﺮ هﻮ ﻟﻠﻤﻄﻮرﻳﻦ واﻟ ﺮاﻏﺒﻴﻦ ﺑﺎﻻﺳ ﺘﻔﺎدة ﻣ ﻦ ﺑﺮﻧ ﺎﻣﺞ ‪Expedition‬‬
‫داﺧﻞ ﺗﻄﺒﻴﻘﺎﺗﻬﻢ‬

‫‪١١‬‬
‫اﻟﺒﺎب اﻷول‬

‫وﺳﻨﻔﺘﺮض ﻓﻲ هﺬا اﻟﻜﺘﺎب اﻧﻚ ﺳﺘﺸﻐﻞ اﻟﺒﺮﻧﺎﻣﺞ ﻋﻠﻰ ﺟﻬﺎز واﺣ ﺪ ﻓﻘ ﻂ ﺑ ﺪون ﺷ ﺒﻜﺔ‬
‫ﻟﺬا ﺳﻨﺨﺘﺎر اﻟﺨﻴﺎر اﻷول ‪Expedition Workstation‬‬

‫ﻏـﻴـﺮ‬
‫وﺳﺘﻈﻬﺮ ﻣﻌﻚ اﻟﺸﺎﺷﺔ اﻟﺘﺎﻟﻴﺔ واﻟﺘﻲ ﺗﻮﺿﺢ ﻣﺮاﺣﻞ اﻟﺘﺜﺒﻴﺖ – ﺷﻜﻞ ) ‪( ٣ -١‬‬

‫ﻣﺴﻤﻮح‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬ ‫ﺷﻜﻞ )‪( ٣ -١‬‬

‫ﻟﻠﻌﺮض‬
‫وﻃﺒﻌﺎ أﺛﻨﺎء ﺗﻨﺼﻴﺐ اﻟﺒﺮﻧﺎﻣﺞ ﺳﻴﻘﻮم اﻟﻤﻌ ﺎﻟﺞ ﺑﻄﻠ ﺐ ﺗﺤﺪﻳ ﺪ ﻣﻜ ﺎن ﺗﻨ ﺼﻴﺐ اﻟﺒﺮﻧ ﺎﻣﺞ‬
‫وآﺬﻟﻚ ﺳﻴﻄﻠﺐ ﻣﻨﻚ ادﺧﺎل اﻟﺮﻗﻢ اﻟﺘﺴﻠﺴﻠﻲ ﻟﻠﺒﺮﻧﺎﻣﺞ ﻣﻦ ﺧﻼل اﻟﻘﺮص اﻟﻤ ﺮن اﻟ ﺬي‬
‫ﺳﺘﺠﺪﻩ ﻣﺮاﻓﻘﺎ ﻟﻼﺳﻄﻮاﻧﺎت اﻟﻀﻮﺋﻴﺔ‬
‫وﻻ ﺗﻘﻠﻖ أﺧﻲ اﻟﻤﻬﻨﺪس ﻋﻨ ﺪﻣﺎ ﻳﺘﻮﻗ ﻒ اﻟﺒﺮﻧ ﺎﻣﺞ وﻳﻈﻬ ﺮ ﻟ ﻚ رﺳ ﺎﻟﺔ ادﺧ ﺎل اﻟﻘ ﺮص‬
‫اﻟﺜ ﺎﻧﻲ ﺣﻴ ﺚ أن اﻟﻘ ﺮص اﻟﺜ ﺎﻧﻲ ﺑ ﻪ ﻗﺎﻋ ﺪة ﺑﻴﺎﻧ ﺎت ‪ Sybase‬واﻟﺘ ﻲ ﻳﻌﺘﻤ ﺪ ﻋﻠﻴﻬ ﺎ‬

‫ﻓﻘﻂ‬
‫ﺑﺮﻧﺎﻣﺠﻨﺎ ﻓﻲ اﻟﺘﺸﻐﻴﻞ‬

‫إﺿﺎﻓﺔ ﻣﻜﻮﻧﺎت أﺧﺮى‬


‫ﺑﻌﺾ ﺗﻨﺼﻴﺐ اﻟﺒﺮﻧﺎﻣﺞ ﺳﻨﻘﻮم ﺑﺈﺿﺎﻓﺔ ﺑﺮﻧﺎﻣﺞ ‪ Info Maker‬وهﻮ ﺑﺮﻧﺎﻣﺞ ﺧﺎص‬
‫ﺑﺈﻧﺸﺎء اﻟﺘﻘﺎرﻳﺮ وهﻮ اﺧﺘﻴﺎري ‪ ،‬وﻋﻨﺪ اﻟﺮﻏﺒﺔ ﻓﻲ ﺗﻨﺼﻴﺒﻪ ) وأﻧﺎ أﻓﻀﻞ ذﻟﻚ ( ﻧﻀﻊ‬
‫اﻟﻘﺮص اﻟﻀﻮﺋﻲ اﻷول ﺛﻢ ﻧﺨﺘﺎر ‪ – Install Other Application‬ﺷﻜﻞ )‪( ٤-١‬‬

‫‪١٢‬‬
‫ﻣﺎهﻮ ‪Expedition‬‬

‫ﻏـﻴـﺮ‬
‫ﻣﺴﻤﻮح‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬ ‫ﺷﻜﻞ )‪( ٤ -١‬‬

‫ﻧﺴﺨﺔ‬
‫وﺑﻌﺪ اﻟﻨﻘﺮ ﺳﺘﻈﻬﺮ اﻟﺸﺎﺷﺔ اﻟﺘﺎﻟﻴﺔ وﺳﻨﺨﺘﺎر ﻣﻨﻬﺎ ﺟﻤﻴﻊ اﻟﻌﻨﺎﺻﺮ ﺑﺎﻟﺘﺘﺎﻟﻲ‪ -‬ﺷﻜﻞ)‪( ٥ -١‬‬

‫ﻟﻠﻌﺮض‬
‫ﻓﻘﻂ‬
‫ﺷﻜﻞ )‪( ٥ -١‬‬

‫‪١٣‬‬
‫اﻟﺒﺎب اﻷول‬

‫ﺑﺪء ﺗﺸﻐﻴﻞ اﻟﺒﺮﻧﺎﻣﺞ‬

‫ﻏـﻴـﺮ‬ ‫ﺑﻌﺪ اﻻﻧﺘﻬﺎء ﻣﻦ ﺗﻨﺼﻴﺐ اﻟﺒﺮﻧﺎﻣﺞ ﻧﻀﻐﻂ ﻋﻠﻰ‬


‫‪Start Æ Programs Æ PrimaveraÆ Expedition‬‬
‫ﻓﺘﻈﻬ ﺮ ﻧﺎﻓ ﺬة اﻟﻮﻟ ﻮج ﻟﻠﺒﺮﻧ ﺎﻣﺞ آﻤ ﺎ ﺑﺎﻟ ﺸﻜﻞ )‪ - ( ٦ – ١‬واﻟﺘ ﻲ ﺗﻄﺎﻟﺒ ﻚ ﺑﺈدﺧ ﺎل اﺳ ﻢ‬
‫اﻟﻤ ﺴﺘﺨﺪم وآﻠﻤ ﺔ اﻟ ﺴﺮ وﺳ ﻨﺘﻌﻠﻢ ﻓﻴﻤ ﺎ ﺑﻌ ﺪ آﻴﻔﻴ ﺔ ﺗﻐﻴﻴ ﺮ أﺳ ﻤﺎء اﻟﻤ ﺴﺘﺨﺪﻣﻴﻦ ودرﺟ ﺎت‬

‫ﻣﺴﻤﻮح‬
‫اﻟﺼﻼﺣﻴﺔ اﻟﺨﺎﺻﺔ ﺑﻜﻞ واﺣﺪ ﻣﻨﻬﻢ ‪ ،‬واﻻﻓﺘﺮاﺿﻲ ﻟﻠﺒﺮﻧﺎﻣﺞ هﻮ‬
‫‪User Name: EXP‬‬
‫‪Password : EXP‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬
‫ﻟﻠﻌﺮض‬ ‫ﺷﻜﻞ )‪( ٦ – ١‬‬

‫ﻓﻘﻂ‬ ‫واﺟﻬﺔ اﻟﻤﺴﺘﺨﺪم‬


‫ﺑﻌﺪ ﺗﺸﻐﻴﻞ اﻟﺒﺮﻧﺎﻣﺞ ﺳﺘﻈﻬﺮ ﻟﻨﺎ اﻟﻨﺎﻓﺬة اﻟﺮﺋﻴﺴﻴﺔ ﻟﻠﺒﺮﻧﺎﻣﺞ آﻤﺎ ﺑﺎﻟﺸﻜﻞ ) ‪ ( ٧ -١‬وآﻤﺎ‬
‫هﻮ اﻟﻤﻌﺘﺎد ﻓﻲ ﺷﺮح ﺑﺮاﻣﺞ اﻟﺘﻄﺒﻴﻘﺎت ﻟﺒﻴﺌﺔ وﻳﻨﺪوز ﻻﺑﺪ ﻣﻦ ﺷﺮح واﺟﻬﺔ اﻟﻤﺴﺘﺨﺪم‬
‫واﻟﺘﻲ ﻳﺮاهﺎ اﻟﻤﺴﺘﺨﺪم ﺑﻤﺠﺮد ﺗﺸﻐﻴﻞ اﻟﺒﺮﻧﺎﻣﺞ وﺗﺸﺘﺮك ﺟﻤﻴﻊ ﺗﻄﺒﻴﻘﺎت ﺑﻴﺌﺔ وﻳﻨﺪوز ﻓﻲ‬
‫وﺟﻮد ﺷﺮﻳﻂ اﻟﻌﻨﻮان وﺷﺮﻳﻂ اﻟﻘﻮاﺋﻢ وأﺷﺮﻃﺔ اﻷدوات ﻓﻲ أﻋﻠﻰ اﻟﻨﺎﻓﺬة وﻓﻲ ﺷﺮﻳﻂ‬
‫اﻟﺤﺎﻟﺔ ﻓﻲ أﺳﻔﻞ اﻟﻨﺎﻓﺬة‬

‫‪١٤‬‬
‫ﻣﺎهﻮ ‪Expedition‬‬

‫‪١‬‬ ‫‪٢‬‬

‫‪٣‬‬

‫‪٤‬‬
‫ﻏـﻴـﺮ‬
‫ﻣﺴﻤﻮح‬
‫‪٥‬‬

‫‪٦‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬
‫‪٧‬‬ ‫ﺷﻜﻞ )‪( ٧ – ١‬‬

‫‪ -١‬ﺷﺮﻳﻂ اﻟﻌﻨﻮان‬
‫‪ -٢‬ﺷﺮﻳﻂ اﻟﻘﻮاﺋﻢ‬
‫‪ -٣‬ﺷﺮﻳﻂ اﻷدوات‬

‫ﻟﻠﻌﺮض‬
‫‪ -٤‬ﻣﺠﻠﺪات اﻟﻤﺸﺎرﻳﻊ‬
‫‪ -٥‬ﻣﺠﻠﺪ اﻟﻘﻮاﻟﺐ‬
‫‪ -٦‬ﻣﻨﻄﻘﺔ اﻟﻌﺮض‬
‫‪ -٧‬ﺷﺮﻳﻂ اﻟﺤﺎﻟﺔ‬

‫ﻓﻘﻂ‬ ‫وﺳﻨﻘﻮم اﻵن ﺑﺸﺮح ﻣﺒﺴﻂ ﻟﺘﻠﻚ اﻟﻌﻨﺎﺻﺮ‬

‫اوﻻ ‪ :‬ﺷﺮﻳﻂ اﻟﻌﻨﻮان‬


‫وﺑﻪ ﻧﺠﺪ اﺳﻢ اﻟﺒﺮﻧ ﺎﻣﺞ واﺳ ﻢ اﻟﻤ ﺸﺮوع اﻟﻤﻔﺘ ﻮح ﺣﺎﻟﻴ ﺎ وﻓ ﻲ اﻟﻨﺎﺣﻴ ﺔ اﻟﻴﻤﻨ ﻰ ﻧﺠ ﺪ ازرار‬
‫اﻟ ﺘﺤﻜﻢ ﺑﺎﻟﻨﺎﻓ ﺬة واﻟﺘ ﻲ ﺗ ﺴﺘﺨﺪم ﻟﻐﻠ ﻖ اﻟﺒﺮﻧ ﺎﻣﺞ او ﺗ ﺼﻐﻴﺮﻩ او ﺗﻐﻴﻴ ﺮ ﺣﺠ ﻢ اﻹﻃ ﺎر‬
‫اﻟﻤﻌﺮوض ﻋﻠﻰ اﻟﺸﺎﺷﺔ ﻣﺜﻠﻬﺎ ﻣﺜﻞ أي ﺗﻄﺒﻴﻖ ﻳﻌﻤﻞ ﻓﻲ ﺑﻴﺌﺔ وﻳﻨﺪوز‬

‫‪١٥‬‬
‫اﻟﺒﺎب اﻷول‬

‫ﺛﺎﻧﻴﺎ ‪ :‬ﺷﺮﻳﻂ اﻟﻘﻮاﺋﻢ‬

‫ﻏـﻴـﺮ‬
‫وﺑﻪ ﻧﺠﺪ ﺟﻤﻴﻊ اﻷواﻣﺮ اﻟﻤﺴﺘﺨﺪﻣﺔ ﺑﺎﻟﺒﺮﻧﺎﻣﺞ ﻣﻨﻈﻤﺔ ﻓﻲ ﻣﺠﻤﻮﻋﺔ ﻣﻦ اﻟﻘﻮاﺋﻢ اﻟﻤﺨﺘﻠﻔﺔ‬
‫وﻋﻨﺪ ﺗﺸﻐﻴﻞ اﻟﺒﺮﻧﺎﻣﺞ ﺗﻈﻬﺮ اﻟﻘﻮاﺋﻢ اﻟﺘﺎﻟﻴﺔ ‪:‬‬
‫‪• File‬‬
‫‪• Edit‬‬
‫‪• Tools‬‬

‫ﻣﺴﻤﻮح‬
‫‪• Define‬‬
‫‪• Window‬‬
‫‪• Help‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫وﻋﻨﺪ ﻓﺘﺢ أﺣﺪ اﻟﻤﺸﺎرﻳﻊ ﺗﻈﻬﺮ ﻗﺎﺋﻤﺘﺎن إﺿﺎﻓﻴﺘﺎن ﺑﺎﻹﺿﺎﻓﺔ إﻟﻰ ﺑﻘﻴﺔ اﻟﻘﻮاﺋﻢ وهﻤﺎ ‪:‬‬

‫‪• View‬‬
‫‪• Organize‬‬

‫ﻧﺴﺨﺔ‬
‫وﺳﻴﺘﻢ ﺷﺮح ﺟﻤﻴﻊ اﻷواﻣﺮ أﺛﻨﺎء ﺷﺮﺣﻨﺎ ﻟﻠﺒﺮﻧﺎﻣﺞ ﻓﻲ هﺬا اﻟﻜﺘﺎب‬

‫ﺛﺎﻟﺜﺎ ‪ :‬ﺷﺮﻳﻂ اﻷدوات‬


‫ﻳﺤﺘ ﻮي ﺷ ﺮﻳﻂ اﻷدوات اﻟ ﻰ أﻳﻘﻮﻧ ﺎت ﻋﺒ ﺎرة ﻋ ﻦ اﺧﺘ ﺼﺎر ﻟﻸواﻣ ﺮ اﻟﻤﻮﺟ ﻮدة ﺑ ﺸﺮﻳﻂ‬
‫اﻟﻘﻮاﺋﻢ وآﻤﺎ هﻮ اﻟﺤﺎل ﻣﻊ ﺷﺮﻳﻂ اﻟﻘﻮاﺋﻢ ﺳﺘﺠﺪ ان ﻋﻨﺎﺻ ﺮ ﺷ ﺮﻳﻂ اﻷدوات ﺗﺨﺘﻠ ﻒ ﻣ ﻦ‬

‫ﻟﻠﻌﺮض‬
‫ﺣﺎﻟﺔ ﻓﺘﺢ اﻟﺒﺮﻧﺎﻣﺞ ﻓﻘﻂ او ﻓﻲ ﺣﺎﻟﺔ ﻓﺘﺢ ﻣﺸﺮوع‬
‫وﻟﻤﻌﺮﻓﺔ أي أﻣﺮ ﻣﻦ اﻷواﻣﺮ اﻟﻤﻮﺟﻮدة ﻋﻠﻰ اﻷﻳﻘﻮﻧﺎت آﻞ ﻣﺎ ﻋﻠﻴﻚ ﻓﻌﻠﻪ هﻮ وﺿﻊ‬
‫ﻣﺆﺷﺮ اﻟﻔﺄرة ﻓﻮق اﻷﻳﻘﻮﻧﺔ وﺳﻴﻈﻬﺮ ﻣﺴﺘﻄﻴﻞ أﺻﻔﺮ ﺑﻪ أﺳﻢ هﺬا اﻷﻣﺮ‪ -‬ﺷﻜﻞ )‪(٨-١‬‬

‫ﻓﻘﻂ‬ ‫ﺷﻜﻞ )‪( ٨ – ١‬‬

‫‪١٦‬‬
‫ﻣﺎهﻮ ‪Expedition‬‬

‫راﺑﻌﺎ ‪ :‬ﻣﺠﻠﺪات اﻟﻤﺸﺎرﻳﻊ‬

‫ﻏـﻴـﺮ‬
‫ﻳﻌﺘﺒﺮ هﺬا اﻟﻌﻨﺼﺮ ﻣﻦ أهﻢ ﻋﻨﺎﺻ ﺮ واﺟﻬ ﺔ اﻟﻤ ﺴﺘﺨﺪم ﺣﻴ ﺚ ﻣ ﻦ ﺧﻼﻟ ﻪ ﻳﻤﻜ ﻦ اﻟﺘﻨﻘ ﻞ‬
‫ﺑ ﻴﻦ اﻟﻤ ﺸﺎرﻳﻊ اﻟﻤﺨﺘﻠﻔ ﺔ اﻟﻤﺨﺰﻧ ﺔ ﺑﻘﺎﻋ ﺪة ﺑﻴﺎﻧ ﺎت اﻟﺒﺮﻧ ﺎﻣﺞ وﻧﻼﺣ ﻆ أﻧ ﻪ ﻋﻨ ﺪ ﺗ ﺸﻐﻴﻞ‬
‫اﻟﺒﺮﻧﺎﻣﺞ ﺳﻴﻈﻬﺮ أﻣﺎﻣﻨﺎ ‪ ٧‬ﻣﺸﺎرﻳﻊ إﻓﺘﺮاﺿﻴﺔ ﺗﺄﺗﻲ ﻣﻊ ﻧﺴﺨﺔ اﻟﺒﺮﻧﺎﻣﺞ وﻳﻤﻜﻨﻨﺎ ﻓﻴﻤ ﺎ ﺑﻌ ﺪ‬
‫ﺣ ﺬف ه ﺬﻩ اﻟﻤ ﺸﺎرﻳﻊ وإﺿ ﺎﻓﺔ ﻣ ﺸﺎرﻳﻌﻨﺎ اﻟﺘ ﻲ ﺳ ﻨﻘﻮم ﺑﺈدﺧﺎﻟﻬ ﺎ ﻟﻠﺒﺮﻧ ﺎﻣﺞ وآ ﺬﻟﻚ ﻳﻤﻜﻨﻨ ﺎ‬
‫ﺗﻐﻴﻴﺮ ﻃﺮﻳﻘﺔ ﺳﺮد هﺬﻩ اﻟﻤﺸﺎرﻳﻊ ﻣﻦ ﺧ ﻼل اﻟ ﻀﻐﻂ ﻋﻠ ﻰ اﻟﺮﻣ ﺰ ‪ View‬او اﻟﺒﺤ ﺚ ﻓ ﻲ‬

‫ﻣﺴﻤﻮح‬
‫اﻟﻤﺸﺎرﻳﻊ اﻟﻤﻮﺟﻮدة ﻣﻦ ﺧﻼل اﻟﻀﻐﻂ ﻋﻠﻰ اﻟﺮﻣﺰ ‪Find‬‬

‫وﻣﻦ اﻟﻤﻼﺣﻆ أن آﻞ ﻣﺸﺮوع ﻳﻨﻘﺴﻢ اﻟﻰ ﻣﺠﻠﺪات رﺋﻴﺴﻴﺔ هﻲ ‪:‬‬


‫‪• Project Information‬‬
‫‪• Communication‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫‪• Contract Information‬‬
‫‪• Logs‬‬
‫وآﻞ ﻣﺠﻠﺪ ﻣﻦ هﺬﻩ اﻟﻤﺠﻠﺪات ﻳﻨﻘﺴﻢ اﻟﻰ وﺣﺪات ﻓﺮﻋﻴﺔ أﺧﺮى – ﺷﻜﻞ )‪( ٩ -١‬‬

‫ﻧﺴﺨﺔ‬
‫اﻟﻤﺸﺮوع اﻟﻤﻔﺘﻮح ﻟﻠﻌﺮض‬

‫ﻟﻠﻌﺮض‬
‫ﻣﺠﻠﺪات اﻟﻤﺸﺮوع‬
‫ﻋﻨﺎﺻﺮ اﻟﻤﺠﻠﺪ‬

‫ﻓﻘﻂ‬
‫ﺷﻜﻞ )‪( ٩ – ١‬‬

‫‪١٧‬‬
‫اﻟﺒﺎب اﻷول‬

‫ﺧﺎﻣﺴﺎ ‪ :‬ﻣﺠﻠﺪ اﻟﻘﻮاﻟﺐ‬


‫اﻟﻘﻮاﻟﺐ هﻲ ﻋﺒﺎرة ﻋﻦ ﻣ ﺸﺎرﻳﻊ ﺳ ﺎﺑﻘﺔ اﻟﺘﻌﺮﻳ ﻒ ﻳﻤﻜ ﻦ اﺳ ﺘﺨﺪاﻣﻬﺎ ﻓ ﻲ ﺑﻨ ﺎء ﻣ ﺸﺎرﻳﻊ‬

‫ﻏـﻴـﺮ‬
‫ﺟﺪﻳﺪة دون اﻟﻌﻨﺎء ﻓﻲ إدﺧﺎل آﻢ آﺒﻴﺮ ﻣﻦ اﻟﺒﻴﺎﻧ ﺎت اﻷﺳﺎﺳ ﻴﺔ اﻟﺘ ﻲ ﺗﺘ ﺸﺎﺑﻪ دوﻣ ﺎ – ﻓﻤ ﺜﻼ‬
‫ﺑﻔﺮض أﻧﻨﺎ ﻧﻘﻮم ﺑﺈدارة ﻋﺪة ﻣﺸﺎرﻳﻊ ﻟﺒﻨﺎء ﻣﺪارس ﻓﻲ ﻣﻨﺎﻃﻖ ﻣﺨﺘﻠﻔﺔ وآﻠﻬﺎ ﺗﺎﺑﻌﺔ ﻟﻤﺎﻟ ﻚ‬
‫واﺣ ﺪ و اﺳﺘ ﺸﺎري واﺣ ﺪ ﻓﻴﻤﻜﻨﻨ ﺎ ﻋﻤ ﻞ ﻗﺎﻟ ﺐ ﻟﻤ ﺸﺮوع ﻣﺪرﺳ ﺔ ﻣ ﻨﻬﻢ ﺑ ﻪ ﺟﻤﻴ ﻊ ﺑﻴﺎﻧ ﺎت‬
‫اﻟﻤﺎﻟﻚ واﻻﺳﺘﺸﺎري ﺛ ﻢ ﻧ ﺴﺘﺨﺪم ه ﺬا اﻟﻘﺎﻟ ﺐ ﻓ ﻲ إﻧ ﺸﺎء ﺑﻘﻴ ﺔ اﻟﻤ ﺸﺎرﻳﻊ واﻟﺘ ﻲ ﻳﺘﻐﻴ ﺮ ﺑﻬ ﺎ‬
‫ﺑﻴﺎﻧﺎت ﻣﻘﺎوﻟﻲ اﻟﺒﺎﻃﻦ ﻓﻘﻂ ‪.‬‬

‫ﻣﺴﻤﻮح‬ ‫ﺳﺎدﺳﺎ ‪ :‬ﻣﻨﻄﻘﺔ اﻟﻌﺮض‬


‫ﻓ ﻲ وﺳ ﻂ ﻧﺎﻓ ﺬة اﻟﺒﺮﻧ ﺎﻣﺞ ﺗﻈﻬ ﺮ ﻣﻨﻄﻘ ﺔ اﻟﻌ ﺮض وﺑﻬ ﺎ ﻣﻠﺨ ﺺ ﻟﺒﻴﺎﻧ ﺎت اﻟﻤ ﺸﺎرﻳﻊ‬
‫اﻟﻤﻔﺘﻮﺣﺔ ﻣﻘﺴﻤﺔ اﻟﻰ ﻋﺪة ﻣﺠﻤﻮﻋﺎت وآﺬﻟﻚ ﻗﺎﺋﻤ ﺔ ﺑﺎﻟﺘﻨﺒﻴﻬ ﺎت اﻟﻤﻬﻤ ﺔ واﻟﺘﻘ ﺎرﻳﺮ وﻏﻴ ﺮ‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ذﻟﻚ ﻣﻦ اﻟﻤﻌﻠﻮﻣﺎت‬
‫وﻳﻤﻜﻦ ﺗﻐﻴﻴﺮ ﺗﺮﺗﻴﺐ اﻟﻤﺠﻤﻮﻋ ﺎت ﺑﻤﻨﻄﻘ ﺔ اﻟﻌ ﺮض واﺿ ﺎﻓﺔ ﻋﻨﺎﺻ ﺮ أﺧ ﺮى اﻟﻴﻬ ﺎ آﻤ ﺎ‬
‫ﺳﻨﺘﻌﻠﻢ ﻓﻴﻤﺎ ﺑﻌﺪ ﺑﺎﻟﺘﻔﺼﻴﻞ‬

‫وﻟﻔﺘﺢ أي ﻋﻨﺼﺮ ﻧﻨﻘﺮ ﻋﻠﻴﻪ ﺑﺎﻟﻔﺄرة ﻓﺘﻈﻬﺮ ﻧﺎﻓﺬﺗﻪ آﻤﺎ ﺑﺎﻟﺸﻜﻞ )‪( ١٠ -١‬‬

‫ﻧﺴﺨﺔ‬
‫ﻟﻠﻌﺮض‬
‫ﻓﻘﻂ‬
‫ﺷﻜﻞ )‪( ١٠ – ١‬‬

‫‪١٨‬‬
‫ﻣﺎهﻮ ‪Expedition‬‬

‫ﺳﺎﺑﻌﺎ ‪ :‬ﺷﺮﻳﻂ اﻟﺤﺎﻟﺔ‬

‫ﻏـﻴـﺮ‬
‫ﻓﻲ ﺷﺮﻳﻂ اﻟﺤﺎﻟﺔ ﻳﺘﻢ ﺑﻌﺾ اﻟﻤﻌﻠﻮﻣﺎت اﻟﺘﻮﺿ ﻴﺤﻴﺔ ﻋﻨ ﺪ ﺗﻨﻔﻴ ﺬ اﻷواﻣ ﺮ وﺗﻈﻬ ﺮ ﺑﻌ ﺾ‬
‫( ﻓﻲ ﺣﺎﻟﺔ وﺟ ﻮد ﻣﻠ ﻒ‬ ‫اﻟﺮﻣﻮز واﻷﻳﻘﻮﻧﺎت ﻣﺜﻞ وﺟﻮد اﺷ ﺎرة اﻟﻤﻠ ﻒ اﻟﻤﺮﻓ ﻖ )‬
‫ﻣﺮﻓﻖ ﻣﻊ اﻟﻤﺸﺮوع اﻟﻤﻔﺘﻮح ﻣﺜﻼ ‪.‬‬

‫ﻣﺴﻤﻮح‬ ‫أول ﻣﺸﺮوع ﻟﻚ ﺑﺎﻟﺒﺮﻧﺎﻣﺞ‬

‫آﻤﺎ هﻮ ﻣﻌﺘﺎد ﻓﻲ ﺷﺮح اﻟﺘﻄﺒﻴﻘﺎت ﻻﺑﺪ ﻣﻦ ﺷﺮح ﻃﺮﻳﻘﺔ إﻧﺸﺎء ﻣﻠﻒ ﺑﻮاﺳﻄﺔ اﻟﺒﺮﻧﺎﻣﺞ‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫وﻟﺬا ﺳﻨﻘﻮم اﻵن ﺑﺸﺮح آﻴﻔﻴﺔ إﺿﺎﻓﺔ ﻣﺸﺮوع ﺟﺪﻳﺪ ﻟﻘﺎﻋﺪة ﺑﻴﺎﻧﺎت اﻟﺒﺮﻧﺎﻣﺞ ﺑﺎﻟﺨﻄﻮات‬
‫اﻟﻤﺘﺘﺎﻟﻴﺔ وﺑﺎﻟﺼﻮر اﻹﻳﻀﺎﺣﻴﺔ‬

‫‪ -١‬ﻧﻀﻊ ﻣﺆﺷﺮ اﻟﻔﺄرة ﻓﻲ أﻋﻠﻰ ﻣﺠﻠﺪات‬


‫اﻟﻤﺸﺎرﻳﻊ ﻋﻨﺪ ‪All Projects‬‬

‫ﻧﺴﺨﺔ‬
‫آﻤﺎ ﺑﺎﻟﺸﻜﻞ رﻗﻢ )‪( ١١ -١‬‬

‫ﻟﻠﻌﺮض‬
‫ﻓﻘﻂ‬
‫ﺷﻜﻞ )‪( ١١ – ١‬‬

‫‪ -٢‬ﻣﻦ ﻗﺎﺋﻤﺔ ‪ File‬ﻧﺨﺘﺎر اﻷﻣﺮ ‪ New Project‬ﻓﻴﻈﻬﺮ ﻣﺮﺑﻊ ﺣﻮار آﻤﺎ ﺑﺎﻟﺸﻜﻞ‬
‫رﻗﻢ ) ‪ ( ١٢ -١‬وﻧﻀﻐﻂ ﻋﻠﻰ اﻟﺰر اﻷول واﻟﺨﺎص ﺑﻤﻌﺎﻟﺞ إﻧﺸﺎء اﻟﻤﺸﺎرﻳﻊ‬

‫… ‪File Æ New Project Æ Use Jumpstart Wizard‬‬

‫‪١٩‬‬
‫اﻟﺒﺎب اﻷول‬

‫ﻏـﻴـﺮ‬
‫ﻧﻀﻐﻂ ﻋﻠﻰ هﺬا اﻟﺰر‬

‫ﻣﺴﻤﻮح‬ ‫ﺷﻜﻞ )‪( ١٢ – ١‬‬

‫‪ -٣‬أول ﻧﺎﻓﺬة ﻣﻦ اﻟﻤﻌﺎﻟﺞ ﺧﺎﺻﺔ ﺑﺈدﺧﺎل اﻟﺒﻴﺎﻧﺎت اﻟﺮﺋﻴﺴﻴﺔ ﻟﻠﻤﺸﺮوع آﻤﺎ ﺑﺎﻟﺸﻜﻞ‬
‫رﻗﻢ ) ‪ ( ١٣ -١‬وﺳﻨﻘﻮم ﺑﺈدﺧﺎل اﻟﺒﻴﺎﻧﺎت اﻟﺘﺎﻟﻴﺔ ﻋﻠﻰ ﺳﺒﻴﻞ اﻟﺘﺪرﻳﺐ‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬
‫‪Name : Project1‬‬ ‫ﻟﻠﻌﺮض‬
‫ﻣﺸﺮوع إﻧﺸﺎء ﻣﺪرﺳﺔ ﻧﻤﻮذﺟﻴﺔ ‪Title :‬‬
‫ﺷﻜﻞ )‪( ١٣ – ١‬‬

‫ﻓﻘﻂ‬
‫‪Value: 5000000‬‬
‫اﻟﻘﺎهﺮة ‪Location:‬‬
‫ﻣﺸﺮوع إﻧﺸﺎء ﻣﺪرﺳﺔ ﺛﺎﻧﻮﻳﺔ ﻟﻠﺒﻨﻴﻦ ‪Description :‬‬

‫وﻳﻤﻜﻦ اﻟﺘﻐﺎﺿﻲ ﻋﻦ ﺑﻘﻴﺔ اﻟﺒﻴﺎﻧﺎت ﻣﺜﻞ رﻗﻢ اﻟﻤﺸﺮوع ورﻗﻢ اﻟﻮﻇﻴﻔﺔ‬


‫ﺛﻢ ﻳﺘﻢ اﻟﻀﻐﻂ ﻋﻠﻰ اﻟﺴﻬﻢ ﻟﻼﻧﺘﻘﺎل ﻟﻠﻤﺮﺣﻠﺔ اﻟﺘﺎﻟﻴﺔ ‪Next‬‬

‫‪٢٠‬‬
‫ﻣﺎهﻮ ‪Expedition‬‬

‫‪ -٤‬ﻓﻲ هﺬﻩ اﻟﻨﺎﻓﺬة ﺳﻴﻄﻠﺐ اﻟﺒﺮﻧﺎﻣﺞ ﺗﺤﺪﻳﺪ ﻣﺎ اذا آﻨﺎ ﺳﻨﺴﺘﺨﺪم أﺣﺪ اﻟﻘﻮاﻟﺐ ام ﺳﻨﺒﺪأ‬
‫اﻟﻤﺸﺮوع ﻣﻦ اﻟﺼﻔﺮ وﺳﻨﺨﺘﺎر‪ Start with blank‬ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ اﻟﺴﻬﻢ‬
‫ﻟﻼﻧﺘﻘﺎل ﻟﻠﺨﻄﻮة اﻟﺘﺎﻟﻴﺔ ‪ -‬ﺷﻜﻞ )‪( ١٤-١‬‬

‫ﻏـﻴـﺮ‬
‫ﻣﺴﻤﻮح‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬ ‫ﺷﻜﻞ )‪( ١٤ – ١‬‬

‫‪ -٥‬ﻓ ﻲ ه ﺬﻩ اﻟﻤﺮﺣﻠ ﺔ ﺳ ﻴﺘﻢ إدﺧ ﺎل ﺑﻴﺎﻧ ﺎت اﻟ ﺸﺮآﺎت اﻟﻤ ﺸﺎرآﺔ ﻓ ﻲ ﺗﻨﻔﻴ ﺬ اﻟﻤ ﺸﺮوع‬
‫) اﻟﻤﻘﺎول اﻟﻌ ﺎم – ﻣﻘ ﺎوﻟﻲ اﻟﺒ ﺎﻃﻦ – اﻟﻤ ﻮردﻳﻦ – اﻻﺳﺘ ﺸﺎري – اﻟﻤﺎﻟ ﻚ ‪(... -‬‬

‫ﻧﺴﺨﺔ‬
‫وآ ﺬﻟﻚ ﺳ ﻴﺘﻢ إدﺧ ﺎل ﺑﻴﺎﻧ ﺎت اﻷﺷ ﺨﺎص اﻟﻤ ﺴﺌﻮﻟﻴﻦ ﻓ ﻲ ﺗﻠ ﻚ اﻟ ﺸﺮآﺎت ﻓﺘﻈﻬ ﺮ‬
‫اﻣﺎﻣﻚ اﻟﻨﺎﻓﺬة آﻤﺎ ﺑﺎﻟﺸﻜﻞ )‪(١٥ – ١‬‬

‫ﻟﻠﻌﺮض‬
‫ﻓﻘﻂ‬
‫وﻹﺿﺎﻓﺔ ﺷﺮآﺔ ﺟﺪﻳﺪة ﻳﺘﻢ اﻟﻨﻘﺮ ﻋﻠﻰ اﻷﻣﺮ ‪ New Company‬ﻓﻴﻈﻬﺮ أﻣﺎﻣﻚ ﻣﺮﺑﻊ‬
‫ﺷﻜﻞ )‪( ١٥ – ١‬‬

‫ﺣﻮار ﻳﻄﻠﺐ ﻣﻨﻚ إدﺧﺎل ﺑﻌﺾ اﻟﺒﻴﺎﻧﺎت آﻤﺎ ﺑﺎﻟﺸﻜﻞ )‪ ( ١٦ -١‬وﻧﻘﻮم ﺑﺈدﺧﺎل اﻟﺒﻴﺎﻧﺎت‬
‫اﻟﺘﺎﻟﻴﺔ ﺑﻪ‬

‫‪٢١‬‬
‫اﻟﺒﺎب اﻷول‬

‫ﻏـﻴـﺮ‬
‫ﻣﺴﻤﻮح‬ ‫ﺷﻜﻞ )‪( ١٦ – ١‬‬
‫‪Abbreviation‬‬
‫اﻻﺧﺘﺼﺎر ‪ :‬وﻳﻤﻜﻨﻚ ﻣﻦ ادراج ﺣﺘﻰ ﺛﻤﺎﻧﻴﺔ ﺣﺮوف ﻟﻜﻞ ﺷﺮآﺔ‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬ ‫‪Name‬‬
‫اﻷﺳﻢ ‪ :‬وﺑﻪ ﻧﺪرج أﺳﻢ اﻟﺸﺮآﺔ‬
‫‪Role‬‬
‫اﻟﺪور اﻟﻮﻇﻴﻔﻲ ‪ :‬وﺳﺘﺠﺪ أﻧﻬﺎ ﻣﻨﻘﺴﻤﺔ اﻟﻰ اﻵﺗﻲ‬

‫ﻧﺴﺨﺔ‬
‫‪Abbrev.‬‬ ‫‪Description‬‬ ‫اﻟﻤﻌﻨﻰ‬
‫‪ARC‬‬ ‫‪Architect‬‬ ‫ﺷﺮآﺔ ﻣﻌﻤﺎرﻳﺔ‬
‫‪CM‬‬ ‫‪Construction Manager‬‬ ‫ﺷﺮآﺔ إدارة ﻣﺸﺎرﻳﻊ‬
‫‪CON‬‬ ‫‪Contractor‬‬ ‫ﺷﺮآﺔ ﻣﻘﺎوﻻت‬

‫ﻟﻠﻌﺮض‬
‫‪DES‬‬ ‫‪Design Consultant‬‬ ‫اﻻﺳﺘﺸﺎري‬
‫‪ENG‬‬ ‫‪Engineer‬‬ ‫ﻣﻬﻨﺪس‬
‫‪GC‬‬ ‫‪General Contractor‬‬ ‫اﻟﻤﻘﺎول اﻟﻌﺎم‬
‫‪OTH‬‬ ‫‪Other‬‬ ‫ﺗﺼﻨﻴﻔﺎت أﺧﺮى‬
‫‪OWN‬‬ ‫‪Owner‬‬ ‫اﻟﻤﺎﻟﻚ‬
‫‪SUB‬‬
‫‪SUP‬‬
‫ﻓﻘﻂ‬
‫‪Subcontractor‬‬
‫‪Supplier‬‬
‫ﻣﻘﺎول اﻟﺒﺎﻃﻦ‬
‫ﻣﻮرد‬

‫‪Spec Section‬‬
‫ﻟﻌﺮض ﻗﺎﺋﻤﺔ ﺑﺒﻨﻮد اﻟﻤﻮاﺻﻔﺎت اﻟﺨﺎﺻﺔ ﺑﺎﻟﻤﺸﺮوع ﺑﺤﻴﺚ ﻳﺘﻢ رﺑﻂ اﻟﺸﺮآﺔ ﺑﺘﻠﻚ اﻟﺒﻨﻮد‬
‫وﻳﻤﻜﻨﻚ اﺿﺎﻓﺔ ﺑﻨﻮد أﺧﺮى ﻏﻴﺮ اﻟﻤﻮﺟﻮدة ﻓﻲ هﺬﻩ اﻟﻘﺎﺋﻤﺔ ﻣﻦ ﺧﻼل ﻗﺎﺋﻤﺔ‬
‫…‪Define Æ Dictionaries Æ Spec Sections‬‬

‫‪٢٢‬‬
‫ﻣﺎهﻮ ‪Expedition‬‬

‫ﺛﻢ ﻧﻘﻮم ﺑﺈدﺧﺎل ﺑﻴﺎﻧﺎت اﻟﺸﺨﺺ اﻟﻤﺴﺌﻮل ﻓﻲ اﻟﺨﺎﻧﺎت اﻟﺘﺎﻟﻴﺔ ‪:‬‬


‫‪Initials‬‬

‫ﻏـﻴـﺮ‬
‫ﺧﺎﻧﺔ اﻟﺤﺮوف اﻷوﻟﻰ ‪ :‬وﻳﻤﻜﻨﻚ ادراج ‪ ٣‬ﺣﺮوف ﻟﻜﻞ أﺳﻢ آﺈﺧﺘﺼﺎر‬
‫‪Name‬‬
‫ﺧﺎﻧﺔ اﻷﺳﻢ ‪ :‬وﺑﻪ ﻧﺪرج أﺳﻢ اﻟﺸﺨﺺ اﻟﻤﺴﺌﻮل‬
‫‪Title‬‬
‫اﻟﻠﻘﺐ ‪ :‬وﺳﺘﺠﺪ ﺑﻪ اﻷﻟﻘﺎب اﻟﺘﺎﻟﻴﺔ‬

‫ﻣﺴﻤﻮح‬
‫‪Mr.‬‬ ‫اﻟﺴﻴﺪ‬
‫‪Mrs.‬‬ ‫اﻟﺴﻴﺪة‬
‫‪Miss.‬‬ ‫اﻵﻧﺴﺔ‬
‫‪Ms.‬‬ ‫اﻟﻔﺎﺿﻠﺔ‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫‪Dr.‬‬ ‫اﻟﺪآﺘﻮر‬
‫‪Prof.‬‬ ‫اﻷﺳﺘﺎذ دآﺘﻮر‬

‫وﺳﻨﻘﻮم اﻵن ﺑﺈدﺧﺎل اﻟﺒﻴﺎﻧﺎت اﻟﺘﺎﻟﻴﺔ ﻋﻠﻰ ﺳﺒﻴﻞ اﻟﺘﺪرﻳﺐ‬


‫‪Company‬‬

‫ﻧﺴﺨﺔ‬
‫‪Abbreviation : EMAD‬‬
‫‪Name‬‬ ‫ﺷﺮآﺔ اﻟﻤﻬﻨﺪس ﻋﻤﺎد ﻟﻺﻧﺸﺎءات ‪:‬‬
‫‪Role‬‬ ‫‪: GC‬‬
‫‪Key Contact‬‬

‫ﻟﻠﻌﺮض‬
‫‪Initials‬‬ ‫‪:ALI‬‬
‫‪Name‬‬ ‫ﻋﻠﻲ ﺳﻴﺪ ‪:‬‬
‫‪Title‬‬ ‫‪: Mr.‬‬

‫وﻓﻲ ﺣﺎﻟﺔ اﻟﺮﻏﺒﺔ ﻓﻲ إﺿﺎﻓﺔ ﻣﺴﺌﻮل ﺁﺧﺮ ﻧﻀﻊ ﻣﺆﺷﺮ اﻟﻔﺄرة ﻋﻠﻰ اﻟﺸﺮآﺔ ﺛﻢ ﻧﺨﺘﺎر‬

‫ﻓﻘﻂ‬
‫اﻷﻣﺮ ‪ New Contact‬ﻓﻴﻈﻬﺮ ﻣﺮﺑﻊ اﻟﺤﻮار اﻟﺘﺎﻟﻲ – ﺷﻜﻞ ) ‪( ١٧ -١‬‬

‫ﺷﻜﻞ )‪( ١٧ – ١‬‬

‫‪٢٣‬‬
‫اﻟﺒﺎب اﻷول‬

‫وﺳﻨﻘﻮم ﺑﺈدﺧﺎل اﻟﺒﻴﺎﻧﺎت اﻟﺘﺎﻟﻴﺔ ﻋﻠﻰ ﺳﺒﻴﻞ اﻟﺘﺪرﻳﺐ‬


‫‪Initials‬‬ ‫‪:MOH‬‬

‫ﻏـﻴـﺮ‬
‫‪Name‬‬ ‫ﻣﺤﻤﺪ ﺧﺎﻟﺪ ‪:‬‬
‫‪Title‬‬ ‫‪: Mr.‬‬
‫وﺑﻌﺪ اﻟﻨﻘﺮ ﻋﻠﻰ زر ‪ OK‬ﺗﻈﻬﺮ اﻟﻨﺎﻓﺬة ﺑﻌﺪ إﺿﺎﻓﺔ اﻟﺒﻴﺎﻧﺎت إﻟﻴﻬﺎ آﻤﺎ ﺑﺎﻟﺸﻜﻞ )‪( ١٨ -١‬‬

‫ﻣﺴﻤﻮح‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬ ‫ﺷﻜﻞ )‪( ١٨ – ١‬‬
‫ﺛﻢ ﻧﻘﻮم ﺑﺈﺿﺎﻓﺔ ﺑﻴﺎﻧﺎت اﻟﻤﺎﻟﻚ ﺑﻨﻔﺲ اﻟﺨﻄﻮات اﻟﺴﺎﺑﻘﺔ وﻟﺘﻜﻦ آﺎﻟﺘﺎﻟﻲ‬

‫ﻧﺴﺨﺔ‬
‫‪Abbreviation : MOE‬‬
‫‪Name‬‬ ‫وزارة اﻟﺘﺮﺑﻴﺔ واﻟﺘﻌﻠﻴﻢ ‪:‬‬
‫‪Role‬‬ ‫‪: OWN‬‬
‫‪Key Contact‬‬
‫‪Initials‬‬ ‫‪:KHA‬‬

‫ﻟﻠﻌﺮض‬
‫‪Name‬‬ ‫ﺧﺎﻟﺪ ﻣﺤﻤﺪ ‪:‬‬
‫‪Title‬‬ ‫‪: Mr.‬‬

‫ﻓﻘﻂ‬
‫ﺷﻜﻞ )‪( ١٩ – ١‬‬

‫‪٢٤‬‬
‫ﻣﺎهﻮ ‪Expedition‬‬

‫‪ -٦‬ﺛﻢ ﺗﺄﺗﻲ ﻣﺮﺣﻠﺔ ﺗﻌﻴﻴﻦ اﻟﺸﺮآﺎت ﻟﻠﻤﺸﺮوع وذﻟﻚ ﺑﺎﺧﺘﻴﺎر ‪Key Parties‬‬
‫ﻓﺘﻈﻬﺮ أﻣﺎﻣﻨﺎ اﻟﻨﺎﻓﺬة اﻟﺘﺎﻟﻴﺔ واﻟﺘﻲ ﻳﺘﻢ اﺧﺘﻴﺎر اﻟﺸﺮآﺎت ﻣﻦ ﺧﻼل اﻟﻘﻮاﺋﻢ اﻟﻤﻨﺴﺪﻟﺔ‬
‫واﻟﺘﻲ ﺳﺘﻈﻬﺮ اﻟﺒﻴﺎﻧﺎت اﻟﺘﻲ ﻗﻤﻨﺎ ﺑﺈدﺧﺎﻟﻬﺎ ﻓﻲ اﻟﻔﻘﺮة اﻟﺴﺎﺑﻘﺔ – ﺷﻜﻞ )‪( ٢٠ -١‬‬

‫ﻏـﻴـﺮ‬
‫ﻣﺴﻤﻮح‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﺷﺮآﺔ اﻟﻤﻬﻨﺪس ﻋﻤﺎد ﻟﻺﻧﺸﺎءات ‪Your Company :‬‬
‫ﺷﻜﻞ )‪( ٢٠ – ١‬‬
‫وﺳﻨﻘﻮم ﺑﺘﺤﺪﻳﺪ اﻟﺒﻴﺎﻧﺎت اﻟﺘﺎﻟﻴﺔ‬

‫ﻧﺴﺨﺔ‬
‫‪Owner :‬‬ ‫وزارة اﻟﺘﺮﺑﻴﺔ واﻟﺘﻌﻠﻴﻢ‬
‫‪Project Manager:‬‬ ‫ﻋﻠﻲ ﺳﻴﺪ‬
‫‪Submittal Coordinator :‬‬ ‫ﻣﺤﻤﺪ ﺧﺎﻟﺪ‬

‫‪ -٧‬ﺑﻌﺪ ذﻟﻚ ﻧﺨﺘﺎر ‪ Currency‬ﻟﺘﺤﺪﻳﺪ اﻟﻌﻤﻠﺔ اﻟﺨﺎﺻﺔ ﺑﺎﻟﻤﺸﺮوع وﺳﻌﺮ ﺻﺮف‬

‫ﻟﻠﻌﺮض‬
‫اﻟﺪوﻻر اﻟﻤﻘﺎﺑﻞ ﻟﻌﻤﻠﺔ اﻟﻤﺸﺮوع – ﺷﻜﻞ )‪( ٢١ -١‬‬

‫ﻓﻘﻂ‬
‫ﺷﻜﻞ )‪( ٢١ – ١‬‬

‫‪٢٥‬‬
‫اﻟﺒﺎب اﻷول‬

‫‪ -٧‬ﺑﻌﺪ ذﻟﻚ ﺗﻈﻬﺮ ﻧﺎﻓﺬة ‪ Cost Codes‬واﻟﺨﺎﺻﺔ ﺑﺎآﻮاد اﻟﺘﻜﻠﻔﺔ وﻟﻜﻨﻨﺎ‬


‫ﺳﻨﺘﺠﺎهﻠﻬﺎ اﻵن ﻟﺤﻴﻦ ﺷﺮح اﻟﺮﻗﺎﺑﺔ ﻋﻠﻰ اﻟﺘﻜﻠﻔﺔ‬

‫ﻏـﻴـﺮ‬
‫ﻣﺴﻤﻮح‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬ ‫ﺷﻜﻞ )‪( ٢٢ – ١‬‬

‫‪ -٨‬ﻧﻨﺘﻘﻞ اﻟﻰ ﺧﻄﻮة ادﺧﺎل ﺑﻴﺎﻧﺎت اﻟﻤﺸﺮوع اﻟﺰﻣﻨﻴﺔ ) ﺗﺎرﻳﺦ اﻟﺘﻌﺎﻗﺪ – ﺗﺎرﻳﺦ اﻟﺒﺪء‬
‫اﻟﻔﻌﻠﻲ – ﺗﺎرﻳﺦ اﻟﻨﻬﻮ اﻟﻤﺘﻮﻗﻊ (‬

‫ﻧﺴﺨﺔ‬
‫ﻟﻠﻌﺮض‬
‫ﻓﻘﻂ‬ ‫ﺷﻜﻞ )‪( ٢٣ – ١‬‬

‫وﻹدﺧﺎل اﻟﺘﻮارﻳﺦ ﻧﻨﻘﺮ ﻋﻠﻰ اﻟﺮﻣﺰ اﻟﻤﺠﺎور ﻟﻠﺨﺎﻧﺔ ﻓﺘﻈﻬﺮ اﻷﺟﻨﺪة آﻤﺎ ﺑﺎﻟﺸﻜﻞ رﻗﻢ‬
‫)‪ ( ٢٤ -١‬ﺛﻢ ﻧﺘﺤﺮك ﻣﻦ ﺧﻼل اﻷﺳﻬﻢ اﻟﻤﻮﺟﻮدة ﺑﺎﻷﺟﻨﺪة ﻟﺘﺤﺪﻳﺪ اﻟﻴﻮم واﻟﺸﻬﺮ واﻟﺴﻨﺔ‬
‫ﺛﻢ ﻧﻘﻮم ﺑﺎﻟﻨﻘﺮ اﻟﻤﺰدوج ﻋﻠﻰ اﻟﺘﺎرﻳﺦ اﻟﻤﻄﻠﻮب ﻓﺘﺨﺘﻔﻲ ﻧﺎﻓﺬة اﻷﺟﻨﺪة وﻧﺠﺪ أن اﻟﺘﺎرﻳﺦ‬
‫ﻗﺪ ﺗﻢ ﺗﺴﺠﻴﻠﻪ ﺗﻠﻘﺎﺋﻴﺎ ﻓﻲ اﻟﺨﺎﻧﺔ اﻟﻤﻄﻠﻮﺑﺔ‬

‫‪٢٦‬‬
‫ﻣﺎهﻮ ‪Expedition‬‬

‫ﻏـﻴـﺮ‬
‫ﻣﺴﻤﻮح‬ ‫ﺷﻜﻞ )‪( ٢٤ – ١‬‬

‫وﺳﻨﺪﺧﻞ اﻵن هﺬﻩ اﻟﺘﻮارﻳﺦ ﻋﻠﻰ ﺳﺒﻴﻞ اﻟﻤﺜﺎل ‪:‬‬

‫‪Contract Date‬‬
‫‪Proceed Date‬‬ ‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫‪: 1/5/2006‬‬
‫‪: 1/8/2006‬‬
‫‪Completion Date : 11/4/2007‬‬

‫ﻧﺴﺨﺔ‬
‫واذا أردﻧﺎ رﺑﻂ اﻟﺒﺮﻧﺎﻣﺞ اﻟﺰﻣﻨﻲ ﻟﻠﻤﺸﺮوع واﻟﺬي ﺗﻢ إﻧﺘﺎﺟﻪ ﺑﺒﺮﻧﺎﻣﺞ ‪Primavera‬‬
‫ﻧﺨﺘﺎر ﻣﻦ اﻟﻘﺎﺋﻤﺔ اﻟﻤﻨﺴﺪﻟﺔ ‪ Schedule‬ﻧﻮع اﻟﺒﺮﻧﺎﻣﺞ ) ‪ Primavera3‬او‬

‫ﻟﻠﻌﺮض‬
‫‪( Primavera Enterprise‬‬
‫ﺛﻢ ﻧﺤﺪد ﻣﺴﺎر ﻣﺠﻠﺪ اﻟﺒﺮﻧﺎﻣﺞ – آﻤﺎ ﺑﺎﻟﺸﻜﻞ ) ‪( ٢٥ – ١‬‬

‫ﻓﻘﻂ‬
‫ﺷﻜﻞ )‪( ٢٥ – ١‬‬

‫‪٢٧‬‬
‫اﻟﺒﺎب اﻷول‬

‫‪ -٨‬اﻟﺨﻄﻮة اﻷﺧﻴﺮة هﻲ ﺗﺤﺪﻳﺪ اﻟﻤﺴﺘﺨﺪﻣﻴﻦ اﻟﻤﺴﻤﻮح ﻟﻬﻢ ﺑﺎﻟﺪﺧﻮل ﻋﻠﻰ اﻟﺒﻴﺎﻧﺎت‬


‫ﻟﺘﻌﺪﻳﻠﻬﺎ – آﻤﺎ ﺑﺎﻟﺸﻜﻞ )‪( ٢٦ – ١‬‬
‫وﺳﻮف ﻧﺸﺮح ﻓﻲ اﻻﺑﻮاب اﻟﻘﺎدﻣﺔ آﻴﻔﻴﺔ إﺿﺎﻓﺔ ﻣﺴﺘﺨﺪﻣﻴﻦ وﺗﺤﺪﻳﺪ ﺻﻼﺣﻴﺎﺗﻬﻢ‬

‫ﻏـﻴـﺮ‬
‫اﻣﺎ اﻵن ﺳﻨﻘﻮم ﺑﺘﺤﺪﻳﺪ اﻟﻤﺴﺘﺨﺪم اﻻﻓﺘﺮاﺿﻲ اﻟﻤﻮﺟﻮد ﻓﻲ اﻟﺒﺮﻧﺎﻣﺞ‬

‫ﻣﺴﻤﻮح‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬ ‫ﺷﻜﻞ )‪( ٢٦ – ١‬‬

‫واﺧﻴﺮا ﻧﻀﻐﻂ ﻋﻠﻰ زر ‪ Finish‬ﻻﻧﻬﺎء اﻟﻤﻌﺎﻟﺞ ﻓﻴﻈﻬﺮ ﻣﺮﺑﻊ أﺧﻴﺮ ﻳﻌﺮض ﻣﺨﺘﺼﺮ‬
‫ﻟﺠﻤﻴﻊ اﻟﺒﻴﺎﻧﺎت وﻳﻄﻠﺐ ﻣﻨﻚ ﺗﺄآﻴﺪ ﻋﻤﻠﻴﺔ إﻧﺸﺎء اﻟﻤﺸﺮوع ‪ ،‬ﻓﻨﻀﻐﻂ ﻋﻠﻰ زر‬

‫ﻧﺴﺨﺔ‬
‫‪ - Create The Project‬ﺷﻜﻞ )‪( ٢٧ -١‬‬

‫ﻟﻠﻌﺮض‬
‫ﻓﻘﻂ‬ ‫ﺷﻜﻞ )‪( ٢٧ – ١‬‬

‫وﺑﻌﺪ اﻻﻧﺘﻬﺎء ﻳﻈﻬﺮ ﻣﺸﺮوﻋﻨﺎ اﻟﺠﺪﻳﺪ داﺧﻞ ﻣﺠﻠﺪ اﻟﻤﺸﺎرﻳﻊ – ﺷﻜﻞ ) ‪( ٢٨ -١‬‬

‫‪٢٨‬‬
‫ﻣﺎهﻮ ‪Expedition‬‬

‫ﻏـﻴـﺮ‬
‫ﻣﺴﻤﻮح‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬
‫ﺷﻜﻞ )‪( ٢٨ – ١‬‬

‫إﺿﺎﻓﺔ اﻟﻤﺰﻳﺪ ﻣﻦ اﻟﺸﺮآﺎت ﻟﻤﺸﺮوﻋﻚ‬


‫ﺑﻌﺪ أن ﺗﻌﻠﻤﻨﺎ آﻴﻔﻴﺔ إﻧﺸﺎء ﻣﺸﺮوع ﺟﺪﻳﺪ ﺳﻨﺘﻌﻠﻢ ﺑﻌﺾ اﻟﻤﻬﺎرات اﻷﺧ ﺮى وﻣ ﻦ ﺿ ﻤﻨﻬﺎ‬

‫ﻟﻠﻌﺮض‬
‫آﻴﻔﻴﺔ إﺿﺎﻓﺔ ﺷﺮآﺎت ﻟﻠﻤﺸﺮوع ‪ ،‬وﻟﻠﺘﺴﻬﻴﻞ ﺳﻨﺴﺘﺨﺪم اﻟﻤ ﺸﺎرﻳﻊ اﻟﺠ ﺎهﺰة اﻟﻤﻮﺟ ﻮدة ﻣ ﻊ‬
‫ﻧﺴﺨﺔ اﻟﺒﺮﻧﺎﻣﺞ‬
‫وﺑﺎﻟﺮﺟﻮع ﻟﻠﺸﻜﻞ رﻗﻢ )‪ ( ٢٨ – ١‬ﺳﻨﺠﺪ أن هﻨﺎك ﻣﺸﺮوع أﺳﻤﻪ ‪DEMO‬‬
‫ﺳ ﻨﻘﻮم اﻵن ﺑﺘﻮﺳ ﻴﻊ اﻟﻘﺎﺋﻤ ﺔ ﻋ ﻦ ﻃﺮﻳ ﻖ اﻟ ﻀﻐﻂ ﻋﻠ ﻰ رﻣ ﺰ ‪ +‬ﺛ ﻢ ﻧﺘﺤ ﺮك ﻟﻨ ﺼﻞ اﻟ ﻰ‬
‫ﻣﺠﻠﺪ ‪ Project Information‬ﺛﻢ ﻧﻘﻮل ﺑﺎﻟﻨﻘﺮ اﻟﻤﺰدوج ﻋﻠﻰ ‪Companies‬‬

‫ﻓﻘﻂ‬
‫آﻤﺎ ﺑﺎﻟﺸﻜﻞ )‪( ٢٩ – ١‬‬

‫ﺷﻜﻞ )‪( ٢٩ – ١‬‬

‫‪٢٩‬‬
‫اﻟﺒﺎب اﻷول‬

‫ﻓﺘﻈﻬ ﺮ أﻣﺎﻣﻨ ﺎ ﻧﺎﻓ ﺬة ‪ Company Directory‬واﻟﺘ ﻲ ﻣ ﻦ ﺧﻼﻟﻬ ﺎ ﻳﻤﻜ ﻦ اﺿ ﺎﻓﺔ‬


‫وﺣﺬف وﺗﻌﺪﻳﻞ ﺑﻴﺎن اﻟﺸﺮآﺎت اﻟﻤﺴﺠﻠﺔ ﺑﻘﺎﻋﺪة ﺑﻴﺎﻧﺎت اﻟﻤﺸﺮوع – ﺷﻜﻞ )‪( ٣٠ -١‬‬

‫ﻏـﻴـﺮ‬
‫ﻣﺴﻤﻮح‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬
‫ﺷﻜﻞ )‪( ٣٠ – ١‬‬

‫وﻹﺿﺎﻓﺔ ﺑﻴﺎﻧﺎت ﺷﺮآﺔ ﺟﺪﻳﺪة ﻧﻀﻐﻂ اﻟﺰر ‪ Add‬ﻓﻴﻈﻬﺮ أﻣﺎﻣﻨﺎ ﻣﺮﺑﻊ ﺣﻮار آﻤﺎ‬
‫ﺑﺎﻟﺸﻜﻞ ) ‪( ٣١ -١‬‬
‫ﻣﻨﻄﻘﺔ ﺑﻴﺎﻧﺎت اﻟﺸﺮآﺔ‬

‫ﻟﻠﻌﺮض‬
‫ﻓﻘﻂ‬ ‫ﻣﻨﻄﻘﺔ أﺳﻤﺎء اﻟﻤﻮﻇﻔﻴﻦ ﺑﺎﻟﺸﺮآﺔ‬

‫ﺷﻜﻞ )‪( ٣١ – ١‬‬

‫‪٣٠‬‬
‫ﻣﺎهﻮ ‪Expedition‬‬

‫آﻤﺎ ﺗﻼﺣﻆ ﺗﻨﻘﺴﻢ اﻟﻨﺎﻓﺬة إﻟﻰ ﻗﺴﻤﻴﻦ وهﻤﺎ‬

‫ﻏـﻴـﺮ‬
‫اﻟﻘﺴﻢ اﻟﻌﻠﻮي ﻟﺒﻴﺎﻧﺎت اﻟﺸﺮآﺔ‬
‫اﻟﻘﺴﻢ اﻟﺴﻔﻠﻲ ﻟﺒﻴﺎﻧﺎت اﻷﺷﺨﺎص اﻟﻌﺎﻣﻠﻮن ﺑﺎﻟﺸﺮآﺔ‬

‫ﺑﻴﺎﻧﺎت اﻟﺸﺮآﺔ‬
‫‪Abbreviation‬‬

‫ﻣﺴﻤﻮح‬
‫اﻻﺧﺘﺼﺎر وهﻮ ﻣﻜﻮن ﻣﻦ ﺣﺮوف ﺑﺤﺪ أﻗﺼﻰ ‪ ٨‬ﺣﺮوف‬
‫‪Company Name‬‬
‫أﺳﻢ اﻟﺸﺮآﺔ‬
‫‪Role‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﺳﺒﻖ ﺷﺮﺣﻬﺎ ﻓﻲ اﻟﺼﻔﺤﺔ ) ‪ ( ٢٢‬وهﻲ ﻧﻮع اﻟﺸﺮآﺔ ) ﻣﺎﻟﻚ – اﺳﺘﺸﺎري – ﻣﻘﺎول‬
‫ﺑﺎﻃﻦ ‪(... -‬‬
‫‪Key Contact‬‬
‫اﻟﺸﺨﺺ اﻟﻤﺴﺌﻮل ﺑﺎﻟﺸﺮآﺔ واﻟﺬي ﻳﺘﻢ اﻻﺗﺼﺎل ﺑﻪ – وﻻﻳﻤﻜﻦ ﺗﺤﺪﻳﺪﻩ ﻗﺒﻞ إدﺧﺎل ﺑﻴﺎﻧﺎت‬
‫اﻟﻤﻮﻇﻔﻴﻦ ﺑﺎﻟﺸﺮآﺔ‬

‫ﻧﺴﺨﺔ‬
‫‪Tax ID‬‬
‫ﻣﻌﺮف ﻣﻠﻒ اﻟﻀﺮاﺋﺐ ﻟﻠﺸﺮآﺔ ) ﺧﺎص ﺑﺎﻟﻮﻻﻳﺎت اﻟﻤﺘﺤﺪة اﻷﻣﺮﻳﻜﻴﺔ (‬
‫‪Location‬‬
‫ﻣﻮﺿﻊ اﻟﺸﺮآﺔ وﻳﻤﻜﻦ ان ﻳﻜﻮن أي ﻣﻦ اﻵﺗﻲ‬

‫ﻟﻠﻌﺮض‬
‫ﻣﻜﺘﺐ‬ ‫‪Office‬‬
‫ﻣﻮﻗﻊ‬ ‫‪Field‬‬
‫ﻏﻴﺮ ﻣﺤﺪد‬ ‫)ﻓﺎرغ (‬
‫‪NAICS Code‬‬
‫ﺗﺼﻨﻴﻒ اﻟﺸﺮآﺔ ﻃﺒﻘﺎ ﻟﺘﺼﻨﻴﻒ أﻣﺮﻳﻜﺎ اﻟﺸﻤﺎﻟﻴﺔ اﻟﺼﻨﺎﻋﻲ‬

‫ﻓﻘﻂ‬
‫‪North American Industry Classification‬‬
‫وﺳﺘﺠﺪ أن اﻟﺸﺮآﺎت ﻣﻘﺴﻤﺔ اﻟﻰ ﻋﺪة أﻧﻮاع ﻓﻤﺜﻼ‬
‫ﺧﺎص ﺑﺸﺮآﺎت ﺗﺸﻄﻴﺒﺎت اﻟﻤﺒﺎﻧﻲ‬ ‫‪2383‬‬
‫‪ 238210‬ﺧﺎص ﺑﺸﺮآﺎت ﻣﻘﺎوﻻت اﻷﻋﻤﺎل اﻟﻜﻬﺮﺑﺎﺋﻴﺔ‬

‫وﻟﻦ ﺗﺤﺘﺎج أﺧﻲ اﻟﻤﻬﻨﺪس ﻋﻠﻰ ﺣﻔﻆ هﺬﻩ اﻷآﻮاد وإﻧﻤﺎ ﻋﻠﻴﻚ اﻟﻨﻘﺮ ﺑﺎﻟﻔﺄرة ﻓﻲ اﻟﺨﺎﻧﺔ‬
‫وﺳﺘﻈﻬﺮ ﻟﻚ ﻗﺎﺋﻤﺔ ﻣﻨﺴﺪﻟﺔ ﺑﻬﺎ ﺟﻤﻴﻊ اﻟﺘﺼﻨﻴﻔﺎت آﻤﺎ ﺑﺎﻟﺸﻜﻞ ) ‪( ٣٢ -١‬‬

‫‪٣١‬‬
‫اﻟﺒﺎب اﻷول‬

‫ﻏـﻴـﺮ‬
‫ﻣﺴﻤﻮح‬ ‫ﺷﻜﻞ )‪( ٣٢ – ١‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫‪Spec Section‬‬
‫ﺗﺼﻨﻴﻒ اﻟﺸﺮآﺔ ﻃﺒﻘﺎ ﻟﺘﺼﻨﻴﻒ ﻣﻌﻬﺪ ﻣﻮاﺻﻔﺎت اﻟﺘﺸﻴﻴﺪ اﻷﻣﺮﻳﻜﻴﺔ‬
‫)‪Construction Specification Institute (CSI Master Format‬‬
‫وهﻲ ﺗﺤﺘﻮي ﻋﻠﻰ ﻗﺎﺋﻤﺔ ﻣﻨﺴﺪﻟﺔ ﺑﺠﻤﻴﻊ أﻧﻮاع اﻟﺘﺼﻨﻴﻔﺎت اﻟﻤﻮﺟﻮدة‬

‫ﻧﺴﺨﺔ‬
‫ﻟﺘﺤﻤﻴﻞ ﻧﺴﺨﺔ ﻣﻦ ‪ Master Format‬ﻗﻢ ﺑﺰﻳﺎرة ‪www.csinet.org/MasterFormat‬‬

‫ﻟﻠﻌﺮض‬ ‫‪Ball In Court‬‬


‫ﻟﺘﺤﺪﻳﺪ اﻟﻤﺨﺘﺺ ﺑﺎﻟﺸﺮآﺔ واﻟﺬي ﻳﺘﻢ ﺗﻮﺟﻴﻪ اﻟﻤﺮاﺳﻼت اﻟﻴﻪ‬
‫‪DBE‬‬
‫هﺬا اﻟﺨﻴﺎر ﻳﺘﻢ اﺧﺘﻴﺎرﻩ اذا ﻣﺎ آﺎﻧﺖ اﻟﺸﺮآﺔ ﻋﻀﻮ ﻓﻲ اﻟﺒﺮﻧﺎﻣﺞ اﻹﻧﻤﺎﺋﻲ‬

‫ﻓﻘﻂ‬
‫‪Disadvantaged Business Enterprise Program‬‬
‫) ﺧﻴﺎر ﻟﻠﻮﻻﻳﺎت اﻟﻤﺘﺤﺪة اﻷﻣﺮﻳﻜﻴﺔ (‬
‫‪WBE‬‬
‫هﺬا اﻟﺨﻴﺎر ﻳﺘﻢ اﺧﺘﻴﺎرﻩ اذا ﻣﺎ آﺎﻧﺖ اﻟﺸﺮآﺔ ﻋﻀﻮ ﻓﻲ ﺟﻤﻌﻴﺔ‬
‫‪Women's Business Enterprise Council‬‬
‫) ﺧﻴﺎر ﻟﻠﻮﻻﻳﺎت اﻟﻤﺘﺤﺪة اﻷﻣﺮﻳﻜﻴﺔ (‬

‫‪MBE‬‬

‫‪٣٢‬‬
‫ﻣﺎهﻮ ‪Expedition‬‬

‫‪MBE‬‬
‫هﺬا اﻟﺨﻴﺎر ﻳﺘﻢ اﺧﺘﻴﺎرﻩ اذا ﻣﺎ آﺎﻧﺖ اﻟﺸﺮآﺔ ﻋﻀﻮ ﻓﻲ ﺟﻤﻌﻴﺔ‬

‫ﻏـﻴـﺮ‬
‫‪Minority Business Enterprise Council‬‬
‫) ﺧﻴﺎر ﻟﻠﻮﻻﻳﺎت اﻟﻤﺘﺤﺪة اﻷﻣﺮﻳﻜﻴﺔ (‬

‫ﺑﻴﺎﻧﺎت اﻟﻤﻮﻇﻔﻴﻦ‬

‫ﻣﺴﻤﻮح‬
‫واﻟﻤﻘﺼﻮد هﻨﺎ اﻟﻤﻮﻇﻔﻴﻦ اﻟﺬي ﺳﻴﺘﻢ اﻻﺗﺼﺎل ﺑﻬﻢ ﻋﻨﺪ ﻣﺨﺎﻃﺒﺔ اﻟﺸﺮآﺔ وﻟﻴﺲ آﻞ‬
‫ﻣﻮﻇﻔﻲ ﺗﻠﻚ اﻟﺸﺮآﺔ‬
‫وﺑﻌﺪ إدﺧﺎل ﺑﻴﺎﻧﺎت اﻟﺸﺮآﺔ ﻧﻀﻐﻂ ﻋﻠﻰ زر ‪ Add‬ﻓﻴﻈﻬﺮ أﻣﺎﻣﻨﺎ ﻣﺮﺑﻊ ﺣﻮار اﻟﺨﺎص‬
‫ﺑﺈدﺧﺎل ﺑﻴﺎﻧﺎت اﻟﻤﻮﻇﻒ – ﺷﻜﻞ ) ‪( ٣٣-١‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬
‫ﻟﻠﻌﺮض‬
‫ﻓﻘﻂ‬ ‫ﺷﻜﻞ )‪( ٣٣– ١‬‬

‫وﺳﻨﻘﻮم اﻵن ﺑﺘﻔﺼﻴﻞ هﺬﻩ اﻟﺤﻘﻮل‬

‫‪Initials‬‬
‫اﻷﺣﺮف اﻷوﻟﻰ ﻣﻦ اﻻﺳﻢ )ﻣﻘﺪار ‪ ٣‬ﺣﺮوف ( وﻳﻔﻀﻞ ان ﻳﺆﺧﺬ اﻟﺤﺮف اﻷول ﻣﻦ آ ﻞ‬
‫اﺳﻢ ﻣﻦ اﻻﺳﻢ اﻟﺜﻼﺛﻲ ﻓﻤﺜﻼ ﻧﻜﺘﺐ ‪ EHH‬ﻟﻼﺳﻢ ‪Emad Hamed Hassan‬‬

‫‪٣٣‬‬
‫اﻟﺒﺎب اﻷول‬

‫‪Title‬‬
‫اﻟﻠﻘﺐ ‪ :‬وﻳﻤﻜﻦ ان ﻳﻜﻮن واﺣﺪ ﻣﻦ اﻵﺗﻲ‬

‫ﻏـﻴـﺮ‬
‫‪Mr.‬‬ ‫اﻟﺴﻴﺪ‬
‫‪Mrs.‬‬ ‫اﻟﺴﻴﺪة‬
‫‪Miss.‬‬ ‫اﻵﻧﺴﺔ‬
‫‪Ms.‬‬ ‫اﻟﻔﺎﺿﻠﺔ‬
‫‪Dr.‬‬ ‫اﻟﺪآﺘﻮر‬

‫ﻣﺴﻤﻮح‬
‫‪Prof.‬‬ ‫اﻷﺳﺘﺎذ دآﺘﻮر‬

‫اﻟﻠﻘﺐ ‪ MS‬ﻳﺘﻢ اﺳﺘﺨﺪاﻣﻪ ﻟﻠﻤﺮأة اﻟﺘﻲ ﻟﻢ ﻳﺘﻢ ﺗﺤﺪﻳﺪ ﺣﺎﻟﺘﻬﺎ اﻻﺟﺘﻤﺎﻋﻴﺔ ﺑﻌﻜﺲ ‪ Miss‬اﻟﺬي ﻳﺴﺘﺨﺪم‬
‫ﻟﻶﻧﺴﺔ و ‪ Mrs.‬اﻟﺬي ﻳﺴﺘﺨﺪم ﻟﻠﺴﻴﺪة‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬ ‫‪Name‬‬
‫اﻻﺳﻢ ‪ :‬ﻳﺘﻢ آﺘﺎﺑﺔ اﻻﺳﻢ ﻓﻲ هﺬﻩ اﻟﺨﺎﻧﺔ وﻳﻔﻀﻞ ﻋﻨﺪ اﻟﺮﻏﺒﺔ ﻓﻲ آﺘﺎﺑﺔ اﻻﺳﻢ اﻟﺜﻼﺛﻲ ان‬
‫ﻳﺘﻢ اﻟﻀﻐﻂ ﻋﻠﻰ اﻟﺰر …‪ Full Name‬ﺣﻴﺚ ﻳﻈﻬﺮ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري آﻤﺎ ﺑﺎﻟﺸﻜﻞ‬

‫ﻧﺴﺨﺔ‬
‫)‪( ٣٤ – ١‬‬

‫ﻟﻠﻌﺮض‬
‫ﻓﻘﻂ‬
‫ﺷﻜﻞ )‪( ٣٤– ١‬‬

‫وﺳﻨﺠﺪ أﻧﻪ ﺗﻮﺟﺪ ‪ ٣‬ﺧﺎﻧﺎت ﻟﻸﺳﻢ اﻟﻜﺎﻣﻞ وهﻢ‬


‫اﻻﺳﻢ اﻷول‬ ‫‪First‬‬
‫‪ Middle‬اﻻﺳﻢ اﻷوﺳﻂ‬
‫اﻻﺳﻢ اﻷﺧﻴﺮ‬ ‫‪Last‬‬
‫وﺑﻌﺪ آﺘﺎﺑﺔ اﻻﺳﻢ ﻓﻲ هﺬﻩ اﻟﺨﺎﻧﺎت اﻟﺜﻼث ﺳﻴﻘﻮم اﻟﺒﺮﻧﺎﻣﺞ ﺑﺘﺠﻤﻴﻊ اﻻﺳﻢ اﻟﺜﻼﺛﻲ ﻓﻲ‬
‫ﺧﺎﻧﺔ ‪Name‬‬

‫‪٣٤‬‬
‫ﻣﺎهﻮ ‪Expedition‬‬

‫وﺗﻮﺟﺪ ﺧﺎﻧﺎت أﺧﺮى وهﻲ‪:‬‬


‫‪Suffix‬‬

‫ﻏـﻴـﺮ‬
‫اﻟﻼﺣﻘﺔ ‪ :‬وهﻲ اﻟﻜﻠﻤﺎت اﻟﺘﻲ ﺗﻠﺤﻖ ﺑﺎﻻﺳﻢ ﻣﺜﻞ ) اﻟﻤﺤﺘﺮم – اﻟﻔﺎﺿﻞ ‪( ... -‬‬
‫‪Salutation‬‬
‫إﻓﺘﺘﺎﺣﻴﺔ اﻟﺮﺳﺎﺋﻞ ‪ :‬وهﻲ اﻟﺠﻤﻠ ﺔ اﻟﺘ ﻲ ﺗﻜﺘ ﺐ ﻗﺒ ﻞ اﻻﺳ ﻢ ﻣﺜ ﻞ ) ﺳ ﻌﺎدة اﻟﻤ ﺪﻳﺮ – ﺳ ﻴﺎدة‬
‫اﻷﺳﺘﺎذ ‪(... -‬‬

‫ﻣﺴﻤﻮح‬
‫وﺑﺎﻟﻌﻮدة ﻟﻠﺸﻜﻞ ) ‪ ( ٣٣ -١‬ﻧﺴﺘﻜﻤﻞ ﺑﻘﻴﺔ اﻟﺤﻘﻮل‬
‫‪Employee ID‬‬
‫رﻗﻢ ﺗﻌﺮﻳﻒ اﻟﻤﻮﻇﻒ ) اﻟﺮﻗﻢ اﻟﻀﺮﻳﺒﻲ(‬
‫‪Job Title‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫اﻟﻠﻘﺐ اﻟﻮﻇﻴﻔﻲ ‪ :‬ﻣﺜﻞ ) ﻣﺪﻳﺮ ﻋﺎم – ﻣﺪﻳﺮ ﻣﺸﺎرﻳﻊ ‪(... -‬‬
‫‪Male‬‬
‫اﻟﻨﻮع ‪ :‬ذآﺮ‬
‫‪Female‬‬
‫اﻟﻨﻮع ‪ :‬أﻧﺜﻰ‬

‫ﻧﺴﺨﺔ‬
‫‪Location‬‬
‫وﻳﻘﺼﺪ ﺑﻬﺎ ﻣﻜﺎن اﻟﺸﺨﺺ هﻞ هﻮ ‪Office – Site – Home‬‬
‫‪City/State/Country/Postal Code/Country Code‬‬
‫ﺣﻘﻮل اﻟﻌﻨﻮان اﻟﺒﺮﻳﺪي ﻟﻠﺸﺨﺺ‬

‫ﻟﻠﻌﺮض‬
‫‪Phone Numbers‬‬
‫ﺣﻘﻮل أرﻗﺎم اﻟﻬﻮاﺗﻒ اﻟﺨﺎﺻﺔ ﺑﻪ ﻣﻊ ﻣﻼﺣﻈﺔ أن ‪ Ext‬هﻲ ﺧﺎﻧﺔ اﻟﺮﻗﻢ اﻟﺪاﺧﻠﻲ‬
‫ﺑﺎﻟﺸﺮآﺔ ) أي اﻟﺘﺤﻮﻳﻠﺔ (‬
‫‪Drawings‬‬
‫إدﺧﺎل اﻟﻤﻘﺎﺳﺎت اﻟﻤﻔﻀﻠﺔ ﻟﻠﻮﺣﺎت ‪ Size‬وﻋﺪد اﻟﻨﺴﺦ ‪ Copies‬واﻟﺘﻲ ﻳﻄﻠﺒﻬﺎ ذﻟﻚ‬

‫ﻓﻘﻂ‬
‫اﻟﻤﻮﻇﻒ ) ﺧﻴﺎر ﻣﻬﻢ ﺟﺪا ﻋﻨﺪ ﻋﻤﻞ اﻟﺘﻘﺪﻳﻤﺎت ‪( Submittals‬‬
‫‪E-Mail Address / Method‬‬
‫ﻋﻨﻮان اﻟﺒﺮﻳﺪ اﻻﻟﻜﺘﺮوﻧﻲ وﻃﺮﻳﻘﺔ اﺳﺘﻘﺒﺎل اﻟﺒﺮﻳﺪ ﻣﻦ ﺧﻼل ﺑﺮﻧﺎﻣﺞ ‪Expedition‬‬
‫وهﻲ ﻣﻘﺴﻤﺔ إﻟﻰ‪:‬‬
‫ﻓﻲ ﺣﺎﻟﺔ ﻋﺪم وﺟﻮد إﻣﻜﺎﻧﻴﺔ اﺳﺘﻘﺒﺎل اﻟﺒﺮﻳﺪ اﻻﻟﻜﺘﺮوﻧﻲ‬ ‫‪None‬‬
‫ﻓﻲ ﺣﺎﻟﺔ إﻣﻜﺎﻧﻴﺔ اﺳﺘﻘﺒﺎل اﻟﺒﺮﻳﺪ ﻣﻦ ﺧﻼل اﻟﺸﺒﻜﺔ اﻟﺪاﺧﻠﻴﺔ ﻟﺸﺮآﺘﻚ‬ ‫‪Local‬‬
‫‪ Remote‬ﻓﻲ ﺣﺎﻟﺔ إﻣﻜﺎﻧﻴﺔ اﺳﺘﻘﺒﺎل اﻟﺒﺮﻳﺪ ﻣﻦ ﺧﻼل اﻻﻧﺘﺮﻧﺖ‬
‫‪ Non-Exp‬ﻓﻲ ﺣﺎﻟﺔ أن اﻟﻤﻮﻇﻒ ﻟﻴﺲ ﻟﺪﻳﻪ ﺑﺮﻧﺎﻣﺞ ‪Expedition‬‬

‫‪٣٥‬‬
‫اﻟﺒﺎب اﻷول‬

‫ﺗﻌﺪﻳﻞ ﺑﻴﺎﻧﺎت ﺷﺮآﺔ أو ﻣﻮﻇﻒ‬


‫ﺑﻌﺪ أن أﺿﻔﻨﺎ ﺑﻴﺎﻧﺎت ﺷﺮآﺔ أو ﻣﻮﻇﻒ ﺳﻨﺘﻌﻠﻢ اﻵن آﻴﻔﻴﺔ ﺗﻌﺪﻳﻞ ﺗﻠﻚ اﻟﺒﻴﺎﻧﺎت‬

‫ﻏـﻴـﺮ‬
‫ﺑﻨﻔﺲ اﻟﺨﻄﻮات اﻟﺴﺎﺑﻖ ﺷﺮﺣﻬﺎ ﻧﻔﺘﺢ ﻣﺠﻠﺪ اﻟﺸﺮآﺎت ﻓﻲ اﻟﻤﺸﺮوع ﺛﻢ ﻧﻘﻒ ﻋﻠﻰ اﻟﺸﺮآﺔ‬
‫اﻟﻤﻄﻠﻮب ﺗﻌﺪﻳﻞ ﺑﻴﺎﻧﺎﺗﻬ ﺎ وﻧ ﻀﻊ ﻣﺆﺷ ﺮ اﻟﻔ ﺄرة ﻋﻠ ﻰ اﻟﺮﻣ ﺰ اﻟﻤﺠ ﺎور ﻷﺳ ﻢ اﻟ ﺸﺮآﺔ آﻤ ﺎ‬
‫ﺑﺎﻟﺸﻜﻞ ) ‪( ٣٥ – ١‬‬

‫ﻣﺴﻤﻮح‬ ‫ﺷﻜﻞ )‪( ٣٥ – ١‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ زر ‪ Open‬ﻓﺘﻔﺘﺢ اﻟﻨﺎﻓﺬة وﺑﻬﺎ اﻟﺒﻴﺎﻧﺎت ﺛﻢ ﻧﻘﻮم ﺑﺘﻌﺪﻳﻞ اﻟﺒﻴﺎﻧﺎت‬
‫اﻟﻤﻄﻠﻮﺑﺔ ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ زر ‪ OK‬ﻟﺤﻔﻆ اﻟﺘﻐﻴﻴﺮات اﻟﻤﻄﻠﻮﺑﺔ‬
‫وﺑﻨﻔﺲ اﻟﻄﺮﻳﻘﺔ ﻳﺘﻢ ﺗﻌﺪﻳﻞ ﺑﻴﺎﻧﺎت اﻟﻤﻮﻇﻒ‬

‫ﻧﺴﺨﺔ‬
‫ﺣﺬف ﺑﻴﺎﻧﺎت ﺷﺮآﺔ أو ﻣﻮﻇﻒ‬
‫ﻓﻲ ﺣﺎﻟﺔ اﻟﺮﻏﺒﺔ ﻓﻲ ﺣﺬف ﺑﻴﺎﻧﺎت ﻧﻘﻮم ﺑﺘﺤﺪﻳﺪ اﻟﺒﻴﺎﻧﺎت اﻟﻤﻄﻠﻮب ﺣﺬﻓﻬﺎ ﻋﻦ ﻃﺮﻳﻖ‬
‫اﻟﻮﻗﻮف ﺑﻤﺆﺷﺮ اﻟﻔﺄرة ﻋﻠﻰ اﻟﺮﻣﺰ اﻟﻤﺠﺎور ﻷﺳﻢ اﻟﺸﺮآﺔ ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ زر ﻓﺘﻈﻬﺮ‬
‫رﺳﺎﻟﺔ ﺗﺤﺬﻳﺮ آﻤﺎ ﺑﺎﻟﺸﻜﻞ )‪ ( ٣٦ -١‬ﺛﻢ ﻧﻀﻐﻂ ‪Yes‬‬

‫ﻟﻠﻌﺮض‬ ‫ﺷﻜﻞ )‪( ٣٦ – ١‬‬

‫ﻓﻘﻂ‬
‫ﻓﺘﻈﻬﺮ رﺳﺎﻟﺔ أﺧﺮى ﺗﺴﺄل ﻓﻲ اﻟﺮﻏﺒﺔ ﻓﻲ اﻟﺤﺬف ﻣﻦ ﻗﺎﻋﺪة ﺑﻴﺎﻧﺎت اﻟﺒﺮﻧﺎﻣﺞ أم ﻻ؟‬
‫ﻓﻌﻨﺪﻣﺎ ﻧﺨﺘﺎر ‪ Yes‬ﻳﺘﻢ اﻟﺤﺬف ﻣﻦ اﻟﺒﺮﻧﺎﻣﺞ ﻧﻬﺎﺋﻴﺎ أﻣﺎ ﻋﻨﺪﻣﺎ ﻧﺨﺘﺎر ‪ No‬ﻳﺘﻢ اﻟﺤﺬف‬
‫ﻣﻦ اﻟﻤﺸﺮوع اﻟﻤﻔﺘﻮح ﻓﻘﻂ وﺗﺒﻘﻰ ﺑﻴﺎﻧﺎت اﻟﺸﺮآﺔ ﻣﺘﺎﺣﺔ ﻓﻲ ﻗﺎﻋﺪة اﻟﺒﻴﺎﻧﺎت ﺑﺤﻴﺚ ﻳﻤﻜﻦ‬
‫إﺿﺎﻓﺘﻬﺎ ﻣﺮة أﺧﺮى – ﺷﻜﻞ ) ‪( ٣٧ -١‬‬

‫ﺷﻜﻞ )‪( ٣٧ – ١‬‬

‫‪٣٦‬‬
‫ﻣﺎهﻮ ‪Expedition‬‬

‫ﻧﺴﺦ ﺑﻴﺎﻧﺎت ﺷﺮآﺎت ﻣﻦ ﻣﺸﺮوع ﻟﻤﺸﺮوع‬

‫ﻏـﻴـﺮ‬
‫ﻣ ﻦ اﻟﻤﻴ ﺰات اﻟﺠﻤﻴﻠ ﺔ ﻓ ﻲ ﺑﺮﻧ ﺎﻣﺞ ‪Expedition‬ﻋﻤﻠﻴ ﺔ ﻧ ﺴﺦ ﻣﺠﻠ ﺪ اﻟ ﺸﺮآﺎت ﻣ ﻦ‬
‫ﻣﺸﺮوع ﻟﻤﺸﺮوع‬
‫ﻓﻤ ﺜﻼ ﻟ ﻮ أﻧﻨ ﻲ ﻗﻤ ﺖ ﺑﺈﻧ ﺸﺎء ﻣ ﺸﺮوع ﺟﺪﻳ ﺪ ووﺟ ﺪت أﻧﻨ ﻲ ﺳ ﺄﺗﻌﺎﻣﻞ ﻣ ﻊ ﻣﺠﻤﻮﻋ ﺔ ﻣ ﻦ‬
‫اﻟ ﺸﺮآﺎت اﻟ ﺴﺎﺑﻖ اﻟﺘﻌﺎﻣ ﻞ ﻣﻌﻬ ﺎ ﻓ ﻲ ﻣ ﺸﺮوع ﻗ ﺪﻳﻢ ﻓﻌﻨﺪﺋ ﺬ ﻧﻘ ﻮم ﺑﻨ ﺴﺦ ﺑﻴﺎﻧ ﺎت ﺗﻠ ﻚ‬
‫اﻟﺸﺮآﺎت ﻣﻦ اﻟﻤﺸﺮوع اﻟﻘﺪﻳﻢ إﻟﻰ اﻟﻤﺸﺮوع اﻟﺠﺪﻳﺪ آﺎﻵﺗﻲ‬

‫ﻣﺴﻤﻮح‬ ‫‪ -١‬ﻧﻔﺘﺢ ﻣﺠﻠﺪ اﻟﺸﺮآﺎت ﻓﻲ اﻟﻤﺸﺮوع اﻟﺠﺪﻳﺪ‬


‫‪ -٢‬ﻣﻦ ﻗﺎﺋﻤﺔ ‪ Tools‬ﻧﺨﺘﺎر اﻷﻣﺮ … ‪Copy Contacts‬‬
‫… ‪Tools Æ Copy Contacts‬‬
‫ﻓﺘﻈﻬﺮ أﻣﺎﻣﻨﺎ اﻟﻨﺎﻓﺬة اﻟﺘﺎﻟﻴﺔ – ﺷﻜﻞ ) ‪( ٣٨ – ١‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬
‫ﻟﻠﻌﺮض‬
‫ﺷﻜﻞ )‪( ٣٨ – ١‬‬
‫‪ -٣‬ﻓ ﻲ اﻟﺠﺎﻧ ﺐ اﻷﻳ ﺴﺮ ﻗﺎﺋﻤ ﺔ اﻟ ﺸﺮآﺎت ﻓ ﻲ ﺟﻤﻴ ﻊ اﻟﻤ ﺸﺎرﻳﻊ وﻓ ﻲ اﻟﺠﺎﻧ ﺐ اﻷﻳﻤ ﻦ‬
‫ﻗﺎﺋﻤﺔ اﻟﺸﺮآﺎت ﻓﻲ ﻣﺸﺮوﻋﻨﺎ‬
‫‪ -٤‬إذا رﻏﺒﻨﺎ ﻓﻲ ﻧﺴﺦ ﺟﻤﻴ ﻊ اﻟ ﺸﺮآﺎت ﻣ ﻦ اﻟﺠﺎﻧ ﺐ اﻷﻳ ﺴﺮ ﻟﻠﺠﺎﻧ ﺐ اﻷﻳﻤ ﻦ ﻧ ﻀﻐﻂ‬
‫ﻋﻠﻰ اﻟﺰر ‪Add All‬‬

‫ﻓﻘﻂ‬
‫‪ -٥‬إذا رﻏﺒﻨﺎ ﻓﻲ ﻧﺴﺦ ﺑﻴﺎﻧﺎت ﺷﺮآﺔ واﺣﺪة ﻓﻘﻂ أو ﺗﺤﺪﻳﺪ ﻋﺪة ﺷﺮآﺎت ﻳ ﺘﻢ ذﻟ ﻚ ﻣ ﻦ‬
‫ﺧ ﻼل ﺗﺤﺪﻳ ﺪ اﻟ ﺸﺮآﺔ اﻟﻤﻄﻠﻮﺑ ﺔ ﺛ ﻢ ﻧ ﻀﻐﻂ ﻋﻠ ﻰ زر ‪ Add‬وﺑﺘﻜ ﺮار اﻟﺘﺤﺪﻳ ﺪ‬
‫واﻟﻀﻐﻂ ﻳﻤﻜﻦ ﻧﺴﺦ ﺑﻴﺎﻧﺎت أي ﻋﺪد ﻣﻦ اﻟﺸﺮآﺎت‬
‫وﻓﻲ ﺣﺎﻟﺔ ﺣﺪوث ﺗﻀﺎرب ﻋﻨﺪ اﻟﻨﺴﺦ ﺳﺘﻈﻬﺮ رﺳﺎﻟﺔ ﺗﻔﻴﺪ ﺑﺬﻟﻚ – ﺷﻜﻞ ) ‪( ٣٩ -١‬‬

‫ﺷﻜﻞ )‪( ٣٩ – ١‬‬

‫‪٣٧‬‬
‫اﻟﺒﺎب اﻷول‬

‫ﻗﻮاﺋﻢ اﻟﺘﻮزﻳﻊ‬

‫ﻏـﻴـﺮ‬
‫اﻟﻤﻘﺼﻮد ﺑﻘﻮاﺋﻢ اﻟﺘﻮزﻳ ﻊ ‪ Distribution list‬ه ﻮ ﺗﺠﻤﻴ ﻊ اﻟ ﺸﺮآﺎت ﻓ ﻲ ﻣﺠﻤﻮﻋ ﺎت‬
‫ﻣﺘﺨﺼﺼﺔ ﻓﻤ ﺜﻼ ﻳ ﺘﻢ إﻧ ﺸﺎء ﻗﺎﺋﻤ ﺔ ﺧﺎﺻ ﺔ ﺑ ﺸﺮآﺎت اﻹﻧ ﺸﺎءات اﻟﺨﺮﺳ ﺎﻧﻴﺔ ) أﺳ ﻤﻨﺖ –‬
‫ﺣﺪﻳﺪ – ﺷﺪات ﻣﻌﺪﻧﻴﺔ ‪ -‬ﻣﻘﺎوﻟﻲ ﺗﻨﻔﻴﺬ ‪ (.. -‬ﺑﺤﻴﺚ ﻋﻨﺪ اﻟﺮﻏﺒﺔ ﻓﻲ إرﺳﺎل ﻣﺴﺘﻨﺪ ﺧﺎص‬
‫ﺑﺎﻷﻋﻤﺎل اﻟﺨﺮﺳﺎﻧﻴﺔ ﻳﺘﻢ إرﺳﺎﻟﻪ اﻟﻤﺴﺘﻨﺪ إﻟﻰ ﻗﺎﺋﻤﺔ اﻟﺘﻮزﻳ ﻊ واﻟﺘ ﻲ ﺑ ﺪورهﺎ ﺗﻘ ﻮم ﺑﺈرﺳ ﺎل‬

‫ﻣﺴﻤﻮح‬
‫ﻧﺴﺨﺔ ﻣﻦ اﻟﻤﺴﺘﻨﺪ إﻟﻰ آﻞ اﻟﻤﺸﺎرآﻮن ﻓﻲ ﻗﺎﺋﻤﺔ اﻟﺘﻮزﻳﻊ‬

‫إﻧﺸﺎء ﻗﺎﺋﻤﺔ ﺗﻮزﻳﻊ‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺘﺒﻊ اﻵﺗﻲ ﻋﻨﺪ اﻟﺮﻏﺒﺔ ﻓﻲ ﻧﺘﺒﺦ اﻟﺨﻄﻮات اﻟﺘﺎﻟﻴﺔ ﻋﻨﺪ اﻟﺮﻏﺒﺔ ﻓﻲ إﻧﺸﺎء ﻗﺎﺋﻤﺔ ﺗﻮزﻳﻊ‬
‫‪ -١‬ﻣﻦ ﻗﺎﺋﻤﺔ ‪ Define‬ﻧﺨﺘﺎر … ‪Distribution Lists‬‬
‫… ‪Define Æ Distribution Lists‬‬

‫‪ -٢‬ﻓﺘﻈﻬﺮ اﻟﻨﺎﻓﺬة اﻟﺘﺎﻟﻴﺔ – ﺷﻜﻞ )‪( ٤٠ -١‬‬

‫ﻧﺴﺨﺔ‬
‫ﻟﻠﻌﺮض‬
‫ﻓﻘﻂ‬ ‫ﺷﻜﻞ )‪( ٤٠ – ١‬‬

‫‪ -٣‬ﻧ ﻀﻐﻂ ﻋﻠ ﻰ اﻟ ﺰر ‪ Add‬ﻓﺘﻈﻬ ﺮ اﻟﻨﺎﻓ ﺬة اﻟﺘﺎﻟﻴ ﺔ واﻟﺘ ﻲ ﺗﻄﻠ ﺐ ﻣﻨ ﻚ ﺗﺤﺪﻳ ﺪ اﺳ ﻢ‬


‫ﻟﻘﺎﺋﻤﺔ اﻟﺘﻮزﻳﻊ ﺑﺤﻴﺚ ﻻ ﻳﺰﻳﺪ ﻋﻦ ‪ ١٢‬ﺣﺮف ﻓﻲ ﺧﺎﻧﺔ ‪Distribution List‬‬
‫وﻳﻤﻜﻦ آﺘﺎﺑﺔ اﻟﻌﻨﻮان اﻹﻳﻀﺎﺣﻲ ﻓﻲ ﺧﺎﻧﺔ ‪ - Title‬ﺷﻜﻞ ) ‪( ٤١ -١‬‬

‫‪٣٨‬‬
‫ﻣﺎهﻮ ‪Expedition‬‬

‫ﻏـﻴـﺮ‬
‫ﻣﺴﻤﻮح‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﺷﻜﻞ )‪( ٤١ – ١‬‬

‫‪ -٤‬ﻓ ﻲ ﺣﺎﻟ ﺔ اﻟﺮﻏﺒ ﺔ ﻓ ﻲ إﺿ ﺎﻓﺔ آ ﻞ اﻟ ﺸﺮآﺎت ﻳ ﺘﻢ اﻟ ﻀﻐﻂ ﻋﻠ ﻰ ‪ Add All‬وﻓ ﻲ‬


‫ﺣﺎﻟﺔ اﻟﺮﻏﺒﺔ إﺿﺎﻓﺔ ﺷﺮآﺔ ﺑﻌﺪ ﺷﺮآﺔ ﻣﻦ ﺧﻼل ﺗﺤﺪﻳﺪ اﻟ ﺸﺮآﺔ ﺛ ﻢ اﻟ ﻀﻐﻂ ﻋﻠ ﻰ‬

‫ﻧﺴﺨﺔ‬
‫زر ‪ Add‬ﺛﻢ اﻟﻀﻐﻂ ﻋﻠﻰ زر ‪ Ctrl‬ﺛﻢ ﺗﺤﺪﻳﺪ اﻟﺸﺮآﺔ اﻷﺧ ﺮى واﻟ ﻀﻐﻂ ﻋﻠ ﻰ‬
‫‪ Add‬وهﻜﺬا ‪ ،‬وﻳﻤﻜﻦ ﺑﺪﻻ ﻣﻦ اﻟﻀﻐﻂ ﻋﻠﻰ اﻟﺰر ان ﻳﺘﻢ اﻟﻨﻘﺮ اﻟﻤ ﺰدوج ﻋﻠ ﻰ‬
‫اﻻﺳﻢ وﺑﺎﻟﺘﺎﻟﻲ ﻳﺘﻢ إﺿﺎﻓﺔ اﻻﺳﻢ ﻟﻠﻘﺎﺋﻤﺔ‬

‫‪ -٥‬ﻓﻲ ﺣﺎﻟﺔ ﺣﺪوث ﺧﻄﺄ ﻳﺘﻢ ﺗﺤﺪﻳﺪ اﻟﺸﺮآﺔ اﻟﻤﻄﻠﻮب إزاﻟﺘﻬﺎ ﻣﻦ اﻟﻘﺎﺋﻤﺔ اﻟﻴﻤﻨﻰ ﺛﻢ‬

‫ﻟﻠﻌﺮض‬
‫اﻟﻀﻐﻂ ﻋﻠﻰ زر ‪ Remove‬وﻋﻨﺪ اﻟﺮﻏﺒﺔ ﻓﻲ إزاﻟﺔ اﻟﻜﻞ ‪Remove All‬‬
‫‪ -٦‬ﺑﻌﺪ اﻻﻧﺘﻬﺎء ﻳﺘﻢ اﻟﻀﻐﻂ ﻋﻠﻰ ‪Finish‬‬

‫ﻓﻘﻂ‬ ‫ﻓﻲ ﺣﺎﻟﺔ وﺟﻮد أآﺜﺮ ﻣﻦ ﻣﻮﻇﻒ ﻓﻲ اﻟﺸﺮآﺔ‬


‫آﻤﺎ ﺗﺮى ﻓﻲ اﻟﺸﻜﻞ اﻟﺴﺎﺑﻖ ﻓﺄﻧﻪ ﺗﻮﺟﺪ إﺣﺪى اﻟﺸﺮآﺎت ﻟﺪﻳﻬﺎ ‪ ٤‬ﻣﻮﻇﻔﻴﻦ‬
‫ﻣﺴﺠﻠﻴﻦ ﻓﻲ ﻗﺎﺋﻤﺔ ‪ Contact‬وﺑﺎﻟﺘﺎﻟﻲ ﻳﻤﻜﻦ اﺧﺘﻴﺎر ﺑﻌﺾ ﻣﻨﻬﻢ أو آﻠﻬﻢ ﺛﻢ‬
‫ﻳﺘﻢ اﻹﺿﺎﻓﺔ إﻟﻰ ﻗﺎﺋﻤﺔ اﻟﺘﻮزﻳﻊ‬

‫‪٣٩‬‬
‫اﻟﺒﺎب اﻷول‬

‫ﻧﺴﺦ ﺑﻴﺎﻧﺎت ﻗﺎﺋﻤﺔ ﺗﻮزﻳﻊ ﻷﺧﺮى‬

‫ﻏـﻴـﺮ‬
‫ﺑﻌﺪ إﻧﺸﺎء ﻗﺎﺋﻤﺔ ﺗﻮزﻳﻊ ﻗﺪ ﻧﻀﻄﺮ ﻟﻨﺴﺦ ﺗﻠﻚ اﻟﺒﻴﺎﻧﺎت إﻟﻰ ﻗﺎﺋﻤﺔ أﺧﺮى ‪ ،‬ﻟﺬا ﺑﺪﻻ ﻣ ﻦ‬
‫إﻋﺎدة اﻟﺨﻄﻮات اﻟﺴﺎﺑﻘﺔ ﺳﻨﻘﻮم ﺑﻨﺴﺦ اﻟﺒﻴﺎﻧﺎت ﻣﺮة واﺣﺪة‬
‫وﻟﻌﻤﻞ ذﻟﻚ ﻳﺘﻢ ﻣﻦ اﺧﺘﻴﺎر ﻗﺎﺋﻤﺔ ‪ Define‬ﺛﻢ ‪ Distribution List‬ﺛ ﻢ ﻳ ﺘﻢ اﻟ ﻀﻐﻂ‬
‫ﻋﻠﻰ زر ‪ Copy‬ﻓﺘﻈﻬ ﺮ اﻟﻨﺎﻓ ﺬة آﻤ ﺎ ﺑﺎﻟ ﺸﻜﻞ ) ‪ ( ٤٢ -١‬ﺛ ﻢ ﻳ ﺘﻢ ﺗﺤﺪﻳ ﺪ اﻟﻘﺎﺋﻤ ﺔ اﻟﻤ ﺮاد‬
‫اﻟﻨﺴﺦ ﻣﻨﻬ ﺎ ‪ From List‬ﺛ ﻢ ﻳ ﺘﻢ ﺗﺤﺪﻳ ﺪ اﻟﻘﺎﺋﻤ ﺔ اﻟﻤ ﺮاد اﻟﻨ ﺴﺦ اﻟﻴﻬ ﺎ ‪ To List‬ﺛ ﻢ ﻳ ﺘﻢ‬

‫ﻣﺴﻤﻮح‬ ‫اﻟﻀﻐﻂ ﻋﻠﻰ زر ‪Finish‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬ ‫ﺷﻜﻞ )‪( ٤٢ – ١‬‬

‫ﻟﻠﻌﺮض‬
‫رﺑﻂ ‪ Expedition‬ﺑﺎﻟﺒﺮﻧﺎﻣﺞ اﻟﺰﻣﻨﻲ ب ‪Primavera‬‬
‫ان اﻟﺘﻜﺎﻣ ﻞ ﺑ ﻴﻦ ﺑ ﺮاﻣﺞ ﺷ ﺮآﺔ ‪ Primavera‬ﻟﻬ ﻮ أﻣ ﺮ ﺿ ﺮوري ﺣﺘ ﻰ ﻳ ﺘﻢ إدارة‬

‫ﻓﻘﻂ‬
‫اﻟﻌﻤ ﻞ ﺑﻜﻔ ﺎءة ﻋﺎﻟﻴ ﺔ ‪ ،‬ﻟ ﺬا ﺳ ﺘﺠﺪ اﻧ ﻪ ﻣ ﻦ ﺧ ﻼل ﺑﺮﻧ ﺎﻣﺞ ‪ Expedition‬ﺳ ﻨﺘﻤﻜﻦ ﻣ ﻦ‬
‫رﺑ ﻂ اﻟﺒﺮﻧ ﺎﻣﺞ اﻟﺰﻣﻨ ﻲ واﻟ ﺬي ﺗ ﻢ ﺗﻜﻮﻳﻨ ﻪ ﺑﺒﺮﻧ ﺎﻣﺞ ‪ P3‬ﺑﺤﻴ ﺚ اﻧ ﻪ ﻋﻨ ﺪﻣﺎ ﻳ ﺘﻢ ﺗﺤ ﺪﻳﺚ‬
‫ﻟﻠﺒﺮﻧﺎﻣﺞ اﻟﺰﻣﻨﻲ داﺧﻞ ﺑﺮﻧﺎﻣﺞ ‪ P3‬ﻳﻘﻮم ﺑﺮﻧﺎﻣﺠﻨﺎ ﺑﺘﺤﺪﻳﺚ هﺬا اﻟﺠﺪول اﻟﺰﻣﻨﻲ‬

‫وﻟﻘﺪ ﻗﻤﻨﺎ ﺑﺸﺮح ﺗﻠﻚ اﻟﺨﻄﻮة ﻓﻲ ﻣﺮﺣﻠﺔ إﻧﺸﺎء ﻣﺸﺮوع ﺟﺪﻳﺪ ﻣﻦ ﺧﻼل اﻟﻤﻌﺎﻟﺞ وﻟﻜﻨﻨ ﺎ‬
‫اﻵن ﺳﻨﺸﺮح هﺬﻩ اﻟﺨﻄﻮة ﻣﻦ ﺧﺎرج اﻟﻤﻌﺎﻟﺞ ﺣﻴﺚ اﻧﻨﺎ ﻗﺪ ﻧﺘﻐﺮض ﻟﻌﻤﻞ ﻣﻠ ﻒ ﻣ ﺸﺮوع‬
‫ﻗﺒﻞ إﻧﺸﺎء اﻟﺒﺮﻧﺎﻣﺞ اﻟﺰﻣﻨﻲ ﻟﻪ‬

‫‪٤٠‬‬
‫ﻣﺎهﻮ ‪Expedition‬‬

‫اﻟﺨﻄﻮات هﻲ ‪:‬‬

‫ﻏـﻴـﺮ‬
‫‪ -١‬ﻧﺤﺪد اﻟﻤﺸﺮوع اﻟﻤﻄﻠﻮب ﺛﻢ ﻣﻦ ﻗﺎﺋﻤﺔ ‪ Define‬ﻧﺨﺘﺎر اﻷﻣﺮ‬
‫‪Project Preferences‬‬
‫‪Define Æ Project Preferences‬‬

‫ﻣﺴﻤﻮح‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬ ‫ﺷﻜﻞ )‪( ٤٣ – ١‬‬

‫ﻟﻠﻌﺮض‬
‫‪ -٢‬ﻧﻘﻮم ﺑﻔﺘﺢ ﺗﺒﻮﻳﺐ ‪ Schedule‬ﺛﻢ ﻧﺨﺘﺎر ﻣﻦ اﻟﻘﺎﺋﻤﺔ اﻟﻤﻨﺴﺪﻟﺔ‬
‫ﻓﻲ ﺣﺎﻟﺔ ‪Primavera Project Planner P3‬‬
‫‪ -٣‬ﺛﻢ ﻧﺤﺪد اﻟﻤﺴﺎر ‪ Path‬ﻣﻦ ﺧﻼل اﺳﺘﻌﺮاض ﻣﺠﻠﺪ ﺑﺮﻧﺎﻣﺞ ‪ P3‬ﺛﻢ ﻣﺠﻠﺪ‬
‫اﻟﻤﺸﺎرﻳﻊ ﺛﻢ ﻧﺤﺪد اﻟﻤﺠﻤﻮﻋﺔ‬
‫‪P3‬‬

‫ﻓﻘﻂ‬
‫‪ -٤‬اﻣﺎ ﻓﻲ ﺣﺎﻟﺔ اﺧﺘﻴﺎر‬
‫‪ P3e‬وهﻲ ﻟﺒﺮﻧﺎﻣﺞ ‪Primavera Enterprise‬‬
‫ﺳﻨﺤﺪد ﻓﻲ هﺬﻩ اﻟﺤﺎﻟﺔ ﻗﺎﻋﺪة اﻟﺒﻴﺎﻧﺎت ‪ Database‬ﺛﻢ ﻧﺤﺪد اﻟﻤﺸﺮوع ‪Project‬‬

‫‪٤١‬‬
‫א ﻏـﻴـﺮ‬ ‫א‬
‫א ﻣﺴﻤﻮح‬
‫‪Dictionaries‬‬ ‫א‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬
‫ﻟﻠﻌﺮض‬
‫ﻓﻘﻂ‬
‫اﻟﻘﻮاﻣﻴﺲ ‪Dictionaries‬‬

‫ﻏـﻴـﺮ‬ ‫א‬ ‫א‬

‫ﻣﺴﻤﻮح‬
‫ﻋﻨﺪﻣﺎ ﻧﻘﻮل آﻠﻤﺔ ﻗﺎﻣﻮس ﻳﺘﺒﺎدر إﻟﻰ ذهﻨﻨﺎ ﻓﻲ اﻟﺤﺎل ﻗﺎﻣﻮس اﻟﻠﻐﺔ اﻹﻧﺠﻠﻴﺰﻳﺔ‬
‫وﻟﻜﻨﻨﺎ ﻧﻘﺼﺪ أﻣﺮ ﺁﺧﺮ وهﻮ ﺗﻌﺮﻳﻒ آﻞ اﻟﺘﺼﻨﻴﻔﺎت اﻟﻤﻤﻜﻨﺔ ﻟﻠﺒﺮﻧﺎﻣﺞ ﻣﺜﻞ ‪:‬‬
‫أﻗﺴﺎم اﻟﻤﻮاﺻﻔﺎت‬
‫ﺗﺼﻨﻴﻒ اﻟﺸﺮآﺎت‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫أﻧﻮاع اﻟﺘﻘﺪﻳﻤﺎت‬
‫أﻧﻮاع اﻟﺮﺳﻮﻣﺎت‬
‫إﺻﺪارات اﻟﺮﺳﻮﻣﺎت‬
‫ﻣﻘﺎﺳﺎت اﻟﻠﻮﺣﺎت‬
‫اآﻮاد اﻟﻠﻮﺣﺎت‬

‫ﻧﺴﺨﺔ‬ ‫ﻣﻨﺎﻃﻖ اﻟﻌﻤﻞ‬


‫اﻷدوار ﺑﺎﻟﻤﺒﻨﻰ‬
‫اﻟﻐﺮف‬
‫وﻏﻴﺮ ذﻟﻚ ﻣﻦ اﻟﻤﻌﻠﻮﻣﺎت‬

‫ﻟﻠﻌﺮض‬ ‫أوﻻ ‪ :‬أﻗﺴﺎم اﻟﻤﻮاﺻﻔﺎت‬


‫اﻟﺒﺮﻧ ﺎﻣﺞ ﻳﻌﺘﻤ ﺪ ﻋﻠ ﻰ ﺗ ﺼﻨﻴﻒ ‪ Master Format‬اﻟ ﺼﺎدر ﻣ ﻦ ﻣﻌﻬ ﺪ ﻣﻮاﺻ ﻔﺎت‬
‫اﻟﺘﺸﻴﻴﺪ اﻷﻣﺮﻳﻜﻴﺔ )‪Construction Specification Institute (CSI‬‬

‫ﻓﻘﻂ‬
‫وﻳﻤﻜﻨﻚ أﺧﻲ اﻟﻤﻬﻨﺪس اﻻﻋﺘﻤﺎد ﻋﻠﻴﻪ أو إﻋﺪاد ﺗﺼﻨﻴﻔﺎت ﺧﺎﺻﺔ ﺑﻚ آﺎﻵﺗﻲ ‪:‬‬
‫‪ -١‬ﻧﻀﻊ ﻣﺆﺷﺮ اﻟﻔﺄرة ﻋﻠﻰ ‪All Projects‬‬
‫‪ -٢‬ﻣﻦ ﻗﺎﺋﻤﺔ ‪ Define‬ﻧﺨﺘﺎر اﻟﻘﺎﺋﻤﺔ اﻟﻔﺮﻋﻴﺔ ‪ Dictionaries‬ﺛﻢ ﻧﺨﺘ ﺎر اﻷﻣ ﺮ‬
‫…‪Spec Sections‬‬
‫‪Define Æ Dictionaries Æ Spec Sections‬‬

‫‪ -٣‬ﻓﺘﻈﻬﺮ أﻣﺎﻣﻚ ﻧﺎﻓﺬة ﺑﻬﺎ ﺟﻤﻴﻊ أﻗﺴﺎم اﻟﻤﻮاﺻﻔﺎت – ﺷﻜﻞ )‪( ١ – ٢‬‬

‫‪٤٣‬‬
‫اﻟﺒﺎب اﻟﺜﺎﻧﻲ‬

‫ﻏـﻴـﺮ‬
‫ﻣﺴﻤﻮح‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬ ‫ﺷﻜﻞ )‪( ١ – ٢‬‬

‫‪ -٣‬ﻹﺿﺎﻓﺔ ﻋﻨﺼﺮ ﺟﺪﻳﺪ ﻧﻀﻊ ﻣﺆﺷﺮ اﻟﻔﺄرة ﻋﻠﻰ اﻟﻌﻨﺼﺮ اﻟﺬي ﺳ ﻴﺘﻢ اﻹدراج ﺑﻌ ﺪﻩ‬

‫ﻧﺴﺨﺔ‬
‫ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ زر ‪ Add‬وﻧﻜﺘﺐ رﻗﻢ اﻟﻤﻮاﺻ ﻔﺔ ﻓ ﻲ ﺧﺎﻧ ﺔ ‪Section Value‬‬
‫وﻧﻜﺘﺐ وﺻﻒ اﻟﻤﻮاﺻﻔﺔ ﻓﻲ ﺧﺎﻧﺔ ‪Description‬‬
‫‪ -٤‬وﻟﺤﺬف ﻋﻨﺼﺮ ﻧﻀﻊ ﻣﺆﺷﺮ اﻟﻔﺄرة ﻋﻠﻰ اﻟﻌﻨﺼﺮ اﻟﻤﺮاد ﺣﺬﻓﻪ ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ‬
‫زر ‪Delete‬‬

‫ﻟﻠﻌﺮض‬
‫‪ -٥‬وﻟﺘﻐﻴﻴﺮ ﺗﺮﺗﻴﺐ اﻟﻌﻨﺎﺻﺮ ﻧﻀﻐﻂ ﻋﻠﻰ زر ‪ Sort Order‬ﻓﻴﻈﻬﺮ ﺳﻬﻤﺎن آﻤﺎ‬
‫ﺑﺎﻟﺸﻜﻞ ) ‪ ( ٢ -٢‬ﺛﻢ ﻧﻘﻮم ﺑﻮﺿﻊ اﻟﻤﺆﺷﺮ ﻋﻠﻰ اﻟﻌﻨﺼﺮ اﻟﻤﺮاد ﺗﺤﺮﻳﻜﻪ ﺛﻢ‬
‫ﻧﻀﻐﻂ ﺑﺎﻟﺴﻬﻢ اﻟﻌﻠﻮي أو اﻟﺴﻔﻠﻲ‬

‫ﻓﻘﻂ‬
‫ﺷﻜﻞ )‪( ٢– ٢‬‬

‫‪٤٤‬‬
Dictionaries ‫اﻟﻘﻮاﻣﻴﺲ‬

Master Format ‫وﻓﻴﻤﺎ ﻳﻠﻲ ﺳﺮد ﺳﺮﻳﻊ ﻟﺒﻌﺾ ﻣﻮاﺻﻔﺎت‬

No
01000 ‫ﻏـﻴـﺮ‬
Master Format ‫اﻟﻤﻮاﺻﻔﺔ‬
General Requirements

01100 Summary
‫اﻟﻤﻘﺎﺑﻞ اﻟﻌﺮﺑﻲ‬
‫ﻣﺘﻄﻠﺒﺎت ﻋﺎﻣﺔ‬

‫ﻣﻠﺨﺺ‬

‫ﻣﺴﻤﻮح‬
01200 Price and Payment Procedures ‫اﻟﺴﻌﺮ واﻟﺪﻓﻌﺎت‬

01300 Administrative Requirements ‫اﻟﻤﺘﻄﻠﺒﺎت اﻹدارﻳﺔ‬

01400 Quality Requirements ‫ﻣﺘﻄﻠﺒﺎت اﻟﺠﻮدة‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫اﻟﻤﻨﺸﺂت وأﻧﻈﻤﺔ اﻟﻤﺮاﻗﺒﺔ‬
01500 Temporary Facilities and Controls
‫اﻟﻤﺆﻗﺘﺔ‬
01600 Product Requirements ‫ﻣﺘﻄﻠﺒﺎت اﻟﻤﻮاد‬

01700 Execution Requirements ‫ﻣﺘﻄﻠﺒﺎت اﻟﺘﻨﻔﻴﺬ‬

‫ﻧﺴﺨﺔ‬
02000 Site Works ‫أﻋﻤﺎل اﻟﻤﻮﻗﻊ اﻟﻌﺎم‬

02050 Basic Site Materials and Methods ‫اﻟﻤﻮاد اﻷﺳﺎﺳﻴﺔ واﻷﺳﺎﻟﻴﺐ‬

02100 Site Remediation ‫ﺗﺴﻮﻳﺔ اﻟﻤﻮﻗﻊ‬

02200 Site Preparation ‫إﻋﺪاد اﻟﻤﻮﻗﻊ‬

02300 Earthwork

02700
‫ﻟﻠﻌﺮض‬
02600 Drainage and Containment
Bases, Ballasts, Pavements, and
Appurtenances
‫اﻷﻋﻤﺎل اﻟﺘﺮاﺑﻴﺔ‬

‫اﻟﺼﺮف اﻟﺤﻲ‬

‫أﻋﻤﺎل اﻟﺮﺻﻒ‬

02900 Planting

03000 Concrete
‫ﻓﻘﻂ‬
03050 Basic Concrete Materials and Methods
‫اﻟﺘﺸﺠﻴﺮ‬

‫اﻟﺨﺮﺳﺎﻧﺔ‬

‫اﻟﻤﻮاد اﻷﺳﺎﺳﻴﺔ واﻷﺳﺎﻟﻴﺐ‬

03100 Concrete Forms and Accessories ‫اﻟﺸﺪات‬

03200 Concrete Reinforcement ‫اﻟﺘﺴﻠﻴﺢ‬

٤٥
‫اﻟﺒﺎب اﻟﺜﺎﻧﻲ‬

‫‪No‬‬ ‫اﻟﻤﻮاﺻﻔﺔ ‪Master Format‬‬ ‫اﻟﻤﻘﺎﺑﻞ اﻟﻌﺮﺑﻲ‬


‫‪03300 Cast-in-Place Concrete‬‬ ‫اﻟﺨﺮﺳﺎﻧﺔ اﻟﻤﺼﺒﻮﺑﺔ ﺑﺎﻟﻤﻮﻗﻊ‬

‫‪04000 Masonry‬‬
‫ﻏـﻴـﺮ‬
‫‪03400 Precast Concrete‬‬

‫‪04050 Basic Masonry Materials and Methods‬‬


‫اﻟﺨﺮﺳﺎﻧﺔ اﻟﺴﺎﺑﻘﺔ اﻟﺼﺐ‬

‫أﻋﻤﺎل اﻟﻤﺒﺎﻧﻲ‬

‫اﻟﻤﻮاد اﻷﺳﺎﺳﻴﺔ واﻷﺳﺎﻟﻴﺐ‬

‫ﻣﺴﻤﻮح‬
‫‪04200 Masonry Units‬‬ ‫ﻣﺒﺎﻧﻲ اﻟﻄﻮب و اﻟﺒﻠﻮك‬

‫‪05000 Metals‬‬ ‫اﻷﻋﻤﺎل اﻟﻤﻌﺪﻧﻴﺔ‬

‫‪05500 Metal Fabrications‬‬ ‫اﻟﻤﺼﻨﻮﻋﺎت اﻟﻤﻌﺪﻧﻴﺔ‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫‪05800 Expansion Control‬‬ ‫أﻧﻈﻤﺔ ﺗﻐﻄﻴﺔ ﻓﻮاﺻﻞ اﻟﺘﻤﺪد‬

‫‪06000 Wood and Plastic‬‬ ‫اﻟﺨﺸﺐ واﻟﺒﻼﺳﺘﻴﻚ‬

‫‪06400 Architectural Woodwork‬‬ ‫أﻋﻤﺎل اﻟﺨﺸﺐ اﻟﻤﻌﻤﺎرﻳﺔ‬

‫‪06600 Plastic Fabrications‬‬ ‫اﻟﻤﺼﻨﻮﻋﺎت اﻟﺒﻼﺳﺘﻴﻜﻴﺔ‬

‫ﻧﺴﺨﺔ‬
‫اﻟﻮﻗﺎﻳﺔ ﻣﻦ اﻟﺤﺮارة‬
‫‪07000 Thermal and Moisture Protection‬‬
‫واﻟﺮﻃﻮﺑﺔ‬
‫‪07100 Waterproofing‬‬ ‫أﻋﻤﺎل اﻟﻌﺰل اﻟﻤﺎﺋﻲ‬

‫‪07200 Insulation‬‬ ‫أﻋﻤﺎل اﻟﻌﺰل اﻟﺤﺮاري‬

‫ﻟﻠﻌﺮض‬
‫أﻋﻤﺎل اﻟﺘﺴﻘﻴﻒ واﻟﺠﻮاﻧﺐ‬
‫‪07400 Roofing and Siding Panels‬‬
‫اﻟﺼﻨﺎﻋﻴﺔ‬
‫‪07500 Membrane Roofing‬‬ ‫أﻏﺸﻴﺔ اﻟﺘﺴﻘﻴﻒ‬

‫‪07600 Flashing and Sheet Metal‬‬ ‫اﻟﺼﻔﺎﺋﺢ واﻷﻟﻮاح اﻟﻤﻌﺪﻧﻴﺔ‬

‫ﻓﻘﻂ‬
‫اﻟﺘﻮاﺑﻊ واﻟﻤﻮاد اﻟﺨﺎﺻﺔ‬
‫‪07700 Roof Specialties and Accessories‬‬
‫ﺑﺎﻷﺳﻘﻒ‬
‫‪07900 Joint Sealers‬‬ ‫ﻣﻮاد ﺣﺸﻮ اﻟﻔﻮاﺻﻞ‬

‫‪08000 Doors and Windows‬‬ ‫اﻷﺑﻮاب واﻟﺸﺒﺎﺑﻴﻚ‬

‫‪08100 Metal Doors and Frames‬‬ ‫اﻷﺑﻮاب واﻹﻃﺎرات اﻟﻤﻌﺪﻧﻴﺔ‬


‫أﻷﺑﻮاب اﻟﺨﺸﺒﻴﺔ‬
‫‪08200 Wood and Plastic Doors‬‬
‫واﻟﺒﻼﺳﺘﻴﻜﻴﺔ‬

‫‪٤٦‬‬
‫اﻟﻘﻮاﻣﻴﺲ ‪Dictionaries‬‬

‫‪No‬‬ ‫اﻟﻤﻮاﺻﻔﺔ ‪Master Format‬‬ ‫اﻟﻤﻘﺎﺑﻞ اﻟﻌﺮﺑﻲ‬


‫‪08300 Specialty Doors‬‬ ‫اﻷﺑﻮاب اﻟﺨﺎﺻﺔ‬

‫ﻏـﻴـﺮ‬
‫‪08400 Entrances and Storefronts‬‬

‫‪08500 Metal Windows‬‬

‫‪08700 Hardware‬‬
‫اﻟﻤﺪاﺧﻞ واﻟﻮاﺟﻬﺎت‬

‫اﻟﻨﻮاﻓﺬ اﻟﻤﻌﺪﻧﻴﺔ‬

‫اﻟﺨﺮدوات‬

‫ﻣﺴﻤﻮح‬
‫‪08800 Glazing‬‬ ‫أﻋﻤﺎل اﻟﺰﺟﺎج‬

‫‪09000 Finishes‬‬ ‫اﻟﺘﺸﻄﻴﺐ‬

‫‪09200 Plaster‬‬ ‫اﻟﺒﻴﺎض اﻷﺳﻤﻨﺘﻲ‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫‪09250 Gypsum Board‬‬ ‫اﻷﻟﻮاح اﻟﺠﺒﺴﻴﺔ‬

‫‪09300 Tile‬‬ ‫اﻟﺴﻴﺮاﻣﻴﻚ‬

‫‪09400 Terrazzo‬‬ ‫ﺑﻼط ﺗﻴﺮازو‬

‫‪09500 Ceilings‬‬ ‫اﻷﺳﻘﻒ‬

‫ﻧﺴﺨﺔ‬
‫‪09600 Flooring‬‬ ‫اﻷرﺿﻴﺎت‬

‫‪09900 Paints and Coatings‬‬ ‫أﻋﻤﺎل اﻟﺪهﺎﻧﺎت‬

‫‪14000 Conveying System‬‬ ‫أﻧﻈﻤﺔ اﻟﻨﻘﻞ‬

‫ﻟﻠﻌﺮض‬
‫‪14100 Dumbwaiters‬‬ ‫ﻣﺼﺎﻋﺪ اﻟﻄﻌﺎم‬

‫‪14200 Elevators‬‬ ‫اﻟﻤﺼﺎﻋﺪ‬

‫‪14300 Escalators‬‬ ‫اﻟﺴﻼﻟﻢ اﻟﻤﺘﺤﺮآﺔ‬

‫ﻓﻘﻂ‬
‫‪14600 Hoists and Cranes‬‬ ‫أﺟﻬﺰة اﻟﺮﻓﻊ‬

‫‪15000 Mechanical‬‬ ‫اﻷﻋﻤﺎل اﻟﻤﻴﻜﺎﻧﻴﻜﻴﺔ‬


‫‪Basic Mechanical Materials and‬‬
‫‪15050‬‬ ‫اﻟﻤﻮاد اﻷﺳﺎﺳﻴﺔ واﻷﺳﺎﻟﻴﺐ‬
‫‪Methods‬‬
‫ﺷﺒﻜﺔ ﻣﻮاﺳﻴﺮ اﻟﻮﻗﺎﻳﺔ ﻣﻦ‬
‫‪15300 Fire Protection Piping‬‬
‫اﻟﺤﺮﻳﻖ‬
‫‪15400 Plumbing Piping‬‬ ‫ﻣﻮاﺳﻴﺮ اﻟﺴﺒﺎآﺔ‬

‫‪15450 Plumping Equipment‬‬ ‫ﻣﻌﺪات اﻟﺴﺒﺎآﺔ‬

‫‪٤٧‬‬
‫اﻟﺒﺎب اﻟﺜﺎﻧﻲ‬

‫‪No‬‬ ‫اﻟﻤﻮاﺻﻔﺔ ‪Master Format‬‬ ‫اﻟﻤﻘﺎﺑﻞ اﻟﻌﺮﺑﻲ‬


‫‪15500 Heat-Generation‬‬ ‫أﻋﻤﺎل اﻟﺘﺪﻓﺌﺔ‬

‫ﻏـﻴـﺮ‬
‫‪15600 Refrigeration Equipment‬‬

‫‪15800 Air Distribution‬‬

‫‪15900 Testing, Adjusting, and Balancing‬‬


‫ﻣﻌﺪات اﻟﺘﺒﺮﻳﺪ‬

‫ﺗﻮزﻳﻊ اﻟﻬﻮاء‬

‫اﻻﺧﺘﺒﺎر واﻟﻀﺒﻂ واﻟﻤﻮازﻧﺔ‬

‫ﻣﺴﻤﻮح‬
‫‪16000 Electrical‬‬ ‫اﻷﻋﻤﺎل اﻟﻜﻬﺮﺑﺎﺋﻴﺔ‬

‫‪16050 Basic Electrical Materials and Methods‬‬ ‫اﻟﻤﻮاد اﻷﺳﺎﺳﻴﺔ واﻷﺳﺎﻟﻴﺐ‬

‫‪16300 Transmission and Distribution‬‬ ‫اﻟﻨﻘﻞ واﻟﺘﻮزﻳﻊ‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫‪16400 Low-Voltage Distribution‬‬ ‫ﺗﻮزﻳﻊ اﻟﺠﻬﺪ اﻟﻤﻨﺨﻔﺾ‬

‫‪16500 Lighting‬‬ ‫اﻹﻧﺎرة‬

‫‪16600 Special Systems‬‬ ‫أﻧﻈﻤﺔ ﺧﺎﺻﺔ‬

‫‪16700 Communications‬‬ ‫أﻧﻈﻤﺔ اﻻﺗﺼﺎﻻت‬

‫ﻧﺴﺨﺔ‬
‫‪16720 Alarm and Detection System‬‬ ‫أﻧﻈﻤﺔ اﻹﻧﺬار واﻟﻜﺸﻒ‬

‫‪16730 Clock and Program System‬‬ ‫أﻧﻈﻤﺔ ﺑﺮﻣﺠﺔ اﻟﻮﻗﺖ‬

‫‪16770 Public Address‬‬ ‫أﻧﻈﻤﺔ اﻻﺳﺘﺪﻋﺎء‬

‫ﻟﻠﻌﺮض‬
‫‪16900 Controls‬‬ ‫أﻧﻈﻤﺔ اﻟﺘﺤﻜﻢ‬

‫وهﺬﻩ ﻟﻴﺴﺖ آﻞ اﻟﺒﻨﻮد وﻟﻜﻨﻨﺎ ﻗﻤﻨﺎ ﺑﺎﺧﺘﺼﺎرهﺎ وﺳﻨﺤﺎول إدراج ﻧﺴﺨﺔ آﺎﻣﻠﺔ ﻣﻦ‬

‫ﻓﻘﻂ‬
‫‪ Master Format‬ﻓﻲ ﻣﻼﺣﻖ هﺬا اﻟﻜﺘﺎب‬

‫وﻳﻤﻜﻨﻚ أﺧﻲ اﻟﻤﻬﻨﺪس اﺳﺘﺨﺪام ﻣﻮاﺻﻔﺎت ﺧﺎﺻﺔ ﺑﻚ ﺑﺎﻟﻠﻐﺔ اﻟﻌﺮﺑﻴﺔ ﻋﻦ ﻃﺮﻳﻖ إدراج‬
‫ﺗﻠﻚ اﻟﻤﻮاﺻﻔﺎت آﻤﺎ أﺳﻠﻔﻨﺎ ﻋﻦ ﻃﺮﻳﻖ اﻷﻣﺮ ‪ Add‬ﻣﻊ ﻣﺮاﻋﺎة ﺗﺮﻗﻴﻢ ﺗﻠﻚ اﻟﻤﻮاﺻﻔﺎت‬
‫ﺑﻄﺮﻳﻘﺔ ﻣﺴﻠﺴﻠﺔ ﻣﻊ ﻋﺪم ﺗﻜﺮار رﻗﻢ اﻟﻤﺴﻠﺴﻞ‬

‫‪٤٨‬‬
‫اﻟﻘﻮاﻣﻴﺲ ‪Dictionaries‬‬

‫ﺛﺎﻧﻴﺎ ‪ :‬اﻷدوار اﻟﻮﻇﻴﻔﻴﺔ‬

‫ﻏـﻴـﺮ‬
‫ﻋﻨﺪ ﻓﺘﺢ اﻟﺒﺮﻧﺎﻣﺞ ﺳﻨﺠﺪ اﻧﻪ ﺗﻢ ﺗﻌﻴﻴﻦ أدوار اﻟﻤﺸﺎرآﻴﻦ ﻓﻲ اﻟﻤﺸﺮوع آﺎﻵﺗﻲ ‪:‬‬

‫اﻻﺧﺘﺼﺎر‬ ‫اﻟﻮﺻﻒ‬ ‫اﻻﺳﺘﺨﺪام‬


‫‪ARC‬‬ ‫‪Architect‬‬ ‫ﻣﻌﻤﺎري ‪ -‬ﺗﺼﻤﻴﻢ‬

‫ﻣﺴﻤﻮح‬
‫‪CM‬‬ ‫‪Construction‬‬ ‫إدارة ﻣﺸﺮوﻋﺎت‬
‫‪Manager‬‬
‫‪CON‬‬ ‫‪Contractor‬‬ ‫ﻣﻘﺎول‬
‫‪DES‬‬ ‫‪Design Consultant‬‬ ‫اﺳﺘﺸﺎري ‪ -‬ﺗﺼﻤﻴﻢ‬
‫‪ENG‬‬ ‫‪Engineer‬‬ ‫ﻣﻬﻨﺪس ‪ -‬ﺗﺼﻤﻴﻢ‬
‫‪GC‬‬
‫‪OTH‬‬
‫‪OWN‬‬
‫‪SUB‬‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫‪General Contractor‬‬
‫‪Other‬‬
‫‪Owner‬‬
‫‪Subcontractor‬‬
‫ﻣﻘﺎول ﻋﻤﻮﻣﻲ‬
‫أﺧﺮى‬
‫اﻟﻤﺎﻟﻚ‬
‫ﻣﻘﺎول اﻟﺒﺎﻃﻦ‬

‫ﻧﺴﺨﺔ‬
‫‪SUP‬‬ ‫‪Supplier‬‬ ‫اﻟﻤﻮرد‬

‫وﻳﻤﻜﻨﻚ ﺗﻌﺪﻳﻞ اﻟﻘﻴﻢ اﻟﺴﺎﺑﻘﺔ أو إﺿﺎﻓﺔ ﻗﻴﻢ أﺧﺮى ﻣﻦ ﺧﻼل‬


‫‪Define Æ Dictionaries Æ Roles… Æ Add‬‬

‫ﻟﻠﻌﺮض‬
‫وﻳﻤﻜﻨﻚ ﺣﺬف ﻗﻴﻤﺔ ﻋﻦ ﻃﺮﻳﻖ‬
‫‪Define Æ Dictionaries Æ Roles… Æ Delete‬‬
‫وﻳﻤﻜﻨﻚ اﻟﺘﺮﺗﻴﺐ ﻋﻦ ﻃﺮﻳﻖ‬
‫‪Define Æ Dictionaries Æ Roles… Æ Sort Order‬‬

‫ﻓﻘﻂ‬ ‫ﺛﺎﻟﺜﺎ ‪ :‬اآﻮاد اﻹﺟﺮاءات‬


‫ﻋﻨﺪ ﺗﻘﺪﻳﻢ ﻟﻮﺣﺔ أو ﻋﻴﻨﺔ ﻟﻼﺳﺘﺸﺎري ﻳﻘﻮم اﻻﺳﺘﺸﺎري ﺑﺎﻟﻤﻮاﻓﻘﺔ أو اﻟﺮﻓﺾ أو إﺑﺪاء‬
‫ﻣﻼﺣﻈﺎت ﻟﺬا آﺎن ﻻﺑﺪ ﻣﻦ اﻻﺗﻔﺎق ﻋﻠﻰ آﻮد آﻞ إﺟﺮاء ﻣﺎﺑﻴﻦ اﻻﺳﺘﺸﺎري واﻟﻤﻘﺎول‬
‫ﺣﺘﻰ ﻳﻤﻜﻦ اﺳﺘﻤﺮار اﻟﻌﻤﻞ ﺑﺴﻬﻮﻟﺔ‬
‫وﻓﻴﻤﺎ ﻳﻠﻲ ﺟﻤﻴﻊ اﻹﺟﺮاءات اﻟﻤﺘﺪاوﻟﺔ ﻣﺎﺑﻴﻦ اﻟﻤﻘﺎول واﻻﺳﺘﺸﺎري‬

‫‪٤٩‬‬
‫اﻟﺒﺎب اﻟﺜﺎﻧﻲ‬

‫اﻻﺧﺘﺼﺎر‬ ‫اﻟﻮﺻﻒ‬ ‫اﻟﻤﻌﻨﻰ‬


‫‪AAN‬‬ ‫‪Approved as Noted‬‬ ‫اﻟﻤﻮاﻓﻘﺔ ﻣﻊ وﺟﻮد ﻣﻼﺣﻈﺎت‬

‫ﻏـﻴـﺮ‬
‫‪ANR‬‬ ‫‪Approved Noted‬‬ ‫اﻟﻤﻮاﻓﻘﺔ ﻣﻊ إﻋﺎدة اﻟﺘﻘﺪﻳﻢ ﺑﻌﺪ‬
‫‪Resubmit‬‬ ‫إﻧﻬﺎء اﻟﻤﻼﺣﻈﺎت‬
‫‪AOK‬‬ ‫‪All Correct‬‬ ‫اﻟﻤﻮاﻓﻘﺔ ﻋﻠﻰ اﻟﻜﻞ‬
‫‪APP‬‬ ‫‪Approved‬‬ ‫اﻟﻤﻮاﻓﻘﺔ‬
‫‪CLO‬‬ ‫‪Closed‬‬ ‫إﻏﻼق اﻟﻤﻮﺿﻮع‬

‫ﻣﺴﻤﻮح‬
‫‪DIS‬‬ ‫‪Disapproved‬‬ ‫ﻋﺪم اﻟﻤﻮاﻓﻘﺔ‬
‫‪NA‬‬ ‫‪Not Applicable‬‬ ‫ﻏﻴﺮ ﻗﺎﺑﻞ ﻟﻼﺳﺘﻌﻤﺎل‬
‫‪NEW‬‬ ‫‪New Item‬‬ ‫ﻋﻨﺼﺮ ﺟﺪﻳﺪ‬
‫‪NM‬‬ ‫‪Not Made‬‬ ‫ﺑﺪون إﺟﺮاء‬
‫‪OLD‬‬ ‫‪Old Business‬‬ ‫ﻋﻤﻞ ﻗﺪﻳﻢ‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫‪OPN‬‬ ‫‪Open‬‬ ‫ﻓﺘﺢ اﻟﻤﻮﺿﻮع‬
‫‪OUT‬‬ ‫‪Outstanding Item‬‬ ‫ﻣﻮﺿﻮع ﻣﻌﻠﻖ‬
‫‪PRO‬‬ ‫‪Proceed‬‬ ‫ﻣﻜﺘﻤﻞ‬
‫‪REJ‬‬ ‫‪Rejected‬‬ ‫ﻣﺮﻓﻮض‬
‫‪UNS‬‬ ‫‪UnSubmitted‬‬ ‫ﻟﻢ ﻳﻘﺪم‬

‫ﻧﺴﺨﺔ‬
‫وﻳﻤﻜﻨﻚ ﺗﻌﺪﻳﻞ اﻟﻘﻴﻢ اﻟﺴﺎﺑﻘﺔ أو إﺿﺎﻓﺔ ﻗﻴﻢ أﺧﺮى ﻣﻦ ﺧﻼل‬
‫‪Define Æ Dictionaries Æ Status… Æ Add‬‬
‫وﻳﻤﻜﻨﻚ ﺣﺬف ﻗﻴﻤﺔ ﻋﻦ ﻃﺮﻳﻖ‬

‫ﻟﻠﻌﺮض‬
‫‪Define Æ Dictionaries Æ Status … Æ Delete‬‬
‫وﻳﻤﻜﻨﻚ اﻟﺘﺮﺗﻴﺐ ﻋﻦ ﻃﺮﻳﻖ‬
‫‪Define Æ Dictionaries Æ Status … Æ Sort Order‬‬

‫ﻓﻘﻂ‬ ‫راﺑﻌﺎ ‪ :‬اآﻮاد اﻷﺳﺒﺎب‬


‫ﻋﻨﺪ ﺣﺪوث ﺗﻌﺪﻳﻼت ﻓﻲ اﻟﻤﻮاد اﻟﻤﺴﺘﺨﺪﻣﺔ أو ﻓﻲ اﻟﺘﺼﻤﻴﻤﺎت ﻓﻼﺑﺪ ﻣﻦ ذآﺮ اﻟﺴﺒﺐ‬
‫وهﻞ هﻮ ﻧﺘﻴﺠﺔ ﻟﻄﻠﺐ اﻟﻤﺎﻟﻚ أم ﻧﺘﻴﺠﺔ ﻟﻈﺮوف اﻟﻌﻤﻞ ﺑﺎﻟﻤﻮﻗﻊ أم ﻧﺘﻴﺠﺔ ﻟﻈﺮوف ﻏﻴﺮ‬
‫ﻣﺘﻮﻗﻌﺔ أم ﻏﻴﺮ ذﻟﻚ ﻣﻦ اﻷﺳﺒﺎب‬
‫وﻟﻌﺮض أآﻮاد اﻷﺳﺒﺎب ﻧﺘﺒﻊ اﻟﺨﻄﻮات اﻟﺘﺎﻟﻴﺔ‬
‫‪Define Æ Dictionaries Æ Change Document Reason Codes‬‬
‫ﻓﺘﻈﻬﺮ ﻣﻌﻚ اﻷآﻮاد اﻟﺘﺎﻟﻴﺔ‬

‫‪٥٠‬‬
‫اﻟﻘﻮاﻣﻴﺲ ‪Dictionaries‬‬

‫اﻟﻜﻮد‬ ‫اﻟﻮﺻﻒ‬ ‫اﻟﻤﻌﻨﻰ‬


‫‪ADMIN‬‬ ‫‪Administrative‬‬ ‫ﺳﺒﺐ إداري‬

‫ﻏـﻴـﺮ‬
‫‪CUSTREQUEST‬‬ ‫‪Customer Request‬‬ ‫ﻃﻠﺐ اﻟﻌﻤﻴﻞ )اﻟﻤﺎﻟﻚ (‬
‫‪DEFICIENCY‬‬ ‫‪Construction Deficiency‬‬ ‫اﻟﻨﻘﺺ ﻓﻲ اﻟﺘﻨﻔﻴﺬ‬
‫‪ERROROMIN‬‬ ‫‪Errors and Omissions‬‬ ‫اﻷﺧﻄﺎء و اﻹهﻤﺎل‬
‫‪FIELDCOND‬‬ ‫‪Field Conditions‬‬ ‫ﻇﺮوف اﻟﻤﻮﻗﻊ‬
‫‪PLANNED‬‬ ‫‪Planned‬‬ ‫اﻟﺘﺨﻄﻴﻂ‬

‫ﻣﺴﻤﻮح‬
‫‪UNFORESEEN‬‬ ‫‪Unforeseen Conditions‬‬ ‫ﻏﻴﺮ ﻣﺘﻮﻗﻊ‬

‫وﻳﻤﻜﻦ اﻹﺿﺎﻓﺔ واﻟﺘﻌﺪﻳﻞ واﻟﺤﺬف وإﻋﺎدة اﻟﺘﺮﺗﻴﺐ آﻤﺎ ﺳﺒﻖ ﺷﺮﺣﻪ‬

‫ﺧﺎﻣﺴﺎ ‪ :‬ﻓﺌﺎت اﻟﺘﻘﺪﻳﻤﺎت‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫‪Product Data‬‬
‫وﺗﻨﻘﺴﻢ ﻓﺌﺎت اﻟﺘﻘﺪﻳﻤﺎت ‪ Submittals Category‬إﻟﻰ‬
‫اﻟﻮﺻﻒ‬ ‫اﻟﻤﻌﻨﻰ‬
‫ﻣﻌﻠﻮﻣﺎت اﻟﻤﻨﺘﺞ‬

‫ﻧﺴﺨﺔ‬
‫‪Shop Drawing‬‬ ‫رﺳﻮﻣﺎت ﺗﻨﻔﻴﺬﻳﺔ‬
‫‪Mock Up‬‬ ‫ﻧﻤﻮذج ﺑﺎﻟﺤﺠﻢ اﻟﻄﺒﻴﻌﻲ‬
‫‪Sample‬‬ ‫ﻋﻴﻨﺔ‬
‫‪Certification‬‬ ‫ﺷﻬﺎدة‬
‫‪As-Built‬‬ ‫آﻤﺎ هﻮ ﻣﻨﻔﺬ‬

‫ﻟﻠﻌﺮض‬
‫‪Close-Out‬‬ ‫اﻟﺘﺨﻠﺺ‬
‫‪Warranty‬‬ ‫ﺿﻤﺎن‬
‫‪Test Report‬‬ ‫ﻧﺘﻴﺠﺔ اﺧﺘﺒﺎر‬
‫‪Operation/Maintenance‬‬ ‫آﺘﻴﺐ اﻟﺘﺸﻐﻴﻞ واﻟﺼﻴﺎﻧﺔ‬
‫‪Manual‬‬

‫ﻓﻘﻂ‬
‫‪MSDS - Material‬‬ ‫ﻣﻮاﺻﻔﺎت اﻷﻣﺎن ﻟﻠﻤﺎدة‬
‫‪Safety Data Sheets‬‬

‫وﻳﻤﻜﻦ اﻹﺿﺎﻓﺔ واﻟﺘﻌﺪﻳﻞ واﻟﺤﺬف وإﻋﺎدة اﻟﺘﺮﺗﻴﺐ آﻤﺎ ﺳﺒﻖ ﺷﺮﺣﻪ‬

‫‪٥١‬‬
‫اﻟﺒﺎب اﻟﺜﺎﻧﻲ‬

‫ﺳﺎدﺳﺎ ‪ :‬أﻧﻮاع اﻟﺘﻘﺪﻳﻤﺎت‬

‫ﻏـﻴـﺮ‬
‫وﺗﻨﻘﺴﻢ أﻧﻮاع اﻟﺘﻘﺪﻳﻤﺎت ‪ Submittals Types‬إﻟﻰ‬
‫اﻻﺧﺘﺼﺎر‬ ‫اﻟﻮﺻﻒ‬ ‫اﻟﻤﻌﻨﻰ‬
‫‪POSTCON Post-Construction‬‬ ‫ﺑﻌﺪ اﻟﺘﻨﻔﻴﺬ‬
‫‪PRECON Pre-Construction‬‬ ‫ﻗﺒﻞ اﻟﺘﻨﻔﻴﺬ‬

‫ﻣﺴﻤﻮح‬ ‫ﺳﺎﺑﻌﺎ ‪ :‬اﻟﺘﻘﺎرﻳﺮ اﻟﻴﻮﻣﻴﺔ‬


‫وهﻲ ﺗﻨﻘﺴﻢ إﻟﻰ‬
‫‪ -١‬أﻧﻮاع اﻟﻤﻌﺪات ‪Equipment Types‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬ ‫‪Temperature‬‬
‫‪Precipitation‬‬
‫‪Sky‬‬
‫‪Wind‬‬
‫‪ -٢‬درﺟﺎت اﻟﺤﺮارة‬
‫‪ -٣‬ﺣﺎﻟﺔ اﻷﻣﻄﺎر‬
‫‪ -٤‬ﺣﺎﻟﺔ اﻟﺠﻮ ) ﺻﺎﻓﻲ – ﻏﻴﻮم (‬
‫‪ -٥‬ﺳﺮﻋﺔ اﻟﺮﻳﺎح‬

‫ﻧﺴﺨﺔ‬
‫‪ -٦‬اﻟﺤﺎﻟﺔ اﻟﻤﻨﺎﺧﻴﺔ ‪Weather Impact‬‬
‫‪ -٧‬ﻃﻮل ﻣﺪة اﻟﻈﺮوف اﻟﻤﻨﺎﺳﺒﺔ ‪Length of suitable Conditions‬‬
‫وﺑﺎﺳﺘﻌﺮاض آﻞ واﺣﺪة ﻣﻦ اﻟﻌﻨﺎﺻﺮ اﻟﺴﺎﺑﻘﺔ ﺳﻨﺠﺪ اﻧﻬﺎ ﺗﺘﻔﺮع إﻟﻰ ﻋﺪة أﻗﺴﺎم وﻳﻤﻜﻨﻚ‬
‫ﻣﻦ ﻣﺸﺎهﺪة ذﻟﻚ ﺑﻨﻔﺴﻚ ﻣﻦ ﺧﻼل اﻟﻘﺎﺋﻤﺔ‬
‫‪Define Æ Dictionaries Æ Daily Reports Æ‬‬

‫ﻟﻠﻌﺮض‬ ‫ﺛﺎﻣﻨﺎ ‪ :‬ﺗﺄﺛﻴﺮ اﻟﻌﻤﻞ‬


‫وﻳﻤﻜﻦ أن ﻳﻜﻮن أﺣﺪ اﻟﺤﺎﻻت اﻵﺗﻴﺔ‬

‫‪No‬‬
‫‪Unknown‬‬ ‫ﻓﻘﻂ‬
‫اﻟﻮﺻﻒ‬

‫‪Yes-Work Impeded‬‬
‫اﻟﻤﻌﻨﻰ‬
‫ﻻ ﻳﻮﺟﺪ‬
‫ﻏﻴﺮ ﻣﻌﺮوف‬
‫اﻟﻌﻤﻞ ﻣﻌﺮﻗﻞ‬
‫‪Yes-Work Stopped‬‬ ‫اﻟﻌﻤﻞ ﻣﺘﻮﻗﻒ‬

‫‪٥٢‬‬
‫اﻟﻘﻮاﻣﻴﺲ ‪Dictionaries‬‬

‫ﺗﺎﺳﻌﺎ ‪ :‬ﻣﺼﺎدر اﻟﺤﻮادث‬

‫ﻏـﻴـﺮ‬
‫أﺛﻨﺎء اﻟﻌﻤﻞ ﺑﺎﻟﻤﻮﻗﻊ ﺗﺤﺪث ﺑﻌﺾ اﻟﺤﻮادث ﻧﺘﻴﺠﺔ ﻟﺤﺮآﺔ اﻟﻤﻌﺪات واﻟﻌﻤﺎل ﻟﺬا ﻻﺑﺪ ﻣﻦ‬
‫ﺗﺼﻨﻴﻒ ﺗﻠﻚ اﻟﻤﺼﺎدر ‪ ،‬وﻟﻤﻌﺮﻓﺔ ﺗﻠﻚ اﻟﺘﺼﻨﻴﻔﺎت ﻳﺘﻢ ذﻟﻚ ﻣﻦ ﺧﻼل‬
‫‪Define Æ Dictionaries Æ Safety Æ Accident Sources‬‬
‫وﺳﻴﻈﻬﺮ أﻣﺎﻣﻚ اﻵﺗﻲ‬

‫ﻣﺴﻤﻮح‬
‫اﻟﻮﺻﻒ‬ ‫اﻟﻤﻌﻨﻰ‬
‫‪Absorption, Bite / Sting‬‬ ‫ﻟﺪغ اﻟﺤﺸﺮات أو ﻋﺾ اﻟﺤﻴﻮاﻧﺎت اﻟﻀﺎﻟﺔ‬
‫‪Carrying, throwing or holding‬‬ ‫ﺣﻤﻞ اﻷﺷﻴﺎء أو رﻣﻴﻬﺎ‬
‫‪object‬‬
‫‪Caught in, under or between, not‬‬ ‫اﻟﺘﻌﻠﻖ ﺗﺤﺖ اﻷﺷﻴﺎء أو ﺑﻴﻨﻬﺎ‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫‪elsewhere classified‬‬
‫‪Contact not otherwise specified‬‬ ‫اﻻﺗﺼﺎل ) ﻏﻴﺮ ﻣﺤﺪد (‬
‫‪Contact with electrical current‬‬ ‫اﻻﺗﺼﺎل ﺑﺎﻟﺘﻴﺎر اﻟﻜﻬﺮﺑﺎﺋﻲ‬
‫‪Contact with temperature‬‬ ‫اﻻﺗﺼﺎل ﺑﻌﻨﺎﺻﺮ ﺣﺮارﻳﺔ‬
‫‪extremes‬‬

‫ﻧﺴﺨﺔ‬
‫‪Falling object or particle‬‬ ‫ﺳﻘﻮط اﻷﺟﺴﺎم أو اﻟﻌﻨﺎﺻﺮ‬
‫‪Flying object or particle‬‬ ‫ﺗﻄﺎﻳﺮ اﻷﺟﺴﺎم أو اﻟﻌﻨﺎﺻﺮ‬
‫‪From ramp, runway, walkway‬‬ ‫ﻣﻦ ﺧﻼل اﻟﻤﻤﺮات وأﻣﺎآﻦ اﻟﺴﻴﺮ‬
‫‪From scaffold or ladder‬‬ ‫ﻣﻦ اﻟﺴﻼﻟﻢ أو اﻟﺸﺪات‬
‫‪From vehicle / Motor Vehicle /‬‬ ‫ﻣﻦ اﻟﺘﺼﺎدم ﺑﺴﻴﺎرة أو ﻋﺮﺑﺔ‬

‫ﻟﻠﻌﺮض‬
‫‪Struck by vehicle‬‬
‫‪In machine or machine part‬‬ ‫ﻓﻲ ﺟﺰء ﻣﻦ اﻟﻤﺎآﻴﻨﺔ‬
‫‪Into shafts, excavations, floor‬‬ ‫ﻣﻦ ﻓﺘﺤﺎت اﻟﺪور أو اﻷﻣﺎآﻦ اﻟﻤﺤﻔﻮرة‬
‫‪openings, etc‬‬ ‫أو اﻟﻤﻨﺎور‬
‫‪Lifting object‬‬ ‫ﻧﺘﻴﺠﺔ ﻟﺮﻓﻊ اﻷﺟﺴﺎم‬

‫ﻓﻘﻂ‬
‫‪Manual handling, not elsewhere‬‬ ‫ﻧﺘﻴﺠﺔ ﻟﻠﻤﻨﺎوﻟﺔ ﺑﺎﻟﻴﺪ ﻟﻠﻤﻮاد‬
‫‪classified‬‬
‫‪Moving or stationary object‬‬ ‫ﻧﺘﻴﺠﺔ ﻟﻌﻨﺼﺮ ﻣﺘﺤﺮك أو ﺛﺎﺑﺖ‬
‫‪Object being handled‬‬ ‫ﻧﺘﻴﺠﺔ ﻟﻠﻌﻨﺼﺮ اﻟﻤﻤﺴﻮك‬

‫وآﻤﺎ ﺗﺮى ﻓﺈن ﻣﺼﺎدر اﻟﺤﻮادث ﻗﺪ ﺗﻜﻮن أآﺜﺮ ﻣﻦ ذﻟﻚ ﻟﺬا ﻳﻤﻜﻨﻚ أﺧﻲ اﻟﻤﻬﻨﺪس ﺗﻐﻴﻴﺮ‬
‫هﺬﻩ اﻟﺘﺼﻨﻴﻔﺎت وإﺿﺎﻓﺔ اﻟﻤﺰﻳﺪ إﻟﻴﻬﺎ‬

‫‪٥٣‬‬
‫اﻟﺒﺎب اﻟﺜﺎﻧﻲ‬

‫ﻋﺎﺷﺮا ‪ :‬اﻧﺘﻬﺎآﺎت اﻷﻣﺎن ﺑﺎﻟﻤﻮﻗﻊ‬

‫ﻏـﻴـﺮ‬
‫ان ﻋﻨﺼﺮ اﻷﻣﺎن ﻣﻦ أهﻢ اﻟﻌﻨﺎﺻﺮ ﻓﻲ اﻟﻌﻤﻞ ﺣﺘﻰ ﻧﻤﻨﻊ ﺣﺪوث اﻟﺤﻮادث ﻟﺬا ﺳﻨﻘﻮم‬
‫ﺑﺘﺤﺪﻳﺪ اﻟﻌﻨﺎﺻﺮ اﻟﺘﻲ ﻳﺠﺐ اﻟﺘﻔﺘﻴﺶ ﻋﻠﻴﻬﺎ ﺑﺎﻟﻤﻮﻗﻊ‬
‫اﻟﻜﻮد‬ ‫اﻟﻮﺻﻒ‬ ‫اﻟﻤﻌﻨﻰ‬
‫‪HH‬‬ ‫‪Hard hats‬‬ ‫اﻟﺨﻮذة‬
‫‪PC‬‬ ‫‪Power cords‬‬ ‫أﺳﻼك اﻟﺘﻴﺎر اﻟﻜﻬﺮﺑﺎﺋﻲ‬

‫ﻣﺴﻤﻮح‬
‫‪SCAF‬‬ ‫‪Scaffolds‬‬ ‫اﻟﺸﺪات‬

‫اﺣﺪ ﻋﺸﺮ ‪NAICS Codes :‬‬


‫وﻗﺪ ﺳﺒﻖ وان ﻓﺴﺮﻧﺎ اﻟﻤﺼﻄﻠﺢ ﺑﺘﺼﻨﻴﻒ أﻣﺮﻳﻜﺎ اﻟﺸﻤﺎﻟﻴﺔ اﻟﺼﻨﺎﻋﻲ‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫‪North America Industry Classification System‬‬
‫وهﻮ ﻣﻘﺴﻢ آﺎﻵﺗﻲ‬
‫اﻟﻜﻮد‬ ‫اﻟﻮﺻﻒ‬ ‫اﻟﻤﻌﻨﻰ‬
‫‪23‬‬ ‫‪Construction‬‬ ‫إﻧﺸﺎءات‬

‫ﻧﺴﺨﺔ‬
‫‪236‬‬ ‫‪Construction of Buildings‬‬ ‫إﻧﺸﺎءات ﻣﺒﺎﻧﻲ‬
‫‪Residential Building‬‬ ‫إﻧﺸﺎءات ﻣﺒﺎﻧﻲ ﺳﻜﻨﻴﺔ‬
‫‪2361‬‬
‫‪Construction‬‬
‫‪Nonresidential Building‬‬ ‫إﻧﺸﺎءات ﻣﺒﺎﻧﻲ ﻏﻴﺮ ﺳﻜﻨﻴﺔ‬
‫‪2362‬‬
‫‪Construction‬‬

‫ﻟﻠﻌﺮض‬
‫‪Industrial Building‬‬ ‫إﻧﺸﺎءات ﻣﺒﺎﻧﻲ ﺻﻨﺎﻋﻴﺔ‬
‫‪23621‬‬
‫‪Construction‬‬
‫‪Commercial and Institutional‬‬ ‫إﻧﺸﺎءات ﻣﺒﺎﻧﻲ ﺗﺠﺎرﻳﺔ‬
‫‪23622‬‬
‫‪Building Construction‬‬
‫‪Heavy and Civil Engineering‬‬ ‫إﻧﺸﺎءات ﻣﺪﻧﻴﺔ‬
‫‪237‬‬
‫‪Construction‬‬

‫‪23711‬‬

‫‪23712‬‬
‫ﻓﻘﻂ‬
‫‪Water and Sewer Line and‬‬
‫‪Related Structures‬‬
‫‪Construction‬‬
‫‪Oil and Gas Pipeline and‬‬
‫‪Related Structures‬‬
‫إﻧﺸﺎءات ﺧﻄﻮط اﻟﻤﻴﺎﻩ واﻟﺼﺮف‬
‫اﻟﺼﺤﻲ‬

‫إﻧﺸﺎءات ﺧﻄﻮط اﻟﺒﺘﺮول واﻟﻐﺎز‬

‫‪Construction‬‬
‫‪Power and Communication‬‬ ‫إﻧﺸﺎءات ﺧﻄﻮط اﻟﻄﺎﻗﺔ‬
‫‪23713‬‬ ‫‪Line and Related Structures‬‬ ‫واﻻﺗﺼﺎﻻت‬
‫‪Construction‬‬

‫‪٥٤‬‬
Dictionaries ‫اﻟﻘﻮاﻣﻴﺲ‬

‫اﻟﻜﻮد‬ ‫اﻟﻮﺻﻒ‬ ‫اﻟﻤﻌﻨﻰ‬


2372 Land Subdivision ‫ﺗﻘﺴﻴﻢ اﻷراﺿﻲ‬

‫ﻏـﻴـﺮ‬
Highway, Street, and Bridge ‫إﻧﺸﺎءات اﻟﻄﺮق واﻟﺸﻮارع‬
2373
Construction ‫واﻟﻜﺒﺎري‬
Poured Concrete Foundation ‫ﻣﻘﺎوﻟﻲ ﺻﺐ اﻟﺨﺮﺳﺎﻧﺔ‬
23811
and Structure Contractors
Structural Steel and Precast ‫ﻣﻘﺎوﻟﻲ اﻟﻤﻨﺸﺂت اﻟﻤﻌﺪﻧﻴﺔ‬
23812
Concrete Contractors ‫واﻟﺨﺮﺳﺎﻧﺔ ﺳﺎﺑﻘﺔ اﻟﺼﺐ‬

‫ﻣﺴﻤﻮح‬
23813 Framing Contractors ‫ﻣﻘﺎوﻟﻲ اﻟﻬﻴﺎآﻞ اﻟﺨﺮﺳﺎﻧﻴﺔ‬
23814 Masonry Contractors ‫ﻣﻘﺎوﻟﻲ اﻟﻤﺒﺎﻧﻲ‬
23815 Glass and Glazing Contractors ‫ﻣﻘﺎوﻟﻲ اﻟﺰﺟﺎج‬
23816 Roofing Contractors ‫ﻣﻘﺎوﻟﻲ اﻷﺳﻘﻒ‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
Building Equipment ‫ﻣﻘﺎوﻟﻲ ﻣﻌﺪات اﻟﻤﺒﺎﻧﻲ‬
2382
Contractors
23821 Electrical Contractors ‫ﻣﻘﺎوﻟﻲ اﻷﻋﻤﺎل اﻟﻜﻬﺮﺑﺎﺋﻴﺔ‬
Plumbing, Heating, and Air- ‫ﻣﻘﺎوﻟﻲ اﻷﻋﻤﺎل اﻟﺼﺤﻴﺔ واﻟﺘﺒﺮﻳﺪ‬
23822
Conditioning Contractors ‫واﻟﺘﻜﻴﻴﻒ‬
2383 Building Finishing Contractors ‫ﻣﻘﺎوﻟﻲ ﺗﺸﻄﻴﺒﺎت اﻟﻤﺒﺎﻧﻲ‬
23831

23832
23833
‫ﻧﺴﺨﺔ‬
Drywall and Insulation
Contractors
Painting and Wall Covering
Contractors
Flooring Contractors
‫ﻣﻘﺎوﻟﻲ اﻟﻘﻮاﻃﻴﻊ اﻟﺠﺎﻓﺔ واﻟﻌﺰل‬

‫ﻣﻘﺎوﻟﻲ اﻟﺪهﺎﻧﺎت‬

‫ﻣﻘﺎوﻟﻲ اﻷرﺿﻴﺎت‬

‫ﻟﻠﻌﺮض‬
23834 Tile and Terrazzo Contractors ‫ﻣﻘﺎوﻟﻲ اﻟﺴﻴﺮاﻣﻴﻚ واﻟﺘﻴﺮازو‬
23835 Finish Carpentry Contractors ‫ﻣﻘﺎوﻟﻲ اﻟﻨﺠﺎرة‬
23891 Site Preparation Contractors ‫ﻣﻘﺎوﻟﻲ ﺗﺠﻬﻴﺰ اﻟﻤﻮاﻗﻊ‬

‫اﻟﻜﻮد‬
DUPE
FOLW
‫ﻓﻘﻂ‬
Duplicate
‫اﻟﻮﺻﻒ‬

Follow-up needed
‫ ﺗﺮﺗﻴﺒﺎت اﻷﻣﺎن ﺑﺎﻟﻤﻮﻗﻊ‬: ‫اﺛﻨﺎ ﻋﺸﺮ‬
‫اﻟﻤﻌﻨﻰ‬
‫ﻣﻜﺮرة‬
‫ﺗﺤﺘﺎج ﻟﻤﺘﺎﺑﻌﺔ‬
RSLV Resolved ‫ﻣﻮﻃﺪة‬
UNFD Unfounded ‫ﻏﻴﺮ ﻣﻮﺟﻮدة‬

٥٥
‫اﻟﺒﺎب اﻟﺜﺎﻧﻲ‬

‫ﺛﻼﺛﺔ ﻋﺸﺮ ‪ :‬اﻟﺮﺳﻮﻣﺎت‬


‫وﺗﻨﻘﺴﻢ إﻟﻰ اﻵﺗﻲ‬

‫ﻏـﻴـﺮ‬
‫‪ -١‬رﺳﻮﻣﺎت اﻟﻌﻄﺎء ‪Bid Package‬‬
‫‪ -٢‬ﺗﺼﻨﻴﻒ اﻟﺮﺳﻮﻣﺎت ‪ Disciplines‬وهﻲ‬
‫اﻟﻜﻮد‬ ‫اﻟﻮﺻﻒ‬ ‫اﻟﻤﻌﻨﻰ‬
‫‪ARCH‬‬ ‫‪Architecture‬‬ ‫ﻟﻮﺣﺎت ﻣﻌﻤﺎرﻳﺔ‬

‫ﻣﺴﻤﻮح‬
‫‪CIVIL‬‬ ‫‪Civil‬‬ ‫ﻟﻮﺣﺎت ﻣﺪﻧﻴﺔ‬
‫‪ELEC‬‬ ‫‪Electrical‬‬ ‫ﻟﻮﺣﺎت آﻬﺮﺑﺎء‬
‫‪FIRE‬‬ ‫‪Fire Protection‬‬ ‫ﻟﻮﺣﺎت ﻣﻘﺎوﻣﺔ اﻟﺤﺮﻳﻖ‬
‫‪Heat , Ventilation and Air‬‬ ‫ﻟﻮﺣﺎت اﻟﺘﺪﻓﺌﺔ واﻟﺘﻬﻮﻳﺔ واﻟﺘﺒﺮﻳﺪ‬
‫‪HVAC‬‬
‫‪Condition‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫‪LAND‬‬ ‫‪Landscape‬‬ ‫ﻟﻮﺣﺎت ﺗﻨﺴﻴﻖ اﻟﻤﻮﻗﻊ‬
‫‪LIGHT‬‬ ‫‪Lighting‬‬ ‫ﻟﻮﺣﺎت اﻹﻧﺎرة‬
‫‪MECH‬‬ ‫‪Mechanical‬‬ ‫ﻟﻮﺣﺎت ﻣﻴﻜﺎﻧﻴﻜﻴﺔ‬
‫‪PLUMB Plumbing‬‬ ‫ﻟﻮﺣﺎت اﻟﺼﺤﻲ‬
‫‪POWER Power‬‬ ‫ﻟﻮﺣﺎت اﻟﻄﺎﻗﺔ‬

‫ﻧﺴﺨﺔ‬
‫‪STRUCT Structural‬‬ ‫ﻟﻮﺣﺎت إﻧﺸﺎﺋﻴﺔ‬
‫‪UTIL‬‬ ‫‪Utilities‬‬ ‫ﻟﻮﺣﺎت ﻣﺮاﻓﻖ‬

‫‪ -٣‬أرﻗﺎم اﻟﻠﻮﺣﺎت ‪File Numbers‬‬


‫‪ -٤‬ﻣﻘﺎس اﻟﻠﻮﺣﺎت ‪(.... A4 – A3- A2 ) Paper Sizes‬‬

‫ﻟﻠﻌﺮض‬
‫‪ -٥‬ﻣﻮﻗﻒ اﻟﻠﻮﺣﺎت ‪ Phases‬وهﻲ‬
‫اﻟﻜﻮد‬ ‫اﻟﻮﺻﻒ‬ ‫اﻟﻤﻌﻨﻰ‬
‫‪Approved for‬‬ ‫ﺗﻢ اﻟﻤﻮاﻓﻘﺔ ﻋﻠﻴﻪ ﻟﻠﺘﻨﻔﻴﺬ‬
‫‪AFC‬‬
‫‪Construction‬‬

‫ﻓﻘﻂ‬
‫‪IFB‬‬ ‫‪Issued for Bid‬‬ ‫إﺻﺪار ﻟﻠﻄﺮح‬
‫‪IFC‬‬ ‫‪Issued for Construction‬‬ ‫إﺻﺪار ﻟﻠﺘﻨﻔﻴﺬ‬
‫‪AS-BUILT‬‬ ‫‪As-Built‬‬ ‫آﻤﺎ هﻮ ﻣﻨﻔﺬ ) ﻃﺒﻘﺎ ﻟﻠﺮﻓﻊ (‬
‫‪SCHEM‬‬ ‫‪Schematic Documents‬‬ ‫رﺳﻮﻣﺎت أوﻟﻴﺔ‬
‫‪DESIGN‬‬ ‫‪Design Development‬‬ ‫رﺳﻮﻣﺎت ﻣﺮﺣﻠﺔ اﻟﺘﺼﻤﻴﻢ‬
‫‪PROGRESS Progress Documents‬‬ ‫رﺳﻮﻣﺎت اﻟﺘﻘﺪﻳﻢ‬
‫‪FINAL‬‬ ‫‪Final Documents‬‬ ‫ﻟﻮﺣﺎت ﻧﻬﺎﺋﻴﺔ‬

‫‪٥٦‬‬
‫اﻟﻘﻮاﻣﻴﺲ ‪Dictionaries‬‬

‫أرﺑﻌﺔ ﻋﺸﺮ ‪ :‬اﻟﻤﻨﺎﻃﻖ وأرﻗﺎم اﻟﻐﺮف‬

‫ﻏـﻴـﺮ‬
‫ﻓﻲ اﻟﺤﺎﻻت اﻟﺜﻼﺛﺔ ﻋﺸﺮ اﻟﺴﺎﺑﻘﺔ آﻨﺎ ﻧﻀﻊ ﻣﺆﺷﺮ اﻟﻔﺄرة ﻋﻠﻰ ‪ All Projects‬ﺛﻢ‬

‫‪Define Æ Dictionaries Æ‬‬


‫ﻧﺨﺘﺎر اﻟﻘﺎﺋﻤﺔ‬

‫ﻣﺴﻤﻮح‬
‫أﻣﺎ ﻓﻲ ﺣﺎﻟﺔ ﺗﻌﺮﻳﻒ اﻟﻐﺮف وﻣﻨﺎﻃﻖ اﻟﻌﻤﻞ ﻓﻼﺑﺪ ﻣﻦ ﺗﺤﺪﻳﺪ اﻟﻤﺸﺮوع اﻟﻤﻄﻠﻮب ﺗﻌﺮﻳﻒ‬
‫ﺑﻴﺎﻧﺎﺗﻪ ﻋﻦ ﻃﺮﻳﻖ ﺗﺤﺪﻳﺪﻩ ﺑﻤﺆﺷﺮ اﻟﻔﺄرة آﻤﺎ ﻓﻲ اﻟﺸﻜﻞ ) ‪( ٣ -٢‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬
‫ﻟﻠﻌﺮض‬
‫ﺷﻜﻞ ) ‪( ٣ -٢‬‬

‫ﺛﻢ ﻣﻦ ﻗﺎﺋﻤﺔ ‪ Define‬ﻧﺨﺘﺎر اﻟﺘﺎﻟﻲ‬


‫‪Define Æ Dictionaries Æ Drawing Areas‬‬

‫ﻓﻘﻂ‬
‫ﻓﺘﻈﻬﺮ أﻣﺎﻣﻨﺎ اﻟﻨﺎﻓﺬة اﻟﺘﺎﻟﻴﺔ واﻟﺘﻲ ﺗﻮﺿﺢ ﻣﻨﺎﻃﻖ اﻟﻌﻤﻞ ﺑﺎﻟﻤﺸﺮوع وﺳﺘﺠﺪ اﻧﻪ ﻓﻲ ﺣﺎﻟﺔ‬
‫اﻷﻣﺜﻠﺔ اﻟﻤﻠﺤﻘﺔ ﺑﺎﻟﺒﺮﻧﺎﻣﺞ أﻧﻬﺎ ﻣﻘﺴﻤﺔ إﻟﻰ أرﺑﻊ ﻣﻨﺎﻃﻖ وهﻲ ‪:‬‬
‫‪A – B – C – Mechanical‬‬
‫وﺳﺘﺠﺪ اﻧﻪ ﺗﻢ ﻋﻤﻞ ﺗﻘﺴﻴﻤﺎت أﺧﺮى ﻣﺜﻞ دﻣﺞ ﻣﻨﻄﻘﺘﻴﻦ ﻣﻊ ﺑﻌﻀﻬﻤﺎ اﻟﺒﻌﺾ ﻣﺜﻞ ‪:‬‬
‫‪AB – AC‬‬
‫وﺧﻴﺎر ﺁﺧﺮ وهﻮ " آﻞ اﻟﻤﻨﺎﻃﻖ ‪ – " All‬ﺷﻜﻞ ) ‪( ٤ – ٢‬‬

‫‪٥٧‬‬
‫اﻟﺒﺎب اﻟﺜﺎﻧﻲ‬

‫ﻏـﻴـﺮ‬
‫ﻣﺴﻤﻮح‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬ ‫‪Add‬‬
‫ﺷﻜﻞ ) ‪( ٤ -٢‬‬

‫وآﻤﺎ ﺗﻌﻠﻤﻨﺎ ﻓﻲ اﻟﺴﺎﺑﻖ ﻓﺄﻧﻪ ﻳﻤﻜﻨﻨﺎ‬


‫• إﺿﺎﻓﺔ ﻣﻨﺎﻃﻖ أﺧﺮى‬

‫ﻧﺴﺨﺔ‬ ‫‪Delete‬‬ ‫• ﺣﺬف ﻣﻨﺎﻃﻖ‬


‫• ﺗﻌﺪﻳﻞ اﻟﺘﺮﺗﻴﺐ ‪Sort Order‬‬

‫وﻣﻦ اﻟﻤﻌﻠﻮم أن ﺗﺤﺪﻳﺪ ﻣﻨﺎﻃﻖ ﻟﻠﻌﻤﻞ هﻮ ﻣﻦ اﻷﻣﻮر اﻟﺘﻨﻈﻴﻤﻴﺔ اﻟﻤﻬﻤﺔ ﺣﻴﺚ ﻳﺘﻢ ﺗﺤﺪﻳﺪ‬

‫ﻟﻠﻌﺮض‬
‫ﻣﺴﺌﻮﻟﻴﺎت آﻞ ﻣﻨﻄﻘﺔ ﻣﻊ ﻃﺎﻗﻢ ﺗﻨﻔﻴﺬ ﻣﻌﻴﻦ وﺑﺎﻟﺘﺎﻟﻲ ﻳﻤﻜﻦ اﻟﺴﻴﻄﺮة ﻋﻠﻰ اﻟﻤﺸﺮوع‬

‫وﺑﻌﺪ ﺗﺤﺪﻳﺪ اﻟﻤﻨﺎﻃﻖ ﻳﻤﻜﻦ ﺗﺤﺪﻳﺪ اﻷدوار ‪ Elevations‬وآﺬﻟﻚ اﻟﻐﺮف ‪Rooms‬‬


‫ﻣﻦ ﺧﻼل اﻟﻘﻮاﺋﻢ ‪:‬‬
‫‪Define Æ Dictionaries Æ Punch List Elevations‬‬

‫ﻓﻘﻂ‬
‫‪Define Æ Dictionaries Æ Punch List Rooms‬‬

‫اﻟﺨﻼﺻﺔ‬
‫ﺑﻌﺪ أن اﺳﺘﻌﺮﺿﻨﺎ آﻴﻔﻴﺔ ﺗﻌﺮﻳﻒ اﻟﻘﻮاﻣﻴﺲ ﺳﻨﺬآﺮ اﻟﻨﻮاﻓﺬ اﻟﺘﻲ ﺳﻨﺤﺘﺎج ﻓﻴﻬﺎ هﺬﻩ‬
‫اﻟﻘﻮاﻣﻴﺲ ﺑﺸﻜﻞ ﻣﺨﺘﺼﺮ اﻵن ﺣﻴﺚ أﻧﻨﺎ ﺳﻨﻘﻮم ﺑﺸﺮح ﺗﻠﻚ اﻟﻨﻮاﻓﺬ ﻓﻲ اﻷﺑﻮاب اﻟﺘﺎﻟﻴﺔ‬
‫وهﻲ آﻤﺎ ﻓﻲ اﻟﺠﺪول اﻟﺘﺎﻟﻲ‬

‫‪٥٨‬‬
Dictionaries ‫اﻟﻘﻮاﻣﻴﺲ‬

‫اﻟﻨﺎﻓﺬة‬ ‫اﻟﻘﻮاﻣﻴﺲ اﻟﻤﺴﺘﺨﺪﻣﺔ‬


Status

‫ﻏـﻴـﺮ‬
• Project Properties
Project Information

Company Role
Company Role
• Companies NAICS
Spec Sections

• Issues Status

‫ﻣﺴﻤﻮح‬
• Request Information Reason Code
Communication

• Notice Spec Sections


• Non Compliance Status
• Correspondence Sent Status
• Correspondence Received Spec Sections

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
• Meeting Minutes
Status
• Notepads
• Contracts
Spec Sections
Contract Information

• Purchase Order
Status
• Change Management

‫ﻧﺴﺨﺔ‬
• Trends Status

• Proposals Reason Code


• Change Orders Spec Sections
• All Requests and Changes Status

Bid Packages

‫ﻟﻠﻌﺮض‬
Phase
• Drawings Set Discipline
• Drawings Area
File No
Spec Sections
• Submittal Packages Status

‫ﻓﻘﻂ‬
• Submittals Submittal Type
Logs

Temperature
Precipitation
Sky
• Daily Reports
Wind
Drawing Areas
Equipment Type
• Insurance
Status
• Punch List

٥٩
‫א ﻏـﻴـﺮ‬ ‫א‬
‫ﻣﺴﻤﻮح‬
‫‪Submittals‬‬ ‫א‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬
‫ﻟﻠﻌﺮض‬
‫ﻓﻘﻂ‬
‫اﻟﺘﻘﺪﻳﻤﺎت‬

‫ﻏـﻴـﺮ‬ ‫א‬

‫ﻣﺴﻤﻮح‬
‫ﻳﻌﺘﺒ ﺮ ﻣﻮﺿ ﻮع ﻣﺘﺎﺑﻌ ﺔ اﻟﺘﻘ ﺪﻳﻤﺎت ‪ Submittals‬ﻣ ﻦ أه ﻢ اﻟﻤﻮاﺿ ﻴﻊ ﻓ ﻲ ﻗﻄ ﺎع‬
‫ﺷﺮآﺎت اﻟﻤﻘﺎوﻻت ﺣﻴﺚ أن ﻋﺪم ﻣﺘﺎﺑﻌﺔ هﺬﻩ اﻟﺘﻘﺪﻳﻤﺎت ﻳﺆدي إﻟﻰ ﺗﺄﺧﻴﺮ ﻓ ﻲ زﻣ ﻦ ﺗﻨﻔﻴ ﺬ‬
‫اﻟﻤﺸﺮوع ‪ ،‬ﻟﺬا آﺎن ﻣ ﻦ اﻟﻮاﺟ ﺐ اﻻهﺘﻤ ﺎم ﺑﻤﺘﺎﺑﻌ ﺔ اﻟﺘﻘ ﺪﻳﻤﺎت وﻣﺘﺎﺑﻌ ﺔ اﻹﺟ ﺮاءات اﻟﺘ ﻲ‬
‫اﺗﺨﺬت ﻣﻊ آﻞ ﺗﻘﺪﻳﻢ ﺳﻮاء ﺑﺎﻟﻤﻮاﻓﻘﺔ أو اﻟﺮﻓﺾ أو إﻋﺎدة اﻟﺘﻘﺪﻳﻢ‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬ ‫أﻧﻮاع اﻟﺘﻘﺪﻳﻤﺎت‬


‫ﺗﺘﻨ ﻮع اﻟﺘﻘ ﺪﻳﻤﺎت ﺣ ﺴﺐ اﻟﻤ ﺸﺮوع وﺣ ﺴﺐ اﻟﻬ ﺪف ﻣ ﻦ اﺳ ﺘﺨﺪام اﻟﺒﺮﻧ ﺎﻣﺞ ﻓﻤ ﺜﻼ‬

‫ﻧﺴﺨﺔ‬
‫اﺳﺘﺨﺪام اﻟﻤﻜﺎﺗﺐ اﻻﺳﺘﺸﺎرﻳﺔ ﻟﻠﺒﺮﻧﺎﻣﺞ ﻳﺨﺘﻠﻒ ﻋﻦ اﺳ ﺘﺨﺪام ﺷ ﺮآﺎت اﻟﻤﻘ ﺎوﻻت وﻧﻈ ﺮا‬
‫ﻷﻧﻨﺎ ﻓﻲ هﺬا اﻟﻜﺘﺎب ﻧﺪرس ﺣﺎﻟﺔ اﺳ ﺘﺨﺪام اﻟﺒﺮﻧ ﺎﻣﺞ ﻟ ﺸﺮآﺎت اﻟﻤﻘ ﺎوﻻت ﻓ ﺄن اﻟﺘﻘ ﺪﻳﻤﺎت‬
‫ﺗﻜﻮن ﻷي ﻣﻦ اﻵﺗﻲ ‪:‬‬
‫‪Shop Drawings‬‬ ‫‪ -١‬ﺗﻘﺪﻳﻤﺎت ﻟﻠﺮﺳﻮﻣﺎت اﻟﺘﻨﻔﻴﺬﻳﺔ‬

‫ﻟﻠﻌﺮض‬
‫‪ -٢‬ﺗﻘﺪﻳﻤﺎت ﻟﺮﺳﻮﻣﺎت ﻣﺎ ﺑﻌﺪ اﻟﺘﻨﻔﻴﺬ ‪As Built Drawings‬‬
‫‪ -٣‬ﺗﻘﺪﻳﻤﺎت ﻟﻠﻤﻮاﺻﻔﺎت اﻟﻔﻨﻴﺔ ﻟﻠﻤﻮاد‬
‫‪ -٤‬ﺗﻘﺪﻳﻤﺎت ﻟﻌﻴﻨﺎت اﻟﻤﻮاد اﻟﻤﻄﻠﻮﺑﺔ‬
‫‪ -٥‬ﺗﻘﺪﻳﻤﺎت ﻟﺸﻬـﺎدات اﻟﻀﻤﺎن‬
‫‪ -٦‬ﺗﻘﺪﻳﻤﺎت اﻋﺘﻤﺎد ﻣﻘﺎوﻟﻲ اﻟﺒﺎﻃﻦ أو اﻟﻤﻮردﻳﻦ‬

‫ﻓﻘﻂ‬
‫وﻟﻠﺘﻨﻈ ﻴﻢ ﻳ ﺘﻢ ﻋﻤ ﻞ ﺣ ﺰم ﻟﻠﺘﻘ ﺪﻳﻤﺎت ‪ Submittal Packages‬ﺑﺤﻴ ﺚ ﻳ ﺘﻢ ﺗﺠﻤﻴ ﻊ‬
‫ﺗﻘﺪﻳﻤﺎت اﻟﻌﻴﻨﺎت ﻣﻊ ﺑﻌﻀﻬﺎ اﻟﺒﻌﺾ وﺗﻘﺪﻳﻤﺎت اﻟﺮﺳﻮﻣﺎت ﻣﻊ ﺑﻌﻀﻬﺎ اﻟﺒﻌﺾ وهﻜﺬا ‪..‬‬
‫ﻣﻤﺎ ﻳﺴﻬﻞ ﻣﻦ ﻋﻤﻠﻴﺎت اﻟﻔﺮز واﻟﺒﺤﺚ وﺳﻨﺸﺮح اﻵن ﻃﺮﻳﻘﺔ ﻋﻤﻞ ﺣﺰم اﻟﺘﻘﺪﻳﻤﺎت‬

‫‪٦١‬‬
‫اﻟﺒﺎب اﻟﺜﺎﻟﺚ‬

‫ﺣﺰم اﻟﺘﻘﺪﻳﻤﺎت ‪Submittal Packages‬‬

‫ﻏـﻴـﺮ‬
‫ﻗﺒﻞ ان ﻧﺸﺮح ﻃﺮﻳﻘﺔ اﻧﺸﺎء اﻟﺤﺰم ﻻﺑﺪ ﻣﻦ ﺗﺤﺪﻳﺪ اﻧ ﻮاع اﻟﺤ ﺰم اﻟﻤﻄﻠﻮﺑ ﺔ ﻓﻤ ﺜﻼ ﻳﻤﻜ ﻦ‬
‫ﻋﻤ ﻞ ﺣﺰﻣ ﺔ ﻟﻠﺮﺳ ﻮﻣﺎت اﻟﺘﻨﻔﻴﺬﻳ ﺔ وﺣﺰﻣ ﺔ ﻟﻤ ﻮاد اﻟ ﺴﺒﺎآﺔ وﺣﺰﻣ ﺔ ﻟﻸﺑ ﻮاب واﻟ ﺸﺒﺎﺑﻴﻚ‬
‫وﺣﺰﻣﺔ ﻟﻤﻮاد اﻷﻋﻤﺎل اﻟﻜﻬﺮﺑﺎﺋﻴﺔ وهﻜﺬا ‪...‬‬
‫وﺑﻌﺪ ﺗﺤﺪﻳﺪ اﻟﺤﺰم ﻧﺘﺒﻊ اﻟﺨﻄﻮات اﻟﺘﺎﻟﻴﺔ ‪:‬‬

‫ﻣﺴﻤﻮح‬
‫‪ -‬ﻓ ﻲ اﻟﻤﺜ ﺎل ‪ Demo‬اﻟﻤﻮﺟ ﻮد ﺑﺎﻟﺒﺮﻧ ﺎﻣﺞ ﻧﻘ ﻮم ﺑﻔ ﺘﺢ ﻣﺠﻠ ﺪ ‪ Log‬ﺛ ﻢ ﻧﻨﻘ ﺮ ﻧﻘ ﺮا‬
‫ﻣﺰدوﺟﺎ ﻋﻠﻰ ﻋﻨﺼﺮ ‪ Submittal Packages‬آﻤﺎ ﺑﺎﻟﺸﻜﻞ ) ‪( ١ - ٣‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬ ‫ﺷﻜﻞ ) ‪( ١ – ٣‬‬

‫ﻧﺴﺨﺔ‬ ‫ﻓﺘﻈﻬﺮ أﻣﺎﻣﻨﺎ اﻟﻨﺎﻓﺬة اﻟﺘﺎﻟﻴﺔ – ﺷﻜﻞ ) ‪( ٢ – ٣‬‬

‫ﻟﻠﻌﺮض‬
‫ﻓﻘﻂ‬
‫ﺷﻜﻞ ) ‪( ٢ – ٣‬‬

‫‪٦٢‬‬
‫اﻟﺘﻘﺪﻳﻤﺎت‬

‫وآﻤﺎ ﺗﺮى ﻓﻲ اﻟﻨﺎﻓﺬة ﻓ ﺈن اﻟﺤ ﺰم ﺗﻈﻬ ﺮ ﻣﺮﺗﺒ ﺔ ﻓ ﻲ ﺟ ﺪول وأﻣ ﺎم آ ﻞ ﺣﺰﻣ ﺔ اﻳﻘﻮﻧ ﺔ ﻣ ﻊ‬
‫ﻣﻼﺣﻈ ﺔ أن ﺗﻠ ﻚ اﻷﻳﻘﻮﻧ ﺔ ﻗ ﺪ ﺗﺄﺧ ﺬ واﺣ ﺪ ﻣ ﻦ اﻷﺷ ﻜﺎل اﻟﺜﻼﺛ ﺔ ﻃﺒﻘ ﺎ ﻟﺨﺎﺻ ﻴﺔ اﻷهﻤﻴ ﺔ‬
‫‪ Priority‬واﻟﺘﻲ ﺳﻨﺸﺮح ﺑﻌﺪ ﻗﻠﻴﻞ آﻴﻔﻴﺔ ﺗﺤﺪﻳﺪهﺎ – اﻟﺸﻜﻞ ) ‪( ٣ – ٣‬‬

‫ﻏـﻴـﺮ‬ ‫أهﻤﻴﺔ ﻗﺼﻮى‬


‫أهﻤﻴﺔ ﻋﺎدﻳﺔ‬
‫أهﻤﻴﺔ ﻣﻨﺨﻔﻀﺔ‬
‫ﺷﻜﻞ ) ‪( ٣ – ٣‬‬

‫ﻣﺴﻤﻮح‬
‫وﻟﻔ ﺘﺢ ﻧﺎﻓ ﺬة أي ﺣﺰﻣ ﺔ ﻣ ﻦ اﻟﺤ ﺰم ﻧﻨﻘ ﺮ ﻧﻘ ﺮا ﻣﺰدوﺟ ﺎ ﻋﻠ ﻰ اﻷﻳﻘﻮﻧ ﺔ اﻟﻤﺠ ﺎورة ﻷﺳ ﻢ‬
‫اﻟﺤﺰﻣ ﺔ أو ﻧﻘ ﻮم ﺑﺘﺤﺪﻳ ﺪ اﻟﺤﺰﻣ ﺔ ﺑﻤﺆﺷ ﺮ اﻟﻔ ﺄرة ﺛ ﻢ ﻧ ﻀﻐﻂ ﻋﻠ ﻰ زر ‪ Open‬ﻓﺘﻈﻬ ﺮ‬
‫أﻣﺎﻣﻨﺎ ﻧﺎﻓﺬة ﺗﻠﻚ اﻟﺤﺰﻣﺔ‬
‫وﺑﻔﺮض أﻧﻨﺎ ﺳﻨﻘﻮم ﺑﻔﺘﺢ ﻧﺎﻓﺬة ﺣﺰﻣﺔ ‪ Earthwork‬اﻟﻤﻮﺟﻮدة ﺑﺎﻟﻤﺜﺎل‪ -‬ﺷﻜﻞ )‪( ٤ -٣‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬ ‫ﻣﻨﻄﻘﺔ ﺑﻴﺎﻧﺎت اﻟﺤﺰﻣﺔ‬

‫ﻧﺴﺨﺔ‬
‫ﻟﻠﻌﺮض‬ ‫ﻣﻨﻄﻘﺔ ﺑﻴﺎﻧﺎت اﻟﺘﻘﺪﻳﻤﺎت اﻟﻤﻮﺟﻮدة ﺑﻬﺬﻩ اﻟﺤﺰﻣﺔ‬

‫ﻓﻘﻂ‬ ‫ﺷﻜﻞ ) ‪( ٤ – ٣‬‬

‫وﺳﻨﻘﻮم اﻵن ﺑﺸﺮح ﻣﻜﻮﻧﺎت اﻟﺠﺰء اﻟﻌﻠﻮي ﻣﻦ اﻟﻨﺎﻓﺬة‬


‫‪Package No:‬‬
‫رﻗﻢ اﻟﺤﺰﻣﺔ وﻻ ﻳﻤﻜﻦ إﻧﺸﺎء ﺣﺰﻣﺔ ﺑﺪون رﻗﻢ ﺗﻌﺮﻳﻔﻲ‬
‫‪Title :‬‬
‫اﺳﻢ اﻟﺤﺰﻣﺔ‬

‫‪٦٣‬‬
‫اﻟﺒﺎب اﻟﺜﺎﻟﺚ‬

‫‪Ball in Court :‬‬


‫اﻟﺸﺨﺺ اﻟﻤﺴﺌﻮل ﻋﻦ هﺬا اﻟﻤﻮﺿﻮع‬

‫ﻏـﻴـﺮ‬
‫وﺳﺘﺠﺪ اﻧﻪ ﻳﺘﻜﻮن ﻣﻦ ﺣﻘﻠﻴﻦ اﻷول ﻟﻠﺸﺮآﺔ واﻟﺜﺎﻧﻲ ﻟﻠﻤﻮﻇﻒ اﻟﻤﻮﺟﻮد ﺑﺘﻠﻚ اﻟﺸﺮآﺔ‬
‫‪Status:‬‬
‫اﻟﺤﺎﻟﺔ اﻟﺨﺎﺻﺔ ﺑﺎﻟﺤﺰﻣﺔ ) راﺟﻊ أآﻮاد اﻻﺟﺮاءات ﻓﻲ اﻟﺒﺎب اﻟﺜﺎﻧﻲ (‬
‫‪Priority :‬‬
‫درﺟﺔ اﻷهﻤﻴﺔ وهﻲ اﻣﺎ ) ﻗﺼﻮى – ﻋﺎدﻳﺔ – ﻣﻨﺨﻔﻀﺔ ( ‪ ،‬آﻤﺎ ﺑﺎﻟﺸﻜﻞ رﻗﻢ ) ‪( ٣ -٣‬‬

‫ﻣﺴﻤﻮح‬
‫‪Activity ID:‬‬
‫ﻣﻌﺮف اﻟﻨﺸﺎط وﻳﺴﺘﺨﺪم ﻟﺮﺑﻂ اﻟﺤﺰﻣﺔ ﺑﻨﺸﺎط ﻓﻲ اﻟﺠﺪول اﻟﺰﻣﻨﻲ ﻟﺒﺮﻧﺎﻣﺞ اﻟﺒﺮﻳﻤﺎﻓﻴﺮا‬
‫وﻓﻲ ﺣﺎﻟﺔ رﺑﻂ اﻟﻤﺸﺮوع ﻣﻊ ﺑﺮﻧﺎﻣﺞ اﻟﺒﺮﻳﻤﺎﻓﻴﺮ ﺳﺘﻈﻬﺮ ﺟﻤﻴﻊ اﻷﻧﺸﻄﺔ ﻓﻲ اﻟﻘﺎﺋﻤﺔ‬
‫اﻟﻤﻨﺴﺪﻟﺔ اﻣﺎ ﻓﻲ ﺣﺎﻟﺔ ﻋﺪم رﺑﻂ اﻟﻤﺸﺮوع ﺑﺠﺪول زﻣﻨﻲ ﺳﻨﺠﺪ ان هﺬا اﻟﺨﻴﺎر ﻏﻴﺮ ﻓﻌﺎل‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫راﺟﻊ رﺑﻂ ‪ Expedition‬ﺑﺎﻟﺒﺮﻧﺎﻣﺞ اﻟﺰﻣﻨﻲ ل ‪ Primavera‬ﺻﻔﺤﺔ رﻗﻢ ‪٤٠‬‬

‫ﻧﺴﺨﺔ‬ ‫وﻓﻴﻤﺎ ﻳﻠﻲ اﻟﺤﻘﻮل اﻟﺨﺎﺻﺔ ﺑﺘﺤﺪﻳﺪ ﺣﺮآﺔ اﻟﻤﺮاﺳﻼت‬

‫‪Received From:‬‬
‫ﻣﺮﺳﻞ ﻣﻦ ) اﻟﺸﺮآﺔ اﻟﻤﻮردة ﻣﺜﻼ (‬

‫ﻟﻠﻌﺮض‬ ‫‪Sent To:‬‬


‫ﻣﺮﺳﻞ إﻟﻰ ) اﻹﺳﺘﺸﺎري ﻟﻺﻋﺘﻤﺎد (‬
‫‪Returned By:‬‬
‫رﺟﻮع ﻣﻦ ) اﻹﺳﺘﺸﺎري ﺑﻌﺪ اﺗﺨﺎذ ﻗﺮار اﻹﻋﺘﻤﺎد (‬

‫ﻓﻘﻂ‬
‫‪Forwarded To:‬‬
‫ﺗﻤﺮﻳﺮ إﻟﻰ ) اﻟﺸﺮآﺔ اﻟﻤﻮردة ﺑﻌﺪ اﺗﺨﺎذ ﻗﺮار اﻹﻋﺘﻤﺎد (‬
‫‪Required Start :‬‬
‫اﻟﺘﺎرﻳﺦ اﻟﻤﻄﻠﻮب ﻟﻠﺒﺪء‬
‫‪Required Finish :‬‬
‫اﻟﺘﺎرﻳﺦ اﻟﻤﻄﻠﻮب ﻟﻠﻨﻬﻮ‬

‫‪٦٤‬‬
‫اﻟﺘﻘﺪﻳﻤﺎت‬

‫وﻓﻴﻤﺎ ﻳﻠﻲ اﻟﺤﻘﻮل اﻟﺨﺎﺻﺔ ﺑﻤﻠﺨﺺ أﻋﺪاد اﻟﺘﻘﺪﻳﻤﺎت واﻟﺘﻲ ﺗﻈﻬﺮ ﻓﻲ اﻟﻤﻨﻄﻘﺔ اﻟﺴﻔﻠﻰ‬

‫ﻏـﻴـﺮ‬
‫‪Total Items :‬‬
‫اﻟﻌﺪد اﻟﻜﻠﻲ ﻟﻠﺘﻘﺪﻳﻤﺎت اﻟﻤﻮﺟﻮدة ﻓﻲ هﺬﻩ اﻟﺤﺰﻣﺔ‬
‫‪Submitted :‬‬
‫ﻋﺪد اﻟﺘﻘﺪﻳﻤﺎت اﻟﺘﻲ ﺗﻢ إرﺳﺎﻟﻬﺎ‬

‫ﻣﺴﻤﻮح‬
‫‪Unapproved :‬‬
‫ﻋﺪد اﻟﺘﻘﺪﻳﻤﺎت اﻟﻐﻴﺮ ﻣﻮاﻓﻖ ﻋﻠﻴﻬﺎ‬
‫‪Approved :‬‬
‫ﻋﺪد اﻟﺘﻘﺪﻳﻤﺎت اﻟﺘﻲ ﺗﻢ اﻟﻤﻮاﻓﻘﺔ ﻋﻠﻴﻬﺎ‬
‫‪Complete :‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺒﺔ اﻟﻤﺌﻮﻳﺔ ﻹﻧﻬﺎء اﻟﺘﻘﺪﻳﻤﺎت وهﻲ ﺗﺴﺎوي ﻧﺴﺒﺔ اﻟﺘﻘﺪﻳﻤﺎت اﻟﻤﻮاﻓﻖ ﻋﻠﻴﻬﺎ إﻟﻰ اﺟﻤﺎﻟﻲ‬
‫اﻟﺘﻘﺪﻳﻤﺎت ﺑﻬﺬﻩ اﻟﺤﺰﻣﺔ‬

‫وﻓﻲ ﻣﺜﺎﻟﻨﺎ هﺬا ﺳﻨﺠﺪ اﻧﻪ ﻳﻮﺟﺪ ‪ ٦‬ﺗﻘﺪﻳﻤﺎت ﺑﻬﺎ اﻵﺗﻲ‬

‫ﻧﺴﺨﺔ‬
‫)‪Approved (APP‬‬ ‫‪ ٣‬ﺗﻘﺪﻳﻤﺎت ﺑﻜﻮد ﻣﻮاﻓﻘﺔ‬
‫‪ ١‬ﺗﻘﺪﻳﻢ ﺑﻜﻮد ﻣﻮاﻓﻘﺔ ﻣﻊ ﻣﻼﺣﻈﺎت )‪Approved as Noted (AAN‬‬
‫)‪New Item (NEW‬‬ ‫‪ ٢‬ﺗﻘﺪﻳﻢ ﺑﻜﻮد ﺟﺪﻳﺪ‬

‫‪ ٦‬إﺟﻤﺎﻟﻲ اﻟﺘﻘﺪﻳﻤﺎت‬

‫ﻟﻠﻌﺮض‬
‫‪٤‬‬
‫= ‪٪ ٦٦‬‬ ‫ﻧﺴﺒﺔ اﻹﻧﺠﺎز =‬
‫‪٦‬‬

‫وﺳﻨﺠﺪ ﻓﻲ اﺳﻔﻞ اﻟﻨﺎﻓﺬة زر ‪ Apply‬وهﻮ ﺧﺎص ﺑﺘﻄﺒﻴﻖ اﻟﺘﻌﺪﻳﻞ اﻟﺬي ﻧﺠﺮﻳﻪ ﻋﻠﻰ أي‬

‫ﻓﻘﻂ‬ ‫ﺣﻘﻞ ﻣﻦ اﻟﺤﻘﻮل دون اﻏﻼق اﻟﻨﺎﻓﺬة‬


‫وﻹﻏﻼق اﻟﻨﺎﻓﺬة ﻳﺘﻢ اﻟﻀﻐﻂ ﻋﻠﻰ زر اﻹﻏﻼق أو اﻟﻀﻐﻂ ﻋﻠﻰ زر ‪OK‬‬
‫وﻓﻲ اﻷﻋﻠﻰ ﻳﻮﺟﺪ زر ‪ Update‬وهﻮ ﺧﺎص ﺑﺘﺤﺪﻳﺚ اﻟﺒﻴﺎﻧﺎت وﺳﻨﻘﻮم ﺑﺸﺮﺣﻪ ﻓﻲ‬
‫ﻗﺴﻢ ﺗﻌﺪﻳﻞ اﻟﺒﻴﺎﻧﺎت‬

‫أﻣﺎ ﻣﻜﻮﻧﺎت اﻟﺠﺰء اﻟﺴﻔﻠﻲ واﻟﺨﺎﺻﺔ ﺑﺎﻟﺘﻘﺪﻳﻤﺎت ﺳﻨﻘﻮم ﺑﺸﺮﺣﻬﺎ ﺑﺎﻟﺘﻔﺼﻴﻞ ﻓﻲ ﻗﺴﻢ‬
‫اﺿﺎﻓﺔ اﻟﺘﻘﺪﻳﻤﺎت ﻟﻠﻤﺸﺮوع‬

‫‪٦٥‬‬
‫اﻟﺒﺎب اﻟﺜﺎﻟﺚ‬

‫إﺿﺎﻓﺔ ﺣﺰﻣﺔ ﺟﺪﻳﺪة‬

‫ﻏـﻴـﺮ‬
‫ﻹﺿﺎﻓﺔ ﺣﺰﻣﺔ ﺟﺪﻳﺪة ﻧﻀﻐﻂ ﻋﻠﻰ زر ‪ Add‬واﻟﺬي ﺑﺪورﻩ ﺳﻴﻔﺘﺢ ﻧﺎﻓﺬة ﺟﺪﻳﺪة ﺑﺪون‬
‫ﺑﻴﺎﻧﺎت آﻤﺎ ﺑﺎﻟﺸﻜﻞ ) ‪( ٥ -٣‬‬
‫آﻤﺎ ﻳﻤﻜﻦ اﺟﺮاء ﻧﻔﺲ اﻷﻣﺮ ﻣﻦ ﺧﻼل اﻟﻘﻮاﺋﻢ آﺎﻟﺘﺎﻟﻲ ‪:‬‬
‫‪Edit Æ Add Item‬‬

‫ﻣﺴﻤﻮح‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬
‫ﻟﻠﻌﺮض‬
‫ﺷﻜﻞ ) ‪( ٥ -٣‬‬

‫‪ -‬ﺛﻢ ﻧﻘﻮم ﺑﻮﺿﻊ ﻣﺆﺷﺮ اﻟﻔﺄرة داﺧﻞ ﺧﺎﻧﺔ ‪ Package No‬ﻓﻴﻈﻬﺮ اﻟﺴﻬﻢ ﺛﻢ ﻧﺒﺤﺚ‬
‫ﻓﻲ ارﻗﺎم اﻟﺤﺰم ﺣﺘﻰ ﻧﺘﺄآﺪ ﻣﻦ ﻋﺪم وﺟﻮد اﻟﺮﻗﻢ اﻟﺨﺎص ﺑﺎﻟﺤﺰﻣﺔ اﻟﺠﺪﻳﺪة ﻓﻲ أرﻗﺎم‬
‫اﻟﺤﺰم اﻷﺧﺮى وﺑﻌﺪ ذﻟﻚ ﻧﻘﻮم ﺑﻜﺘﺎﺑﺔ رﻗﻢ اﻟﺤﺰﻣﺔ ) ﻣﺜﻼ ‪( 9999‬‬

‫ﻓﻘﻂ‬ ‫‪ -‬ﺛﻢ ﻧﻜﺘﺐ اﺳﻢ اﻟﺤﺰﻣﺔ وﻟﻴﻜﻦ )‪( Ceramic‬‬


‫‪ -‬ﺛﻢ ﻧﻘﻮم ﺑﺘﻌﺒﺌﺔ ﺑﻘﻴﺔ اﻟﺒﻴﺎﻧﺎت ﻟﺘﺤﺪﻳﺪ اﻟﺸﺮآﺔ اﻟﻤﻮردة واﻻﺳﺘﺸﺎري واﻷهﻤﻴﺔ ) أو ﻳﻤﻜﻦ‬
‫ﺗﺮآﻬﺎ ﻓﺎرﻏﺔ ﻓﻲ ﻣﺜﺎﻟﻨﺎ هﺬا (‬
‫وﺑﺎﻟﻀﻐﻂ ﻋﻠﻰ زر ‪ Ok‬ﻳﺘﻢ اﻏﻼق اﻟﻨﺎﻓﺬة وﺳﻨﻼﺣﻆ ان اﻟﺤﺰﻣﺔ اﻟﺠﺪﻳﺪة ﺳﺘﻈﻬﺮ ﻓﻲ‬
‫اﺳﻔﻞ ﻗﺎﺋﻤﺔ اﻟﺤﺰم‬

‫‪٦٦‬‬
‫اﻟﺘﻘﺪﻳﻤﺎت‬

‫ﺗﻌﺪﻳﻞ ﺑﻴﺎﻧﺎت ﺣﺰﻣﺔ‬

‫ﻏـﻴـﺮ‬
‫ﺑﻌﺪ اﻧﺸﺎء اﻟﺤﺰﻣﺔ اﻟﺠﺪﻳﺪة ﻗﺪ ﻧﺤﺘ ﺎج إﻟ ﻰ ﺗﻌ ﺪﻳﻞ ﺑﻴﺎﻧﺘﻬ ﺎ ﻣﺜ ﻞ ﺗﻐﻴﻴ ﺮ اﻹﺳ ﻢ أو اﻟﻤ ﻮرد أو‬
‫اﻻﺳﺘ ﺸﺎري أو ﻣﻮﻋ ﺪ اﻟﺒ ﺪء اﻟﻤﻘﺘ ﺮح وﻏﻴ ﺮ ذﻟ ﻚ ﻣ ﻦ اﻟﺒﻴﺎﻧ ﺎت وﻟﻌﻤ ﻞ ذﻟ ﻚ ﻧﻘ ﻮم ﺑﻔ ﺘﺢ‬
‫اﻟﺤﺰﻣﺔ ﺛﻢ اﻟﻘﻴﺎم ﺑﺎﻟﺘﻐﻴﻴﺮات اﻟﻤﻄﻠﻮﺑﺔ ﻣﻊ اﻟﻌﻠﻢ اﻧﻪ ﻻﻳﻤﻜﻨﻨﺎ ﺗﻐﻴﻴﺮ رﻗﻢ اﻟﺤﺰﻣﺔ‬

‫ﻣﺴﻤﻮح‬ ‫ﺣﺬف ﺣﺰﻣﺔ‬


‫ﻳﻤﻜﻦ ﺣﺬف أي ﺣﺰﻣﺔ ﻣﻦ ﺧﻼل ﺗﺤﺪﻳ ﺪ أﻳﻘﻮﻧ ﺔ اﻟﺤﺰﻣ ﺔ ﺑﻤﺆﺷ ﺮ اﻟﻔ ﺄرة ﺛ ﻢ اﻟ ﻀﻐﻂ ﻋﻠ ﻰ‬
‫زر ‪ Delete‬ﻓﺘﻈﻬﺮ رﺳﺎﻟﺔ اﻟﺘﺄآﻴﺪ آﻤﺎ ﺑﺎﻟﺸﻜﻞ ) ‪( ٦ -٣‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬
‫ﺷﻜﻞ )‪( ٦ – ٣‬‬

‫إﺿﺎﻓﺔ اﻟﺘﻘﺪﻳﻤﺎت‬

‫ﻟﻠﻌﺮض‬
‫ﺑﻌﺪ أن ﺗﻌﻠﻤﻨﺎ آﻴﻔﻴﺔ إﻧﺸﺎء ﺣﺰم اﻟﺘﻘﺪﻳﻤﺎت ﺳﻨﺘﻌﻠﻢ اﻵن ﻃﺮﻳﻘﺔ إﺿﺎﻓﺔ اﻟﺘﻘﺪﻳﻤﺎت إﻟﻰ ﺗﻠﻚ‬
‫اﻟﺤﺰم وﻳﻠﺰم اﻹﺷﺎرة أﻧﻨﺎ ﻳﻤﻜﻨﻨﺎ إﺿﺎﻓﺔ ﺗﻘﺪﻳﻤﺎت ﺑﺪون ﺣﺰم وﻟﻜﻦ ﻣﻦ اﻷﻓﻀﻞ رﺑﻂ‬
‫اﻟﺘﻘﺪﻳﻤﺎت ﺑﺤﺰم ﺣﺘﻰ ﻳﻜﻮن اﻟﻌﻤﻞ ﻣﻨﻈﻢ‬
‫وﻹﺿﺎﻓﺔ اﻟﺘﻘﺪﻳﻤﺎت إﻟﻰ اﻟﻤﺸﺮوع ﻳﺘﻢ ذﻟﻚ ﻣﻦ ﺧﻼل ﻃﺮﻳﻘﺘﻴﻦ وهﻤﺎ ‪:‬‬

‫ﻓﻘﻂ‬
‫‪ -١‬ﻣﻦ ﺧﻼل ﻓﺘﺢ اﻟﺤﺰﻣﺔ ﺛﻢ إﺿﺎﻓﺔ اﻟﺘﻘﺪﻳﻢ‬
‫‪ -٢‬ﻣﻦ ﺧﻼل إﺿﺎﻓﺔ اﻟﺘﻘﺪﻳﻢ ﻣﺒﺎﺷﺮة ﻓﻲ وﺣﺪة ‪ Submittals‬ﻓﻲ ﻣﺠﻠﺪ ‪Log‬‬

‫وآﻤﺎ ﺗﺮى ﻓﺈن اﻟﻄﺮﻳﻘﺔ اﻟﺜﺎﻧﻴﺔ ﻣﻨﺎﺳﺒﺔ ﺟﺪا ﻓﻲ ﺣﺎﻟﺔ إﺿﺎﻓﺔ ﺗﻘﺪﻳﻢ ﻏﻴﺮ ﻣﺮﺗﺒﻂ ﺑﺤﺰﻣﺔ‬
‫ﻣﻦ اﻟﺤﺰم اﻟﻤﻮﺟﻮدة ﺑﺎﻟﻤﺸﺮوع‬

‫‪٦٧‬‬
‫اﻟﺒﺎب اﻟﺜﺎﻟﺚ‬

‫أوﻻ ‪ :‬إﺿﺎﻓﺔ اﻟﺘﻘﺪﻳﻤﺎت ﻣﻦ داﺧﻞ اﻟﺤﺰﻣﺔ‬

‫ﻏـﻴـﺮ‬
‫ﺳﻨﻘﻮم ﺑﺸﺮح هﺬﻩ اﻟﻄﺮﻳﻘﺔ ﻣﻦ ﺧﻼل ﻣﺜﺎل ﻋﻤﻠﻲ ﺣﻴﺚ ﻧﻔﺘﺢ اﻟﺤﺰﻣﺔ اﻟﺴﺎﺑﻘﺔ إﻧﺸﺎؤهﺎ‬
‫) ‪ ( 9999 Ceramic‬ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ زر ‪ Add‬ﻓﺘﻈﻬﺮ أﻣﺎﻣﻨﺎ اﻟﻨﺎﻓﺬة اﻟﺘﺎﻟﻴﺔ‬

‫ﻣﺴﻤﻮح‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬ ‫ﺷﻜﻞ )‪( ٧ – ٣‬‬

‫ﻓﻨﻼﺣﻆ أن اﻟﺒﺮﻧﺎﻣﺞ ﻗﺎم ﺑﺘﺮﻗﻴﻢ اﻟﺘﻘﺪﻳﻢ ﺗﻠﻘﺎﺋﻴﺎ ﺑﺮﻗﻢ ‪ 1‬ﻓﻲ ﺧﺎﻧﺔ ‪ Submittal‬واﻟﺬي‬

‫ﻟﻠﻌﺮض‬
‫ﺑﺪورﻩ ﺳﻴﺘﻐﻴﺮ ﻓﻲ آﻞ ﻣﺮة ﻧﻀﻴﻒ ﻓﻴﻬﺎ ﺗﻘﺪﻳﻢ ﺟﺪﻳﺪ ﻟﺘﻠﻚ اﻟﺤﺰﻣﺔ وﻳﻤﻜﻦ ان ﻧﻐﻴﺮ ﺗﻠﻚ‬
‫اﻟﻘﻴﻤﺔ آﻤﺎ ﻧﺮﻏﺐ‬
‫اﻣﺎ ﺧﺎﻧﺔ ‪ Number‬ذات ﺗﺮﻗﻴﻢ ﺗﻠﻘﺎﺋﻲ ﻣﺘﺘﺎﻟﻲ وآﺬﻟﻚ ﻳﻤﻜﻦ ﺗﻐﻴﻴﺮﻩ‬
‫ﺛﻢ ﻧﻘﻮم ﺑﺈدﺧﺎل اﻟﺒﻴﺎﻧﺎت اﻟﺘﺎﻟﻴﺔ ‪:‬‬
‫‪Title : Kitchen wall Ceramic 30cm sample‬‬ ‫اﺳﻢ اﻟﺘﻘﺪﻳﻢ‬

‫ﻓﻘﻂ‬
‫‪Type :Pre-Construction‬‬ ‫اﻟﻨﻮع ‪ :‬ﻗﺒﻞ اﻟﺘﻨﻔﻴﺬ‬
‫)راﺟﻊ أﻧﻮاع اﻟﺘﻘﺪﻳﻤﺎت ﻓﻲ ﺑﺎب اﻟﻘﻮاﻣﻴﺲ ﺻﻔﺤﺔ ‪( ٥٢‬‬
‫‪Received From : Finish‬‬ ‫ﻣﻦ ﺷﺮآﺔ اﻟﺘﺸﻄﻴﺒﺎت اﻟﻤﺤﺪودة‬
‫‪Sent TO : Design‬‬ ‫إﻟﻰ اﻻﺳﺘﺸﺎري‬
‫‪Required Start : 04/02/2007‬‬ ‫ﺗﺎرﻳﺦ اﻟﺒﺪء‬
‫‪Required Finish : 20/02/2007‬‬ ‫ﺗﺎرﻳﺦ اﻟﻨﻬﻮ‬
‫ﻣﻊ ﻣﻼﺣﻈﺔ اﻧﻨﻲ آﺘﺒﺖ هﺬﻩ اﻟﺘﻮارﻳﺦ ﻋﻨﺪﻣﺎ آﺎن ﺗﺎرﻳﺦ ﺟﻬﺎزي هﻮ ‪ ٢٠٠٧/٢/٢٥‬م‬

‫‪٦٨‬‬
‫اﻟﺘﻘﺪﻳﻤﺎت‬

‫ﻓﻨﻼﺣﻆ ان اﻟﺒﺮﻧﺎﻣﺞ ﻳﻘﻮم ﺑﺤﺴﺎب ﻋﺪد اﻷﻳﺎم آﺎﻵﺗﻲ‬


‫ﻋﺪد اﻷﻳﺎم اﻟﺘﻲ ﻣﺮت ﻣﻨﺬ ارﺳﺎل اﻟﺘﻘﺪﻳﻢ‬

‫ﻏـﻴـﺮ‬
‫‪Held = 25/02/2007 – 04/02/2007 = 21 Days‬‬
‫ﻋﺪد أﻳﺎم اﻟﺘﺄﺧﻴﺮ ﻓﻲ اﻟﺘﻘﺪﻳﻢ‬
‫‪Overdue= 25/02/2007 – 20/02/2007 = 5 Days‬‬
‫وﻃﺒﻌﺎ ﻇﻬﺮت هﺬﻩ اﻟﺘﻮارﻳﺦ ﻷﻧﻨﺎ ﺣﺎﻟﺔ اﻟﺘﻘﺪﻳﻢ ﻣﺤﺪدة ﻋﻠﻰ ‪UnSubmitted‬‬
‫ودﻋﻨﺎ ﻧﺤﺪد ﺣﺎﻟﺔ أﺧﺮى وهﻲ ﺣﺎﻟﺔ اﻟﻤﻮاﻓﻘﺔ ‪ Approved‬وذﻟﻚ ﻣﻦ ﺧﻼل اﻟﻌﻮدة إﻟﻰ‬

‫ﻣﺴﻤﻮح‬
‫ﻧﺎﻓﺬة اﻟﺤﺰﻣﺔ ﻋﻦ ﻃﺮﻳﻖ اﻟﻀﻐﻂ ﻋﻠﻰ زر ‪ Ok‬ﻓﺘﻈﻬﺮ اﻟﻨﺎﻓﺬة آﻤﺎ ﺑﺎﻟﺸﻜﻞ )‪( ٨ -٣‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬
‫ﻟﻠﻌﺮض‬
‫ﺷﻜﻞ )‪( ٨ – ٣‬‬

‫ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ اﻟﻘﺎﺋﻤﺔ اﻟﻤﻨﺴﺪﻟﺔ ﻟﻠﺤﺎﻟﺔ ‪ Status‬وﻧﺨﺘﺎر ﺣﺎﻟﺔ اﻟﻤﻮاﻓﻘﺔ ‪Approved‬‬
‫ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ زر ‪ Apply‬وﻧﻔﺘﺢ اﻟﺘﻘﺪﻳﻢ رﻗﻢ ‪ 1‬ﻣﺮة أﺧﺮى ﻓﻨﻼﺣﻆ أن‬
‫‪Held = 0‬‬
‫‪Overdue=0‬‬

‫ﻓﻘﻂ‬
‫رﻗﻢ ﺁﺧﺮ ﻣﺮاﺟﻌﺔ ‪Last Rev# 001‬‬

‫وﺳﻴﻈﻬﺮ أﻣﺎﻣﻨﺎ ﻓﻲ ﻗﺴﻢ اﻟﻤﺮاﺟﻌﺎت ‪ Review Cycles‬ﻣﺮاﺟﻌﺔ ﺑﺮﻗﻢ ‪001‬‬


‫وﻳﻤﻜﻦ ان ﺗﻜﻮن ﻟﺪﻳﻨﺎ ﻋ ﺪة ﻣﺮاﺟﻌ ﺎت ﻓﻤ ﺜﻼ ﻳﻤﻜ ﻦ ان ﻳ ﺮﻓﺾ اﻻﺳﺘ ﺸﺎري اﻟﻌﻴﻨ ﺔ ﻓﻨﻘ ﻮم‬
‫ﺑﺎرﺳﺎل ﻋﻴﻨﺔ أﺧﺮى ﻓﻴﻮاﻓﻖ ﻋﻠﻴﻬﺎ ﻣﻊ ﺑﻌﺾ اﻟﻤﻼﺣﻈﺎت ﻓﻨﻌﻴﺪ ﺗﻘ ﺪﻳﻤﻬﺎ ﻣ ﺮة أﺧ ﺮى ﺑﻌ ﺪ‬
‫ﻣﺮاﻋﺎة اﻟﻤﻼﺣﻈﺎت وهﻜﺬا ‪...‬‬
‫وﻳﻤﻜ ﻦ آ ﺬﻟﻚ ارﺳ ﺎل اﻟﺘﻘ ﺪﻳﻢ إﻟ ﻰ ﻋ ﺪة ﻣ ﺮاﺟﻌﻴﻦ ﻋ ﻦ ﻃﺮﻳ ﻖ ﺗﺤﺪﻳ ﺪ ﻣﺮﺑ ﻊ اﺧﺘﻴ ﺎر‬
‫‪Multiple Reviewers‬‬

‫‪٦٩‬‬
‫اﻟﺒﺎب اﻟﺜﺎﻟﺚ‬

‫ﺛﻢ ﻧﻨﺘﻘﻞ اﻵن إﻟﻰ اﻟﻘﺴﻢ اﻟﺜﺎﻧﻲ وهﻮ ﻗﺴﻢ اﻟﺘﻮزﻳﻊ ‪Distribution‬‬

‫ﻏـﻴـﺮ‬
‫وﻓﻴﻪ ﻳﺘﻢ اﺧﺘﻴﺎر اﻷﻃ ﺮاف اﻟ ﺬﻳﻦ ﺳ ﻴﺘﻢ إرﺳ ﺎل ﻧ ﺴﺨﺔ ﻣ ﻦ اﻟﺘﻘ ﺪﻳﻤﺎت إﻟ ﻴﻬﻢ وﺳ ﻨﻘﻮم اﻵن‬
‫ﺑﺈﺿﺎﻓﺔ اﻟﺸﺮآﺎت ﻋﻦ ﻃﺮﻳﻖ اﻟﻀﻐﻂ ﻋﻠﻰ زر ‪ Add‬ﻓﺘﻈﻬﺮ اﻟﻨﺎﻓﺬة اﻟﺘﺎﻟﻴﺔ‬

‫ﻣﺴﻤﻮح‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬ ‫ﺷﻜﻞ )‪( ٩ – ٣‬‬

‫وآﻤﺎ ﺗﻼﺣﻆ ﻳﻤﻜﻦ اﺧﺘﻴﺎر ﻗﺎﺋﻤﺔ ﺗﻮزﻳﻊ ﻣﻌﺮﻓﺔ أو اﺧﺘﻴﺎر ﺷﺮآﺎت ﻣﻨﻔﺼﻠﺔ‬

‫ﻟﻠﻌﺮض‬
‫) راﺟﻊ إﻧﺸﺎء ﻗﻮاﺋﻢ اﻟﺘﻮزﻳﻊ ﺑﺎﻟﺒﺎب اﻷول ﺻﻔﺤﺔ ‪( ٣٨‬‬
‫‪ -‬وﻓﻲ ﺣﺎﻟﺘﻨﺎ ﺳﻨﻘﻮم ﺑﺎﺧﺘﻴﺎر ‪ Companies‬ﺛﻢ ﻧﺨﺘﺎر ﺷﺮآﺔ ‪Finish‬‬
‫‪ -‬ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ زر ‪ Add‬ﻓﻴﺘﻢ إدراج اﻟﺸﺮآﺔ ﻓﻲ اﻟﺠﺎﻧﺐ اﻷﻳﻤﻦ‬
‫‪ -‬ﺛ ﻢ ﻧﺤ ﺪد رﻗ ﻢ اﻟﻤﺮاﺟﻌ ﺔ اﻟﻤﻄﻠ ﻮب إرﺳ ﺎﻟﻬﺎ ﻣ ﻦ ﺧﺎﻧ ﺔ ‪ Rev No‬ﺛ ﻢ ﻧﻜﺘ ﺐ ﻋ ﺪد‬

‫ﻓﻘﻂ‬
‫اﻟﻨﺴﺦ ﻓﻲ ﺧﺎﻧﺔ ‪Copies‬‬
‫‪ -‬وﻓﻲ ﺣﺎﻟﺔ وﺟﻮد ﻣﻼﺣﻈﺎت ﻧﻘﻮم ﺑﻜﺘﺎﺑﺘﻬﺎ ﻓﻲ ﺧﺎﻧﺔ ‪Remarks‬‬
‫‪ -‬ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ زر ‪ Next‬ﻓﺘﻈﻬ ﺮ اﻟﻨﺎﻓ ﺬة اﻟﺘﺎﻟﻴ ﺔ ﻣ ﻦ اﻟﻤﻌ ﺎﻟﺞ واﻟﺘ ﻲ ﺑﻬ ﺎ أﺳ ﻤﺎء‬
‫اﻟﺸﺮآﺎت اﻟﺘﻲ ﺗﻢ اﺧﺘﻴﺎرهﺎ آﻤﺎ ﺑﺎﻟﺸﻜﻞ )‪( ١٠ -٣‬‬
‫‪ -‬ﻳﺘﻢ ﺗﺤﺪﻳﺪ ﺧﺎﻧﺔ ‪ Transmit‬ﻓﻲ ﻟﺘﺤﺪﻳﺪ ﻣﺎ اذا آﺎﻧﺖ اﻟﻨﺴﺦ ارﺳﻠﺖ ام ﻟﻢ ﺗﺮﺳﻞ‬
‫‪ -‬واﺧﻴﺮا ﻳﺘﻢ اﻟﻀﻐﻂ ﻋﻠﻰ زر ‪Finish‬‬

‫‪٧٠‬‬
‫اﻟﺘﻘﺪﻳﻤﺎت‬

‫ﻏـﻴـﺮ‬
‫ﻣﺴﻤﻮح‬ ‫ﺷﻜﻞ )‪( ١٠ – ٣‬‬

‫ﺛﻢ ﻧﻨﺘﻘﻞ اﻵن إﻟﻰ اﻟﻘﺴﻢ اﻟﺜﺎﻟﺚ وهﻮ ﻗﺴﻢ اﻟﺠﺪوﻟﺔ اﻟﺰﻣﻨﻴﺔ ‪Distribution‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫وﺳ ﺘﻈﻬﺮ اﻟﻨﺎﻓ ﺬة آﻤ ﺎ ﺑﺎﻟ ﺸﻜﻞ ) ‪ ( ١١ -٣‬وﺑﻬ ﺎ ﻣﺠﻤﻮﻋ ﺔ ﻣ ﻦ اﻟﺨﺎﻧ ﺎت اﻟﺨﺎﺻ ﺔ ﺑ ﺮﺑﻂ‬
‫اﻟﺘﻘﺪﻳﻢ ﻣﻊ اﻟﺠﺪول اﻟﺰﻣﻨﻲ ﺑﺎﻟﺒﺮﻳﻤﺎﻓﻴﺮا‬

‫ﻧﺴﺨﺔ‬
‫ﻟﻠﻌﺮض‬
‫ﻓﻘﻂ‬ ‫ﺷﻜﻞ )‪( ١١ – ٣‬‬

‫وﺳﻮف ﻧﺸﺮح هﺬا اﻟﻤﻮﺿﻮع ﻓﻲ ﺑﺎب ﻣﺴﺘﻘﻞ وﻳﻤﻜﻦ ﺗﺨﻄ ﻲ ه ﺬا اﻟﻘ ﺴﻢ اﻵن إﻟ ﻰ اﻟﻘ ﺴﻢ‬
‫اﻟﺘﺎﻟﻲ وهﻮ ﻗﺴﻢ اﻟﺤﺎﻟﺔ ‪Current Status‬‬
‫وﻓﻲ هﺬا اﻟﻘﺴﻢ ﺳﻨﺤﺪد اﻵﺗﻲ ‪:‬‬

‫‪٧١‬‬
‫اﻟﺒﺎب اﻟﺜﺎﻟﺚ‬

‫‪Items In Submittal‬‬
‫ﻋﺪد اﻟﻮﺣﺪات ) اﻟﻌﻴﻨﺎت – اﻟﻠﻮﺣﺎت – اﻟﺨﻄﺎﺑﺎت – اﻟﺦ ‪ (...‬اﻟﻤﺮﻓﻘﺔ ﺑﺎﻟﺘﻘﺪﻳﻢ‬

‫ﻏـﻴـﺮ‬
‫وﻓﻲ ﺣﺎﻟﺘﻨﺎ ﺳﻨﻘﺪم ﻣﺜﻼ ‪ ٣‬ﻋﻴﻨﺎت ﻣﻦ اﻟﺴﻴﺮاﻣﻴﻚ‬
‫‪Source Abbreviation‬‬
‫اﻟﺸﺮآﺔ اﻟﺘﺎﺑﻊ ﻟﻬﺎ ﺗﻠﻚ اﻟﻮﺣﺪات ) ﻋﻴﻨﺎت – ﻟﻮﺣﺎت – اﻟﺦ ‪(...‬‬
‫ﻓﻔﻲ ﺣﺎﻟﺘﻨﺎ ﺳﻨﺨﺘﺎر ﺷﺮآﺔ ‪ FINISH‬ﺛﻢ ﻧﺨﺘﺎر اﻟﺸﺨﺺ اﻟﻤﺴﺌﻮل‬
‫‪Code‬‬

‫ﻣﺴﻤﻮح‬
‫اﻟﻜﻮد اﻟﺨﺎص ) ﻳﻤﻜﻦ ﺗﺤﺪﻳﺪ أآﻮاد ﺧﺎﺻﺔ ﺑﻚ (‬
‫‪Drawing‬‬
‫رﻗﻢ اﻟﻠﻮﺣﺔ اﻟﺘﺎﺑﻊ ﻟﻬﺎ هﺬا اﻟﺘﻘﺪﻳﻢ‬
‫‪Filed Date‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﺗﺎرﻳﺦ ادﺧﺎل ﺑﻴﺎﻧﺎت اﻟﺘﻘﺪﻳﻢ ﺳﻨﺨﺘﺎرﻓﻲ ﺣﺎﻟﺘﻨﺎ هﺬﻩ ﺗﺎرﻳﺦ ‪ ٢٠٠٧/٢/٢٥‬م‬
‫‪Filed By‬‬
‫اﻟﺸﺨﺺ اﻟﻘﺎﺋﻢ ﺑﺎدﺧﺎل ﺑﻴﺎﻧﺎت اﻟﺘﻘﺪﻳﻢ وﺳﻨﺨﺘﺎر ﻓﻲ ﺣﺎﻟﺘﻨﺎ اﻟﺴﻴﺪ ‪Steve Johnson‬‬
‫‪Approved By/Date‬‬
‫ﺗﺤﺪﻳﺪ اﻟﺸﺨﺺ اﻟﺬي واﻓﻖ ﻋﻠﻰ اﻟﺘﻘﺪﻳﻢ وﺗﺎرﻳﺦ اﻟﻤﻮاﻓﻘﺔ‬

‫ﻧﺴﺨﺔ‬
‫ﺳﻨﺨﺘﺎر ﻓﻲ ﺣﺎﻟﺘﻨﺎ هﺬﻩ اﻻﺳﺘﺸﺎري ‪ George Lafferty‬وﺗﺎرﻳﺦ ‪ ٢٠٠٧/٢/٢٥‬م‬

‫وﻓﻲ اﻟﺠﺰء اﻟﺴﻔﻠﻲ ﻳﻘ ﻮم اﻟﺒﺮﻧ ﺎﻣﺞ ﺗﻠﻘﺎﺋﻴ ﺎ ﺑﻌ ﺮض ﺗ ﻮارﻳﺦ ارﺳ ﺎل وارﺗﺠ ﺎع اﻟﺘﻘ ﺪﻳﻤﺎت‬
‫وﻻ ﻳﺴﺘﻄﻴﻊ اﻟﻤﺴﺘﺨﺪم ﻣﻦ ﺗﺤﺮﻳﺮ هﺬﻩ اﻟﺤﻘﻮل‬

‫ﻟﻠﻌﺮض‬
‫ﻓﻘﻂ‬
‫ﺷﻜﻞ )‪( ١٢ – ٣‬‬

‫‪٧٢‬‬
‫اﻟﺘﻘﺪﻳﻤﺎت‬

‫ﺛﺎﻧﻴﺎ ‪ :‬إﺿﺎﻓﺔ اﻟﺘﻘﺪﻳﻢ ﻣﻦ وﺣﺪة ‪Submittals‬‬

‫ﻏـﻴـﺮ‬
‫ﻓﻲ هﺬﻩ اﻟﻄﺮﻳﻘﺔ ﻳﺘﻢ اﺿﺎﻓﺔ اﻟﺘﻘﺪﻳﻢ ﻣﻦ ﺧﻼل ﻓﺘﺢ وﺣﺪة ‪ Submittals‬اﻟﻤﻮﺟﻮدة ﻓﻲ‬
‫ﻣﺠﻠﺪ ‪ Log‬ﺑﺎﻟﻤﺸﺮوع ﻋﻦ ﻃﺮﻳﻖ اﻟﻨﻘﺮ اﻟﻤﺰدوج آﻤﺎ ﺑﺎﻟﺸﻜﻞ )‪( ١٣ – ٣‬‬

‫ﻣﺴﻤﻮح‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬ ‫ﺷﻜﻞ )‪( ١٣ – ٣‬‬

‫ﻓﺘﻈﻬﺮ أﻣﺎﻣﻨﺎ ﻧﺎﻓﺬة اﻟﺘﻘﺪﻳﻤﺎت آﻤﺎ ﺑﺎﻟﺸﻜﻞ ) ‪( ١٤ – ٣‬‬

‫ﻧﺴﺨﺔ‬
‫ﻟﻠﻌﺮض‬
‫ﻓﻘﻂ‬
‫ﺷﻜﻞ )‪( ١٤ – ٣‬‬

‫‪٧٣‬‬
‫اﻟﺒﺎب اﻟﺜﺎﻟﺚ‬

‫وﻹﺿﺎﻓﺔ ﺗﻘﺪﻳﻢ ﻳﺘﻢ اﻟﻀﻐﻂ ﻋﻠﻰ زر ‪ Add‬ﻓﺘﻈﻬﺮ ﻧﺎﻓﺬة إﺿﺎﻓﺔ اﻟﺘﻘﺪﻳﻢ اﻟﺘﺎﻟﻴﺔ‬

‫ﻏـﻴـﺮ‬
‫ﻣﺴﻤﻮح‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬ ‫ﺷﻜﻞ )‪( ١٥ – ٣‬‬

‫ﻧﺴﺨﺔ‬
‫وﻧﻼﺣ ﻆ هﻨ ﺎ أﻧ ﻪ ﻳﻤﻜ ﻦ أن ﻳ ﺘﻢ اﺧﺘﻴ ﺎر ﺣﺰﻣ ﺔ ﻣ ﻦ اﻟﺤ ﺰم ﻣ ﻦ ﺧ ﻼل اﻟﻨﻘ ﺮ ﻋﻠ ﻰ ﺧﺎﻧ ﺔ‬
‫‪ Package‬أو ﻳﺘﻢ ﺗﺮآﻬﺎ ﻓﺎرﻏﺔ ﻓﻲ ﺣﺎﻟﺔ اﻟﺮﻏﺒ ﺔ ﻓ ﻲ إﺿ ﺎﻓﺔ ﺗﻘ ﺪﻳﻢ ﻏﻴ ﺮ ﻣﻨ ﻀﻢ إﻟ ﻰ‬
‫ﺣﺰﻣﺔ ﻣﻦ اﻟﺤﺰم اﻟﺴﺎﺑﻖ إﻧﺸﺎؤهﺎ ‪.‬‬
‫ﺛ ﻢ ﻳ ﺘﻢ ﺑﻌ ﺪ ذﻟ ﻚ اﺿ ﺎﻓﺔ رﻗ ﻢ ﻟﻠﺘﻘ ﺪﻳﻢ ﻋ ﻦ ﻃﺮﻳ ﻖ آﺘﺎﺑ ﺔ اﻟ ﺮﻗﻢ ﻓ ﻲ ﺧﺎﻧ ﺔ ‪Submittal‬‬
‫وﻟﻠﺘﺄآﺪ ﻣﻦ ﻋﺪم ﺗﻜﺮار اﻟﺮﻗﻢ ﻳﻤﻜﻦ اﻟﻨﻘ ﺮ داﺧ ﻞ اﻟﺨﺎﻧ ﺔ ﻓﺘﻈﻬ ﺮ ﻗﺎﺋﻤ ﺔ ﻣﻨ ﺴﺪﻟﺔ ﺑﻬ ﺎ ﺟﻤﻴ ﻊ‬

‫ﻟﻠﻌﺮض‬
‫ارﻗﺎم اﻟﺘﻘﺪﻳﻤﺎت ﻓﻲ ﺗﻠﻚ اﻟﺤﺰﻣﺔ ‪.‬‬
‫وﺑﻌﺪ ذﻟﻚ ﻳﺘﻢ ﺗﻜﻤﻠﺔ ﺑﻘﻴﺔ اﻟﺨﻄﻮات ﺑﻨﻔﺲ اﻟﻄﺮﻳﻘﺔ اﻟﺴﺎﺑﻘﺔ ‪. ...‬‬

‫ﻋﺮض اﻟﺠﺪول اﻟﺰﻣﻨﻲ ﻟﻠﺘﻘﺪﻳﻤﺎت‬

‫ﻓﻘﻂ‬
‫ﺑﻌ ﺪ اﺿ ﺎﻓﺔ اﻟﺘﻘ ﺪﻳﻤﺎت ﻟﻠﻤ ﺸﺮوع وﺗﺤﺪﻳ ﺪ اﻟﺘ ﻮارﻳﺦ ﻳﻤﻜ ﻦ ﻋ ﺮض اﻟﺠ ﺪول اﻟﺰﻣﻨ ﻲ‬
‫ﻟﻤﺨﻄﻂ اﻟﺘﻘﺪﻳﻤﺎت ﻟﻠﻤﺸﺮوع ﺑﺤﻴﺚ ﻳﻤﻜﻦ ﻣﺘﺎﺑﻌﺔ اﻟﺘﻘﺪﻳﻤﺎت ﻣﻦ ﺧﻼل اﻟﻀﻐﻂ ﻋﻠﻰ زر‬
‫‪ View Bar Chart‬ﻓﺘﻈﻬﺮ اﻟﻨﺎﻓﺬة اﻟﺘﺎﻟﻴﺔ – ﺷﻜﻞ ) ‪( ١٦- ٣‬‬
‫وهﻲ ﻣﻘﺴﻤﺔ إﻟﻰ ﻗﺴﻢ أﻳﺴﺮ ﺑﻪ أﺳﻤﺎء اﻟﺘﻘﺪﻳﻤﺎت وﻗﺴﻢ أﻳﻤﻦ ﺑﻪ اﻟﻤﺨﻄﻂ اﻟﺒﻴﺎﻧﻲ ﻣﻊ‬
‫ﻣﻼﺣﻈﺔ ان اﻟﻘﻀﻴﺐ اﻟﺰﻣﻨﻲ ﻳﻜﻮن ﺑﺎﺣﺪ ﻣﻦ اﻷﻟﻮان اﻟﺜﻼﺛﺔ‬
‫ﻟﻠﺘﻘﺪﻳﻤﺎت اﻟﻤﺴﺠﻠﺔ ﺑﺎﻟﺒﺮﻧﺎﻣﺞ واﻟﺘﻲ ﻟﻢ ﺗﺮﺳﻞ ﺑﻌﺪ‬ ‫أﺣﻤﺮ‬
‫أﺻﻔﺮ ﻟﻠﺘﻘﺪﻳﻤﺎت اﻟﺘﻲ أرﺳﻠﺖ وﺟﺎري ﻣﻌﺎﻟﺠﺘﻬﺎ‬
‫أﺧﻀﺮ ﻟﻠﺘﻘﺪﻳﻤﺎت اﻟﺘﻲ ﺗﻢ اﻟﻤﻮاﻓﻘﺔ ﻋﻠﻴﻬﺎ‬

‫‪٧٤‬‬
‫اﻟﺘﻘﺪﻳﻤﺎت‬

‫ﻏـﻴـﺮ‬
‫ﻣﺴﻤﻮح‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬
‫ﺷﻜﻞ )‪( ١٦ – ٣‬‬

‫ﻃﺒﺎﻋﺔ اﻟﺘﻘﺪﻳﻢ ﻹرﺳﺎﻟﻪ ﺑﺎﻟﻔﺎآﺲ أو اﻟﺒﺮﻳﺪ‬


‫ﺑﻌ ﺪ ﺗﺤﺪﻳ ﺪ اﻟﺘﻮزﻳ ﻊ ‪ Distribution‬ﻓ ﻲ ﻧﻤ ﻮذج اﻟﺘﻘ ﺪﻳﻢ ) راﺟ ﻊ ﺻ ﻔﺤﺔ ‪ ( ٧٠‬ﻳ ﺘﻢ‬
‫اﺧﺘﻴﺎر اﻟﺘﻘﺪﻳﻢ اﻟﻤﻄﻠﻮب ﺛﻢ اﻟﻘﻮاﺋﻢ‬

‫ﻟﻠﻌﺮض‬
‫… ‪Tools Æ Transmittal Queue‬‬
‫ﻓﺘﻈﻬﺮ اﻟﻨﺎﻓﺬة‬

‫ﻓﻘﻂ‬
‫‪٧٥‬‬
‫اﻟﺒﺎب اﻟﺜﺎﻟﺚ‬

‫وﺑﻬﺎ ﺟﻤﻴﻊ اﻟﺘﻘﺪﻳﻤﺎت اﻟﺠﺎهﺰة ﻟﻺرﺳﺎل ﺛﻢ ﻧﺨﺘﺎر اﻟﺘﻘﺪﻳﻢ اﻟﻤﻄﻠﻮب وﻧﻀﻐﻂ ﻋﻠﻰ اﻟﺰر‬
‫‪ Transmittals‬داﺧ ﻞ ﻣﺠﻠ ﺪ‬ ‫‪ Create‬ﻓﻴ ﺘﻢ إرﺳ ﺎل اﻟﺘﻘ ﺪﻳﻢ إﻟ ﻰ وﺣ ﺪة‬
‫‪ Communications‬اﻟﺨﺎص ﺑﺎﻟﻤﺸﺮوع – ﺷﻜﻞ ) ‪( ١٨ -٣‬‬

‫ﻏـﻴـﺮ‬
‫وﻻ ﺗﻨﺴﻰ أن ﺗﺤﺪد اﻻﺧﺘﻴﺎر ‪ Print Transmittals during create‬ﺣﺘﻰ ﻳﺘﻢ‬
‫ﻃﺒﺎﻋﺔ اﻟﺘﻘﺪﻳﻢ ﻋﻠﻰ اﻟﻄﺎﺑﻌﺔ ﻣﺒﺎﺷﺮة‬
‫وﻳﻤﻜﻦ ﺗﺠﻤﻴﻊ اﻟﺘﻘﺪﻳﻤﺎت اﻟﺨﺎﺻﺔ ﺑﺸﺮآﺔ ﻣﺎ ﻋﻦ ﻃﺮﻳﻖ ﺗﺤﺪﻳﺪ اﻻﺧﺘﻴﺎر‬
‫‪Combine Transmittals to the same contact‬‬

‫ﻣﺴﻤﻮح‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬ ‫ﺷﻜﻞ )‪( ١٨ – ٣‬‬
‫وﻓﻴﻤﺎ ﻳﻠﻲ ﺷﻜﻞ اﻟﺘﻘﺪﻳﻢ ﺑﻌﺪ ﻃﺒﺎﻋﺘﻪ‬

‫ﻧﺴﺨﺔ‬
‫ﻋﻨﻮان اﻟﺸﺮآﺔ اﻟﻤﺮﺳﻞ ﻟﻬﺎ‬
‫اﺳﻢ اﻟﻤﺸﺮوع‬

‫ﻋﻨﺎﻳﺔ ‪:‬‬

‫ﻟﻠﻌﺮض‬ ‫ﺑﻴﺎﻧﺎت اﻟﺘﻘﺪﻳﻢ واﻟﺘﻲ ﺳﻨﺸﺮح آﻴﻔﻴﺔ‬

‫ﻓﻘﻂ‬
‫ﺗﺨﺼﻴﺼﻬﺎ ﻓﻲ ﺑﺎب اﻟﻤﺮاﺳﻼت‬

‫اﺳﻢ ﻣﻌﺪ اﻟﺘﻘﺪﻳﻢ وﺗﻮﻗﻴﻌﻪ‬


‫ﺷﻜﻞ )‪( ١٨ – ٣‬‬

‫‪٧٦‬‬
‫اﻟﺘﻘﺪﻳﻤﺎت‬

‫ﺗﺤﺪﻳﺚ ﺣﺰﻣﺔ اﻟﺘﻘﺪﻳﻢ‬

‫ﻏـﻴـﺮ‬
‫ﺑﻌﺪ إدﺧﺎل اﻟﺘﻘﺪﻳﻤﺎت إﻟﻰ ﺣﺰﻣﺔ ﻣﻦ اﻟﺤﺰم ﻗﺪ ﻧﺮﻏﺐ ﻓﻲ ﺗﻌﺪﻳﻞ ﺑﻴﺎﻧﺎﺗﻬﺎ ﻣﺮة واﺣﺪة ﻣﺜﻞ‬
‫ﺗﺨﺼﻴﺺ ﺣﺎﻟﺔ اﻟﻤﻮاﻓﻘﺔ ‪ Approved‬ﻟﻜﻞ اﻟﺘﻘﺪﻳﻤﺎت ﻓﻲ ﺗﻠﻚ اﻟﺤﺰﻣﺔ وﻟﻌﻤﻞ ذﻟﻚ‬
‫ﺳﻨﻔﺘﺮض أﻧﻨﺎ ﻓﻲ ﻣﺜﺎل ‪ Demo‬ﺳﻨﻘﻮم ﺑﻔﺘﺢ ﺣﺰﻣﺔ ‪Concrete Formwork‬‬
‫وﺳﻨﺠﺪ أﻧﻬﺎ ﺗﺘﻜﻮن ﻣﻦ ﺗﻘﺪﻳﻤﻴﻦ وهﻤﺎ‬
‫‪Concrete Formwork Shop drawing‬‬ ‫اﻟﺮﺳﻮﻣﺎت اﻟﺘﻨﻔﻴﺬﻳﺔ ﻟﻠﺸﺪة‬

‫ﻣﺴﻤﻮح‬
‫‪Concrete Formwork Calculations‬‬ ‫اﻟﺤﺴﺎﺑﺎت اﻹﻧﺸﺎﺋﻴﺔ ﻟﻠﺸﺪة‬
‫وﺳﻨﺠﺪ أن ﺣﺎﻟﺘﻬﻤﺎ هﻲ ﺟﺪﻳﺪ ‪NEW‬‬
‫وأﻧﻨﺎ اﻵن ﻧﺮﻏﺐ ﻓﻲ ﺗﺤﻮﻳﻞ اﻟﺤﺎﻟﺔ إﻟﻰ ‪Approved‬‬
‫ﺳﻨﻘﻮم اﻵن ﺑﺎﻟﻀﻐﻂ ﻋﻠﻰ زر ‪ Update‬ﻓﺘﻈﻬﺮ اﻟﻨﺎﻓﺬة اﻟﺘﺎﻟﻴﺔ – ﺷﻜﻞ ) ‪( ١٩ -٣‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬ ‫ﺷﻜﻞ )‪( ١٩ – ٣‬‬

‫ﻟﻠﻌﺮض‬
‫ﺛﻢ ﻧﺨﺘﺎر اﻟﺘﻘﺪﻳﻤﺎت اﻟﻤﻄﻠﻮﺑﺔ اﻣﺎ واﺣﺪة ﺗﻠﻮ اﻷﺧﺮى أو ﺑﺎﻷﻣﺮ ‪Select All‬‬
‫ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ زر ‪ Next‬ﻟﻺﻧﺘﻘﺎل إﻟﻰ اﻟﺨﻄﻮة اﻟﺘﺎﻟﻴﺔ ﻣﻦ اﻟﻤﻌﺎﻟﺞ‬

‫ﻓﻘﻂ‬
‫ﺷﻜﻞ )‪( ٢٠ – ٣‬‬

‫‪٧٧‬‬
‫اﻟﺒﺎب اﻟﺜﺎﻟﺚ‬

‫ﺛﻢ ﻣﻦ ﺧﺎﻧﺔ ‪ Status‬ﻧﻀﻐﻂ ﺑﺎﻟﻤﺆﺷﺮ وﻧﺨﺘﺎر ﻣﻦ اﻟﻘﺎﺋﻤﺔ اﻟﻤﻨﺴﺪﻟﺔ ‪ App‬وهﻲ‬


‫اﺧﺘﺼﺎر ﻟﻠﺤﺎﻟﺔ ‪ ) Approved‬راﺟﻊ اﻟﻜﺘﺎب ﺻﻔﺤﺔ ‪( ٥٠‬‬

‫ﻏـﻴـﺮ‬
‫ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ زر ‪ Next‬ﻟﻺﻧﺘﻘﺎل ﻟﻠﺨﻄﻮة اﻟﺘﺎﻟﻴﺔ – ﺷﻜﻞ ) ‪( ٢١ -٣‬‬

‫ﻣﺴﻤﻮح‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬ ‫ﺷﻜﻞ )‪( ٢١ – ٣‬‬

‫ﻧﺴﺨﺔ‬
‫وهﻨﺎ ﻳﻄﻠﺐ ﻣﻨﺎ اﻟﻤﻌﺎﻟﺞ ﺳﺆاﻟﻴﻦ‬
‫اﻷول هﻞ ﺗﺮﻏﺐ ﻓﻲ ﺗﺤﺪﻳﺚ ﺑﻴﺎﻧﺎت اﻟﺘﻘﺪﻳﻤﺎت اﻟﻤﻌﺘﻤﺪة ﻣﻦ ﻗﺒﻞ ؟‬
‫واﻻﻓﺘﺮاﺿﻲ هﻮ ‪ NO‬ﻷن اﻟﺘﺤﺪﻳﺚ ﻏﺎﻟﺒﺎ ﻳﻜﻮن ﻟﺘﻘﺪﻳﻤﺎت ﻟﻢ ﺗﻌﺘﻤﺪ ﺑﻌﺪ‬

‫ﻟﻠﻌﺮض‬
‫اﻟﺜﺎﻧﻲ هﻞ ﺗﺮﻏﺐ ﺑﺈﺿﺎﻓﺔ ﻣﺮاﺟﻌﺎت ﺟﺪﻳﺪة ﻟﻠﺘﻘﺪﻳﻤﺎت اﻟﺠﺎري ﺗﺤﺪﻳﺜﻬﺎ ؟‬
‫واﻻﻓﺘﺮاﺿﻲ هﻮ ‪Add new revisions‬‬

‫وأﺧﻴﺮا ﻧﻀﻐﻂ ﻋﻠﻰ زر ‪ Finish‬وﺑﺬا ﻳﻜﻮن اﻟﺘﺤﺪﻳﺚ ﻗﺪ ﺗﻢ – ﺷﻜﻞ ) ‪( ٢٢ -٣‬‬

‫ﻓﻘﻂ‬
‫ﺷﻜﻞ )‪( ٢٢ – ٣‬‬

‫‪٧٨‬‬
‫اﻟﺘﻘﺪﻳﻤﺎت‬

‫ﻧﺴﺦ اﻟﺘﻘﺪﻳﻤﺎت‬

‫ﻏـﻴـﺮ‬
‫ﻋﻨﺪم ﻧﻌﻤﻞ ﻓﻲ ﻣﺸﺮوع آﺒﻴﺮ ﺳﻨﺠﺪ ان هﻨﺎك ﻋﺪد آﺒﻴﺮ ﻣﻦ اﻟﺘﻘﺪﻳﻤﺎت ﻣﻜﺮرة ﻣﻊ‬
‫اﺧﺘﻼف ﻓﻘﻂ ﻓﻲ ﺗﻮارﻳﺦ اﻟﺘﻘﺪﻳﻢ أو اﻟﺤﺎﻟﺔ وﺑﺪﻻ ﻣﻦ ادﺧﺎل ﺗﻠﻚ اﻟﺘﻘﺪﻳﻤﺎت ﻣﺮات ﻋﺪﻳﺪة‬
‫ﻧﻠﺠﺄ ﻟﻌﻤﻠﻴﺔ ﻧﺴﺦ اﻟﺘﻘﺪﻳﻢ ﻷي ﻋﺪد ﻣﻦ اﻟﻤﺮات ﺛﻢ ﻧﻘﻮم ﺑﺘﺤﺪﻳﺚ ﺑﻴﺎﻧﺎت اﻟﺘﻘﺪﻳﻢ‬

‫وﺑﺎﻟﻌﻮدة ﻟﻤﺜﺎﻟﻨﺎ وﺑﻔﺘﺢ ﺣﺰﻣﺔ ‪ Ceramic‬اﻟﺴﺎﺑﻖ إﻧﺸﺎؤهﺎ ﺳﻨﻘﻮم اﻵن ﺑﺘﺤﺪﻳﺪ ﺗﻘﺪﻳﻢ ‪1‬‬

‫ﻣﺴﻤﻮح‬‫واﻟﺨﺎص ﺑﻌﻴﻨﺎت ﺳﻴﺮاﻣﻴﻚ ﺣﻮاﺋﻂ اﻟﻤﻄﺒﺦ ﺷﻜﻞ ) ‪( ٢٣ – ٣‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬
‫ﻟﻠﻌﺮض‬
‫ﺛﻢ ﻣﻦ ﻗﺎﺋﻤﺔ ‪Tools Æ Generate Document … :‬‬
‫ﺷﻜﻞ )‪( ٢٣ – ٣‬‬

‫ﻓﻴﻈﻬﺮ ﻣﻌﺎﻟﺞ اﻟﻨﺴﺦ وﻧﺨﺘﺎر ﻋﺪد اﻟﻨﺴﺦ اﻟﻤﻄﻠﻮﺑﺔ وﻟﺘﻜﻦ ﻣﺜﻼ ‪٢‬‬

‫ﻓﻘﻂ‬
‫ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ زر ‪ Finish‬ﻓﻴﻘﻮم اﻟﻤﻌﺎﻟﺞ ﺑﺈﻧﺸﺎء اﻟﻨﺴﺦ – ﺷﻜﻞ ) ‪( ٢٤ – ٣‬‬

‫ﺷﻜﻞ )‪( ٢٤ – ٣‬‬

‫‪٧٩‬‬
‫اﻟﺒﺎب اﻟﺜﺎﻟﺚ‬

‫ﻣﻠﺨﺺ ﺧﻄﻮات اﻟﺘﻘﺪﻳﻢ‬

‫ﻏـﻴـﺮ‬
‫ﻓﻴﻤﺎ ﻳﻠﻲ ﺷﻜﻞ ﻣﺒﺴﻂ ﻟﻤﺮاﺣﻞ اﻟﺘﻘﺪﻳﻢ‬

‫اﻟﺒﺪاﻳﺔ‬

‫ﻣﺴﻤﻮح‬
‫إﺿﺎﻓﺔ ﺗﻘﺪﻳﻢ ﺟﺪﻳﺪ‬ ‫إﻧﺸﺎء ﺣﺰﻣﺔ‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﺗﺴﺠﻴﻞ اﻟﻤﺮاﺟﻌﺎت واﻟﺘﻮارﻳﺦ‬

‫ﺗﺤﺪﻳﺪ ﻗﻮاﺋﻢ اﻟﺘﻮزﻳﻊ‬

‫ﻧﺴﺨﺔ‬
‫إدﺧﺎل اﻟﺠﺪوﻟﺔ اﻟﺰﻣﻨﻴﺔ‬

‫ﻟﻠﻌﺮض‬
‫ﺗﺤﺪﻳﺪ ﺣﺎﻟﺔ اﻟﺘﻘﺪﻳﻢ‬ ‫ﺗﺤﺪﻳﺚ اﻟﺘﻘﺪﻳﻢ‬

‫ﻓﻘﻂ‬ ‫ﻃﺒﺎﻋﺔ اﻟﺘﻘﺪﻳﻢ‬

‫ﺷﻜﻞ )‪( ٢٥ – ٣‬‬

‫‪٨٠‬‬
‫א א א ﻏـﻴـﺮ‬
‫אﻣﺴﻤﻮح‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫‪Drawings Tracking‬‬

‫ﻧﺴﺨﺔ‬
‫ﻟﻠﻌﺮض‬
‫ﻓﻘﻂ‬
‫اﻟﺒﺎب اﻟﺮاﺑﻊ‬

‫ﻏـﻴـﺮ‬
‫ان اﻟﺮﺳﻮﻣﺎت اﻟﻬﻨﺪﺳﻴﺔ هﻲ روح أي ﻣﺸﺮوع هﻨﺪﺳﻲ ﻟﺬا ﻓﺈن ﻋﻤﻠﻴﺔ ﺗﻨﻈﻴﻢ اﻟﺮﺳﻮﻣﺎت‬
‫א‬

‫ﻣﺴﻤﻮح‬
‫وﻣﺮاﺟﻌﺘﻬﺎ وﻋﻤﻞ اﻟﺘﻌﺪﻳﻞ ﻋﻠﻴﻬﺎ هﻲ ﻣﻦ أهﻢ اﻟﻨﻘﺎط اﻟﺘﻲ ﺗﺸﻐﻞ ﺑﺎل أي ﻣﻬﻨﺪس ‪ ،‬وﻣﻦ‬
‫أﺟﻞ ذﻟﻚ ﻳﻬﺘﻢ ﺑﺮﻧﺎﻣﺞ ‪ Expedition‬ﺑﻤﻮﺿﻮع ﻣﺘﺎﺑﻌﺔ اﻟﺮﺳﻮﻣﺎت‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻣﺮاﺣﻞ إﻧﺘﺎج اﻟﻠﻮﺣﺎت اﻟﻬﻨﺪﺳﻴﺔ‬
‫ﺗﻤﺮ اﻟﻠﻮﺣﺔ ﺑﻌﺪة ﻣﺮاﺣﻞ ﻣﻨﺬ آﻮﻧﻬﺎ ﻓﻜﺮة ﻓﻲ ﻋﻘﻞ اﻟﻤﺼﻤﻢ إﻟﻰ أن ﺗﺼﻞ إﻟﻰ ﻳﺪ ﻣﻬﻨﺪس‬
‫اﻟﺘﻨﻔﻴﺬ ﺑﺎﻟﻤﻮﻗﻊ ‪ ،‬وﻳﺘﻢ ﺗﻀﻤﻴﻦ ﺗﻠﻚ اﻟﻤﺮاﺣﻞ اﻟﻔﺮﻋﻴﺔ ﻣﻦ ﺧﻼل ﻣﺮﺣﻠﺘﻴﻦ أﺳﺎﺳﻴﺘﻴﻦ وهﻤﺎ‬
‫‪ -١‬ﻣﺮﺣﻠﺔ اﻟﺘﺼﻤﻴﻢ واﻟﻤﺮاﺟﻌﺔ‬

‫ﻧﺴﺨﺔ‬
‫‪ -٢‬ﻣﺮﺣﻠﺔ ﺗﻮزﻳﻊ اﻟﻠﻮﺣﺎت‬

‫ﻓﻔ ﻲ اﻟﻤﺮﺣﻠ ﺔ اﻷوﻟ ﻰ ﻳﻘ ﻮم اﻟﻤﻌﻤ ﺎري ﺑﻌﻤ ﻞ اﻟﺮﺳ ﻮﻣﺎت اﻷوﻟﻴ ﺔ ﺛ ﻢ ﺑﺎﻟﺘﻨ ﺴﻴﻖ ﻣ ﻊ ﺑﻘﻴ ﺔ‬
‫اﻷﻗﺴﺎم اﻟﻬﻨﺪﺳﻴﺔ ) ﻣﺪﻧﻲ – ﻣﻴﻜﺎﻧﻴﻜﺎ – آﻬﺮﺑﺎء‪ ( .. -‬ﻳﺘﻢ اﻟﺒﺪء ﺑﻤﺮﺣﻠﺔ اﻟﺘﺼﻤﻴﻢ ﺛﻢ ﺗ ﺄﺗﻲ‬
‫ﻣﺮﺣﻠ ﺔ ﻣﺮاﺟﻌ ﺔ اﻟﺘ ﺼﻤﻴﻢ ﺑﻤ ﺸﺎرآﺔ ﺟﻤﻴ ﻊ اﻷﻗ ﺴﺎم اﻟﻬﻨﺪﺳ ﻴﺔ ﺛ ﻢ أﺧﻴ ﺮا ﺗ ﺄﺗﻲ ﻣﺮﺣﻠ ﺔ‬

‫ﻟﻠﻌﺮض‬
‫اﻟﺮﺳﻮﻣﺎت اﻟﻨﻬﺎﺋﻴﺔ‬
‫وﺑﻌﺪ اﻻﻧﺘﻬﺎء ﻣﻦ اﻟﻠﻮﺣﺎت واﻟﻤﻮاﻓﻘ ﺔ ﻋﻠﻴﻬ ﺎ ﻟﻠﺘﻨﻔﻴ ﺬ ﻳ ﺘﻢ اﻟﻄ ﺮح واﻟﺘﺮﺳ ﻴﺔ ﻟﻠﻤ ﺸﺮوع ﺛ ﻢ‬
‫ﺗ ﺄﺗﻲ اﻟﻤﺮﺣ ـﻠﺔ اﻟﺜﺎﻧﻴ ﺔ واﻟﺘ ﻲ ﻳﻘ ـﻮم ﻓﻴﻬ ـﺎ اﻟﻤﻘ ـﺎول اﻟـﺮﺋﻴ ﺴﻲ ﺑﻌﻤ ﻞ اﻟﺮﺳ ﻮﻣﺎت اﻟﺘﻨﻔﻴﺬﻳ ﺔ‬
‫‪ Shop Drawings‬ﻃﺒﻘﺎ ﻟﺮﺳﻮﻣﺎت اﻟﻌﻄ ﺎء ‪ Tender Drawings‬ﺛ ﻢ ﻳ ﺘﻢ إﻋﺘﻤ ﺎد‬
‫ﺗﻠﻚ اﻟﻠﻮﺣ ﺎت ﻣ ﻦ اﻻﺳﺘ ﺸﺎري ﺛ ﻢ ﻳ ﺘﻢ ﺑﻌ ﺪ ذﻟ ﻚ ﺗﻮزﻳ ﻊ اﻟﻠﻮﺣ ﺎت اﻟﻤﻌﺘﻤ ﺪة ﻋﻠ ﻰ ﻣﻘ ﺎوﻟﻲ‬

‫ﻓﻘﻂ‬
‫اﻟﺒﺎﻃﻦ ﻟﻠﺘﻨﻔﻴﺬ ﺑﻤﻮﺟﺒﻬﺎ‬

‫ﺿﺒﻂ إﻋﺪادات اﻟﻠﻮﺣﺎت‬


‫ﻗﺒﻞ اﻟﺒﺪء ﻓﻲ اﻟﻌﻤﻞ ﻣﻊ ﺑﻴﺎﻧﺎت اﻟﻠﻮﺣﺎت ﻧﻘﻮم ﺑﻀﺒﻂ ﺑﻌﺾ اﻹﻋﺪادات ﻣﺜﻞ‬
‫‪ -‬إﻋﺪاد ﻗﻮاﺋﻢ اﻟﺘﻮزﻳﻊ )راﺟﻊ اﻟﻜﺘﺎب ﺻﻔﺤﺔ ‪( ٣٨‬‬
‫‪ -‬ﺗﺤﺪﻳﺪ اﻟﻘﻮاﻣﻴﺲ اﻟﻤﺴﺘﺨﺪﻣﺔ ) راﺟﻊ اﻟﻜﺘﺎب ﺻﻔﺤﺔ ‪( ٥٦‬‬
‫ذﻟﻚ ﻣﻦ اﺟﻞ ﺗﺴﻬﻴﻞ اﻟﺘﻌﺎﻣﻞ ﻣﻊ اﻟﻠﻮﺣﺎت وإﺟﺮاء ﻋﻤﻠﻴﺎت اﻟﻔﺮز واﻟﺒﺤﺚ‬

‫‪٨٢‬‬
‫ﻣﺘﺎﺑﻌﺔ اﻟﺮﺳﻮﻣﺎت‬

‫ﺗﺮﻗﻴﻢ اﻟﻠﻮﺣﺎت‬

‫ﻏـﻴـﺮ‬
‫ﻗﺒﻞ أن ﻧﺨﻮض ﻓﻲ ﺷ ﺮح آﻴﻔﻴ ﺔ اﻟﺘﻌﺎﻣ ﻞ ﻣ ﻊ اﻟﻠﻮﺣ ﺎت ﻣ ﻦ ﺧ ﻼل اﻟﺒﺮﻧ ﺎﻣﺞ ﻓﺈﻧﻨ ﺎ ﺳ ﻨﻘﻮم‬
‫ﺑ ﺬآﺮ ﻣﻮﺿ ﻮع ﻣﻬ ﻢ ﺟ ﺪا وه ﻮ آﻴﻔﻴ ﺔ ﺗ ﺮﻗﻴﻢ ) ﺗﻜﻮﻳ ﺪ اﻟﻠﻮﺣ ﺔ ( ﺣﺘ ﻰ ﻳﻜ ﻮن رﻗ ﻢ اﻟﻠﻮﺣ ﺔ‬
‫ﻣﻌﺒﺮا ﻋﻦ ﺑﻌﺾ اﻟﺒﻴﺎﻧﺎت اﻟﺮﺋﻴﺴﻴﺔ ﻣﺜﻞ‬
‫‪ -‬اﺳﻢ اﻟﻤﺸﺮوع‬

‫ﻣﺴﻤﻮح‬
‫‪ -‬اﺳﻢ اﻟﻤﺒﻨﻰ‬
‫‪ -‬اﻟﻘﺴﻢ اﻟﺘﺎﺑﻊ ﻟﻪ اﻟﻠﻮﺣﺔ‬
‫وهﻜﺬا ‪..‬‬ ‫‪ -‬اﻟﺪور‬
‫وﻳﻤﻜﻦ اﻻﺳﺘﻐﻨﺎء ﻋﻦ اﺳﻢ اﻟﻤﺸﺮوع وأﺳ ﻢ اﻟﻤﺒﻨ ﻰ ﻓ ﻲ اﻟﻤ ﺸﺎرﻳﻊ اﻟ ﺼﻐﻴﺮة اﻟﻤﻜﻮﻧ ﺔ ﻣ ﻦ‬
‫ﻣﺒﻨﻰ واﺣﺪ وﻓﻴﻤﺎ ﻳﻠﻲ أﻣﺜﻠﺔ ﻟﺘﺮﻗﻴﻢ ﺑﻌﺾ اﻟﻠﻮﺣﺎت‬

‫‪C‬‬ ‫‪T‬‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫‪-‬‬ ‫‪A‬‬ ‫‪2‬‬ ‫‪-‬‬ ‫‪S‬‬ ‫‪T‬‬ ‫‪-‬‬ ‫‪0‬‬ ‫‪5‬‬ ‫‪1‬‬

‫ﻣﺸﺮوع أﺑﺮاج اﻟﻘﺎهﺮة اﻟﺠﺪﻳﺪة – اﻟﻤﺒﻨﻰ ﻃﺮاز ‪ - A2‬اﻟﻘﺴﻢ اﻹﻧﺸﺎﺋﻲ – اﻟﻠﻮﺣﺔ رﻗﻢ ‪٥١‬‬

‫ﻧﺴﺨﺔ‬ ‫‪A‬‬ ‫‪-‬‬ ‫‪P‬‬ ‫‪L‬‬ ‫‪-‬‬ ‫‪0‬‬

‫اﻟﻠﻮﺣﺔ اﻟﻤﻌﻤﺎرﻳﺔ – ﻣﺴﺎﻗﻂ – رﻗﻢ ‪٥‬‬


‫‪5‬‬

‫ﻟﻠﻌﺮض‬
‫ﺷﻜﻞ) ‪( ١ – ٤‬‬

‫وﻳﻤﻜ ﻦ اﺧﺘﻴ ﺎر أي ﻃﺮﻳﻘ ﺔ ﻟﻠﺘﻜﻮﻳ ﺪ وﻟﻜ ﻦ ﻳ ﺘﻢ اﻻﺗﻔ ﺎق ﺑ ﻴﻦ إﻃ ﺮاف اﻟﻤ ﺸﺮوع ) ﻣﻘ ﺎول‬
‫رﺋﻴﺴﻲ – ﻣﻘﺎوﻟﻲ اﻟﺒﺎﻃﻦ – اﻻﺳﺘﺸﺎري ( ﻋﻠﻰ هﺬﻩ اﻟﻄﺮﻳﻘﺔ‬
‫وﻣﻦ اﻟﻤﺸﻬﻮر ﻓﻲ اﺧﺘﺼﺎرات أﻗﺴﺎم اﻟﻠﻮﺣﺎت اﻵﺗﻲ‬

‫ﻓﻘﻂ‬
‫‪A‬‬ ‫‪Architecture‬‬ ‫ﻣﻌﻤﺎري‬
‫‪S‬‬ ‫‪Structural‬‬ ‫إﻧﺸﺎﺋﻲ‬
‫‪C‬‬ ‫‪Civil‬‬ ‫ﻣﺪﻧﻲ‬
‫‪E‬‬ ‫‪Electrical‬‬ ‫آﻬﺮﺑﺎء‬
‫‪M‬‬ ‫‪Mechanical‬‬ ‫ﻣﻴﻜﺎﻧﻴﻜﺎ‬
‫‪P‬‬ ‫‪Plumping‬‬ ‫ﺻﺤﻲ‬
‫‪FS‬‬ ‫ﻧﻈﻢ وﻗﺎﻳﺔ ﻣﻦ اﻟﺤﺮﻳﻖ ‪Fire System‬‬

‫‪٨٣‬‬
‫اﻟﺒﺎب اﻟﺮاﺑﻊ‬

‫ﻏـﻴـﺮ‬
‫اﻟﻠﻮﺣﺎت اﻹﻧﺸﺎﺋﻴﺔ ﺗﺨﺺ ﻟﻮﺣﺎت اﻷﺑﻌﺎد اﻟﺨﺮﺳﺎﻧﻴﺔ وﺗﻔﺎﺻﻴﻞ اﻟﺘﺴﻠﻴﺢ ﻷي ﻋﻨﺼﺮ ﻓﻲ اﻟﻤﺒﻨﻰ ﺑﻴﻨﻤﺎ‬
‫اﻟﻠﻮﺣﺎت اﻟﻤﺪﻧﻴﺔ ﺗﺨﺺ ﻟﻮﺣﺎت اﻟﻄﺮق وﻟﻮﺣﺎت اﻟﻤﻮﻗﻊ اﻟﻌﺎم وﻟﻮﺣﺎت ﺧﻄﻮط اﻟﻤﻴﺎﻩ واﻟﺼﺮف اﻟﺤﻲ‬

‫ﻣﺴﻤﻮح‬
‫اﺳﺘﻌﺮاض ﺑﻴﺎﻧﺎت اﻟﻠﻮﺣﺎت‬
‫ﻋﻨﺪ ﻓﺘﺢ ﻣﺠﻠﺪ ‪ Logs‬وﻓﺘﺢ وﺣﺪة ‪ Drawings‬ﺗﻈﻬﺮ أﻣﺎﻣﻨﺎ اﻟﻨﺎﻓﺬة اﻟﺘﺎﻟﻴﺔ – اﻧﻈﺮ‬
‫إﻟﻰ اﻟﺸﻜﻞ ) ‪( ٢ – ٤‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬
‫ﻟﻠﻌﺮض‬
‫وﻓﻴﻬﺎ ﻗﺎﺋﻤﺔ ﺑﻜﻞ اﻟﻠﻮﺣﺎت اﻟﻤﻮﺟﻮدة ﺑﺎﻟﻤﺸﺮوع وﻇﻬﺮ ﺑﺎﻟﻘﺎﺋﻤﺔ ﻣﺠﻤﻮﻋﺔ ﻣﻦ اﻟﺘﻔﺎﺻﻴﻞ‬
‫ﻣﺜﻞ رﻗﻢ اﻟﻠﻮﺣﺔ – رﻗﻢ ﺁﺧﺮ إﺻﺪار – اﻟﻘﺴﻢ ‪ ...‬اﻟﺦ‬
‫ﺷﻜﻞ ) ‪( ٢ – ٤‬‬

‫ﻓﻘﻂ‬
‫وﻟﻌﺮض ﺑﻴﺎﻧﺎت أﺣﺪ اﻟﻠﻮﺣﺎت ﻧﻀﻊ ﻣﺆﺷﺮ اﻟﻔﺄرة ﻋﻠﻰ اﻟﺮﻣﺰ ) اﻷﻳﻘﻮﻧﺔ ( اﻟﻤﺠﺎور‬
‫ﻷﺳﻢ اﻟﻠﻮﺣﺔ ﺛﻢ ﻧﻨﻘﺮ ﻧﻘﺮا ﻣﺰدوﺟﺎ أو ﻧﻀﻐﻂ ﻋﻠﻰ زر ‪ Open‬ﻓﺘﻈﻬﺮ اﻟﻨﺎﻓﺬة اﻟﺘﺎﻟﻴﺔ‬
‫آﻤﺎ ﺑﺎﻟﺸﻜﻞ رﻗﻢ ) ‪( ٣ – ٤‬‬

‫وﺳﻮف ﻧﺸﺮح آﻞ اﻷﺟﺰاء اﻟﻤﻮﺟﻮدة ﺑﺎﻟﻨﺎﻓﺬة ﻋﻨﺪﻣﺎ ﻧﻘﻮم ﺑﺸﺮح آﻴﻔﻴﺔ إﺿﺎﻓﺔ ﻟﻮﺣﺔ‬
‫ﺟﺪﻳﺪة ﻟﻠﻤﺸﺮوع‬

‫‪٨٤‬‬
‫ﻣﺘﺎﺑﻌﺔ اﻟﺮﺳﻮﻣﺎت‬

‫ﻏـﻴـﺮ‬
‫ﻣﺴﻤﻮح‬ ‫ﺷﻜﻞ ) ‪( ٣ – ٤‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬ ‫إﺿﺎﻓﺔ اﻟﻠﻮﺣﺎت‬


‫ﺳﻨﻘﻮم اﻵن ﺑﺸﺮح ﻋﻤﻠﻲ ﻟﻄﺮﻳﻘﺔ إﺿﺎﻓﺔ ﺑﻴﺎﻧﺎت اﻟﻠﻮﺣﺎت ﻟﻠﻤ ﺸﺮوع ﻓ ﻲ اﻟﺒﺮﻧ ﺎﻣﺞ وذﻟ ﻚ‬
‫ﻣﻦ ﺧﻼل اﻟﻤﺜﺎل ‪ Demo‬اﻟﻤﻮﺟﻮد ﺑﺎﻟﺒﺮﻧﺎﻣﺞ‬

‫ﻧﺴﺨﺔ‬
‫‪ -‬ﻧﻘﻮم ﺑﻔﺘﺢ ﻣﺠﻠﺪ ‪ Logs‬ﺛﻢ ﻧﺘﻮﺟﻪ إﻟﻰ وﺣﺪة اﻟﺮﺳﻮﻣﺎت ‪Drawings‬‬
‫‪ -‬ﺑﻌﺪ ﻇﻬﻮر ﻧﺎﻓﺬة اﻟﺮﺳﻮﻣﺎت ﻧﻀﻐﻂ ﻋﻠﻰ زر ‪ Add‬ﻓﺘﻈﻬﺮ اﻟﻨﺎﻓﺬة اﻟﺘﺎﻟﻴﺔ‬

‫ﻟﻠﻌﺮض‬
‫ﻓﻘﻂ‬
‫ﺷﻜﻞ ) ‪( ٤ – ٤‬‬

‫‪٨٥‬‬
‫اﻟﺒﺎب اﻟﺮاﺑﻊ‬

‫وآﻤ ﺎ ﺗ ﺮى ﻓ ﺈن اﻟﻨﺎﻓ ﺬة ﺗﺘﻜ ﻮن ﻣ ﻦ ﻗ ﺴﻢ رﺋﻴ ﺴﻲ ﺑﺎﻟﻨ ﺼﻒ اﻟﻌﻠ ﻮي وأﺑ ﻮاب ﻓﺮﻋﻴ ﺔ ﻓ ﻲ‬


‫اﻟﻨﺼﻒ اﻟﺴﻔﻠﻲ وﻓﻴﻤﺎ ﻳﻠﻲ ﺷﺮح ﻣﻜﻮﻧﺎت اﻟﻨﺎﻓﺬة‬
‫‪Drawing Number‬‬

‫ﻏـﻴـﺮ‬
‫رﻗﻢ اﻟﻠﻮﺣﺔ وهﻮ ﺣﻘﻞ إﺟﺒﺎري ﻳﺠﺐ إدﺧﺎل ﺑﻴﺎﻧﺎﺗﻪ ‪ ،‬وﻳﻤﻜ ﻦ أن ﻳ ﺘﻢ اﻟﺘ ﺮﻗﻴﻢ ﺑ ﺄي ﻃﺮﻳﻘ ﺔ‬
‫آﻤﺎ ﺳﺒﻖ ﺷﺮﺣﻪ ﻓﻲ ﻃﺮق ﺗﺮﻗﻴﻢ اﻟﻠﻮﺣﺎت وﺳﻨﻜﺘﺐ ﻣﺜﻼ )‪(CT-A2-ST-055‬‬
‫‪Latest Rev‬‬
‫رﻗ ﻢ ﺁﺧ ﺮ ﻣﺮاﺟﻌ ﺔ وه ﻮ ﺣﻘ ﻞ ﻻ ﻳﻤﻜ ﻦ ﺗﺤﺮﻳ ﺮﻩ ﺑ ﻞ ﻳﻘ ﻮم اﻟﺒﺮﻧ ﺎﻣﺞ ﺑﻌ ﺮض رﻗ ﻢ ﺁﺧ ﺮ‬

‫ﻣﺴﻤﻮح‬
‫ﻣﺮاﺟﻌﺔ ﻃﺒﻘﺎ ﻟﺘﺒﻮﻳﺐ اﻟﻤﺮاﺟﻌﺎت ‪Review‬‬
‫‪Discipline‬‬
‫اﻟﻘﺴﻢ اﻟﺘﺎﺑﻊ ﻟﻪ اﻟﻠﻮﺣﺔ وه ﻮ ﻳﻤﻜ ﻦ ان ﻳﻜ ﻮن ) ﻣﻌﻤ ﺎري – إﻧ ﺸﺎﺋﻲ – اﻟ ﺦ ‪ (..‬وﻳ ﺘﻢ ذﻟ ﻚ‬
‫ﻋﻦ ﻃﺮﻳﻖ اﻟﻨﻘﺮ ﺑﺎﻟﻤﺆﺷﺮ داﺧﻞ اﻟﺨﺎﻧﺔ ﻓﺘﻈﻬﺮ اﻟﻘﺎﺋﻤﺔ اﻟﻤﻨﺴﺪﻟﺔ آﻤﺎ ﺑﺎﻟﺸﻜﻞ )‪( ٥ – ٤‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬ ‫ﺷﻜﻞ ) ‪( ٥ – ٤‬‬

‫ﻧﺴﺨﺔ‬
‫وﺳﻨﺨﺘﺎر ﻗﺴﻢ اﻟﻠﻮﺣﺎت اﻹﻧﺸﺎﺋﻴﺔ ‪Structural‬‬
‫)وﻟﻤﻌﺮﻓﺔ ﺑﻘﻴﺔ اﻷﻗﺴﺎم راﺟﻊ اﻟﻜﺘﺎب ﺻﻔﺤﺔ ‪( ٥٦‬‬

‫‪Area‬‬
‫ﻣﻨﻄﻘﺔ اﻟﻌﻤﻞ وهﻲ ﻣﺤﺪدة داﺧﻞ ﻗﺎﻣﻮس اﻟﻤﻨﺎﻃﻖ ﺑﺎﻟﺒﺮﻧﺎﻣﺞ )راﺟﻊ اﻟﻜﺘﺎب ﺻﻔﺤﺔ ‪(٥٧‬‬

‫ﻟﻠﻌﺮض‬
‫وﺳﻨﺨﺘﺎر اﻟﺨﻴﺎر ‪ A‬وهﻮ ﺧﺎص ﺑﻤﻨﻄﻘﺔ أﺳﻤﻬﺎ ‪ A‬ﻓﻲ اﻟﻤﺒﻨﻰ‬
‫وﻳﻤﻜﻦ ﺗﻐﻴﻴﺮ اﻟﻤﻨﺎﻃﻖ وإﺿﺎﻓﺔ ﻣﻨﺎﻃﻖ أﺧﺮى ﻣﻦ ﺧﻼل ﻗﺎﻣﻮس اﻟﻤﻨﺎﻃﻖ‬
‫‪Phase‬‬
‫ﻣﻮﻗﻒ اﻟﻠﻮﺣﺔ )اﻹﺻﺪار( وهﻮ آﻤﺎ ﺳﺒﻖ ﺷﺮﺣﺔ ﻓﻲ اﻟﻜﺘﺎب ) ﺻﻔﺤﺔ ‪ ( ٥٦‬إﻣﺎ أن‬

‫ﻓﻘﻂ‬
‫ﻳﻜﻮن إﺻﺪار ﻟﻠﻄﺮح أو إﺻﺪار ﻟﻠﺘﻨﻔﻴﺬ وهﻜﺬا ‪...‬‬
‫وﺳﻨﺨﺘﺎر إﺻﺪار ﻟﻠﻄﺮح ‪IFB Issued for Bid‬‬
‫‪Progress‬‬
‫ﻧﺴﺒﺔ إآﻤﺎل اﻟﻠﻮﺣﺔ وﺳﻨﻜﺘﺐ ‪٪٥٠‬‬
‫‪Title‬‬
‫ﻋﻨﻮان اﻟﻠﻮﺣﺔ وﺳﻨﻜﺘﺐ ‪Second Floor Upper Reinforcement‬‬
‫أي اﻟﺤﺪﻳﺪ اﻟﻌﻠﻮي ﻟﺴﻘﻒ اﻟﺪور اﻟﺜﺎﻧﻲ‬

‫‪٨٦‬‬
‫ﻣﺘﺎﺑﻌﺔ اﻟﺮﺳﻮﻣﺎت‬

‫‪Latest Bid Package‬‬


‫ﺣﺰﻣﺔ رﺳﻮﻣﺎت اﻟﻌﻄﺎء وﺳﺘﺠﺪ أﻧﻬﺎ ﻏﻴﺮ ﻣﻌﺮﻓﺔ وﻳﻤﻜﻦ ﻋﻤﻞ ﺣﺰم ﻟﻠﻮﺣﺎت اﻟﻌﻄﺎء ﻣﻦ‬
‫ﺧﻼل ﻗﺎﻣﻮس اﻟﺮﺳﻮﻣﺎت واﻟﺴﺎﺑﻖ ﺷﺮﺣﻪ ﻓﻲ ﺑﺎب اﻟﻘﻮاﻣﻴﺲ‬

‫ﻏـﻴـﺮ‬
‫وﻓﺎﺋﺪة هﺬا اﻟﺠﺰء أﻧﻪ ﻳﻤﻜﻦ ﻋﻤﻞ ﺣﺰم ﻟﺮﺳﻮﻣﺎت اﻟﻌﻄﺎء ﻟﻠﻤﻴﻜﺎﻧﻴﻜﺎ واﻟﻜﻬﺮﺑﺎء واﻟﻤﺪﻧﻲ‬
‫وهﻜﺬا ﺑﺤﻴﺚ ﻋﻨﺪ ﻋﻤﻞ ﻟﻮﺣﺔ ﺟﺪﻳﺪة ﻳﺘﻢ رﺑﻂ هﺬﻩ اﻟﻠﻮﺣﺔ ﺑﺎﻟﺤﺰﻣﺔ اﻟﺨﺎﺻﺔ ﺑﻬﺎ ﻣﻦ أﺟﻞ‬
‫ﺗﻨﻈﻴﻢ اﻟﻌﻤﻞ وﺗﺮﺗﻴﺒﻪ‬
‫‪File No‬‬

‫ﻣﺴﻤﻮح‬
‫رﻗﻢ ﻣﻠﻒ اﻟﻠﻮﺣﺔ وهﻮ ﺧﻴﺎر ﺗﺴﺘﺨﺪﻣﻪ ﺑﻌﺾ اﻟﺸﺮآﺎت ﻟﺘﻌﺮﻳﻒ ﻟﻮﺣﺎت اﻟﻤﺸﺎرﻳﻊ‬
‫وﺳﺘﺠﺪ أﻧﻪ ﻓﻲ ﻣﺜﺎل ‪ Demo‬ﺗﻢ اﺧﺘﻴﺎر رﻗﻢ ‪3.5‬‬
‫‪Spec Section‬‬
‫ﻗﺴﻢ اﻟﻤﻮاﺻﻔﺎت وهﻮ ﻃﺒﻘﺎ ل ‪ Master Format‬اﻟﺼﺎدر ﻋﻦ ﻣﻌﻬﺪ ﻣﻮاﺻﻔﺎت‬
‫اﻟﺘﺸﻴﻴﺪ اﻷﻣﺮﻳﻜﻴﺔ ) ‪( CSI‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫وﺳﻨﺨﺘﺎر اﻟﻘﺴﻢ ‪03200 Concrete Reinforcement‬‬
‫)ﻟﻤﻌﺮﻓﺔ ﺑﻘﻴﺔ اﻷﻗﺴﺎم راﺟﻊ اﻟﻜﺘﺎب ﺻﻔﺤﺔ ‪( ٤٥‬‬
‫‪Designer‬‬
‫اﻟﻤﺼﻤﻢ وﺳﻨﺨﺘﺎر ﻣﻦ اﻟﻘﺎﺋﻤﺔ اﻟﻤﻨﺴﺪﻟﺔ ﺷﺮآﺔ ‪ DESIGN‬ﺛﻢ اﻟﻤﻬﻨﺪس ‪Chris A.‬‬

‫ﻧﺴﺨﺔ‬
‫‪Ball in Court‬‬
‫اﻟﺸﺨﺺ اﻟﻤﺴﺌﻮل وﺳﻨﺨﺘﺎر اﻟﻤﻬﻨﺪس ‪Chris A.‬‬
‫‪Priority‬‬
‫درﺟﺔ اﻷهﻤﻴﺔ وﺳﻨﺨﺘﺎر ‪Normal‬‬
‫‪Latest Rev Date‬‬

‫ﻟﻠﻌﺮض‬
‫ﺗﺎرﻳﺦ ﺁﺧﺮ ﻣﺮاﺟﻌﺔ وهﻲ ﺧﺎﻧﺔ ﺗﻌﺮض ﺗﺎرﻳﺦ ﺁﺧﺮ ﻣﺮاﺟﻌﺔ ﻃﺒﻘﺎ ﻟﺘﺒﻮﻳﺐ اﻟﻤﺮاﺟﻌﺎت‬
‫‪ Review‬وﻻ ﻳﻤﻜﻦ ﺗﺤﺮﻳﺮ اﻟﺤﻘﻞ‬

‫وﺑﻌﺪ اﻻﻧﺘﻬﺎء ﻣﻦ إدﺧﺎل اﻟﺒﻴﺎﻧﺎت اﻟﺮﺋﻴﺴﻴﺔ ﺳﻨﻘﻮم ﺑﺎﺳﺘﻌﺮاض اﻟﺘﺒﻮﻳﺒﺎت اﻟﻤﻮﺟﻮدة ﻓﻲ‬
‫اﻟﻤﻨﻄﻘﺔ اﻟﺴﻔﻠﻴﺔ ﻣﻦ اﻟﻨﺎﻓﺬة وهﻲ‬

‫ﻓﻘﻂ‬
‫‪Current Status‬‬
‫ﺑﺎب اﻟﺤﺎﻟﺔ وهﻮ ﻟﻌﺮض ﻣﻮﻗﻒ اﻟﻠﻮﺣﺔ ﻣﻦ ﺣﻴﺚ‬
‫رﻗﻢ ﺁﺧﺮ ﻣﺮاﺟﻌﺔ‬ ‫‪Rev No‬‬
‫ﺗﺎرﻳﺦ إﺻﺪار ﺁﺧﺮ ﻣﺮاﺟﻌﺔ‬ ‫‪Date Issued‬‬
‫‪ Date Received‬ﺗﺎرﻳﺦ وﺻﻮل اﻟﻠﻮﺣﺔ ﻣﻦ اﻟﻤﺼﻤﻢ‬
‫ﺗﺎرﻳﺦ إرﺳﺎل اﻟﻠﻮﺣﺔ ﻟﻠﻤﺮاﺟﻌﺔ‬ ‫‪Date Sent‬‬
‫‪ Date Required‬اﻟﺘﺎرﻳﺦ اﻟﻤﻄﻠﻮب ﻓﻴﻪ وﺻﻮل اﻟﻠﻮﺣﺔ ﻣﻦ اﻟﻤﺮاﺟﻊ‬
‫وﻟﻦ ﺗﺠﺪ أي ﺑﻴﺎﻧﺎت اﻵن ﻷﻧﻨﺎ أﺿﻔﻨﺎ ﻟﻮﺣﺔ ﺟﺪﻳﺪة وﻟﻢ ﻳﺘﻢ ﻋﻠﻴﻬﺎ أي ﻣﺮاﺟﻌﺎت‬

‫‪٨٧‬‬
‫اﻟﺒﺎب اﻟﺮاﺑﻊ‬

‫وﺳﺘﺠﺪ أﻳﻀﺎ ﻓﻲ ﺑﺎب اﻟﺤﺎﻟﺔ‬


‫اﻟﺘﻮزﻳﻊ‬ ‫‪Distribution‬‬

‫ﻏـﻴـﺮ‬
‫رﻗﻢ ﺗﻮزﻳﻊ ﺁﺧﺮ ﻣﺮاﺟﻌﺔ‬ ‫‪Rev No‬‬
‫ﺗﺎرﻳﺦ ﺗﻮزﻳﻊ إﺻﺪار ﺁﺧﺮ ﻣﺮاﺟﻌﺔ‬ ‫‪Date Issued‬‬
‫‪ Date Received‬ﺗﺎرﻳﺦ وﺻﻮل اﻟﻠﻮﺣﺔ ﻣﻦ اﻟﻤﺮاﺟﻊ‬
‫ﺗﺎرﻳﺦ إرﺳﺎل اﻟﻠﻮﺣﺔ ﻟﻠﺸﺮآﺎت وﻣﻘﺎوﻟﻲ اﻟﺒﺎﻃﻦ‬ ‫‪Date Sent‬‬

‫ﻣﺴﻤﻮح‬
‫وﺳﻮف ﻧﻘﻮم ﺑﺸﺮح ﺣﺎﻟﺔ اﻟﻤﺮاﺟﻌﺔ واﻟﺘﻮزﻳﻊ ﻓﻴﻤﺎ ﺑﻌﺪ‬
‫وﺳﻨﻨﺘﻘﻞ اﻵن إﻟﻰ اﻟﺘﺒﻮﻳﺐ اﻟﺜﺎﻧﻲ وهﻮ‬
‫‪Sets‬‬
‫اﻟﻤﺠﻤﻮﻋﺎت وﻳﻘﺼﺪ ﺑﻬﺎ ﺗﻌﺮﻳﻒ اﻟﻤﺠﻤﻮﻋﺎت اﻟﺘﻲ ﺗﻨﺘﻤﻲ إﻟﻴﻬﺎ هﺬﻩ اﻟﻠﻮﺣﺔ ﻓﻜﻤﺎ ﺗﻘﺪم ﻓﻲ‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﺑﺎب اﻟﺘﻘﺪﻳﻤﺎت ﻣﻦ أﻧﻪ ﻳﻔﻀﻞ ﻋﻤﻞ ﺣﺰم ﻟﻠﺘﻘﺪﻳﻤﺎت ﺣﺘﻰ ﻳﺘﻢ ﺗﻨﻈﻴﻢ ﻋﻤﻠﻴﺔ ﻣﺘﺎﺑﻌﺔ‬
‫اﻟﺘﻘﺪﻳﻤﺎت ﻓﺄﻧﻨﺎ آﺬﻟﻚ ﺳﻨﻘﻮم ﺑﻌﻤﻞ ﻣﺠﻤﻮﻋﺎت ﻟﻠﻮﺣﺎت ﺗﺴﻤﻰ ‪ Drawing Sets‬ﻣﺜﻞ ‪:‬‬
‫‪ -‬ﻣﺠﻤﻮﻋﺔ رﺳﻮﻣﺎت اﻷﻋﻤﺎل اﻟﺘﺮاﺑﻴﺔ‬
‫‪ -‬ﻣﺠﻤﻮﻋﺔ اﻟﺮﺳﻮﻣﺎت اﻹﻧﺸﺎﺋﻴﺔ‬
‫‪ -‬ﻣﺠﻤﻮﻋﺔ رﺳﻮﻣﺎت اﻟﺼﺤﻲ‬

‫ﻧﺴﺨﺔ‬
‫وهﻜﺬا ‪..‬‬ ‫‪ -‬ﻣﺠﻤﻮﻋﺔ رﺳﻮﻣﺎت اﻷﻋﻤﺎل اﻟﻜﻬﺮﺑﺎﺋﻴﺔ‬
‫ﻓﻤ ﺜﻼ ﻟﻮﺣ ﺔ اﻟﻤﻮﻗ ﻊ اﻟﻌ ﺎم ﻳﻤﻜ ﻦ وﺿ ﻌﻬﺎ ﻓ ﻲ ﻣﺠﻤﻮﻋ ﺔ اﻷﻋﻤ ﺎل اﻟﺘﺮاﺑﻴ ﺔ وﻣﺠﻤﻮﻋ ﺔ‬
‫اﻟﺨﺪﻣﺎت وﻣﺠﻤﻮﻋﺔ اﻟﻠﻮﺣﺎت اﻟﻤﺴﺎﺣﻴﺔ وهﻜﺬا ‪ ...‬وﺳﻨﺸﺮح اﻟﻤﺠﻤﻮﻋﺎت ﻻﺣﻘﺎ‬
‫واﻵن ﻧﻨﺘﻘﻞ إﻟﻰ اﻟﺘﺒﻮﻳﺐ اﻟﺜﺎﻟﺚ‬
‫‪Review‬‬

‫ﻟﻠﻌﺮض‬
‫اﻟﻤﺮاﺟﻌ ﺎت وﻓﻴ ﻪ ﻳ ﺘﻢ ﺗ ﺴﺠﻴﻞ دورة اﻟﻤﺮاﺟﻌ ﺎت ﻟﻠﻮﺣ ﺔ وﻻ ﺗﻘﻠ ﻖ أﺧ ﻲ اﻟﻤﻬﻨ ﺪس ﻓﺈﻧﻨ ﺎ‬
‫ﺳﻨﻘﻮم ﺑﺸﺮح ﻃﺮﻳﻘﺔ ﺗﻨﻈﻴﻢ اﻟﻤﺮاﺟﻌﺎت ﻟﻠﻮﺣﺔ ﺑﻌﺪ ﻗﻠﻴﻞ‬
‫واﻵن ﻧﻨﺘﻘﻞ ﻟﻠﺘﺒﻮﻳﺐ اﻟﺮاﺑﻊ‬
‫‪Distribution‬‬

‫ﻓﻘﻂ‬
‫اﻟﺘﻮزﻳﻊ وﻓﻴﻪ ﻳﺘﻢ ﺗﺤﺪﻳﺪ اﻷﺷﺨﺎص واﻟﺸﺮآﺎت اﻟﺘﻲ ﺳﻴﺘﻢ إرﺳﺎل إﻟﻴﻬﻢ اﻟﻠﻮﺣ ﺔ وذﻟ ﻚ ﻣ ﻦ‬
‫ﺧﻼل اﻟﻀﻐﻂ ﻋﻠﻰ زر ‪ Add‬ﻓﻴﺒﺪأ اﻟﻤﻌﺎﻟﺞ ﺑﺎﻟﻈﻬﻮر آﻤﺎ ﺑﺎﻟﺸﻜﻞ ) ‪( ٦ – ٤‬‬
‫ﻓﻨﻘﻮم ﺑﺈدﺧﺎل رﻗﻢ اﻟﻤﺮاﺟﻌﺔ ‪ Rev No 001‬ﺛﻢ ﻋﻨﻮان اﻟﻤﺮاﺟﻌﺔ ‪BID Version‬‬
‫أي ﻧ ﺴﺨﺔ اﻟﻄ ﺮح ﺛ ﻢ ﻧﻘ ﻮم ﺑ ﺈدراج ﺗ ﺎرﻳﺦ اﻹﺻ ﺪار ‪ 1/3/2007‬وﺳ ﻨﺠﺪ أن اﻟﺒﺮﻧ ﺎﻣﺞ‬
‫ﻳ ﺪرج ﺗ ﻮارﻳﺦ اﻟﻮﺻ ﻮل واﻹرﺳ ﺎل اﻟﻤﻮﺟ ﻮدة ﻋﻠ ﻰ اﻟﺠﻬ ﺎز وﻳﻤﻜ ﻦ ﺗﻐﻴﻴﺮه ﺎ ﺛ ﻢ ﻧﺤ ﺪد‬
‫ﻣﻮﻗﻒ اﻟﻠﻮﺣﺔ ‪ Phase IFB‬ﺛﻢ ﻧﺠﻌﻞ ‪Progress 100%‬‬

‫‪٨٨‬‬
‫ﻣﺘﺎﺑﻌﺔ اﻟﺮﺳﻮﻣﺎت‬

‫ﻏـﻴـﺮ‬
‫ﻣﺴﻤﻮح‬ ‫ﺷﻜﻞ ) ‪( ٦ – ٤‬‬

‫ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ زر ‪ Next‬ﻟﻼﻧﺘﻘﺎل ﻟﻠﺨﻄﻮة اﻟﺘﺎﻟﻴﺔ – ﺷﻜﻞ ) ‪( ٧ – ٤‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬
‫ﻟﻠﻌﺮض‬
‫ﺷﻜﻞ ) ‪( ٧ – ٤‬‬
‫وﻳﻤﻜ ﻦ إﺧﺘﻴ ﺎر ﻗﺎﺋﻤ ﺔ ﺗﻮزﻳ ﻊ ﻣﺠﻬ ﺰة ﻣ ﻦ ﻗﺒ ﻞ أو اﺧﺘﻴ ﺎر ﺷ ﺮآﺎت ﻣﻨﻔ ﺼﻠﺔ وﺳ ﻨﻘﻮم‬
‫ﺑﺎﻟﻀﻐﻂ ﻋﻠﻰ ﺧﻴﺎر ﺷﺮآﺎت ‪ Companies‬ﺛﻢ ﻧﺤﺪد اﻟﺸﺮآﺎت اﻟﺘﺎﻟﻴﺔ‬
‫‪CPM‬‬ ‫ﺷﺮآﺔ إدارة اﻟﻤﺸﺮوﻋﺎت ﻟﻠﻤﺸﺮوع‬
‫‪STEEL‬‬ ‫ﺷﺮآﺔ ‪ Tri State‬ﻟﻠﺤﺪﻳﺪ‬

‫ﻓﻘﻂ‬
‫ﺛﻢ ﻧﻀﻐﻂ ‪ Next‬ﻟﻼﻧﺘﻘﺎل ﻟﻠﺨﻄﻮة اﻟﺘﺎﻟﻴﺔ – ﺷﻜﻞ ) ‪( ٨ – ٤‬‬
‫وﻧﺤﺪد ﻋﺪد ﻧﺴﺦ اﻟﻠﻮﺣﺎت آﺎﻟﺘﺎﻟﻲ‬
‫اﻟﺸﺮآﺔ اﻷوﻟﻰ ‪ ٣‬ﻧﺴﺦ ﻣﻦ اﻟﻠﻮﺣﺎت‬
‫اﻟﺸﺮآﺔ اﻟﺜﺎﻧﻴﺔ ‪ ٢‬ﻧﺴﺨﺔ ﻣﻦ اﻟﻠﻮﺣﺎت‬
‫وﻧﺤ ﺪد ﻣﻘ ﺎس اﻟﻠﻮﺣ ﺎت ﻋ ﻦ ﻃﺮﻳ ﻖ اﻟﻨﻘ ﺮ داﺧ ﻞ ﺣﻘ ﻞ ‪ Paper Size‬ﻓﺘﻈﻬ ﺮ اﻟﻨﺎﻓ ﺬة‬
‫اﻟﺘﺎﻟﻴﺔ – ﺷﻜﻞ ) ‪ ( ٩ – ٤‬ﺛﻢ ﻧﺨﺘﺎر اﻟﻤﻘﺎس ‪ A1‬ﻟﻜﻞ ﺷﺮآﺔ ﻣﻦ اﻟﺸﺮآﺎت‬

‫‪٨٩‬‬
‫اﻟﺒﺎب اﻟﺮاﺑﻊ‬

‫ﻏـﻴـﺮ‬
‫ﻣﺴﻤﻮح‬ ‫ﺷﻜﻞ ) ‪( ٨ – ٤‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻧﺴﺨﺔ‬ ‫ﺷﻜﻞ ) ‪( ٩ – ٤‬‬

‫وأﺧﻴﺮا وﺑﻌﺪ اﻻﻧﺘﻬ ﺎء ﻣ ﻦ ادﺧ ﺎل ﻣﻘﺎﺳ ﺎت اﻟﻠﻮﺣ ﺎت ﻧ ﻀﻐﻂ ‪ Finish‬ﻓ ﻨﻼﺣﻆ ﻇﻬ ﻮر‬

‫ﻟﻠﻌﺮض‬
‫رﻗﻢ ﺗﻮزﻳﻊ اﻟﻠﻮﺣﺔ آﻤﺎ ﺑﺎﻟﺸﻜﻞ ) ‪( ١٠ – ٤‬‬

‫ﻓﻘﻂ‬ ‫ﺷﻜﻞ ) ‪( ١٠ – ٤‬‬

‫وﻟﻌﺮض اﻟﺸﺮآﺎت ﻳﺘﻢ وﺿﻊ ﻣﺆﺷ ﺮ اﻟﻔ ﺄرة ﻋﻠ ﻰ اﻷﻳﻘﻮﻧ ﺔ اﻟﻤﺠ ﺎورة ﻟ ﺮﻗﻢ ‪ 001‬ﺛ ﻢ ﻳ ﺘﻢ‬
‫اﻟﻀﻐﻂ ﻋﻠﻰ زر ‪ Open‬ﻓﺘﻈﻬﺮ اﻟﻨﺎﻓﺬة اﻟﺘﺎﻟﻴﺔ وﺑﻬﺎ ﺑﻴﺎﻧﺎت اﻟﺘﻮزﻳﻊ – ﺷﻜﻞ ) ‪( ١١-٤‬‬

‫‪٩٠‬‬
‫ﻣﺘﺎﺑﻌﺔ اﻟﺮﺳﻮﻣﺎت‬

‫ﻏـﻴـﺮ‬
‫ﻣﺴﻤﻮح‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬ ‫ﺷﻜﻞ ) ‪( ١١ – ٤‬‬

‫وﺳ ﻨﺠﺪ أن اﻟﺒﺮﻧ ﺎﻣﺞ ﻳﻘ ﻮم ﺑﻌﻤ ﻞ ﻣﺮاﺳ ﻠﺔ ﻟﻠ ﺸﺮآﺘﻴﻦ ﻓ ﻲ ‪Transmittal Queue‬‬


‫وﻟﻠﺘﺄآﺪ ﻣﻦ ذﻟﻚ ﻧﺘﻮﺟﻪ إﻟﻰ‬

‫ﻧﺴﺨﺔ‬
‫…‪Tools Æ Transmittal Queue‬‬

‫ﻟﻠﻌﺮض‬
‫ﻓﻘﻂ‬ ‫ﺷﻜﻞ ) ‪( ١٢ – ٤‬‬

‫ﻓﺘﻈﻬﺮ أﻣﺎﻣﻨﺎ ﻗﺎﺋﻤﺔ ﺑﺎﻟﻤﺮاﺳﻼت اﻟﻤﻮﺟﻮدة ﻓﻲ اﻷرﺷﻴﻒ آﻤﺎ ﺑﺎﻟﺸﻜﻞ ) ‪( ١٣ – ٤‬‬

‫‪٩١‬‬
‫اﻟﺒﺎب اﻟﺮاﺑﻊ‬

‫ﻏـﻴـﺮ‬
‫ﻣﺴﻤﻮح‬ ‫ﺷﻜﻞ ) ‪( ١٣ – ٤‬‬

‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫وﻹﻧﺸﺎء اﻟﻤﺮاﺳ ﻼت ﻧﺨﺘ ﺎر اﻷﻣ ﺮ ‪ Create All‬ﻟﻌﻤ ﻞ ﻣﺮاﺳ ﻼت ﻟﻠ ﺸﺮآﺘﻴﻦ أو ﻧﺨﺘ ﺎر‬
‫‪ Create‬ﻓﻘﻂ ﻟﻌﻤﻞ ﻣﺮاﺳﻠﺔ ﻟﺸﺮآﺔ واﺣﺪة ﻓﻘﻂ‬

‫وﻻ ﻧﻨ ﺴﻰ أﻧ ﻪ ﻓ ﻲ ﺣﺎﻟ ﺔ رﻏﺒﺘﻨ ﺎ ﺑﻄﺒﺎﻋ ﺔ اﻟﻤﺮاﺳ ﻠﺔ ﻧﺨﺘ ﺎر اﻟﺨﻴ ﺎر‬

‫ﻧﺴﺨﺔ‬
‫‪Print Transmittals during create‬‬
‫وﻓﻲ ﺣﺎﻟﺔ رﻏﺒﺔ ﺗﺠﻤﻴﻊ ﻋﺪد ﻣﻦ اﻟﻤﺮاﺳﻼت اﻟﺨﺎﺻﺔ ﺑﺸﺮآﺔ ﻓﻲ ﻣﺮاﺳﻠﺔ واﺣﺪة ﻧﺨﺘﺎر‬
‫‪Combine Transmittals to same contact‬‬
‫وﻓﻴﻤﺎ ﻳﻠﻲ ﺷﻜﻞ اﻟﻤﺮاﺳﻠﺔ ﻋﻨﺪ اﻟﻄﺒﺎﻋﺔ‬

‫ﻟﻠﻌﺮض‬
‫ﻓﻘﻂ‬
‫ﺷﻜﻞ ) ‪( ١٤ – ٤‬‬

‫‪٩٢‬‬
‫ﻣﺘﺎﺑﻌﺔ اﻟﺮﺳﻮﻣﺎت‬

‫واﻵن ﻧﻨﺘﻘﻞ إﻟﻰ اﻟﺘﺒﻮﻳﺐ اﻷﺧﻴﺮ‬


‫‪Sketches‬‬

‫ﻏـﻴـﺮ‬
‫اﻻﺳﻜﺘﺸﺎت أو اﻟﺮﺳﻮﻣﺎت اﻟﺘﺨﻄﻴﻄﻴﺔ واﻟﺘﻲ ﺗﺮﺗﺒﻂ ﺑﺎﻟﻠﻮﺣﺔ‬
‫ﻳﺘﻢ إدراج ﺑﻴﺎﻧﺎت اﻻﺳﻜﺘﺶ ﻋﻦ ﻃﺮﻳﻖ اﻟﻀﻐﻂ ﻋﻠﻰ زر ‪ Add‬ﻓﻴﻈﻬﺮ اﻟﻤﻌﺎﻟﺞ آﻤﺎ‬
‫ﺑﺎﻟﺸﻜﻞ ) ‪( ١٥ – ٤‬‬

‫ﻣﺴﻤﻮح‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬ ‫ﺷﻜﻞ ) ‪( ١٥ – ٤‬‬

‫ﻧﺴﺨﺔ‬
‫ﺛﻢ ﻧﻀﻴﻒ اﻟﺒﻴﺎﻧﺎت اﻟﺘﺎﻟﻴﺔ ﻋﻠﻰ ﺳﺒﻴﻞ اﻟﻤﺜﺎل‬
‫‪Sketch No : SK-1‬‬ ‫رﻗﻢ اﻻﺳﻜﺘﺶ‬
‫‪Title : Sketch of RFT‬‬ ‫ﻋﻨﻮان اﻻﺳﻜﺘﺶ‬
‫‪Designer : Design - Chris A‬‬ ‫اﻟﻤﺼﻤﻢ ‪ /‬اﻟﻤﻬﻨﺪس‬

‫ﻟﻠﻌﺮض‬
‫‪Sketch Date : 01/03/2007‬‬ ‫ﺗﺎرﻳﺦ اﻻﺳﻜﺘﺶ‬
‫‪Sent Date : 05/03/2007‬‬ ‫ﺗﺎرﻳﺦ اﻹرﺳﺎل‬
‫‪Revision No : 001‬‬ ‫رﻗﻢ اﻟﻤﺮاﺟﻌﺔ‬

‫ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ اﻟﺰر ‪ Next‬ﻟﻼﻧﺘﻘﺎل ﻟﻠﺨﻄﻮة اﻟﺘﺎﻟﻴﺔ وهﻲ ﺧﻄﻮة إﺿﺎﻓﺔ اﻟﻤﺮاﺳﻼت‬

‫ﻓﻘﻂ‬
‫وﺳﻨﺨﺘﺎر ﺷﺮآﺔ ‪STEEL‬‬

‫ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ زر ‪ Next‬ﻟﻼﻧﺘﻘﺎل ﻟﻠﺨﻄﻮة اﻟﺘﺎﻟﻴﺔ وهﻲ ﺗﺤﺪﻳﺪ ﻋﺪد ﻧﺴﺦ اﻻﺳﻜﺘﺸﺎت‬
‫وﻣﻘﺎس اﻻﺳﻜﺘﺶ وﺳﻨﺨﺘﺎر اﻟﻌﺪد ‪ 2‬واﻟﻤﻘﺎس ‪A3‬‬

‫ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ ‪ Finish‬وﺑﺬا ﻳﻜﻮن ﻗﺪ وﺻﻠﻨﺎ إﻟﻰ ﺁﺧﺮ ﺧﻄﻮة ﻣﻦ ﺧﻄﻮات إدراج‬
‫ﺑﻴﺎﻧﺎت اﻟﻠﻮﺣﺔ واﻟﺘﻲ ﺳﺘﻈﻬﺮ ﻓﻲ ﻗﺎﺋﻤﺔ اﻟﻠﻮﺣﺎت ﻓﻲ ﻧﺎﻓﺬة ‪Drawings‬‬

‫‪٩٣‬‬
‫ﻏـﻴـﺮ‬
‫ﻣﺴﻤﻮح‬
‫ﻟﻢ‬
‫ﺑﺎﻟﻄﺒﺎﻋﺔ‬
‫ﻳﻜﺘﻤﻞ‬
‫ﻧﺴﺨﺔ‬
‫ﺑﻌﺪ‬
‫ﻟﻠﻌﺮض‬
‫‪......‬‬
‫ﻓﻘﻂ‬