Expedation Demo
Expedation Demo
ﻣﺴﻤﻮح
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ
ﻟﻠﻌﺮض
ﻓﻘﻂ
אﻏـﻴאـﺮ
ﻣﺴﻤﻮح
Primavera Expedition
ﻣﻬﻨﺪس /ﻋﻤﺎد ﺣﺎﻣﺪ ﺣﺴﺎن
ﺑﺎﻟﻄﺒﺎﻋﺔ
اﻹﺻﺪار اﻷول ﻟﻌﺎم ٢٠٠٦م
ﻧﺴﺨﺔ
ﻟﻠﻌﺮض
ﻓﻘﻂ
ﻧﺤﻮ إﻧﺘﺎج ﻣﻮﺳﻮﻋﺔ هﻨﺪﺳﻴﺔ إﻧﺸﺎﺋﻴﺔ إﻟﻜﺘﺮوﻧﻴﺔ
ﻏـﻴـﺮ
ﺇﱃ ﺍﻟﻨﺴﻤﺔ ﺍﻟﺮﻗﻴﻘﺔ ﰲ ﺣﻴﺎﺗﻲ
ﺯﻭﺟﺘﻲ ﺍﳊﺒﻴﺒﺔ
ﻣﺴﻤﻮح
ﺇﱃ ﺍﻟﺒﺴﻤﺔ ﺍﳉﻤﻴﻠﺔ ﰲ ﺣﻴﺎﺗﻲ
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﺃﺧﺘﻲ ﺍﻟﺼﻐﲑﺓ
ﻧﺴﺨﺔ
ﺍﳊﻴﺎﺓ ﺇﱃ ﻗﺮﺓ ﻋﻴﻨﻲ ﰲ
اﻟﻤﻘﺪﻣﺔ ٤ ................................................................................
ﻋﻠﻰ ﺳﺒﻴﻞ اﻟﺘﻌﺮﻳﻒ٥ ...................................................................
آﻴﻒ ﺗﺴﺘﺨﺪم اﻟﻜﺘﺎب ٧ ................................................................
ﻣﺴﻤﻮح
اﻟﺒﺎب اﻷول :ﻣﺎهﻮ ١٠ .................................................Expedition
اﻟﺒﺎب اﻟﺜﺎﻧﻲ :اﻟﻘﻮاﻣﻴﺲ ٤٣ ..............................................................
اﻟﺒﺎب اﻟﺜﺎﻟﺚ :اﻟﺘﻘﺪﻳﻤﺎت ٦١..............................................................
اﻟﺒﺎب اﻟﺮاﺑﻊ :ﻣﺘﺎﺑﻌﺔ اﻟﺮﺳﻮﻣﺎت٨٢......................................................
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ
ﻟﻠﻌﺮض
ﻓﻘﻂ
ﻏـﻴـﺮ
א
ﻣﺴﻤﻮح
ﻳﻌﺎﻟﺞ ﻣﻮﺿﻮﻋﺎت ﺗﺤﺒﻬﺎ وﺗﻌﺸﻘﻬﺎ ،وﻟﻄﺎﻟﻤﺎ آﺎﻧ ﺖ اهﺘﻤﺎﻣ ﺎﺗﻲ ﻃ ﻮال ﻋ ﺸﺮ ﺳ ﻨﻮات ﻣ ﻦ
ﺗﺨﺮﺟﻲ ﻣﻦ آﻠﻴﺔ اﻟﻬﻨﺪﺳﺔ وﺣﺘﻰ اﻟﻴﻮم ﺗﺪور ﻓﻲ ﻣﺤﻴﻂ هﺬﻩ اﻟﻤﻬﻨﺔ اﻟﻌﻈﻴﻤﺔ اﻟﺘ ﻲ أﻋﺘ ﺰ
ﺑﺎﻻﻧﺘﻤﺎء إﻟﻴﻬﺎ " ﻣﻬﻨﺔ اﻟﻬﻨﺪﺳﺔ اﻟﻤﺪﻧﻴﺔ " .
وﻟﻘﺪ ﺑﺪأت اﻟﻤﺸﻮار ﻣﻨﺬ ﺳﻨﻮات ﺑﺎﻟﻜﺘﺎﺑﺔ ﻓﻲ اﻟﻤﻨﺘﺪﻳﺎت واﻟﻤﺠﻤﻮﻋﺎت اﻟﺒﺮﻳﺪﻳﺔ ﻋﻠﻰ ﺷﺒﻜﺔ
ﺑﺎﻟﻄﺒﺎﻋﺔ
اﻟﻤﻌﻠﻮﻣ ﺎت اﻟﻌﺎﻟﻤﻴ ﺔ " اﻻﻧﺘﺮﻧ ﺖ " وﺣﺎوﻟ ﺖ ﻣ ﺮارا وﺗﻜ ﺮارا ﺗﻜ ﻮﻳﻦ ﻣﺠﻤﻮﻋ ﺎت ﻋﻤ ﻞ
ﻟﻨﺸﺮ ﺛﻘﺎﻓﺔ اﻟﻜﺘﺎب اﻹﻟﻜﺘﺮوﻧ ﻲ ﻓ ﻲ اﻟﻤﺠ ﺎل اﻟﻬﻨﺪﺳ ﻲ وﻟﻜﻨﻨ ﻲ ﺻ ﺪﻣﺖ ﻋﻨ ﺪﻣﺎ وﺟ ﺪت أن
ﻣﻌﻈ ﻢ اﻟﻤﻬﻨﺪﺳ ﻴﻦ اﻟﻘ ﺪاﻣﻰ ﻻ ﻳﺘ ﺬوﻗﻮن ﺛﻘﺎﻓ ﺔ اﻟﻜﺘ ﺐ اﻹﻟﻜﺘﺮوﻧﻴ ﺔ وﻓ ﻲ اﻟﻄ ﺮف اﻵﺧ ﺮ
وﺟﺪت ﻧﺴﺒﺔ ﻋﺎﻟﻴ ﺔ ﺟ ﺪا ﻣ ﻦ اﻟﻤﻬﻨﺪﺳ ﻴﻦ ﺣ ﺪﻳﺜﻲ اﻟﺘﺨ ﺮج ﻻ ﻳﻔﻜ ﺮون ﻓ ﻲ ﺗﻄﻮﻳ ﻊ اﻟﺘﻘﻨﻴ ﺔ
اﻟﺤﺪﻳﺜﺔ ﻟﺨﺪﻣﺔ ﻣﺠﺘﻤﻌﺎﺗﻬﻢ .
ﻧﺴﺨﺔ
وآﻢ آﺎن ﻳﺆﻟﻤﻨﻲ ﻣﻨﻈﺮ اﻟﺸﺒﺎب اﻟﻤﺴﻠﻢ وهﻮ ﻳﻬ ﺪر وﻗﺘ ﻪ وﻃﺎﻗﺎﺗ ﻪ أﻣ ﺎم ﺷﺎﺷ ﺎت اﻟﺤﺎﺳ ﺐ
اﻵﻟﻲ ﻓﻲ ﻣﻘﺎهﻲ اﻻﻧﺘﺮﻧﺖ ﻓﻲ اﻟﺪردﺷﺔ وأﻟﻌﺎب اﻟﺸﺒﻜﺔ دون اﻟﺘﻔﻜﻴﺮ وﻟ ﻮ ﻓ ﻲ ﻟﺤﻈ ﺔ ﻣ ﻦ
اﻟﻠﺤﻈﺎت ﻓﻲ آﻴﻔﻴﺔ اﻻﺳﺘﻔﺎدة ﻣﻦ ﺗﻠﻚ اﻟﺜﻮرة اﻟﺮﻗﻤﻴﺔ ﻓﻲ ﺗﻄﻮﻳﺮ اﻟﺬات وﺗﻄﻮﻳﺮ اﻟﻤﺠﺘﻤﻊ
وأرﺟﻮ ﻣﻨﻚ أﺧﻲ اﻟﻜﺮﻳﻢ ﺑﻌﺪ ﻗﺮاءﺗﻚ ﻟﻬﺬا اﻟﻜﺘﺎب ان ﺗﻌﻤﻞ ﻋﻠﻰ ﻣﺴﺎﻋﺪﺗﻲ ﻋﻠﻰ ﺗﻄﻮﻳﺮﻩ
ﻟﻠﻌﺮض
ﻣﻦ ﺧﻼل ارﺳﺎل ﻣﻼﺣﻈﺎﺗﻚ وﻧﻘﺪك اﻟﺒﻨﺎء اﻟﻰ ﺑﺮﻳﺪي اﻹﻟﻜﺘﺮوﻧﻲ ﻓﻲ أي وﻗﺖ
ﻣﻦ هﻮ اﻟﻜﺎﺗﺐ ؟
ﻣﺴﻤﻮح
هﻮ اﻟﻤﻬﻨﺪس /ﻋﻤ ﺎد ﺣﺎﻣ ﺪ ﺣ ﺴﺎن ﻣ ﻦ أﺑﻨ ﺎء ﺟﻤﻬﻮرﻳ ﺔ ﻣ ﺼﺮ اﻟﻌﺮﺑﻴ ﺔ – ﺣﺎﺻ ﻞ ﻋﻠ ﻰ
ﺑﻜﺎﻟﻮرﻳﻮس اﻟﻬﻨﺪﺳ ﺔ اﻟﻤﺪﻧﻴ ﺔ ﻟﻌ ﺎم ١٩٩٧م ،ﻋﻤ ﻞ ﺑﺎﻟﻌﺪﻳ ﺪ ﻣ ﻦ اﻟﻤ ﺸﺎرﻳﻊ اﻟﻬﻨﺪﺳ ﻴﺔ ﻣﻨ ﺬ
ﺗﺎرﻳﺦ ﺗﺨﺮﺟ ﻪ وﺣﺘ ﻰ ﺗ ﺎرﻳﺦ ﺗﺠﻤﻴ ﻊ ه ﺬا اﻟﻜﺘ ﺎب اﻹﻟﻜﺘﺮوﻧ ﻲ وه ﻮ ﻣ ﻦ ﻋ ﺸﺎق اﻟﺤﺎﺳ ﺐ
اﻵﻟﻲ وﻳﻌﻤﻞ ﻓﻲ ﻣﺠ ﺎل اﻟﺘ ﺪرﻳﺐ ﻋﻠ ﻰ ﻋﻠﻮﻣ ﻪ ﺑﺠ ﻮار وﻇﻴﻔﺘ ﻪ اﻟﻬﻨﺪﺳ ﻴﺔ ،وه ﻮ ﻣﺆﺳ ﺲ
ﻣﻮﻗﻊ اﻹﻧﺸﺎﺋﻲ اﻟﻌﺮﺑﻲ www.arab-soft.com/civilوﻳﻘﻮم ﺑﺎﻟﻤﺸﺎرآﺔ ﻓﻲ اﻟﻌﺪﻳ ﺪ
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻣﻦ اﻟﻤﻨﺘﺪﻳﺎت اﻟﻬﻨﺪﺳﻴﺔ اﻟﻌﺮﺑﻴﺔ .
ﻧﺴﺨﺔ
هﺬا اﻟﻜﺘﺎب هﻮ ﻧﺴﺨﺔ ﻣﺠﺎﻧﻴﺔ ﻋﻠﻰ ﺳﺒﻴﻞ اﻟﻌﺮض ﻓﻘ ﻂ ) ( Demo Versionوﻏﻴ ﺮ
ﻣ ﺴﻤﻮح ﺑﻄﺒﺎﻋﺘﻬ ﺎ ورﻗﻴ ﺎ أو آ ﺴﺮ ﺣﻤﺎﻳﺘﻬ ﺎ ﺑﻄ ﺮق اﻟﻬﻨﺪﺳ ﺔ اﻟﻌﻜ ﺴﻴﺔ ،وﻟﻠ ﺮاﻏﺒﻴﻦ ﻓ ﻲ
ﻣﺴﺎﻋﺪﺗﻨﺎ ﻟﻨﺸﺮ هﺬﻩ اﻟﻜﺘﺐ وﺗﻮﻓﻴﺮهﺎ ﻋﻠﻰ ﺳﻴﺮﻓﺮات ﺧﺎﺻﺔ اﻻﺗﺼﺎل ﺑﻨﺎ ﻋﻠﻰ
ت +٩٦٦٥٦٩٥٤٥٠٨٣ /
ﻟﻠﻌﺮض
E-Mail : [email protected]
www.arab-soft.com/civil
ﻓﻘﻂ
ﻟﻤﻦ هﺬا اﻟﻜﺘﺎب ؟
هﺬا اﻟﻜﺘﺎب ﻳﺨﺎﻃﺐ اﻟﻤﻬﻨﺪﺳﻴﻦ اﻟﻌﺎﻣﻠﻴﻦ ﻓﻲ ﺷﺮآﺎت اﻟﻤﻘﺎوﻻت واﻟﺬﻳﻦ ﻟﺪﻳﻬﻢ ﺧﺒﺮة
ﺑﺒﺮاﻣﺞ إدارة اﻟﻤﺸﺮوﻋﺎت اﻹﻧﺸﺎﺋﻴﺔ
ﻏـﻴـﺮ
א א
Primavera Expedition
ﻣﺴﻤﻮح
Primavera Enterprise
Primavera Project Planner P3
هﻲ ﻋﻼﻣﺎت ﺗﺠﺎرﻳﺔ ﻣﺴﺠﻠﺔ ﻟﺸﺮآﺔ
Primavera System Inc
http://www.primavera.com
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ
Microsoft Windows
Microsoft Office
Microsoft Excel
هﻲ ﻋﻼﻣﺎت ﺗﺠﺎرﻳﺔ ﻣﺴﺠﻠﺔ ﻟﺸﺮآﺔ
Microsoft Corporation
ﻟﻠﻌﺮض
http://www.microsoft.com
ﻓﻘﻂ
ﻷﺻﺤﺎﺑﻬﺎ وﻧﺤﻦ ﻧﺤﺘﺮم آﺎﻓﺔ ﺣﻘﻮﻗﻬﻢ ﻟﺬا وﺟﺐ اﻟﺘﻨﻮﻳﻪ
ﻏـﻴـﺮ
מא
هﺬا اﻟﻜﺘﺎب ﻣﻜﺘﻮب ﺑﻄﺮﻳﻘﺔ اﻟﺸﺮح ﺧﻄﻮة ﺑﺨﻄﻮة ﻓﻠﺬا ﻻﺑﺪ ﻣﻦ ﻗﺮاءة اﻷﺑ ﻮاب ﺑﺎﻟﺘﺮﺗﻴ ﺐ
وﺳﺘﺠﺪ أﻧﻨﺎ ﻗﻤﻨﺎ ﺑﻮﺿﻊ ﺻﻮر ﺗﻮﺿﻴﺤﻴﺔ ﻏﻴﺮ ﻣﻠﻮﻧﺔ ﻟﺘﻘﻠﻴﻞ ﺣﺠﻢ اﻟﻤﻠﻒ اﻻﻟﻜﺘﺮوﻧﻲ
ﻣﺴﻤﻮح
وﻟﻸﺳﺘﻔﺎدة اﻟﻘﺼﻮى ﻣﻦ اﻟﻜﺘﺎب ﻳﺠﺐ ان ﻳﻜﻮن ﻟﺪﻳﻚ ﻧﺴﺨﺔ ﻣﻦ اﻟﺒﺮﻧﺎﻣﺞ
Primavera Expedition Version 8.5
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﺳﺘﺠﺪ هﺬا اﻟﺮﻣﺰ ﻋﻨﺪ وﺟﻮد ﻣﻼﺣﻈﺔ ﺟﺎﻧﺒﻴﺔ أو ﺗﻨﺒﻴﻪ
اﻟﺮﻣﻮز اﻟﻤﺴﺘﺨﺪﻣﺔ
ﻧﺴﺨﺔ
هﺬﻩ اﻷﺳﻬﻢ ﻟﺸﺮح ﺧﻄﻮات ﺗﻨﻔﻴﺬ اﻷواﻣﺮ ﻣﻦ اﻟﻘﻮاﺋﻢ
ﻟﻠﻌﺮض
ﻓﻘﻂ
א ﻏـﻴـﺮ א
ﻣﺴﻤﻮح
Expedition
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ
ﻟﻠﻌﺮض
ﻓﻘﻂ
اﻟﺒﺎب اﻷول
ﻏـﻴـﺮ Expedition }%
ﻣﺴﻤﻮح
ﺑﺮﻧﺎﻣﺞ Expeditionهﻮ اﺣﺪ ﺑﺮاﻣﺞ ﺷ ﺮآﺔ Primaveraاﻟﻌﺎﻟﻤﻴ ﺔ اﻟﻤﺘﺨﺼ ﺼﺔ
ﻓ ﻲ ﺑ ﺮاﻣﺞ إدارة اﻟﻤ ﺸﺮوﻋﺎت ،وﻳﺨ ﺘﺺ ه ﺬا اﻟﺒﺮﻧ ﺎﻣﺞ ﺑﻌﻤﻠﻴ ﺔ ﺗﻨﻈ ﻴﻢ اﻟﻌﻤ ﻞ داﺧ ﻞ
اﻟ ﺸﺮآﺎت ﺳ ﻮاء آﺎﻧ ﺖ ﺷ ﺮآﺎت ﻣﻘ ﺎوﻻت او ﻣﻜﺎﺗ ﺐ اﺳﺘ ﺸﺎرﻳﺔ او ﻣﻘ ﺎوﻟﻲ ﺑ ﺎﻃﻦ وﻣ ﻦ
اﻣﺜﻠﺘﻬ ﺎ ﺗﻨﻈ ﻴﻢ اﻋﻤ ﺎل اﻟﺘﻘ ﺪﻳﻤﺎت ﻟﻠﻤ ﻮاد واﻟﺮﺳ ﻮﻣﺎت اﻟﺘﻨﻔﻴﺬﻳ ﺔ وأواﻣ ﺮ اﻟﺘﻐﻴﻴ ﺮ
ﺑﺎﻟﻄﺒﺎﻋﺔ
واﻟﻤﺴﺘﺨﻠﺼﺎت وﻏﻴﺮهﺎ .
ﺗﻨﺼﻴﺐ اﻟﺒﺮﻧﺎﻣﺞ
ﻧﺴﺨﺔ
ﻣﺜﻞ أي ﺑﺮﻧﺎﻣﺞ ﻓﻲ ﺑﻴﺌﺔ وﻳﻨﺪوز ﻳﺄﺗﻲ ﺑﺮﻧﺎﻣﺞ Expeditionﻓﻲ ﻗﺮﺻﻲ ﻟﻴﺰر ﻓﻲ
اﻟﻘﺮص اﻷول ﺳﻨﺠﺪ ﺑﺮﻧﺎﻣﺞ اﻟﺘﻨﺼﻴﺐ Setupواﻟﺬي ﺳﻴﻌﻤﻞ ﺗﻠﻘﺎﺋﻴﺎ ﺑﻤﺠﺮد وﺿﻊ
اﻟﻘﺮص اﻟﻀﻮﺋﻲ ﺑﻤﺤﺮك اﻷﻗﺮاص اﻟﻀﻮﺋﻴﺔ -ﺷﻜﻞ ) ( ١ -١
ﻟﻠﻌﺮض
ﻓﻘﻂ
ﺷﻜﻞ )(١-١
١٠
ﻣﺎهﻮ Expedition
ﻧﻘﻮم ﺑﻌﺪ ذﻟﻚ ﺑﺎﺧﺘﻴﺎر اﻻﺧﺘﻴﺎر اﻷول وهﻮ Install Expedition Applications
ﻏـﻴـﺮ
ﻓﺘﻈﻬﺮ اﻟﻘﺎﺋﻤﺔ اﻟﺜﺎﻧﻴﺔ – ﺷﻜﻞ ) (٢ -١
ﻣﺴﻤﻮح
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ ﺷﻜﻞ )( ٢ -١
وﻓﻲ هﺬﻩ اﻟﺸﺎﺷﺔ ﻧﺤﺪد اﻟﻨﻮع اﻟﻤﻄﻠﻮب ﺗﺸﻐﻴﻠﻪ ﻋﻠﻰ اﻟﺠﻬﺎز ﻣﻦ اﻟﺒﺮﻧﺎﻣﺞ ﺣﻴﺚ اﻧﻪ:
• ﻓ ﻲ ﺣﺎﻟ ﺔ اﻟﺮﻏﺒ ﺔ ﺗ ﺸﻐﻴﻞ اﻟﺒﺮﻧ ﺎﻣﺞ ﻋﻠ ﻰ ﺟﻬ ﺎز ﻃﺮﻓ ﻲ واﺣ ﺪ ﺳﻨ ﺴﺘﺨﺪم
ﻓﻘﻂ
Novell Database Server
• ﻓ ﻲ ﺣﺎﻟ ﺔ اﻟﺮﻏﺒ ﺔ ﻓ ﻲ ﺗ ﺸﻐﻴﻞ ﺧ ﺪﻣﺎت اﻟﺒﺮﻧ ﺎﻣﺞ ﻋ ﻦ ﻃﺮﻳ ﻖ اﻟﻮﻳ ﺐ ﺳﻨ ﺴﺘﺨﺪم
Web Server
• ﻓﻲ ﺣﺎﻟﺔ اﻟﺮﻏﺒﺔ ﻓﻲ ﺗﺸﻐﻴﻞ اﻟﺒﺮﻧﺎﻣﺞ ﻋﻠﻰ اﻷﺟﻬﺰة اﻟﻜﻔﻴﺔ اﻟﻤﺤﻤﻮﻟ ﺔ ) اﻟﻜﻤﺒﻴ ﻮﺗﺮ
اﻟﻜﻔﻲ ( ﺳﻨﺨﺘﺎر Expedition Mobile
• اﻟﺨﻴﺎر اﻷﺧﻴﺮ هﻮ ﻟﻠﻤﻄﻮرﻳﻦ واﻟ ﺮاﻏﺒﻴﻦ ﺑﺎﻻﺳ ﺘﻔﺎدة ﻣ ﻦ ﺑﺮﻧ ﺎﻣﺞ Expedition
داﺧﻞ ﺗﻄﺒﻴﻘﺎﺗﻬﻢ
١١
اﻟﺒﺎب اﻷول
وﺳﻨﻔﺘﺮض ﻓﻲ هﺬا اﻟﻜﺘﺎب اﻧﻚ ﺳﺘﺸﻐﻞ اﻟﺒﺮﻧﺎﻣﺞ ﻋﻠﻰ ﺟﻬﺎز واﺣ ﺪ ﻓﻘ ﻂ ﺑ ﺪون ﺷ ﺒﻜﺔ
ﻟﺬا ﺳﻨﺨﺘﺎر اﻟﺨﻴﺎر اﻷول Expedition Workstation
ﻏـﻴـﺮ
وﺳﺘﻈﻬﺮ ﻣﻌﻚ اﻟﺸﺎﺷﺔ اﻟﺘﺎﻟﻴﺔ واﻟﺘﻲ ﺗﻮﺿﺢ ﻣﺮاﺣﻞ اﻟﺘﺜﺒﻴﺖ – ﺷﻜﻞ ) ( ٣ -١
ﻣﺴﻤﻮح
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ ﺷﻜﻞ )( ٣ -١
ﻟﻠﻌﺮض
وﻃﺒﻌﺎ أﺛﻨﺎء ﺗﻨﺼﻴﺐ اﻟﺒﺮﻧﺎﻣﺞ ﺳﻴﻘﻮم اﻟﻤﻌ ﺎﻟﺞ ﺑﻄﻠ ﺐ ﺗﺤﺪﻳ ﺪ ﻣﻜ ﺎن ﺗﻨ ﺼﻴﺐ اﻟﺒﺮﻧ ﺎﻣﺞ
وآﺬﻟﻚ ﺳﻴﻄﻠﺐ ﻣﻨﻚ ادﺧﺎل اﻟﺮﻗﻢ اﻟﺘﺴﻠﺴﻠﻲ ﻟﻠﺒﺮﻧﺎﻣﺞ ﻣﻦ ﺧﻼل اﻟﻘﺮص اﻟﻤ ﺮن اﻟ ﺬي
ﺳﺘﺠﺪﻩ ﻣﺮاﻓﻘﺎ ﻟﻼﺳﻄﻮاﻧﺎت اﻟﻀﻮﺋﻴﺔ
وﻻ ﺗﻘﻠﻖ أﺧﻲ اﻟﻤﻬﻨﺪس ﻋﻨ ﺪﻣﺎ ﻳﺘﻮﻗ ﻒ اﻟﺒﺮﻧ ﺎﻣﺞ وﻳﻈﻬ ﺮ ﻟ ﻚ رﺳ ﺎﻟﺔ ادﺧ ﺎل اﻟﻘ ﺮص
اﻟﺜ ﺎﻧﻲ ﺣﻴ ﺚ أن اﻟﻘ ﺮص اﻟﺜ ﺎﻧﻲ ﺑ ﻪ ﻗﺎﻋ ﺪة ﺑﻴﺎﻧ ﺎت Sybaseواﻟﺘ ﻲ ﻳﻌﺘﻤ ﺪ ﻋﻠﻴﻬ ﺎ
ﻓﻘﻂ
ﺑﺮﻧﺎﻣﺠﻨﺎ ﻓﻲ اﻟﺘﺸﻐﻴﻞ
١٢
ﻣﺎهﻮ Expedition
ﻏـﻴـﺮ
ﻣﺴﻤﻮح
ﺑﺎﻟﻄﺒﺎﻋﺔ ﺷﻜﻞ )( ٤ -١
ﻧﺴﺨﺔ
وﺑﻌﺪ اﻟﻨﻘﺮ ﺳﺘﻈﻬﺮ اﻟﺸﺎﺷﺔ اﻟﺘﺎﻟﻴﺔ وﺳﻨﺨﺘﺎر ﻣﻨﻬﺎ ﺟﻤﻴﻊ اﻟﻌﻨﺎﺻﺮ ﺑﺎﻟﺘﺘﺎﻟﻲ -ﺷﻜﻞ)( ٥ -١
ﻟﻠﻌﺮض
ﻓﻘﻂ
ﺷﻜﻞ )( ٥ -١
١٣
اﻟﺒﺎب اﻷول
ﻣﺴﻤﻮح
اﻟﺼﻼﺣﻴﺔ اﻟﺨﺎﺻﺔ ﺑﻜﻞ واﺣﺪ ﻣﻨﻬﻢ ،واﻻﻓﺘﺮاﺿﻲ ﻟﻠﺒﺮﻧﺎﻣﺞ هﻮ
User Name: EXP
Password : EXP
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ
ﻟﻠﻌﺮض ﺷﻜﻞ )( ٦ – ١
١٤
ﻣﺎهﻮ Expedition
١ ٢
٣
٤
ﻏـﻴـﺮ
ﻣﺴﻤﻮح
٥
٦
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ
٧ ﺷﻜﻞ )( ٧ – ١
-١ﺷﺮﻳﻂ اﻟﻌﻨﻮان
-٢ﺷﺮﻳﻂ اﻟﻘﻮاﺋﻢ
-٣ﺷﺮﻳﻂ اﻷدوات
ﻟﻠﻌﺮض
-٤ﻣﺠﻠﺪات اﻟﻤﺸﺎرﻳﻊ
-٥ﻣﺠﻠﺪ اﻟﻘﻮاﻟﺐ
-٦ﻣﻨﻄﻘﺔ اﻟﻌﺮض
-٧ﺷﺮﻳﻂ اﻟﺤﺎﻟﺔ
١٥
اﻟﺒﺎب اﻷول
ﻏـﻴـﺮ
وﺑﻪ ﻧﺠﺪ ﺟﻤﻴﻊ اﻷواﻣﺮ اﻟﻤﺴﺘﺨﺪﻣﺔ ﺑﺎﻟﺒﺮﻧﺎﻣﺞ ﻣﻨﻈﻤﺔ ﻓﻲ ﻣﺠﻤﻮﻋﺔ ﻣﻦ اﻟﻘﻮاﺋﻢ اﻟﻤﺨﺘﻠﻔﺔ
وﻋﻨﺪ ﺗﺸﻐﻴﻞ اﻟﺒﺮﻧﺎﻣﺞ ﺗﻈﻬﺮ اﻟﻘﻮاﺋﻢ اﻟﺘﺎﻟﻴﺔ :
• File
• Edit
• Tools
ﻣﺴﻤﻮح
• Define
• Window
• Help
ﺑﺎﻟﻄﺒﺎﻋﺔ
وﻋﻨﺪ ﻓﺘﺢ أﺣﺪ اﻟﻤﺸﺎرﻳﻊ ﺗﻈﻬﺮ ﻗﺎﺋﻤﺘﺎن إﺿﺎﻓﻴﺘﺎن ﺑﺎﻹﺿﺎﻓﺔ إﻟﻰ ﺑﻘﻴﺔ اﻟﻘﻮاﺋﻢ وهﻤﺎ :
• View
• Organize
ﻧﺴﺨﺔ
وﺳﻴﺘﻢ ﺷﺮح ﺟﻤﻴﻊ اﻷواﻣﺮ أﺛﻨﺎء ﺷﺮﺣﻨﺎ ﻟﻠﺒﺮﻧﺎﻣﺞ ﻓﻲ هﺬا اﻟﻜﺘﺎب
ﻟﻠﻌﺮض
ﺣﺎﻟﺔ ﻓﺘﺢ اﻟﺒﺮﻧﺎﻣﺞ ﻓﻘﻂ او ﻓﻲ ﺣﺎﻟﺔ ﻓﺘﺢ ﻣﺸﺮوع
وﻟﻤﻌﺮﻓﺔ أي أﻣﺮ ﻣﻦ اﻷواﻣﺮ اﻟﻤﻮﺟﻮدة ﻋﻠﻰ اﻷﻳﻘﻮﻧﺎت آﻞ ﻣﺎ ﻋﻠﻴﻚ ﻓﻌﻠﻪ هﻮ وﺿﻊ
ﻣﺆﺷﺮ اﻟﻔﺄرة ﻓﻮق اﻷﻳﻘﻮﻧﺔ وﺳﻴﻈﻬﺮ ﻣﺴﺘﻄﻴﻞ أﺻﻔﺮ ﺑﻪ أﺳﻢ هﺬا اﻷﻣﺮ -ﺷﻜﻞ )(٨-١
١٦
ﻣﺎهﻮ Expedition
ﻏـﻴـﺮ
ﻳﻌﺘﺒﺮ هﺬا اﻟﻌﻨﺼﺮ ﻣﻦ أهﻢ ﻋﻨﺎﺻ ﺮ واﺟﻬ ﺔ اﻟﻤ ﺴﺘﺨﺪم ﺣﻴ ﺚ ﻣ ﻦ ﺧﻼﻟ ﻪ ﻳﻤﻜ ﻦ اﻟﺘﻨﻘ ﻞ
ﺑ ﻴﻦ اﻟﻤ ﺸﺎرﻳﻊ اﻟﻤﺨﺘﻠﻔ ﺔ اﻟﻤﺨﺰﻧ ﺔ ﺑﻘﺎﻋ ﺪة ﺑﻴﺎﻧ ﺎت اﻟﺒﺮﻧ ﺎﻣﺞ وﻧﻼﺣ ﻆ أﻧ ﻪ ﻋﻨ ﺪ ﺗ ﺸﻐﻴﻞ
اﻟﺒﺮﻧﺎﻣﺞ ﺳﻴﻈﻬﺮ أﻣﺎﻣﻨﺎ ٧ﻣﺸﺎرﻳﻊ إﻓﺘﺮاﺿﻴﺔ ﺗﺄﺗﻲ ﻣﻊ ﻧﺴﺨﺔ اﻟﺒﺮﻧﺎﻣﺞ وﻳﻤﻜﻨﻨﺎ ﻓﻴﻤ ﺎ ﺑﻌ ﺪ
ﺣ ﺬف ه ﺬﻩ اﻟﻤ ﺸﺎرﻳﻊ وإﺿ ﺎﻓﺔ ﻣ ﺸﺎرﻳﻌﻨﺎ اﻟﺘ ﻲ ﺳ ﻨﻘﻮم ﺑﺈدﺧﺎﻟﻬ ﺎ ﻟﻠﺒﺮﻧ ﺎﻣﺞ وآ ﺬﻟﻚ ﻳﻤﻜﻨﻨ ﺎ
ﺗﻐﻴﻴﺮ ﻃﺮﻳﻘﺔ ﺳﺮد هﺬﻩ اﻟﻤﺸﺎرﻳﻊ ﻣﻦ ﺧ ﻼل اﻟ ﻀﻐﻂ ﻋﻠ ﻰ اﻟﺮﻣ ﺰ Viewاو اﻟﺒﺤ ﺚ ﻓ ﻲ
ﻣﺴﻤﻮح
اﻟﻤﺸﺎرﻳﻊ اﻟﻤﻮﺟﻮدة ﻣﻦ ﺧﻼل اﻟﻀﻐﻂ ﻋﻠﻰ اﻟﺮﻣﺰ Find
ﺑﺎﻟﻄﺒﺎﻋﺔ
• Contract Information
• Logs
وآﻞ ﻣﺠﻠﺪ ﻣﻦ هﺬﻩ اﻟﻤﺠﻠﺪات ﻳﻨﻘﺴﻢ اﻟﻰ وﺣﺪات ﻓﺮﻋﻴﺔ أﺧﺮى – ﺷﻜﻞ )( ٩ -١
ﻧﺴﺨﺔ
اﻟﻤﺸﺮوع اﻟﻤﻔﺘﻮح ﻟﻠﻌﺮض
ﻟﻠﻌﺮض
ﻣﺠﻠﺪات اﻟﻤﺸﺮوع
ﻋﻨﺎﺻﺮ اﻟﻤﺠﻠﺪ
ﻓﻘﻂ
ﺷﻜﻞ )( ٩ – ١
١٧
اﻟﺒﺎب اﻷول
ﻏـﻴـﺮ
ﺟﺪﻳﺪة دون اﻟﻌﻨﺎء ﻓﻲ إدﺧﺎل آﻢ آﺒﻴﺮ ﻣﻦ اﻟﺒﻴﺎﻧ ﺎت اﻷﺳﺎﺳ ﻴﺔ اﻟﺘ ﻲ ﺗﺘ ﺸﺎﺑﻪ دوﻣ ﺎ – ﻓﻤ ﺜﻼ
ﺑﻔﺮض أﻧﻨﺎ ﻧﻘﻮم ﺑﺈدارة ﻋﺪة ﻣﺸﺎرﻳﻊ ﻟﺒﻨﺎء ﻣﺪارس ﻓﻲ ﻣﻨﺎﻃﻖ ﻣﺨﺘﻠﻔﺔ وآﻠﻬﺎ ﺗﺎﺑﻌﺔ ﻟﻤﺎﻟ ﻚ
واﺣ ﺪ و اﺳﺘ ﺸﺎري واﺣ ﺪ ﻓﻴﻤﻜﻨﻨ ﺎ ﻋﻤ ﻞ ﻗﺎﻟ ﺐ ﻟﻤ ﺸﺮوع ﻣﺪرﺳ ﺔ ﻣ ﻨﻬﻢ ﺑ ﻪ ﺟﻤﻴ ﻊ ﺑﻴﺎﻧ ﺎت
اﻟﻤﺎﻟﻚ واﻻﺳﺘﺸﺎري ﺛ ﻢ ﻧ ﺴﺘﺨﺪم ه ﺬا اﻟﻘﺎﻟ ﺐ ﻓ ﻲ إﻧ ﺸﺎء ﺑﻘﻴ ﺔ اﻟﻤ ﺸﺎرﻳﻊ واﻟﺘ ﻲ ﻳﺘﻐﻴ ﺮ ﺑﻬ ﺎ
ﺑﻴﺎﻧﺎت ﻣﻘﺎوﻟﻲ اﻟﺒﺎﻃﻦ ﻓﻘﻂ .
ﺑﺎﻟﻄﺒﺎﻋﺔ
ذﻟﻚ ﻣﻦ اﻟﻤﻌﻠﻮﻣﺎت
وﻳﻤﻜﻦ ﺗﻐﻴﻴﺮ ﺗﺮﺗﻴﺐ اﻟﻤﺠﻤﻮﻋ ﺎت ﺑﻤﻨﻄﻘ ﺔ اﻟﻌ ﺮض واﺿ ﺎﻓﺔ ﻋﻨﺎﺻ ﺮ أﺧ ﺮى اﻟﻴﻬ ﺎ آﻤ ﺎ
ﺳﻨﺘﻌﻠﻢ ﻓﻴﻤﺎ ﺑﻌﺪ ﺑﺎﻟﺘﻔﺼﻴﻞ
وﻟﻔﺘﺢ أي ﻋﻨﺼﺮ ﻧﻨﻘﺮ ﻋﻠﻴﻪ ﺑﺎﻟﻔﺄرة ﻓﺘﻈﻬﺮ ﻧﺎﻓﺬﺗﻪ آﻤﺎ ﺑﺎﻟﺸﻜﻞ )( ١٠ -١
ﻧﺴﺨﺔ
ﻟﻠﻌﺮض
ﻓﻘﻂ
ﺷﻜﻞ )( ١٠ – ١
١٨
ﻣﺎهﻮ Expedition
ﻏـﻴـﺮ
ﻓﻲ ﺷﺮﻳﻂ اﻟﺤﺎﻟﺔ ﻳﺘﻢ ﺑﻌﺾ اﻟﻤﻌﻠﻮﻣﺎت اﻟﺘﻮﺿ ﻴﺤﻴﺔ ﻋﻨ ﺪ ﺗﻨﻔﻴ ﺬ اﻷواﻣ ﺮ وﺗﻈﻬ ﺮ ﺑﻌ ﺾ
( ﻓﻲ ﺣﺎﻟﺔ وﺟ ﻮد ﻣﻠ ﻒ اﻟﺮﻣﻮز واﻷﻳﻘﻮﻧﺎت ﻣﺜﻞ وﺟﻮد اﺷ ﺎرة اﻟﻤﻠ ﻒ اﻟﻤﺮﻓ ﻖ )
ﻣﺮﻓﻖ ﻣﻊ اﻟﻤﺸﺮوع اﻟﻤﻔﺘﻮح ﻣﺜﻼ .
آﻤﺎ هﻮ ﻣﻌﺘﺎد ﻓﻲ ﺷﺮح اﻟﺘﻄﺒﻴﻘﺎت ﻻﺑﺪ ﻣﻦ ﺷﺮح ﻃﺮﻳﻘﺔ إﻧﺸﺎء ﻣﻠﻒ ﺑﻮاﺳﻄﺔ اﻟﺒﺮﻧﺎﻣﺞ
ﺑﺎﻟﻄﺒﺎﻋﺔ
وﻟﺬا ﺳﻨﻘﻮم اﻵن ﺑﺸﺮح آﻴﻔﻴﺔ إﺿﺎﻓﺔ ﻣﺸﺮوع ﺟﺪﻳﺪ ﻟﻘﺎﻋﺪة ﺑﻴﺎﻧﺎت اﻟﺒﺮﻧﺎﻣﺞ ﺑﺎﻟﺨﻄﻮات
اﻟﻤﺘﺘﺎﻟﻴﺔ وﺑﺎﻟﺼﻮر اﻹﻳﻀﺎﺣﻴﺔ
ﻧﺴﺨﺔ
آﻤﺎ ﺑﺎﻟﺸﻜﻞ رﻗﻢ )( ١١ -١
ﻟﻠﻌﺮض
ﻓﻘﻂ
ﺷﻜﻞ )( ١١ – ١
-٢ﻣﻦ ﻗﺎﺋﻤﺔ Fileﻧﺨﺘﺎر اﻷﻣﺮ New Projectﻓﻴﻈﻬﺮ ﻣﺮﺑﻊ ﺣﻮار آﻤﺎ ﺑﺎﻟﺸﻜﻞ
رﻗﻢ ) ( ١٢ -١وﻧﻀﻐﻂ ﻋﻠﻰ اﻟﺰر اﻷول واﻟﺨﺎص ﺑﻤﻌﺎﻟﺞ إﻧﺸﺎء اﻟﻤﺸﺎرﻳﻊ
١٩
اﻟﺒﺎب اﻷول
ﻏـﻴـﺮ
ﻧﻀﻐﻂ ﻋﻠﻰ هﺬا اﻟﺰر
-٣أول ﻧﺎﻓﺬة ﻣﻦ اﻟﻤﻌﺎﻟﺞ ﺧﺎﺻﺔ ﺑﺈدﺧﺎل اﻟﺒﻴﺎﻧﺎت اﻟﺮﺋﻴﺴﻴﺔ ﻟﻠﻤﺸﺮوع آﻤﺎ ﺑﺎﻟﺸﻜﻞ
رﻗﻢ ) ( ١٣ -١وﺳﻨﻘﻮم ﺑﺈدﺧﺎل اﻟﺒﻴﺎﻧﺎت اﻟﺘﺎﻟﻴﺔ ﻋﻠﻰ ﺳﺒﻴﻞ اﻟﺘﺪرﻳﺐ
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ
Name : Project1 ﻟﻠﻌﺮض
ﻣﺸﺮوع إﻧﺸﺎء ﻣﺪرﺳﺔ ﻧﻤﻮذﺟﻴﺔ Title :
ﺷﻜﻞ )( ١٣ – ١
ﻓﻘﻂ
Value: 5000000
اﻟﻘﺎهﺮة Location:
ﻣﺸﺮوع إﻧﺸﺎء ﻣﺪرﺳﺔ ﺛﺎﻧﻮﻳﺔ ﻟﻠﺒﻨﻴﻦ Description :
٢٠
ﻣﺎهﻮ Expedition
-٤ﻓﻲ هﺬﻩ اﻟﻨﺎﻓﺬة ﺳﻴﻄﻠﺐ اﻟﺒﺮﻧﺎﻣﺞ ﺗﺤﺪﻳﺪ ﻣﺎ اذا آﻨﺎ ﺳﻨﺴﺘﺨﺪم أﺣﺪ اﻟﻘﻮاﻟﺐ ام ﺳﻨﺒﺪأ
اﻟﻤﺸﺮوع ﻣﻦ اﻟﺼﻔﺮ وﺳﻨﺨﺘﺎر Start with blankﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ اﻟﺴﻬﻢ
ﻟﻼﻧﺘﻘﺎل ﻟﻠﺨﻄﻮة اﻟﺘﺎﻟﻴﺔ -ﺷﻜﻞ )( ١٤-١
ﻏـﻴـﺮ
ﻣﺴﻤﻮح
ﺑﺎﻟﻄﺒﺎﻋﺔ ﺷﻜﻞ )( ١٤ – ١
-٥ﻓ ﻲ ه ﺬﻩ اﻟﻤﺮﺣﻠ ﺔ ﺳ ﻴﺘﻢ إدﺧ ﺎل ﺑﻴﺎﻧ ﺎت اﻟ ﺸﺮآﺎت اﻟﻤ ﺸﺎرآﺔ ﻓ ﻲ ﺗﻨﻔﻴ ﺬ اﻟﻤ ﺸﺮوع
) اﻟﻤﻘﺎول اﻟﻌ ﺎم – ﻣﻘ ﺎوﻟﻲ اﻟﺒ ﺎﻃﻦ – اﻟﻤ ﻮردﻳﻦ – اﻻﺳﺘ ﺸﺎري – اﻟﻤﺎﻟ ﻚ (... -
ﻧﺴﺨﺔ
وآ ﺬﻟﻚ ﺳ ﻴﺘﻢ إدﺧ ﺎل ﺑﻴﺎﻧ ﺎت اﻷﺷ ﺨﺎص اﻟﻤ ﺴﺌﻮﻟﻴﻦ ﻓ ﻲ ﺗﻠ ﻚ اﻟ ﺸﺮآﺎت ﻓﺘﻈﻬ ﺮ
اﻣﺎﻣﻚ اﻟﻨﺎﻓﺬة آﻤﺎ ﺑﺎﻟﺸﻜﻞ )(١٥ – ١
ﻟﻠﻌﺮض
ﻓﻘﻂ
وﻹﺿﺎﻓﺔ ﺷﺮآﺔ ﺟﺪﻳﺪة ﻳﺘﻢ اﻟﻨﻘﺮ ﻋﻠﻰ اﻷﻣﺮ New Companyﻓﻴﻈﻬﺮ أﻣﺎﻣﻚ ﻣﺮﺑﻊ
ﺷﻜﻞ )( ١٥ – ١
ﺣﻮار ﻳﻄﻠﺐ ﻣﻨﻚ إدﺧﺎل ﺑﻌﺾ اﻟﺒﻴﺎﻧﺎت آﻤﺎ ﺑﺎﻟﺸﻜﻞ ) ( ١٦ -١وﻧﻘﻮم ﺑﺈدﺧﺎل اﻟﺒﻴﺎﻧﺎت
اﻟﺘﺎﻟﻴﺔ ﺑﻪ
٢١
اﻟﺒﺎب اﻷول
ﻏـﻴـﺮ
ﻣﺴﻤﻮح ﺷﻜﻞ )( ١٦ – ١
Abbreviation
اﻻﺧﺘﺼﺎر :وﻳﻤﻜﻨﻚ ﻣﻦ ادراج ﺣﺘﻰ ﺛﻤﺎﻧﻴﺔ ﺣﺮوف ﻟﻜﻞ ﺷﺮآﺔ
ﺑﺎﻟﻄﺒﺎﻋﺔ Name
اﻷﺳﻢ :وﺑﻪ ﻧﺪرج أﺳﻢ اﻟﺸﺮآﺔ
Role
اﻟﺪور اﻟﻮﻇﻴﻔﻲ :وﺳﺘﺠﺪ أﻧﻬﺎ ﻣﻨﻘﺴﻤﺔ اﻟﻰ اﻵﺗﻲ
ﻧﺴﺨﺔ
Abbrev. Description اﻟﻤﻌﻨﻰ
ARC Architect ﺷﺮآﺔ ﻣﻌﻤﺎرﻳﺔ
CM Construction Manager ﺷﺮآﺔ إدارة ﻣﺸﺎرﻳﻊ
CON Contractor ﺷﺮآﺔ ﻣﻘﺎوﻻت
ﻟﻠﻌﺮض
DES Design Consultant اﻻﺳﺘﺸﺎري
ENG Engineer ﻣﻬﻨﺪس
GC General Contractor اﻟﻤﻘﺎول اﻟﻌﺎم
OTH Other ﺗﺼﻨﻴﻔﺎت أﺧﺮى
OWN Owner اﻟﻤﺎﻟﻚ
SUB
SUP
ﻓﻘﻂ
Subcontractor
Supplier
ﻣﻘﺎول اﻟﺒﺎﻃﻦ
ﻣﻮرد
Spec Section
ﻟﻌﺮض ﻗﺎﺋﻤﺔ ﺑﺒﻨﻮد اﻟﻤﻮاﺻﻔﺎت اﻟﺨﺎﺻﺔ ﺑﺎﻟﻤﺸﺮوع ﺑﺤﻴﺚ ﻳﺘﻢ رﺑﻂ اﻟﺸﺮآﺔ ﺑﺘﻠﻚ اﻟﺒﻨﻮد
وﻳﻤﻜﻨﻚ اﺿﺎﻓﺔ ﺑﻨﻮد أﺧﺮى ﻏﻴﺮ اﻟﻤﻮﺟﻮدة ﻓﻲ هﺬﻩ اﻟﻘﺎﺋﻤﺔ ﻣﻦ ﺧﻼل ﻗﺎﺋﻤﺔ
…Define Æ Dictionaries Æ Spec Sections
٢٢
ﻣﺎهﻮ Expedition
ﻏـﻴـﺮ
ﺧﺎﻧﺔ اﻟﺤﺮوف اﻷوﻟﻰ :وﻳﻤﻜﻨﻚ ادراج ٣ﺣﺮوف ﻟﻜﻞ أﺳﻢ آﺈﺧﺘﺼﺎر
Name
ﺧﺎﻧﺔ اﻷﺳﻢ :وﺑﻪ ﻧﺪرج أﺳﻢ اﻟﺸﺨﺺ اﻟﻤﺴﺌﻮل
Title
اﻟﻠﻘﺐ :وﺳﺘﺠﺪ ﺑﻪ اﻷﻟﻘﺎب اﻟﺘﺎﻟﻴﺔ
ﻣﺴﻤﻮح
Mr. اﻟﺴﻴﺪ
Mrs. اﻟﺴﻴﺪة
Miss. اﻵﻧﺴﺔ
Ms. اﻟﻔﺎﺿﻠﺔ
ﺑﺎﻟﻄﺒﺎﻋﺔ
Dr. اﻟﺪآﺘﻮر
Prof. اﻷﺳﺘﺎذ دآﺘﻮر
ﻧﺴﺨﺔ
Abbreviation : EMAD
Name ﺷﺮآﺔ اﻟﻤﻬﻨﺪس ﻋﻤﺎد ﻟﻺﻧﺸﺎءات :
Role : GC
Key Contact
ﻟﻠﻌﺮض
Initials :ALI
Name ﻋﻠﻲ ﺳﻴﺪ :
Title : Mr.
وﻓﻲ ﺣﺎﻟﺔ اﻟﺮﻏﺒﺔ ﻓﻲ إﺿﺎﻓﺔ ﻣﺴﺌﻮل ﺁﺧﺮ ﻧﻀﻊ ﻣﺆﺷﺮ اﻟﻔﺄرة ﻋﻠﻰ اﻟﺸﺮآﺔ ﺛﻢ ﻧﺨﺘﺎر
ﻓﻘﻂ
اﻷﻣﺮ New Contactﻓﻴﻈﻬﺮ ﻣﺮﺑﻊ اﻟﺤﻮار اﻟﺘﺎﻟﻲ – ﺷﻜﻞ ) ( ١٧ -١
٢٣
اﻟﺒﺎب اﻷول
ﻏـﻴـﺮ
Name ﻣﺤﻤﺪ ﺧﺎﻟﺪ :
Title : Mr.
وﺑﻌﺪ اﻟﻨﻘﺮ ﻋﻠﻰ زر OKﺗﻈﻬﺮ اﻟﻨﺎﻓﺬة ﺑﻌﺪ إﺿﺎﻓﺔ اﻟﺒﻴﺎﻧﺎت إﻟﻴﻬﺎ آﻤﺎ ﺑﺎﻟﺸﻜﻞ )( ١٨ -١
ﻣﺴﻤﻮح
ﺑﺎﻟﻄﺒﺎﻋﺔ ﺷﻜﻞ )( ١٨ – ١
ﺛﻢ ﻧﻘﻮم ﺑﺈﺿﺎﻓﺔ ﺑﻴﺎﻧﺎت اﻟﻤﺎﻟﻚ ﺑﻨﻔﺲ اﻟﺨﻄﻮات اﻟﺴﺎﺑﻘﺔ وﻟﺘﻜﻦ آﺎﻟﺘﺎﻟﻲ
ﻧﺴﺨﺔ
Abbreviation : MOE
Name وزارة اﻟﺘﺮﺑﻴﺔ واﻟﺘﻌﻠﻴﻢ :
Role : OWN
Key Contact
Initials :KHA
ﻟﻠﻌﺮض
Name ﺧﺎﻟﺪ ﻣﺤﻤﺪ :
Title : Mr.
ﻓﻘﻂ
ﺷﻜﻞ )( ١٩ – ١
٢٤
ﻣﺎهﻮ Expedition
-٦ﺛﻢ ﺗﺄﺗﻲ ﻣﺮﺣﻠﺔ ﺗﻌﻴﻴﻦ اﻟﺸﺮآﺎت ﻟﻠﻤﺸﺮوع وذﻟﻚ ﺑﺎﺧﺘﻴﺎر Key Parties
ﻓﺘﻈﻬﺮ أﻣﺎﻣﻨﺎ اﻟﻨﺎﻓﺬة اﻟﺘﺎﻟﻴﺔ واﻟﺘﻲ ﻳﺘﻢ اﺧﺘﻴﺎر اﻟﺸﺮآﺎت ﻣﻦ ﺧﻼل اﻟﻘﻮاﺋﻢ اﻟﻤﻨﺴﺪﻟﺔ
واﻟﺘﻲ ﺳﺘﻈﻬﺮ اﻟﺒﻴﺎﻧﺎت اﻟﺘﻲ ﻗﻤﻨﺎ ﺑﺈدﺧﺎﻟﻬﺎ ﻓﻲ اﻟﻔﻘﺮة اﻟﺴﺎﺑﻘﺔ – ﺷﻜﻞ )( ٢٠ -١
ﻏـﻴـﺮ
ﻣﺴﻤﻮح
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﺷﺮآﺔ اﻟﻤﻬﻨﺪس ﻋﻤﺎد ﻟﻺﻧﺸﺎءات Your Company :
ﺷﻜﻞ )( ٢٠ – ١
وﺳﻨﻘﻮم ﺑﺘﺤﺪﻳﺪ اﻟﺒﻴﺎﻧﺎت اﻟﺘﺎﻟﻴﺔ
ﻧﺴﺨﺔ
Owner : وزارة اﻟﺘﺮﺑﻴﺔ واﻟﺘﻌﻠﻴﻢ
Project Manager: ﻋﻠﻲ ﺳﻴﺪ
Submittal Coordinator : ﻣﺤﻤﺪ ﺧﺎﻟﺪ
ﻟﻠﻌﺮض
اﻟﺪوﻻر اﻟﻤﻘﺎﺑﻞ ﻟﻌﻤﻠﺔ اﻟﻤﺸﺮوع – ﺷﻜﻞ )( ٢١ -١
ﻓﻘﻂ
ﺷﻜﻞ )( ٢١ – ١
٢٥
اﻟﺒﺎب اﻷول
ﻏـﻴـﺮ
ﻣﺴﻤﻮح
ﺑﺎﻟﻄﺒﺎﻋﺔ ﺷﻜﻞ )( ٢٢ – ١
-٨ﻧﻨﺘﻘﻞ اﻟﻰ ﺧﻄﻮة ادﺧﺎل ﺑﻴﺎﻧﺎت اﻟﻤﺸﺮوع اﻟﺰﻣﻨﻴﺔ ) ﺗﺎرﻳﺦ اﻟﺘﻌﺎﻗﺪ – ﺗﺎرﻳﺦ اﻟﺒﺪء
اﻟﻔﻌﻠﻲ – ﺗﺎرﻳﺦ اﻟﻨﻬﻮ اﻟﻤﺘﻮﻗﻊ (
ﻧﺴﺨﺔ
ﻟﻠﻌﺮض
ﻓﻘﻂ ﺷﻜﻞ )( ٢٣ – ١
وﻹدﺧﺎل اﻟﺘﻮارﻳﺦ ﻧﻨﻘﺮ ﻋﻠﻰ اﻟﺮﻣﺰ اﻟﻤﺠﺎور ﻟﻠﺨﺎﻧﺔ ﻓﺘﻈﻬﺮ اﻷﺟﻨﺪة آﻤﺎ ﺑﺎﻟﺸﻜﻞ رﻗﻢ
) ( ٢٤ -١ﺛﻢ ﻧﺘﺤﺮك ﻣﻦ ﺧﻼل اﻷﺳﻬﻢ اﻟﻤﻮﺟﻮدة ﺑﺎﻷﺟﻨﺪة ﻟﺘﺤﺪﻳﺪ اﻟﻴﻮم واﻟﺸﻬﺮ واﻟﺴﻨﺔ
ﺛﻢ ﻧﻘﻮم ﺑﺎﻟﻨﻘﺮ اﻟﻤﺰدوج ﻋﻠﻰ اﻟﺘﺎرﻳﺦ اﻟﻤﻄﻠﻮب ﻓﺘﺨﺘﻔﻲ ﻧﺎﻓﺬة اﻷﺟﻨﺪة وﻧﺠﺪ أن اﻟﺘﺎرﻳﺦ
ﻗﺪ ﺗﻢ ﺗﺴﺠﻴﻠﻪ ﺗﻠﻘﺎﺋﻴﺎ ﻓﻲ اﻟﺨﺎﻧﺔ اﻟﻤﻄﻠﻮﺑﺔ
٢٦
ﻣﺎهﻮ Expedition
ﻏـﻴـﺮ
ﻣﺴﻤﻮح ﺷﻜﻞ )( ٢٤ – ١
Contract Date
Proceed Date ﺑﺎﻟﻄﺒﺎﻋﺔ
: 1/5/2006
: 1/8/2006
Completion Date : 11/4/2007
ﻧﺴﺨﺔ
واذا أردﻧﺎ رﺑﻂ اﻟﺒﺮﻧﺎﻣﺞ اﻟﺰﻣﻨﻲ ﻟﻠﻤﺸﺮوع واﻟﺬي ﺗﻢ إﻧﺘﺎﺟﻪ ﺑﺒﺮﻧﺎﻣﺞ Primavera
ﻧﺨﺘﺎر ﻣﻦ اﻟﻘﺎﺋﻤﺔ اﻟﻤﻨﺴﺪﻟﺔ Scheduleﻧﻮع اﻟﺒﺮﻧﺎﻣﺞ ) Primavera3او
ﻟﻠﻌﺮض
( Primavera Enterprise
ﺛﻢ ﻧﺤﺪد ﻣﺴﺎر ﻣﺠﻠﺪ اﻟﺒﺮﻧﺎﻣﺞ – آﻤﺎ ﺑﺎﻟﺸﻜﻞ ) ( ٢٥ – ١
ﻓﻘﻂ
ﺷﻜﻞ )( ٢٥ – ١
٢٧
اﻟﺒﺎب اﻷول
ﻏـﻴـﺮ
اﻣﺎ اﻵن ﺳﻨﻘﻮم ﺑﺘﺤﺪﻳﺪ اﻟﻤﺴﺘﺨﺪم اﻻﻓﺘﺮاﺿﻲ اﻟﻤﻮﺟﻮد ﻓﻲ اﻟﺒﺮﻧﺎﻣﺞ
ﻣﺴﻤﻮح
ﺑﺎﻟﻄﺒﺎﻋﺔ ﺷﻜﻞ )( ٢٦ – ١
واﺧﻴﺮا ﻧﻀﻐﻂ ﻋﻠﻰ زر Finishﻻﻧﻬﺎء اﻟﻤﻌﺎﻟﺞ ﻓﻴﻈﻬﺮ ﻣﺮﺑﻊ أﺧﻴﺮ ﻳﻌﺮض ﻣﺨﺘﺼﺮ
ﻟﺠﻤﻴﻊ اﻟﺒﻴﺎﻧﺎت وﻳﻄﻠﺐ ﻣﻨﻚ ﺗﺄآﻴﺪ ﻋﻤﻠﻴﺔ إﻧﺸﺎء اﻟﻤﺸﺮوع ،ﻓﻨﻀﻐﻂ ﻋﻠﻰ زر
ﻧﺴﺨﺔ
- Create The Projectﺷﻜﻞ )( ٢٧ -١
ﻟﻠﻌﺮض
ﻓﻘﻂ ﺷﻜﻞ )( ٢٧ – ١
وﺑﻌﺪ اﻻﻧﺘﻬﺎء ﻳﻈﻬﺮ ﻣﺸﺮوﻋﻨﺎ اﻟﺠﺪﻳﺪ داﺧﻞ ﻣﺠﻠﺪ اﻟﻤﺸﺎرﻳﻊ – ﺷﻜﻞ ) ( ٢٨ -١
٢٨
ﻣﺎهﻮ Expedition
ﻏـﻴـﺮ
ﻣﺴﻤﻮح
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ
ﺷﻜﻞ )( ٢٨ – ١
ﻟﻠﻌﺮض
آﻴﻔﻴﺔ إﺿﺎﻓﺔ ﺷﺮآﺎت ﻟﻠﻤﺸﺮوع ،وﻟﻠﺘﺴﻬﻴﻞ ﺳﻨﺴﺘﺨﺪم اﻟﻤ ﺸﺎرﻳﻊ اﻟﺠ ﺎهﺰة اﻟﻤﻮﺟ ﻮدة ﻣ ﻊ
ﻧﺴﺨﺔ اﻟﺒﺮﻧﺎﻣﺞ
وﺑﺎﻟﺮﺟﻮع ﻟﻠﺸﻜﻞ رﻗﻢ ) ( ٢٨ – ١ﺳﻨﺠﺪ أن هﻨﺎك ﻣﺸﺮوع أﺳﻤﻪ DEMO
ﺳ ﻨﻘﻮم اﻵن ﺑﺘﻮﺳ ﻴﻊ اﻟﻘﺎﺋﻤ ﺔ ﻋ ﻦ ﻃﺮﻳ ﻖ اﻟ ﻀﻐﻂ ﻋﻠ ﻰ رﻣ ﺰ +ﺛ ﻢ ﻧﺘﺤ ﺮك ﻟﻨ ﺼﻞ اﻟ ﻰ
ﻣﺠﻠﺪ Project Informationﺛﻢ ﻧﻘﻮل ﺑﺎﻟﻨﻘﺮ اﻟﻤﺰدوج ﻋﻠﻰ Companies
ﻓﻘﻂ
آﻤﺎ ﺑﺎﻟﺸﻜﻞ )( ٢٩ – ١
٢٩
اﻟﺒﺎب اﻷول
ﻏـﻴـﺮ
ﻣﺴﻤﻮح
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ
ﺷﻜﻞ )( ٣٠ – ١
وﻹﺿﺎﻓﺔ ﺑﻴﺎﻧﺎت ﺷﺮآﺔ ﺟﺪﻳﺪة ﻧﻀﻐﻂ اﻟﺰر Addﻓﻴﻈﻬﺮ أﻣﺎﻣﻨﺎ ﻣﺮﺑﻊ ﺣﻮار آﻤﺎ
ﺑﺎﻟﺸﻜﻞ ) ( ٣١ -١
ﻣﻨﻄﻘﺔ ﺑﻴﺎﻧﺎت اﻟﺸﺮآﺔ
ﻟﻠﻌﺮض
ﻓﻘﻂ ﻣﻨﻄﻘﺔ أﺳﻤﺎء اﻟﻤﻮﻇﻔﻴﻦ ﺑﺎﻟﺸﺮآﺔ
٣٠
ﻣﺎهﻮ Expedition
ﻏـﻴـﺮ
اﻟﻘﺴﻢ اﻟﻌﻠﻮي ﻟﺒﻴﺎﻧﺎت اﻟﺸﺮآﺔ
اﻟﻘﺴﻢ اﻟﺴﻔﻠﻲ ﻟﺒﻴﺎﻧﺎت اﻷﺷﺨﺎص اﻟﻌﺎﻣﻠﻮن ﺑﺎﻟﺸﺮآﺔ
ﺑﻴﺎﻧﺎت اﻟﺸﺮآﺔ
Abbreviation
ﻣﺴﻤﻮح
اﻻﺧﺘﺼﺎر وهﻮ ﻣﻜﻮن ﻣﻦ ﺣﺮوف ﺑﺤﺪ أﻗﺼﻰ ٨ﺣﺮوف
Company Name
أﺳﻢ اﻟﺸﺮآﺔ
Role
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﺳﺒﻖ ﺷﺮﺣﻬﺎ ﻓﻲ اﻟﺼﻔﺤﺔ ) ( ٢٢وهﻲ ﻧﻮع اﻟﺸﺮآﺔ ) ﻣﺎﻟﻚ – اﺳﺘﺸﺎري – ﻣﻘﺎول
ﺑﺎﻃﻦ (... -
Key Contact
اﻟﺸﺨﺺ اﻟﻤﺴﺌﻮل ﺑﺎﻟﺸﺮآﺔ واﻟﺬي ﻳﺘﻢ اﻻﺗﺼﺎل ﺑﻪ – وﻻﻳﻤﻜﻦ ﺗﺤﺪﻳﺪﻩ ﻗﺒﻞ إدﺧﺎل ﺑﻴﺎﻧﺎت
اﻟﻤﻮﻇﻔﻴﻦ ﺑﺎﻟﺸﺮآﺔ
ﻧﺴﺨﺔ
Tax ID
ﻣﻌﺮف ﻣﻠﻒ اﻟﻀﺮاﺋﺐ ﻟﻠﺸﺮآﺔ ) ﺧﺎص ﺑﺎﻟﻮﻻﻳﺎت اﻟﻤﺘﺤﺪة اﻷﻣﺮﻳﻜﻴﺔ (
Location
ﻣﻮﺿﻊ اﻟﺸﺮآﺔ وﻳﻤﻜﻦ ان ﻳﻜﻮن أي ﻣﻦ اﻵﺗﻲ
ﻟﻠﻌﺮض
ﻣﻜﺘﺐ Office
ﻣﻮﻗﻊ Field
ﻏﻴﺮ ﻣﺤﺪد )ﻓﺎرغ (
NAICS Code
ﺗﺼﻨﻴﻒ اﻟﺸﺮآﺔ ﻃﺒﻘﺎ ﻟﺘﺼﻨﻴﻒ أﻣﺮﻳﻜﺎ اﻟﺸﻤﺎﻟﻴﺔ اﻟﺼﻨﺎﻋﻲ
ﻓﻘﻂ
North American Industry Classification
وﺳﺘﺠﺪ أن اﻟﺸﺮآﺎت ﻣﻘﺴﻤﺔ اﻟﻰ ﻋﺪة أﻧﻮاع ﻓﻤﺜﻼ
ﺧﺎص ﺑﺸﺮآﺎت ﺗﺸﻄﻴﺒﺎت اﻟﻤﺒﺎﻧﻲ 2383
238210ﺧﺎص ﺑﺸﺮآﺎت ﻣﻘﺎوﻻت اﻷﻋﻤﺎل اﻟﻜﻬﺮﺑﺎﺋﻴﺔ
وﻟﻦ ﺗﺤﺘﺎج أﺧﻲ اﻟﻤﻬﻨﺪس ﻋﻠﻰ ﺣﻔﻆ هﺬﻩ اﻷآﻮاد وإﻧﻤﺎ ﻋﻠﻴﻚ اﻟﻨﻘﺮ ﺑﺎﻟﻔﺄرة ﻓﻲ اﻟﺨﺎﻧﺔ
وﺳﺘﻈﻬﺮ ﻟﻚ ﻗﺎﺋﻤﺔ ﻣﻨﺴﺪﻟﺔ ﺑﻬﺎ ﺟﻤﻴﻊ اﻟﺘﺼﻨﻴﻔﺎت آﻤﺎ ﺑﺎﻟﺸﻜﻞ ) ( ٣٢ -١
٣١
اﻟﺒﺎب اﻷول
ﻏـﻴـﺮ
ﻣﺴﻤﻮح ﺷﻜﻞ )( ٣٢ – ١
ﺑﺎﻟﻄﺒﺎﻋﺔ
Spec Section
ﺗﺼﻨﻴﻒ اﻟﺸﺮآﺔ ﻃﺒﻘﺎ ﻟﺘﺼﻨﻴﻒ ﻣﻌﻬﺪ ﻣﻮاﺻﻔﺎت اﻟﺘﺸﻴﻴﺪ اﻷﻣﺮﻳﻜﻴﺔ
)Construction Specification Institute (CSI Master Format
وهﻲ ﺗﺤﺘﻮي ﻋﻠﻰ ﻗﺎﺋﻤﺔ ﻣﻨﺴﺪﻟﺔ ﺑﺠﻤﻴﻊ أﻧﻮاع اﻟﺘﺼﻨﻴﻔﺎت اﻟﻤﻮﺟﻮدة
ﻧﺴﺨﺔ
ﻟﺘﺤﻤﻴﻞ ﻧﺴﺨﺔ ﻣﻦ Master Formatﻗﻢ ﺑﺰﻳﺎرة www.csinet.org/MasterFormat
ﻓﻘﻂ
Disadvantaged Business Enterprise Program
) ﺧﻴﺎر ﻟﻠﻮﻻﻳﺎت اﻟﻤﺘﺤﺪة اﻷﻣﺮﻳﻜﻴﺔ (
WBE
هﺬا اﻟﺨﻴﺎر ﻳﺘﻢ اﺧﺘﻴﺎرﻩ اذا ﻣﺎ آﺎﻧﺖ اﻟﺸﺮآﺔ ﻋﻀﻮ ﻓﻲ ﺟﻤﻌﻴﺔ
Women's Business Enterprise Council
) ﺧﻴﺎر ﻟﻠﻮﻻﻳﺎت اﻟﻤﺘﺤﺪة اﻷﻣﺮﻳﻜﻴﺔ (
MBE
٣٢
ﻣﺎهﻮ Expedition
MBE
هﺬا اﻟﺨﻴﺎر ﻳﺘﻢ اﺧﺘﻴﺎرﻩ اذا ﻣﺎ آﺎﻧﺖ اﻟﺸﺮآﺔ ﻋﻀﻮ ﻓﻲ ﺟﻤﻌﻴﺔ
ﻏـﻴـﺮ
Minority Business Enterprise Council
) ﺧﻴﺎر ﻟﻠﻮﻻﻳﺎت اﻟﻤﺘﺤﺪة اﻷﻣﺮﻳﻜﻴﺔ (
ﺑﻴﺎﻧﺎت اﻟﻤﻮﻇﻔﻴﻦ
ﻣﺴﻤﻮح
واﻟﻤﻘﺼﻮد هﻨﺎ اﻟﻤﻮﻇﻔﻴﻦ اﻟﺬي ﺳﻴﺘﻢ اﻻﺗﺼﺎل ﺑﻬﻢ ﻋﻨﺪ ﻣﺨﺎﻃﺒﺔ اﻟﺸﺮآﺔ وﻟﻴﺲ آﻞ
ﻣﻮﻇﻔﻲ ﺗﻠﻚ اﻟﺸﺮآﺔ
وﺑﻌﺪ إدﺧﺎل ﺑﻴﺎﻧﺎت اﻟﺸﺮآﺔ ﻧﻀﻐﻂ ﻋﻠﻰ زر Addﻓﻴﻈﻬﺮ أﻣﺎﻣﻨﺎ ﻣﺮﺑﻊ ﺣﻮار اﻟﺨﺎص
ﺑﺈدﺧﺎل ﺑﻴﺎﻧﺎت اﻟﻤﻮﻇﻒ – ﺷﻜﻞ ) ( ٣٣-١
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ
ﻟﻠﻌﺮض
ﻓﻘﻂ ﺷﻜﻞ )( ٣٣– ١
Initials
اﻷﺣﺮف اﻷوﻟﻰ ﻣﻦ اﻻﺳﻢ )ﻣﻘﺪار ٣ﺣﺮوف ( وﻳﻔﻀﻞ ان ﻳﺆﺧﺬ اﻟﺤﺮف اﻷول ﻣﻦ آ ﻞ
اﺳﻢ ﻣﻦ اﻻﺳﻢ اﻟﺜﻼﺛﻲ ﻓﻤﺜﻼ ﻧﻜﺘﺐ EHHﻟﻼﺳﻢ Emad Hamed Hassan
٣٣
اﻟﺒﺎب اﻷول
Title
اﻟﻠﻘﺐ :وﻳﻤﻜﻦ ان ﻳﻜﻮن واﺣﺪ ﻣﻦ اﻵﺗﻲ
ﻏـﻴـﺮ
Mr. اﻟﺴﻴﺪ
Mrs. اﻟﺴﻴﺪة
Miss. اﻵﻧﺴﺔ
Ms. اﻟﻔﺎﺿﻠﺔ
Dr. اﻟﺪآﺘﻮر
ﻣﺴﻤﻮح
Prof. اﻷﺳﺘﺎذ دآﺘﻮر
اﻟﻠﻘﺐ MSﻳﺘﻢ اﺳﺘﺨﺪاﻣﻪ ﻟﻠﻤﺮأة اﻟﺘﻲ ﻟﻢ ﻳﺘﻢ ﺗﺤﺪﻳﺪ ﺣﺎﻟﺘﻬﺎ اﻻﺟﺘﻤﺎﻋﻴﺔ ﺑﻌﻜﺲ Missاﻟﺬي ﻳﺴﺘﺨﺪم
ﻟﻶﻧﺴﺔ و Mrs.اﻟﺬي ﻳﺴﺘﺨﺪم ﻟﻠﺴﻴﺪة
ﺑﺎﻟﻄﺒﺎﻋﺔ Name
اﻻﺳﻢ :ﻳﺘﻢ آﺘﺎﺑﺔ اﻻﺳﻢ ﻓﻲ هﺬﻩ اﻟﺨﺎﻧﺔ وﻳﻔﻀﻞ ﻋﻨﺪ اﻟﺮﻏﺒﺔ ﻓﻲ آﺘﺎﺑﺔ اﻻﺳﻢ اﻟﺜﻼﺛﻲ ان
ﻳﺘﻢ اﻟﻀﻐﻂ ﻋﻠﻰ اﻟﺰر … Full Nameﺣﻴﺚ ﻳﻈﻬﺮ اﻟﻤﺮﺑﻊ اﻟﺤﻮاري آﻤﺎ ﺑﺎﻟﺸﻜﻞ
ﻧﺴﺨﺔ
)( ٣٤ – ١
ﻟﻠﻌﺮض
ﻓﻘﻂ
ﺷﻜﻞ )( ٣٤– ١
٣٤
ﻣﺎهﻮ Expedition
ﻏـﻴـﺮ
اﻟﻼﺣﻘﺔ :وهﻲ اﻟﻜﻠﻤﺎت اﻟﺘﻲ ﺗﻠﺤﻖ ﺑﺎﻻﺳﻢ ﻣﺜﻞ ) اﻟﻤﺤﺘﺮم – اﻟﻔﺎﺿﻞ ( ... -
Salutation
إﻓﺘﺘﺎﺣﻴﺔ اﻟﺮﺳﺎﺋﻞ :وهﻲ اﻟﺠﻤﻠ ﺔ اﻟﺘ ﻲ ﺗﻜﺘ ﺐ ﻗﺒ ﻞ اﻻﺳ ﻢ ﻣﺜ ﻞ ) ﺳ ﻌﺎدة اﻟﻤ ﺪﻳﺮ – ﺳ ﻴﺎدة
اﻷﺳﺘﺎذ (... -
ﻣﺴﻤﻮح
وﺑﺎﻟﻌﻮدة ﻟﻠﺸﻜﻞ ) ( ٣٣ -١ﻧﺴﺘﻜﻤﻞ ﺑﻘﻴﺔ اﻟﺤﻘﻮل
Employee ID
رﻗﻢ ﺗﻌﺮﻳﻒ اﻟﻤﻮﻇﻒ ) اﻟﺮﻗﻢ اﻟﻀﺮﻳﺒﻲ(
Job Title
ﺑﺎﻟﻄﺒﺎﻋﺔ
اﻟﻠﻘﺐ اﻟﻮﻇﻴﻔﻲ :ﻣﺜﻞ ) ﻣﺪﻳﺮ ﻋﺎم – ﻣﺪﻳﺮ ﻣﺸﺎرﻳﻊ (... -
Male
اﻟﻨﻮع :ذآﺮ
Female
اﻟﻨﻮع :أﻧﺜﻰ
ﻧﺴﺨﺔ
Location
وﻳﻘﺼﺪ ﺑﻬﺎ ﻣﻜﺎن اﻟﺸﺨﺺ هﻞ هﻮ Office – Site – Home
City/State/Country/Postal Code/Country Code
ﺣﻘﻮل اﻟﻌﻨﻮان اﻟﺒﺮﻳﺪي ﻟﻠﺸﺨﺺ
ﻟﻠﻌﺮض
Phone Numbers
ﺣﻘﻮل أرﻗﺎم اﻟﻬﻮاﺗﻒ اﻟﺨﺎﺻﺔ ﺑﻪ ﻣﻊ ﻣﻼﺣﻈﺔ أن Extهﻲ ﺧﺎﻧﺔ اﻟﺮﻗﻢ اﻟﺪاﺧﻠﻲ
ﺑﺎﻟﺸﺮآﺔ ) أي اﻟﺘﺤﻮﻳﻠﺔ (
Drawings
إدﺧﺎل اﻟﻤﻘﺎﺳﺎت اﻟﻤﻔﻀﻠﺔ ﻟﻠﻮﺣﺎت Sizeوﻋﺪد اﻟﻨﺴﺦ Copiesواﻟﺘﻲ ﻳﻄﻠﺒﻬﺎ ذﻟﻚ
ﻓﻘﻂ
اﻟﻤﻮﻇﻒ ) ﺧﻴﺎر ﻣﻬﻢ ﺟﺪا ﻋﻨﺪ ﻋﻤﻞ اﻟﺘﻘﺪﻳﻤﺎت ( Submittals
E-Mail Address / Method
ﻋﻨﻮان اﻟﺒﺮﻳﺪ اﻻﻟﻜﺘﺮوﻧﻲ وﻃﺮﻳﻘﺔ اﺳﺘﻘﺒﺎل اﻟﺒﺮﻳﺪ ﻣﻦ ﺧﻼل ﺑﺮﻧﺎﻣﺞ Expedition
وهﻲ ﻣﻘﺴﻤﺔ إﻟﻰ:
ﻓﻲ ﺣﺎﻟﺔ ﻋﺪم وﺟﻮد إﻣﻜﺎﻧﻴﺔ اﺳﺘﻘﺒﺎل اﻟﺒﺮﻳﺪ اﻻﻟﻜﺘﺮوﻧﻲ None
ﻓﻲ ﺣﺎﻟﺔ إﻣﻜﺎﻧﻴﺔ اﺳﺘﻘﺒﺎل اﻟﺒﺮﻳﺪ ﻣﻦ ﺧﻼل اﻟﺸﺒﻜﺔ اﻟﺪاﺧﻠﻴﺔ ﻟﺸﺮآﺘﻚ Local
Remoteﻓﻲ ﺣﺎﻟﺔ إﻣﻜﺎﻧﻴﺔ اﺳﺘﻘﺒﺎل اﻟﺒﺮﻳﺪ ﻣﻦ ﺧﻼل اﻻﻧﺘﺮﻧﺖ
Non-Expﻓﻲ ﺣﺎﻟﺔ أن اﻟﻤﻮﻇﻒ ﻟﻴﺲ ﻟﺪﻳﻪ ﺑﺮﻧﺎﻣﺞ Expedition
٣٥
اﻟﺒﺎب اﻷول
ﻏـﻴـﺮ
ﺑﻨﻔﺲ اﻟﺨﻄﻮات اﻟﺴﺎﺑﻖ ﺷﺮﺣﻬﺎ ﻧﻔﺘﺢ ﻣﺠﻠﺪ اﻟﺸﺮآﺎت ﻓﻲ اﻟﻤﺸﺮوع ﺛﻢ ﻧﻘﻒ ﻋﻠﻰ اﻟﺸﺮآﺔ
اﻟﻤﻄﻠﻮب ﺗﻌﺪﻳﻞ ﺑﻴﺎﻧﺎﺗﻬ ﺎ وﻧ ﻀﻊ ﻣﺆﺷ ﺮ اﻟﻔ ﺄرة ﻋﻠ ﻰ اﻟﺮﻣ ﺰ اﻟﻤﺠ ﺎور ﻷﺳ ﻢ اﻟ ﺸﺮآﺔ آﻤ ﺎ
ﺑﺎﻟﺸﻜﻞ ) ( ٣٥ – ١
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ زر Openﻓﺘﻔﺘﺢ اﻟﻨﺎﻓﺬة وﺑﻬﺎ اﻟﺒﻴﺎﻧﺎت ﺛﻢ ﻧﻘﻮم ﺑﺘﻌﺪﻳﻞ اﻟﺒﻴﺎﻧﺎت
اﻟﻤﻄﻠﻮﺑﺔ ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ زر OKﻟﺤﻔﻆ اﻟﺘﻐﻴﻴﺮات اﻟﻤﻄﻠﻮﺑﺔ
وﺑﻨﻔﺲ اﻟﻄﺮﻳﻘﺔ ﻳﺘﻢ ﺗﻌﺪﻳﻞ ﺑﻴﺎﻧﺎت اﻟﻤﻮﻇﻒ
ﻧﺴﺨﺔ
ﺣﺬف ﺑﻴﺎﻧﺎت ﺷﺮآﺔ أو ﻣﻮﻇﻒ
ﻓﻲ ﺣﺎﻟﺔ اﻟﺮﻏﺒﺔ ﻓﻲ ﺣﺬف ﺑﻴﺎﻧﺎت ﻧﻘﻮم ﺑﺘﺤﺪﻳﺪ اﻟﺒﻴﺎﻧﺎت اﻟﻤﻄﻠﻮب ﺣﺬﻓﻬﺎ ﻋﻦ ﻃﺮﻳﻖ
اﻟﻮﻗﻮف ﺑﻤﺆﺷﺮ اﻟﻔﺄرة ﻋﻠﻰ اﻟﺮﻣﺰ اﻟﻤﺠﺎور ﻷﺳﻢ اﻟﺸﺮآﺔ ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ زر ﻓﺘﻈﻬﺮ
رﺳﺎﻟﺔ ﺗﺤﺬﻳﺮ آﻤﺎ ﺑﺎﻟﺸﻜﻞ ) ( ٣٦ -١ﺛﻢ ﻧﻀﻐﻂ Yes
ﻓﻘﻂ
ﻓﺘﻈﻬﺮ رﺳﺎﻟﺔ أﺧﺮى ﺗﺴﺄل ﻓﻲ اﻟﺮﻏﺒﺔ ﻓﻲ اﻟﺤﺬف ﻣﻦ ﻗﺎﻋﺪة ﺑﻴﺎﻧﺎت اﻟﺒﺮﻧﺎﻣﺞ أم ﻻ؟
ﻓﻌﻨﺪﻣﺎ ﻧﺨﺘﺎر Yesﻳﺘﻢ اﻟﺤﺬف ﻣﻦ اﻟﺒﺮﻧﺎﻣﺞ ﻧﻬﺎﺋﻴﺎ أﻣﺎ ﻋﻨﺪﻣﺎ ﻧﺨﺘﺎر Noﻳﺘﻢ اﻟﺤﺬف
ﻣﻦ اﻟﻤﺸﺮوع اﻟﻤﻔﺘﻮح ﻓﻘﻂ وﺗﺒﻘﻰ ﺑﻴﺎﻧﺎت اﻟﺸﺮآﺔ ﻣﺘﺎﺣﺔ ﻓﻲ ﻗﺎﻋﺪة اﻟﺒﻴﺎﻧﺎت ﺑﺤﻴﺚ ﻳﻤﻜﻦ
إﺿﺎﻓﺘﻬﺎ ﻣﺮة أﺧﺮى – ﺷﻜﻞ ) ( ٣٧ -١
٣٦
ﻣﺎهﻮ Expedition
ﻏـﻴـﺮ
ﻣ ﻦ اﻟﻤﻴ ﺰات اﻟﺠﻤﻴﻠ ﺔ ﻓ ﻲ ﺑﺮﻧ ﺎﻣﺞ Expeditionﻋﻤﻠﻴ ﺔ ﻧ ﺴﺦ ﻣﺠﻠ ﺪ اﻟ ﺸﺮآﺎت ﻣ ﻦ
ﻣﺸﺮوع ﻟﻤﺸﺮوع
ﻓﻤ ﺜﻼ ﻟ ﻮ أﻧﻨ ﻲ ﻗﻤ ﺖ ﺑﺈﻧ ﺸﺎء ﻣ ﺸﺮوع ﺟﺪﻳ ﺪ ووﺟ ﺪت أﻧﻨ ﻲ ﺳ ﺄﺗﻌﺎﻣﻞ ﻣ ﻊ ﻣﺠﻤﻮﻋ ﺔ ﻣ ﻦ
اﻟ ﺸﺮآﺎت اﻟ ﺴﺎﺑﻖ اﻟﺘﻌﺎﻣ ﻞ ﻣﻌﻬ ﺎ ﻓ ﻲ ﻣ ﺸﺮوع ﻗ ﺪﻳﻢ ﻓﻌﻨﺪﺋ ﺬ ﻧﻘ ﻮم ﺑﻨ ﺴﺦ ﺑﻴﺎﻧ ﺎت ﺗﻠ ﻚ
اﻟﺸﺮآﺎت ﻣﻦ اﻟﻤﺸﺮوع اﻟﻘﺪﻳﻢ إﻟﻰ اﻟﻤﺸﺮوع اﻟﺠﺪﻳﺪ آﺎﻵﺗﻲ
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ
ﻟﻠﻌﺮض
ﺷﻜﻞ )( ٣٨ – ١
-٣ﻓ ﻲ اﻟﺠﺎﻧ ﺐ اﻷﻳ ﺴﺮ ﻗﺎﺋﻤ ﺔ اﻟ ﺸﺮآﺎت ﻓ ﻲ ﺟﻤﻴ ﻊ اﻟﻤ ﺸﺎرﻳﻊ وﻓ ﻲ اﻟﺠﺎﻧ ﺐ اﻷﻳﻤ ﻦ
ﻗﺎﺋﻤﺔ اﻟﺸﺮآﺎت ﻓﻲ ﻣﺸﺮوﻋﻨﺎ
-٤إذا رﻏﺒﻨﺎ ﻓﻲ ﻧﺴﺦ ﺟﻤﻴ ﻊ اﻟ ﺸﺮآﺎت ﻣ ﻦ اﻟﺠﺎﻧ ﺐ اﻷﻳ ﺴﺮ ﻟﻠﺠﺎﻧ ﺐ اﻷﻳﻤ ﻦ ﻧ ﻀﻐﻂ
ﻋﻠﻰ اﻟﺰر Add All
ﻓﻘﻂ
-٥إذا رﻏﺒﻨﺎ ﻓﻲ ﻧﺴﺦ ﺑﻴﺎﻧﺎت ﺷﺮآﺔ واﺣﺪة ﻓﻘﻂ أو ﺗﺤﺪﻳﺪ ﻋﺪة ﺷﺮآﺎت ﻳ ﺘﻢ ذﻟ ﻚ ﻣ ﻦ
ﺧ ﻼل ﺗﺤﺪﻳ ﺪ اﻟ ﺸﺮآﺔ اﻟﻤﻄﻠﻮﺑ ﺔ ﺛ ﻢ ﻧ ﻀﻐﻂ ﻋﻠ ﻰ زر Addوﺑﺘﻜ ﺮار اﻟﺘﺤﺪﻳ ﺪ
واﻟﻀﻐﻂ ﻳﻤﻜﻦ ﻧﺴﺦ ﺑﻴﺎﻧﺎت أي ﻋﺪد ﻣﻦ اﻟﺸﺮآﺎت
وﻓﻲ ﺣﺎﻟﺔ ﺣﺪوث ﺗﻀﺎرب ﻋﻨﺪ اﻟﻨﺴﺦ ﺳﺘﻈﻬﺮ رﺳﺎﻟﺔ ﺗﻔﻴﺪ ﺑﺬﻟﻚ – ﺷﻜﻞ ) ( ٣٩ -١
٣٧
اﻟﺒﺎب اﻷول
ﻗﻮاﺋﻢ اﻟﺘﻮزﻳﻊ
ﻏـﻴـﺮ
اﻟﻤﻘﺼﻮد ﺑﻘﻮاﺋﻢ اﻟﺘﻮزﻳ ﻊ Distribution listه ﻮ ﺗﺠﻤﻴ ﻊ اﻟ ﺸﺮآﺎت ﻓ ﻲ ﻣﺠﻤﻮﻋ ﺎت
ﻣﺘﺨﺼﺼﺔ ﻓﻤ ﺜﻼ ﻳ ﺘﻢ إﻧ ﺸﺎء ﻗﺎﺋﻤ ﺔ ﺧﺎﺻ ﺔ ﺑ ﺸﺮآﺎت اﻹﻧ ﺸﺎءات اﻟﺨﺮﺳ ﺎﻧﻴﺔ ) أﺳ ﻤﻨﺖ –
ﺣﺪﻳﺪ – ﺷﺪات ﻣﻌﺪﻧﻴﺔ -ﻣﻘﺎوﻟﻲ ﺗﻨﻔﻴﺬ (.. -ﺑﺤﻴﺚ ﻋﻨﺪ اﻟﺮﻏﺒﺔ ﻓﻲ إرﺳﺎل ﻣﺴﺘﻨﺪ ﺧﺎص
ﺑﺎﻷﻋﻤﺎل اﻟﺨﺮﺳﺎﻧﻴﺔ ﻳﺘﻢ إرﺳﺎﻟﻪ اﻟﻤﺴﺘﻨﺪ إﻟﻰ ﻗﺎﺋﻤﺔ اﻟﺘﻮزﻳ ﻊ واﻟﺘ ﻲ ﺑ ﺪورهﺎ ﺗﻘ ﻮم ﺑﺈرﺳ ﺎل
ﻣﺴﻤﻮح
ﻧﺴﺨﺔ ﻣﻦ اﻟﻤﺴﺘﻨﺪ إﻟﻰ آﻞ اﻟﻤﺸﺎرآﻮن ﻓﻲ ﻗﺎﺋﻤﺔ اﻟﺘﻮزﻳﻊ
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺘﺒﻊ اﻵﺗﻲ ﻋﻨﺪ اﻟﺮﻏﺒﺔ ﻓﻲ ﻧﺘﺒﺦ اﻟﺨﻄﻮات اﻟﺘﺎﻟﻴﺔ ﻋﻨﺪ اﻟﺮﻏﺒﺔ ﻓﻲ إﻧﺸﺎء ﻗﺎﺋﻤﺔ ﺗﻮزﻳﻊ
-١ﻣﻦ ﻗﺎﺋﻤﺔ Defineﻧﺨﺘﺎر … Distribution Lists
… Define Æ Distribution Lists
ﻧﺴﺨﺔ
ﻟﻠﻌﺮض
ﻓﻘﻂ ﺷﻜﻞ )( ٤٠ – ١
٣٨
ﻣﺎهﻮ Expedition
ﻏـﻴـﺮ
ﻣﺴﻤﻮح
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﺷﻜﻞ )( ٤١ – ١
ﻧﺴﺨﺔ
زر Addﺛﻢ اﻟﻀﻐﻂ ﻋﻠﻰ زر Ctrlﺛﻢ ﺗﺤﺪﻳﺪ اﻟﺸﺮآﺔ اﻷﺧ ﺮى واﻟ ﻀﻐﻂ ﻋﻠ ﻰ
Addوهﻜﺬا ،وﻳﻤﻜﻦ ﺑﺪﻻ ﻣﻦ اﻟﻀﻐﻂ ﻋﻠﻰ اﻟﺰر ان ﻳﺘﻢ اﻟﻨﻘﺮ اﻟﻤ ﺰدوج ﻋﻠ ﻰ
اﻻﺳﻢ وﺑﺎﻟﺘﺎﻟﻲ ﻳﺘﻢ إﺿﺎﻓﺔ اﻻﺳﻢ ﻟﻠﻘﺎﺋﻤﺔ
-٥ﻓﻲ ﺣﺎﻟﺔ ﺣﺪوث ﺧﻄﺄ ﻳﺘﻢ ﺗﺤﺪﻳﺪ اﻟﺸﺮآﺔ اﻟﻤﻄﻠﻮب إزاﻟﺘﻬﺎ ﻣﻦ اﻟﻘﺎﺋﻤﺔ اﻟﻴﻤﻨﻰ ﺛﻢ
ﻟﻠﻌﺮض
اﻟﻀﻐﻂ ﻋﻠﻰ زر Removeوﻋﻨﺪ اﻟﺮﻏﺒﺔ ﻓﻲ إزاﻟﺔ اﻟﻜﻞ Remove All
-٦ﺑﻌﺪ اﻻﻧﺘﻬﺎء ﻳﺘﻢ اﻟﻀﻐﻂ ﻋﻠﻰ Finish
٣٩
اﻟﺒﺎب اﻷول
ﻏـﻴـﺮ
ﺑﻌﺪ إﻧﺸﺎء ﻗﺎﺋﻤﺔ ﺗﻮزﻳﻊ ﻗﺪ ﻧﻀﻄﺮ ﻟﻨﺴﺦ ﺗﻠﻚ اﻟﺒﻴﺎﻧﺎت إﻟﻰ ﻗﺎﺋﻤﺔ أﺧﺮى ،ﻟﺬا ﺑﺪﻻ ﻣ ﻦ
إﻋﺎدة اﻟﺨﻄﻮات اﻟﺴﺎﺑﻘﺔ ﺳﻨﻘﻮم ﺑﻨﺴﺦ اﻟﺒﻴﺎﻧﺎت ﻣﺮة واﺣﺪة
وﻟﻌﻤﻞ ذﻟﻚ ﻳﺘﻢ ﻣﻦ اﺧﺘﻴﺎر ﻗﺎﺋﻤﺔ Defineﺛﻢ Distribution Listﺛ ﻢ ﻳ ﺘﻢ اﻟ ﻀﻐﻂ
ﻋﻠﻰ زر Copyﻓﺘﻈﻬ ﺮ اﻟﻨﺎﻓ ﺬة آﻤ ﺎ ﺑﺎﻟ ﺸﻜﻞ ) ( ٤٢ -١ﺛ ﻢ ﻳ ﺘﻢ ﺗﺤﺪﻳ ﺪ اﻟﻘﺎﺋﻤ ﺔ اﻟﻤ ﺮاد
اﻟﻨﺴﺦ ﻣﻨﻬ ﺎ From Listﺛ ﻢ ﻳ ﺘﻢ ﺗﺤﺪﻳ ﺪ اﻟﻘﺎﺋﻤ ﺔ اﻟﻤ ﺮاد اﻟﻨ ﺴﺦ اﻟﻴﻬ ﺎ To Listﺛ ﻢ ﻳ ﺘﻢ
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ ﺷﻜﻞ )( ٤٢ – ١
ﻟﻠﻌﺮض
رﺑﻂ Expeditionﺑﺎﻟﺒﺮﻧﺎﻣﺞ اﻟﺰﻣﻨﻲ ب Primavera
ان اﻟﺘﻜﺎﻣ ﻞ ﺑ ﻴﻦ ﺑ ﺮاﻣﺞ ﺷ ﺮآﺔ Primaveraﻟﻬ ﻮ أﻣ ﺮ ﺿ ﺮوري ﺣﺘ ﻰ ﻳ ﺘﻢ إدارة
ﻓﻘﻂ
اﻟﻌﻤ ﻞ ﺑﻜﻔ ﺎءة ﻋﺎﻟﻴ ﺔ ،ﻟ ﺬا ﺳ ﺘﺠﺪ اﻧ ﻪ ﻣ ﻦ ﺧ ﻼل ﺑﺮﻧ ﺎﻣﺞ Expeditionﺳ ﻨﺘﻤﻜﻦ ﻣ ﻦ
رﺑ ﻂ اﻟﺒﺮﻧ ﺎﻣﺞ اﻟﺰﻣﻨ ﻲ واﻟ ﺬي ﺗ ﻢ ﺗﻜﻮﻳﻨ ﻪ ﺑﺒﺮﻧ ﺎﻣﺞ P3ﺑﺤﻴ ﺚ اﻧ ﻪ ﻋﻨ ﺪﻣﺎ ﻳ ﺘﻢ ﺗﺤ ﺪﻳﺚ
ﻟﻠﺒﺮﻧﺎﻣﺞ اﻟﺰﻣﻨﻲ داﺧﻞ ﺑﺮﻧﺎﻣﺞ P3ﻳﻘﻮم ﺑﺮﻧﺎﻣﺠﻨﺎ ﺑﺘﺤﺪﻳﺚ هﺬا اﻟﺠﺪول اﻟﺰﻣﻨﻲ
وﻟﻘﺪ ﻗﻤﻨﺎ ﺑﺸﺮح ﺗﻠﻚ اﻟﺨﻄﻮة ﻓﻲ ﻣﺮﺣﻠﺔ إﻧﺸﺎء ﻣﺸﺮوع ﺟﺪﻳﺪ ﻣﻦ ﺧﻼل اﻟﻤﻌﺎﻟﺞ وﻟﻜﻨﻨ ﺎ
اﻵن ﺳﻨﺸﺮح هﺬﻩ اﻟﺨﻄﻮة ﻣﻦ ﺧﺎرج اﻟﻤﻌﺎﻟﺞ ﺣﻴﺚ اﻧﻨﺎ ﻗﺪ ﻧﺘﻐﺮض ﻟﻌﻤﻞ ﻣﻠ ﻒ ﻣ ﺸﺮوع
ﻗﺒﻞ إﻧﺸﺎء اﻟﺒﺮﻧﺎﻣﺞ اﻟﺰﻣﻨﻲ ﻟﻪ
٤٠
ﻣﺎهﻮ Expedition
اﻟﺨﻄﻮات هﻲ :
ﻏـﻴـﺮ
-١ﻧﺤﺪد اﻟﻤﺸﺮوع اﻟﻤﻄﻠﻮب ﺛﻢ ﻣﻦ ﻗﺎﺋﻤﺔ Defineﻧﺨﺘﺎر اﻷﻣﺮ
Project Preferences
Define Æ Project Preferences
ﻣﺴﻤﻮح
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ ﺷﻜﻞ )( ٤٣ – ١
ﻟﻠﻌﺮض
-٢ﻧﻘﻮم ﺑﻔﺘﺢ ﺗﺒﻮﻳﺐ Scheduleﺛﻢ ﻧﺨﺘﺎر ﻣﻦ اﻟﻘﺎﺋﻤﺔ اﻟﻤﻨﺴﺪﻟﺔ
ﻓﻲ ﺣﺎﻟﺔ Primavera Project Planner P3
-٣ﺛﻢ ﻧﺤﺪد اﻟﻤﺴﺎر Pathﻣﻦ ﺧﻼل اﺳﺘﻌﺮاض ﻣﺠﻠﺪ ﺑﺮﻧﺎﻣﺞ P3ﺛﻢ ﻣﺠﻠﺪ
اﻟﻤﺸﺎرﻳﻊ ﺛﻢ ﻧﺤﺪد اﻟﻤﺠﻤﻮﻋﺔ
P3
ﻓﻘﻂ
-٤اﻣﺎ ﻓﻲ ﺣﺎﻟﺔ اﺧﺘﻴﺎر
P3eوهﻲ ﻟﺒﺮﻧﺎﻣﺞ Primavera Enterprise
ﺳﻨﺤﺪد ﻓﻲ هﺬﻩ اﻟﺤﺎﻟﺔ ﻗﺎﻋﺪة اﻟﺒﻴﺎﻧﺎت Databaseﺛﻢ ﻧﺤﺪد اﻟﻤﺸﺮوع Project
٤١
א ﻏـﻴـﺮ א
א ﻣﺴﻤﻮح
Dictionaries א
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ
ﻟﻠﻌﺮض
ﻓﻘﻂ
اﻟﻘﻮاﻣﻴﺲ Dictionaries
ﻣﺴﻤﻮح
ﻋﻨﺪﻣﺎ ﻧﻘﻮل آﻠﻤﺔ ﻗﺎﻣﻮس ﻳﺘﺒﺎدر إﻟﻰ ذهﻨﻨﺎ ﻓﻲ اﻟﺤﺎل ﻗﺎﻣﻮس اﻟﻠﻐﺔ اﻹﻧﺠﻠﻴﺰﻳﺔ
وﻟﻜﻨﻨﺎ ﻧﻘﺼﺪ أﻣﺮ ﺁﺧﺮ وهﻮ ﺗﻌﺮﻳﻒ آﻞ اﻟﺘﺼﻨﻴﻔﺎت اﻟﻤﻤﻜﻨﺔ ﻟﻠﺒﺮﻧﺎﻣﺞ ﻣﺜﻞ :
أﻗﺴﺎم اﻟﻤﻮاﺻﻔﺎت
ﺗﺼﻨﻴﻒ اﻟﺸﺮآﺎت
ﺑﺎﻟﻄﺒﺎﻋﺔ
أﻧﻮاع اﻟﺘﻘﺪﻳﻤﺎت
أﻧﻮاع اﻟﺮﺳﻮﻣﺎت
إﺻﺪارات اﻟﺮﺳﻮﻣﺎت
ﻣﻘﺎﺳﺎت اﻟﻠﻮﺣﺎت
اآﻮاد اﻟﻠﻮﺣﺎت
ﻓﻘﻂ
وﻳﻤﻜﻨﻚ أﺧﻲ اﻟﻤﻬﻨﺪس اﻻﻋﺘﻤﺎد ﻋﻠﻴﻪ أو إﻋﺪاد ﺗﺼﻨﻴﻔﺎت ﺧﺎﺻﺔ ﺑﻚ آﺎﻵﺗﻲ :
-١ﻧﻀﻊ ﻣﺆﺷﺮ اﻟﻔﺄرة ﻋﻠﻰ All Projects
-٢ﻣﻦ ﻗﺎﺋﻤﺔ Defineﻧﺨﺘﺎر اﻟﻘﺎﺋﻤﺔ اﻟﻔﺮﻋﻴﺔ Dictionariesﺛﻢ ﻧﺨﺘ ﺎر اﻷﻣ ﺮ
…Spec Sections
Define Æ Dictionaries Æ Spec Sections
-٣ﻓﺘﻈﻬﺮ أﻣﺎﻣﻚ ﻧﺎﻓﺬة ﺑﻬﺎ ﺟﻤﻴﻊ أﻗﺴﺎم اﻟﻤﻮاﺻﻔﺎت – ﺷﻜﻞ )( ١ – ٢
٤٣
اﻟﺒﺎب اﻟﺜﺎﻧﻲ
ﻏـﻴـﺮ
ﻣﺴﻤﻮح
ﺑﺎﻟﻄﺒﺎﻋﺔ ﺷﻜﻞ )( ١ – ٢
-٣ﻹﺿﺎﻓﺔ ﻋﻨﺼﺮ ﺟﺪﻳﺪ ﻧﻀﻊ ﻣﺆﺷﺮ اﻟﻔﺄرة ﻋﻠﻰ اﻟﻌﻨﺼﺮ اﻟﺬي ﺳ ﻴﺘﻢ اﻹدراج ﺑﻌ ﺪﻩ
ﻧﺴﺨﺔ
ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ زر Addوﻧﻜﺘﺐ رﻗﻢ اﻟﻤﻮاﺻ ﻔﺔ ﻓ ﻲ ﺧﺎﻧ ﺔ Section Value
وﻧﻜﺘﺐ وﺻﻒ اﻟﻤﻮاﺻﻔﺔ ﻓﻲ ﺧﺎﻧﺔ Description
-٤وﻟﺤﺬف ﻋﻨﺼﺮ ﻧﻀﻊ ﻣﺆﺷﺮ اﻟﻔﺄرة ﻋﻠﻰ اﻟﻌﻨﺼﺮ اﻟﻤﺮاد ﺣﺬﻓﻪ ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ
زر Delete
ﻟﻠﻌﺮض
-٥وﻟﺘﻐﻴﻴﺮ ﺗﺮﺗﻴﺐ اﻟﻌﻨﺎﺻﺮ ﻧﻀﻐﻂ ﻋﻠﻰ زر Sort Orderﻓﻴﻈﻬﺮ ﺳﻬﻤﺎن آﻤﺎ
ﺑﺎﻟﺸﻜﻞ ) ( ٢ -٢ﺛﻢ ﻧﻘﻮم ﺑﻮﺿﻊ اﻟﻤﺆﺷﺮ ﻋﻠﻰ اﻟﻌﻨﺼﺮ اﻟﻤﺮاد ﺗﺤﺮﻳﻜﻪ ﺛﻢ
ﻧﻀﻐﻂ ﺑﺎﻟﺴﻬﻢ اﻟﻌﻠﻮي أو اﻟﺴﻔﻠﻲ
ﻓﻘﻂ
ﺷﻜﻞ )( ٢– ٢
٤٤
Dictionaries اﻟﻘﻮاﻣﻴﺲ
No
01000 ﻏـﻴـﺮ
Master Format اﻟﻤﻮاﺻﻔﺔ
General Requirements
01100 Summary
اﻟﻤﻘﺎﺑﻞ اﻟﻌﺮﺑﻲ
ﻣﺘﻄﻠﺒﺎت ﻋﺎﻣﺔ
ﻣﻠﺨﺺ
ﻣﺴﻤﻮح
01200 Price and Payment Procedures اﻟﺴﻌﺮ واﻟﺪﻓﻌﺎت
ﺑﺎﻟﻄﺒﺎﻋﺔ
اﻟﻤﻨﺸﺂت وأﻧﻈﻤﺔ اﻟﻤﺮاﻗﺒﺔ
01500 Temporary Facilities and Controls
اﻟﻤﺆﻗﺘﺔ
01600 Product Requirements ﻣﺘﻄﻠﺒﺎت اﻟﻤﻮاد
ﻧﺴﺨﺔ
02000 Site Works أﻋﻤﺎل اﻟﻤﻮﻗﻊ اﻟﻌﺎم
02300 Earthwork
02700
ﻟﻠﻌﺮض
02600 Drainage and Containment
Bases, Ballasts, Pavements, and
Appurtenances
اﻷﻋﻤﺎل اﻟﺘﺮاﺑﻴﺔ
اﻟﺼﺮف اﻟﺤﻲ
أﻋﻤﺎل اﻟﺮﺻﻒ
02900 Planting
03000 Concrete
ﻓﻘﻂ
03050 Basic Concrete Materials and Methods
اﻟﺘﺸﺠﻴﺮ
اﻟﺨﺮﺳﺎﻧﺔ
٤٥
اﻟﺒﺎب اﻟﺜﺎﻧﻲ
04000 Masonry
ﻏـﻴـﺮ
03400 Precast Concrete
أﻋﻤﺎل اﻟﻤﺒﺎﻧﻲ
ﻣﺴﻤﻮح
04200 Masonry Units ﻣﺒﺎﻧﻲ اﻟﻄﻮب و اﻟﺒﻠﻮك
ﺑﺎﻟﻄﺒﺎﻋﺔ
05800 Expansion Control أﻧﻈﻤﺔ ﺗﻐﻄﻴﺔ ﻓﻮاﺻﻞ اﻟﺘﻤﺪد
ﻧﺴﺨﺔ
اﻟﻮﻗﺎﻳﺔ ﻣﻦ اﻟﺤﺮارة
07000 Thermal and Moisture Protection
واﻟﺮﻃﻮﺑﺔ
07100 Waterproofing أﻋﻤﺎل اﻟﻌﺰل اﻟﻤﺎﺋﻲ
ﻟﻠﻌﺮض
أﻋﻤﺎل اﻟﺘﺴﻘﻴﻒ واﻟﺠﻮاﻧﺐ
07400 Roofing and Siding Panels
اﻟﺼﻨﺎﻋﻴﺔ
07500 Membrane Roofing أﻏﺸﻴﺔ اﻟﺘﺴﻘﻴﻒ
ﻓﻘﻂ
اﻟﺘﻮاﺑﻊ واﻟﻤﻮاد اﻟﺨﺎﺻﺔ
07700 Roof Specialties and Accessories
ﺑﺎﻷﺳﻘﻒ
07900 Joint Sealers ﻣﻮاد ﺣﺸﻮ اﻟﻔﻮاﺻﻞ
٤٦
اﻟﻘﻮاﻣﻴﺲ Dictionaries
ﻏـﻴـﺮ
08400 Entrances and Storefronts
08700 Hardware
اﻟﻤﺪاﺧﻞ واﻟﻮاﺟﻬﺎت
اﻟﻨﻮاﻓﺬ اﻟﻤﻌﺪﻧﻴﺔ
اﻟﺨﺮدوات
ﻣﺴﻤﻮح
08800 Glazing أﻋﻤﺎل اﻟﺰﺟﺎج
ﺑﺎﻟﻄﺒﺎﻋﺔ
09250 Gypsum Board اﻷﻟﻮاح اﻟﺠﺒﺴﻴﺔ
ﻧﺴﺨﺔ
09600 Flooring اﻷرﺿﻴﺎت
ﻟﻠﻌﺮض
14100 Dumbwaiters ﻣﺼﺎﻋﺪ اﻟﻄﻌﺎم
ﻓﻘﻂ
14600 Hoists and Cranes أﺟﻬﺰة اﻟﺮﻓﻊ
٤٧
اﻟﺒﺎب اﻟﺜﺎﻧﻲ
ﻏـﻴـﺮ
15600 Refrigeration Equipment
ﺗﻮزﻳﻊ اﻟﻬﻮاء
ﻣﺴﻤﻮح
16000 Electrical اﻷﻋﻤﺎل اﻟﻜﻬﺮﺑﺎﺋﻴﺔ
ﺑﺎﻟﻄﺒﺎﻋﺔ
16400 Low-Voltage Distribution ﺗﻮزﻳﻊ اﻟﺠﻬﺪ اﻟﻤﻨﺨﻔﺾ
ﻧﺴﺨﺔ
16720 Alarm and Detection System أﻧﻈﻤﺔ اﻹﻧﺬار واﻟﻜﺸﻒ
ﻟﻠﻌﺮض
16900 Controls أﻧﻈﻤﺔ اﻟﺘﺤﻜﻢ
وهﺬﻩ ﻟﻴﺴﺖ آﻞ اﻟﺒﻨﻮد وﻟﻜﻨﻨﺎ ﻗﻤﻨﺎ ﺑﺎﺧﺘﺼﺎرهﺎ وﺳﻨﺤﺎول إدراج ﻧﺴﺨﺔ آﺎﻣﻠﺔ ﻣﻦ
ﻓﻘﻂ
Master Formatﻓﻲ ﻣﻼﺣﻖ هﺬا اﻟﻜﺘﺎب
وﻳﻤﻜﻨﻚ أﺧﻲ اﻟﻤﻬﻨﺪس اﺳﺘﺨﺪام ﻣﻮاﺻﻔﺎت ﺧﺎﺻﺔ ﺑﻚ ﺑﺎﻟﻠﻐﺔ اﻟﻌﺮﺑﻴﺔ ﻋﻦ ﻃﺮﻳﻖ إدراج
ﺗﻠﻚ اﻟﻤﻮاﺻﻔﺎت آﻤﺎ أﺳﻠﻔﻨﺎ ﻋﻦ ﻃﺮﻳﻖ اﻷﻣﺮ Addﻣﻊ ﻣﺮاﻋﺎة ﺗﺮﻗﻴﻢ ﺗﻠﻚ اﻟﻤﻮاﺻﻔﺎت
ﺑﻄﺮﻳﻘﺔ ﻣﺴﻠﺴﻠﺔ ﻣﻊ ﻋﺪم ﺗﻜﺮار رﻗﻢ اﻟﻤﺴﻠﺴﻞ
٤٨
اﻟﻘﻮاﻣﻴﺲ Dictionaries
ﻏـﻴـﺮ
ﻋﻨﺪ ﻓﺘﺢ اﻟﺒﺮﻧﺎﻣﺞ ﺳﻨﺠﺪ اﻧﻪ ﺗﻢ ﺗﻌﻴﻴﻦ أدوار اﻟﻤﺸﺎرآﻴﻦ ﻓﻲ اﻟﻤﺸﺮوع آﺎﻵﺗﻲ :
ﻣﺴﻤﻮح
CM Construction إدارة ﻣﺸﺮوﻋﺎت
Manager
CON Contractor ﻣﻘﺎول
DES Design Consultant اﺳﺘﺸﺎري -ﺗﺼﻤﻴﻢ
ENG Engineer ﻣﻬﻨﺪس -ﺗﺼﻤﻴﻢ
GC
OTH
OWN
SUB
ﺑﺎﻟﻄﺒﺎﻋﺔ
General Contractor
Other
Owner
Subcontractor
ﻣﻘﺎول ﻋﻤﻮﻣﻲ
أﺧﺮى
اﻟﻤﺎﻟﻚ
ﻣﻘﺎول اﻟﺒﺎﻃﻦ
ﻧﺴﺨﺔ
SUP Supplier اﻟﻤﻮرد
ﻟﻠﻌﺮض
وﻳﻤﻜﻨﻚ ﺣﺬف ﻗﻴﻤﺔ ﻋﻦ ﻃﺮﻳﻖ
Define Æ Dictionaries Æ Roles… Æ Delete
وﻳﻤﻜﻨﻚ اﻟﺘﺮﺗﻴﺐ ﻋﻦ ﻃﺮﻳﻖ
Define Æ Dictionaries Æ Roles… Æ Sort Order
٤٩
اﻟﺒﺎب اﻟﺜﺎﻧﻲ
ﻏـﻴـﺮ
ANR Approved Noted اﻟﻤﻮاﻓﻘﺔ ﻣﻊ إﻋﺎدة اﻟﺘﻘﺪﻳﻢ ﺑﻌﺪ
Resubmit إﻧﻬﺎء اﻟﻤﻼﺣﻈﺎت
AOK All Correct اﻟﻤﻮاﻓﻘﺔ ﻋﻠﻰ اﻟﻜﻞ
APP Approved اﻟﻤﻮاﻓﻘﺔ
CLO Closed إﻏﻼق اﻟﻤﻮﺿﻮع
ﻣﺴﻤﻮح
DIS Disapproved ﻋﺪم اﻟﻤﻮاﻓﻘﺔ
NA Not Applicable ﻏﻴﺮ ﻗﺎﺑﻞ ﻟﻼﺳﺘﻌﻤﺎل
NEW New Item ﻋﻨﺼﺮ ﺟﺪﻳﺪ
NM Not Made ﺑﺪون إﺟﺮاء
OLD Old Business ﻋﻤﻞ ﻗﺪﻳﻢ
ﺑﺎﻟﻄﺒﺎﻋﺔ
OPN Open ﻓﺘﺢ اﻟﻤﻮﺿﻮع
OUT Outstanding Item ﻣﻮﺿﻮع ﻣﻌﻠﻖ
PRO Proceed ﻣﻜﺘﻤﻞ
REJ Rejected ﻣﺮﻓﻮض
UNS UnSubmitted ﻟﻢ ﻳﻘﺪم
ﻧﺴﺨﺔ
وﻳﻤﻜﻨﻚ ﺗﻌﺪﻳﻞ اﻟﻘﻴﻢ اﻟﺴﺎﺑﻘﺔ أو إﺿﺎﻓﺔ ﻗﻴﻢ أﺧﺮى ﻣﻦ ﺧﻼل
Define Æ Dictionaries Æ Status… Æ Add
وﻳﻤﻜﻨﻚ ﺣﺬف ﻗﻴﻤﺔ ﻋﻦ ﻃﺮﻳﻖ
ﻟﻠﻌﺮض
Define Æ Dictionaries Æ Status … Æ Delete
وﻳﻤﻜﻨﻚ اﻟﺘﺮﺗﻴﺐ ﻋﻦ ﻃﺮﻳﻖ
Define Æ Dictionaries Æ Status … Æ Sort Order
٥٠
اﻟﻘﻮاﻣﻴﺲ Dictionaries
ﻏـﻴـﺮ
CUSTREQUEST Customer Request ﻃﻠﺐ اﻟﻌﻤﻴﻞ )اﻟﻤﺎﻟﻚ (
DEFICIENCY Construction Deficiency اﻟﻨﻘﺺ ﻓﻲ اﻟﺘﻨﻔﻴﺬ
ERROROMIN Errors and Omissions اﻷﺧﻄﺎء و اﻹهﻤﺎل
FIELDCOND Field Conditions ﻇﺮوف اﻟﻤﻮﻗﻊ
PLANNED Planned اﻟﺘﺨﻄﻴﻂ
ﻣﺴﻤﻮح
UNFORESEEN Unforeseen Conditions ﻏﻴﺮ ﻣﺘﻮﻗﻊ
ﺑﺎﻟﻄﺒﺎﻋﺔ
Product Data
وﺗﻨﻘﺴﻢ ﻓﺌﺎت اﻟﺘﻘﺪﻳﻤﺎت Submittals Categoryإﻟﻰ
اﻟﻮﺻﻒ اﻟﻤﻌﻨﻰ
ﻣﻌﻠﻮﻣﺎت اﻟﻤﻨﺘﺞ
ﻧﺴﺨﺔ
Shop Drawing رﺳﻮﻣﺎت ﺗﻨﻔﻴﺬﻳﺔ
Mock Up ﻧﻤﻮذج ﺑﺎﻟﺤﺠﻢ اﻟﻄﺒﻴﻌﻲ
Sample ﻋﻴﻨﺔ
Certification ﺷﻬﺎدة
As-Built آﻤﺎ هﻮ ﻣﻨﻔﺬ
ﻟﻠﻌﺮض
Close-Out اﻟﺘﺨﻠﺺ
Warranty ﺿﻤﺎن
Test Report ﻧﺘﻴﺠﺔ اﺧﺘﺒﺎر
Operation/Maintenance آﺘﻴﺐ اﻟﺘﺸﻐﻴﻞ واﻟﺼﻴﺎﻧﺔ
Manual
ﻓﻘﻂ
MSDS - Material ﻣﻮاﺻﻔﺎت اﻷﻣﺎن ﻟﻠﻤﺎدة
Safety Data Sheets
٥١
اﻟﺒﺎب اﻟﺜﺎﻧﻲ
ﻏـﻴـﺮ
وﺗﻨﻘﺴﻢ أﻧﻮاع اﻟﺘﻘﺪﻳﻤﺎت Submittals Typesإﻟﻰ
اﻻﺧﺘﺼﺎر اﻟﻮﺻﻒ اﻟﻤﻌﻨﻰ
POSTCON Post-Construction ﺑﻌﺪ اﻟﺘﻨﻔﻴﺬ
PRECON Pre-Construction ﻗﺒﻞ اﻟﺘﻨﻔﻴﺬ
ﺑﺎﻟﻄﺒﺎﻋﺔ Temperature
Precipitation
Sky
Wind
-٢درﺟﺎت اﻟﺤﺮارة
-٣ﺣﺎﻟﺔ اﻷﻣﻄﺎر
-٤ﺣﺎﻟﺔ اﻟﺠﻮ ) ﺻﺎﻓﻲ – ﻏﻴﻮم (
-٥ﺳﺮﻋﺔ اﻟﺮﻳﺎح
ﻧﺴﺨﺔ
-٦اﻟﺤﺎﻟﺔ اﻟﻤﻨﺎﺧﻴﺔ Weather Impact
-٧ﻃﻮل ﻣﺪة اﻟﻈﺮوف اﻟﻤﻨﺎﺳﺒﺔ Length of suitable Conditions
وﺑﺎﺳﺘﻌﺮاض آﻞ واﺣﺪة ﻣﻦ اﻟﻌﻨﺎﺻﺮ اﻟﺴﺎﺑﻘﺔ ﺳﻨﺠﺪ اﻧﻬﺎ ﺗﺘﻔﺮع إﻟﻰ ﻋﺪة أﻗﺴﺎم وﻳﻤﻜﻨﻚ
ﻣﻦ ﻣﺸﺎهﺪة ذﻟﻚ ﺑﻨﻔﺴﻚ ﻣﻦ ﺧﻼل اﻟﻘﺎﺋﻤﺔ
Define Æ Dictionaries Æ Daily Reports Æ
No
Unknown ﻓﻘﻂ
اﻟﻮﺻﻒ
Yes-Work Impeded
اﻟﻤﻌﻨﻰ
ﻻ ﻳﻮﺟﺪ
ﻏﻴﺮ ﻣﻌﺮوف
اﻟﻌﻤﻞ ﻣﻌﺮﻗﻞ
Yes-Work Stopped اﻟﻌﻤﻞ ﻣﺘﻮﻗﻒ
٥٢
اﻟﻘﻮاﻣﻴﺲ Dictionaries
ﻏـﻴـﺮ
أﺛﻨﺎء اﻟﻌﻤﻞ ﺑﺎﻟﻤﻮﻗﻊ ﺗﺤﺪث ﺑﻌﺾ اﻟﺤﻮادث ﻧﺘﻴﺠﺔ ﻟﺤﺮآﺔ اﻟﻤﻌﺪات واﻟﻌﻤﺎل ﻟﺬا ﻻﺑﺪ ﻣﻦ
ﺗﺼﻨﻴﻒ ﺗﻠﻚ اﻟﻤﺼﺎدر ،وﻟﻤﻌﺮﻓﺔ ﺗﻠﻚ اﻟﺘﺼﻨﻴﻔﺎت ﻳﺘﻢ ذﻟﻚ ﻣﻦ ﺧﻼل
Define Æ Dictionaries Æ Safety Æ Accident Sources
وﺳﻴﻈﻬﺮ أﻣﺎﻣﻚ اﻵﺗﻲ
ﻣﺴﻤﻮح
اﻟﻮﺻﻒ اﻟﻤﻌﻨﻰ
Absorption, Bite / Sting ﻟﺪغ اﻟﺤﺸﺮات أو ﻋﺾ اﻟﺤﻴﻮاﻧﺎت اﻟﻀﺎﻟﺔ
Carrying, throwing or holding ﺣﻤﻞ اﻷﺷﻴﺎء أو رﻣﻴﻬﺎ
object
Caught in, under or between, not اﻟﺘﻌﻠﻖ ﺗﺤﺖ اﻷﺷﻴﺎء أو ﺑﻴﻨﻬﺎ
ﺑﺎﻟﻄﺒﺎﻋﺔ
elsewhere classified
Contact not otherwise specified اﻻﺗﺼﺎل ) ﻏﻴﺮ ﻣﺤﺪد (
Contact with electrical current اﻻﺗﺼﺎل ﺑﺎﻟﺘﻴﺎر اﻟﻜﻬﺮﺑﺎﺋﻲ
Contact with temperature اﻻﺗﺼﺎل ﺑﻌﻨﺎﺻﺮ ﺣﺮارﻳﺔ
extremes
ﻧﺴﺨﺔ
Falling object or particle ﺳﻘﻮط اﻷﺟﺴﺎم أو اﻟﻌﻨﺎﺻﺮ
Flying object or particle ﺗﻄﺎﻳﺮ اﻷﺟﺴﺎم أو اﻟﻌﻨﺎﺻﺮ
From ramp, runway, walkway ﻣﻦ ﺧﻼل اﻟﻤﻤﺮات وأﻣﺎآﻦ اﻟﺴﻴﺮ
From scaffold or ladder ﻣﻦ اﻟﺴﻼﻟﻢ أو اﻟﺸﺪات
From vehicle / Motor Vehicle / ﻣﻦ اﻟﺘﺼﺎدم ﺑﺴﻴﺎرة أو ﻋﺮﺑﺔ
ﻟﻠﻌﺮض
Struck by vehicle
In machine or machine part ﻓﻲ ﺟﺰء ﻣﻦ اﻟﻤﺎآﻴﻨﺔ
Into shafts, excavations, floor ﻣﻦ ﻓﺘﺤﺎت اﻟﺪور أو اﻷﻣﺎآﻦ اﻟﻤﺤﻔﻮرة
openings, etc أو اﻟﻤﻨﺎور
Lifting object ﻧﺘﻴﺠﺔ ﻟﺮﻓﻊ اﻷﺟﺴﺎم
ﻓﻘﻂ
Manual handling, not elsewhere ﻧﺘﻴﺠﺔ ﻟﻠﻤﻨﺎوﻟﺔ ﺑﺎﻟﻴﺪ ﻟﻠﻤﻮاد
classified
Moving or stationary object ﻧﺘﻴﺠﺔ ﻟﻌﻨﺼﺮ ﻣﺘﺤﺮك أو ﺛﺎﺑﺖ
Object being handled ﻧﺘﻴﺠﺔ ﻟﻠﻌﻨﺼﺮ اﻟﻤﻤﺴﻮك
وآﻤﺎ ﺗﺮى ﻓﺈن ﻣﺼﺎدر اﻟﺤﻮادث ﻗﺪ ﺗﻜﻮن أآﺜﺮ ﻣﻦ ذﻟﻚ ﻟﺬا ﻳﻤﻜﻨﻚ أﺧﻲ اﻟﻤﻬﻨﺪس ﺗﻐﻴﻴﺮ
هﺬﻩ اﻟﺘﺼﻨﻴﻔﺎت وإﺿﺎﻓﺔ اﻟﻤﺰﻳﺪ إﻟﻴﻬﺎ
٥٣
اﻟﺒﺎب اﻟﺜﺎﻧﻲ
ﻏـﻴـﺮ
ان ﻋﻨﺼﺮ اﻷﻣﺎن ﻣﻦ أهﻢ اﻟﻌﻨﺎﺻﺮ ﻓﻲ اﻟﻌﻤﻞ ﺣﺘﻰ ﻧﻤﻨﻊ ﺣﺪوث اﻟﺤﻮادث ﻟﺬا ﺳﻨﻘﻮم
ﺑﺘﺤﺪﻳﺪ اﻟﻌﻨﺎﺻﺮ اﻟﺘﻲ ﻳﺠﺐ اﻟﺘﻔﺘﻴﺶ ﻋﻠﻴﻬﺎ ﺑﺎﻟﻤﻮﻗﻊ
اﻟﻜﻮد اﻟﻮﺻﻒ اﻟﻤﻌﻨﻰ
HH Hard hats اﻟﺨﻮذة
PC Power cords أﺳﻼك اﻟﺘﻴﺎر اﻟﻜﻬﺮﺑﺎﺋﻲ
ﻣﺴﻤﻮح
SCAF Scaffolds اﻟﺸﺪات
ﺑﺎﻟﻄﺒﺎﻋﺔ
North America Industry Classification System
وهﻮ ﻣﻘﺴﻢ آﺎﻵﺗﻲ
اﻟﻜﻮد اﻟﻮﺻﻒ اﻟﻤﻌﻨﻰ
23 Construction إﻧﺸﺎءات
ﻧﺴﺨﺔ
236 Construction of Buildings إﻧﺸﺎءات ﻣﺒﺎﻧﻲ
Residential Building إﻧﺸﺎءات ﻣﺒﺎﻧﻲ ﺳﻜﻨﻴﺔ
2361
Construction
Nonresidential Building إﻧﺸﺎءات ﻣﺒﺎﻧﻲ ﻏﻴﺮ ﺳﻜﻨﻴﺔ
2362
Construction
ﻟﻠﻌﺮض
Industrial Building إﻧﺸﺎءات ﻣﺒﺎﻧﻲ ﺻﻨﺎﻋﻴﺔ
23621
Construction
Commercial and Institutional إﻧﺸﺎءات ﻣﺒﺎﻧﻲ ﺗﺠﺎرﻳﺔ
23622
Building Construction
Heavy and Civil Engineering إﻧﺸﺎءات ﻣﺪﻧﻴﺔ
237
Construction
23711
23712
ﻓﻘﻂ
Water and Sewer Line and
Related Structures
Construction
Oil and Gas Pipeline and
Related Structures
إﻧﺸﺎءات ﺧﻄﻮط اﻟﻤﻴﺎﻩ واﻟﺼﺮف
اﻟﺼﺤﻲ
Construction
Power and Communication إﻧﺸﺎءات ﺧﻄﻮط اﻟﻄﺎﻗﺔ
23713 Line and Related Structures واﻻﺗﺼﺎﻻت
Construction
٥٤
Dictionaries اﻟﻘﻮاﻣﻴﺲ
ﻏـﻴـﺮ
Highway, Street, and Bridge إﻧﺸﺎءات اﻟﻄﺮق واﻟﺸﻮارع
2373
Construction واﻟﻜﺒﺎري
Poured Concrete Foundation ﻣﻘﺎوﻟﻲ ﺻﺐ اﻟﺨﺮﺳﺎﻧﺔ
23811
and Structure Contractors
Structural Steel and Precast ﻣﻘﺎوﻟﻲ اﻟﻤﻨﺸﺂت اﻟﻤﻌﺪﻧﻴﺔ
23812
Concrete Contractors واﻟﺨﺮﺳﺎﻧﺔ ﺳﺎﺑﻘﺔ اﻟﺼﺐ
ﻣﺴﻤﻮح
23813 Framing Contractors ﻣﻘﺎوﻟﻲ اﻟﻬﻴﺎآﻞ اﻟﺨﺮﺳﺎﻧﻴﺔ
23814 Masonry Contractors ﻣﻘﺎوﻟﻲ اﻟﻤﺒﺎﻧﻲ
23815 Glass and Glazing Contractors ﻣﻘﺎوﻟﻲ اﻟﺰﺟﺎج
23816 Roofing Contractors ﻣﻘﺎوﻟﻲ اﻷﺳﻘﻒ
ﺑﺎﻟﻄﺒﺎﻋﺔ
Building Equipment ﻣﻘﺎوﻟﻲ ﻣﻌﺪات اﻟﻤﺒﺎﻧﻲ
2382
Contractors
23821 Electrical Contractors ﻣﻘﺎوﻟﻲ اﻷﻋﻤﺎل اﻟﻜﻬﺮﺑﺎﺋﻴﺔ
Plumbing, Heating, and Air- ﻣﻘﺎوﻟﻲ اﻷﻋﻤﺎل اﻟﺼﺤﻴﺔ واﻟﺘﺒﺮﻳﺪ
23822
Conditioning Contractors واﻟﺘﻜﻴﻴﻒ
2383 Building Finishing Contractors ﻣﻘﺎوﻟﻲ ﺗﺸﻄﻴﺒﺎت اﻟﻤﺒﺎﻧﻲ
23831
23832
23833
ﻧﺴﺨﺔ
Drywall and Insulation
Contractors
Painting and Wall Covering
Contractors
Flooring Contractors
ﻣﻘﺎوﻟﻲ اﻟﻘﻮاﻃﻴﻊ اﻟﺠﺎﻓﺔ واﻟﻌﺰل
ﻣﻘﺎوﻟﻲ اﻟﺪهﺎﻧﺎت
ﻣﻘﺎوﻟﻲ اﻷرﺿﻴﺎت
ﻟﻠﻌﺮض
23834 Tile and Terrazzo Contractors ﻣﻘﺎوﻟﻲ اﻟﺴﻴﺮاﻣﻴﻚ واﻟﺘﻴﺮازو
23835 Finish Carpentry Contractors ﻣﻘﺎوﻟﻲ اﻟﻨﺠﺎرة
23891 Site Preparation Contractors ﻣﻘﺎوﻟﻲ ﺗﺠﻬﻴﺰ اﻟﻤﻮاﻗﻊ
اﻟﻜﻮد
DUPE
FOLW
ﻓﻘﻂ
Duplicate
اﻟﻮﺻﻒ
Follow-up needed
ﺗﺮﺗﻴﺒﺎت اﻷﻣﺎن ﺑﺎﻟﻤﻮﻗﻊ: اﺛﻨﺎ ﻋﺸﺮ
اﻟﻤﻌﻨﻰ
ﻣﻜﺮرة
ﺗﺤﺘﺎج ﻟﻤﺘﺎﺑﻌﺔ
RSLV Resolved ﻣﻮﻃﺪة
UNFD Unfounded ﻏﻴﺮ ﻣﻮﺟﻮدة
٥٥
اﻟﺒﺎب اﻟﺜﺎﻧﻲ
ﻏـﻴـﺮ
-١رﺳﻮﻣﺎت اﻟﻌﻄﺎء Bid Package
-٢ﺗﺼﻨﻴﻒ اﻟﺮﺳﻮﻣﺎت Disciplinesوهﻲ
اﻟﻜﻮد اﻟﻮﺻﻒ اﻟﻤﻌﻨﻰ
ARCH Architecture ﻟﻮﺣﺎت ﻣﻌﻤﺎرﻳﺔ
ﻣﺴﻤﻮح
CIVIL Civil ﻟﻮﺣﺎت ﻣﺪﻧﻴﺔ
ELEC Electrical ﻟﻮﺣﺎت آﻬﺮﺑﺎء
FIRE Fire Protection ﻟﻮﺣﺎت ﻣﻘﺎوﻣﺔ اﻟﺤﺮﻳﻖ
Heat , Ventilation and Air ﻟﻮﺣﺎت اﻟﺘﺪﻓﺌﺔ واﻟﺘﻬﻮﻳﺔ واﻟﺘﺒﺮﻳﺪ
HVAC
Condition
ﺑﺎﻟﻄﺒﺎﻋﺔ
LAND Landscape ﻟﻮﺣﺎت ﺗﻨﺴﻴﻖ اﻟﻤﻮﻗﻊ
LIGHT Lighting ﻟﻮﺣﺎت اﻹﻧﺎرة
MECH Mechanical ﻟﻮﺣﺎت ﻣﻴﻜﺎﻧﻴﻜﻴﺔ
PLUMB Plumbing ﻟﻮﺣﺎت اﻟﺼﺤﻲ
POWER Power ﻟﻮﺣﺎت اﻟﻄﺎﻗﺔ
ﻧﺴﺨﺔ
STRUCT Structural ﻟﻮﺣﺎت إﻧﺸﺎﺋﻴﺔ
UTIL Utilities ﻟﻮﺣﺎت ﻣﺮاﻓﻖ
ﻟﻠﻌﺮض
-٥ﻣﻮﻗﻒ اﻟﻠﻮﺣﺎت Phasesوهﻲ
اﻟﻜﻮد اﻟﻮﺻﻒ اﻟﻤﻌﻨﻰ
Approved for ﺗﻢ اﻟﻤﻮاﻓﻘﺔ ﻋﻠﻴﻪ ﻟﻠﺘﻨﻔﻴﺬ
AFC
Construction
ﻓﻘﻂ
IFB Issued for Bid إﺻﺪار ﻟﻠﻄﺮح
IFC Issued for Construction إﺻﺪار ﻟﻠﺘﻨﻔﻴﺬ
AS-BUILT As-Built آﻤﺎ هﻮ ﻣﻨﻔﺬ ) ﻃﺒﻘﺎ ﻟﻠﺮﻓﻊ (
SCHEM Schematic Documents رﺳﻮﻣﺎت أوﻟﻴﺔ
DESIGN Design Development رﺳﻮﻣﺎت ﻣﺮﺣﻠﺔ اﻟﺘﺼﻤﻴﻢ
PROGRESS Progress Documents رﺳﻮﻣﺎت اﻟﺘﻘﺪﻳﻢ
FINAL Final Documents ﻟﻮﺣﺎت ﻧﻬﺎﺋﻴﺔ
٥٦
اﻟﻘﻮاﻣﻴﺲ Dictionaries
ﻏـﻴـﺮ
ﻓﻲ اﻟﺤﺎﻻت اﻟﺜﻼﺛﺔ ﻋﺸﺮ اﻟﺴﺎﺑﻘﺔ آﻨﺎ ﻧﻀﻊ ﻣﺆﺷﺮ اﻟﻔﺄرة ﻋﻠﻰ All Projectsﺛﻢ
ﻣﺴﻤﻮح
أﻣﺎ ﻓﻲ ﺣﺎﻟﺔ ﺗﻌﺮﻳﻒ اﻟﻐﺮف وﻣﻨﺎﻃﻖ اﻟﻌﻤﻞ ﻓﻼﺑﺪ ﻣﻦ ﺗﺤﺪﻳﺪ اﻟﻤﺸﺮوع اﻟﻤﻄﻠﻮب ﺗﻌﺮﻳﻒ
ﺑﻴﺎﻧﺎﺗﻪ ﻋﻦ ﻃﺮﻳﻖ ﺗﺤﺪﻳﺪﻩ ﺑﻤﺆﺷﺮ اﻟﻔﺄرة آﻤﺎ ﻓﻲ اﻟﺸﻜﻞ ) ( ٣ -٢
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ
ﻟﻠﻌﺮض
ﺷﻜﻞ ) ( ٣ -٢
ﻓﻘﻂ
ﻓﺘﻈﻬﺮ أﻣﺎﻣﻨﺎ اﻟﻨﺎﻓﺬة اﻟﺘﺎﻟﻴﺔ واﻟﺘﻲ ﺗﻮﺿﺢ ﻣﻨﺎﻃﻖ اﻟﻌﻤﻞ ﺑﺎﻟﻤﺸﺮوع وﺳﺘﺠﺪ اﻧﻪ ﻓﻲ ﺣﺎﻟﺔ
اﻷﻣﺜﻠﺔ اﻟﻤﻠﺤﻘﺔ ﺑﺎﻟﺒﺮﻧﺎﻣﺞ أﻧﻬﺎ ﻣﻘﺴﻤﺔ إﻟﻰ أرﺑﻊ ﻣﻨﺎﻃﻖ وهﻲ :
A – B – C – Mechanical
وﺳﺘﺠﺪ اﻧﻪ ﺗﻢ ﻋﻤﻞ ﺗﻘﺴﻴﻤﺎت أﺧﺮى ﻣﺜﻞ دﻣﺞ ﻣﻨﻄﻘﺘﻴﻦ ﻣﻊ ﺑﻌﻀﻬﻤﺎ اﻟﺒﻌﺾ ﻣﺜﻞ :
AB – AC
وﺧﻴﺎر ﺁﺧﺮ وهﻮ " آﻞ اﻟﻤﻨﺎﻃﻖ – " Allﺷﻜﻞ ) ( ٤ – ٢
٥٧
اﻟﺒﺎب اﻟﺜﺎﻧﻲ
ﻏـﻴـﺮ
ﻣﺴﻤﻮح
ﺑﺎﻟﻄﺒﺎﻋﺔ Add
ﺷﻜﻞ ) ( ٤ -٢
وﻣﻦ اﻟﻤﻌﻠﻮم أن ﺗﺤﺪﻳﺪ ﻣﻨﺎﻃﻖ ﻟﻠﻌﻤﻞ هﻮ ﻣﻦ اﻷﻣﻮر اﻟﺘﻨﻈﻴﻤﻴﺔ اﻟﻤﻬﻤﺔ ﺣﻴﺚ ﻳﺘﻢ ﺗﺤﺪﻳﺪ
ﻟﻠﻌﺮض
ﻣﺴﺌﻮﻟﻴﺎت آﻞ ﻣﻨﻄﻘﺔ ﻣﻊ ﻃﺎﻗﻢ ﺗﻨﻔﻴﺬ ﻣﻌﻴﻦ وﺑﺎﻟﺘﺎﻟﻲ ﻳﻤﻜﻦ اﻟﺴﻴﻄﺮة ﻋﻠﻰ اﻟﻤﺸﺮوع
ﻓﻘﻂ
Define Æ Dictionaries Æ Punch List Rooms
اﻟﺨﻼﺻﺔ
ﺑﻌﺪ أن اﺳﺘﻌﺮﺿﻨﺎ آﻴﻔﻴﺔ ﺗﻌﺮﻳﻒ اﻟﻘﻮاﻣﻴﺲ ﺳﻨﺬآﺮ اﻟﻨﻮاﻓﺬ اﻟﺘﻲ ﺳﻨﺤﺘﺎج ﻓﻴﻬﺎ هﺬﻩ
اﻟﻘﻮاﻣﻴﺲ ﺑﺸﻜﻞ ﻣﺨﺘﺼﺮ اﻵن ﺣﻴﺚ أﻧﻨﺎ ﺳﻨﻘﻮم ﺑﺸﺮح ﺗﻠﻚ اﻟﻨﻮاﻓﺬ ﻓﻲ اﻷﺑﻮاب اﻟﺘﺎﻟﻴﺔ
وهﻲ آﻤﺎ ﻓﻲ اﻟﺠﺪول اﻟﺘﺎﻟﻲ
٥٨
Dictionaries اﻟﻘﻮاﻣﻴﺲ
ﻏـﻴـﺮ
• Project Properties
Project Information
Company Role
Company Role
• Companies NAICS
Spec Sections
• Issues Status
ﻣﺴﻤﻮح
• Request Information Reason Code
Communication
ﺑﺎﻟﻄﺒﺎﻋﺔ
• Meeting Minutes
Status
• Notepads
• Contracts
Spec Sections
Contract Information
• Purchase Order
Status
• Change Management
ﻧﺴﺨﺔ
• Trends Status
Bid Packages
ﻟﻠﻌﺮض
Phase
• Drawings Set Discipline
• Drawings Area
File No
Spec Sections
• Submittal Packages Status
ﻓﻘﻂ
• Submittals Submittal Type
Logs
Temperature
Precipitation
Sky
• Daily Reports
Wind
Drawing Areas
Equipment Type
• Insurance
Status
• Punch List
٥٩
א ﻏـﻴـﺮ א
ﻣﺴﻤﻮح
Submittals א
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ
ﻟﻠﻌﺮض
ﻓﻘﻂ
اﻟﺘﻘﺪﻳﻤﺎت
ﻏـﻴـﺮ א
ﻣﺴﻤﻮح
ﻳﻌﺘﺒ ﺮ ﻣﻮﺿ ﻮع ﻣﺘﺎﺑﻌ ﺔ اﻟﺘﻘ ﺪﻳﻤﺎت Submittalsﻣ ﻦ أه ﻢ اﻟﻤﻮاﺿ ﻴﻊ ﻓ ﻲ ﻗﻄ ﺎع
ﺷﺮآﺎت اﻟﻤﻘﺎوﻻت ﺣﻴﺚ أن ﻋﺪم ﻣﺘﺎﺑﻌﺔ هﺬﻩ اﻟﺘﻘﺪﻳﻤﺎت ﻳﺆدي إﻟﻰ ﺗﺄﺧﻴﺮ ﻓ ﻲ زﻣ ﻦ ﺗﻨﻔﻴ ﺬ
اﻟﻤﺸﺮوع ،ﻟﺬا آﺎن ﻣ ﻦ اﻟﻮاﺟ ﺐ اﻻهﺘﻤ ﺎم ﺑﻤﺘﺎﺑﻌ ﺔ اﻟﺘﻘ ﺪﻳﻤﺎت وﻣﺘﺎﺑﻌ ﺔ اﻹﺟ ﺮاءات اﻟﺘ ﻲ
اﺗﺨﺬت ﻣﻊ آﻞ ﺗﻘﺪﻳﻢ ﺳﻮاء ﺑﺎﻟﻤﻮاﻓﻘﺔ أو اﻟﺮﻓﺾ أو إﻋﺎدة اﻟﺘﻘﺪﻳﻢ
ﻧﺴﺨﺔ
اﺳﺘﺨﺪام اﻟﻤﻜﺎﺗﺐ اﻻﺳﺘﺸﺎرﻳﺔ ﻟﻠﺒﺮﻧﺎﻣﺞ ﻳﺨﺘﻠﻒ ﻋﻦ اﺳ ﺘﺨﺪام ﺷ ﺮآﺎت اﻟﻤﻘ ﺎوﻻت وﻧﻈ ﺮا
ﻷﻧﻨﺎ ﻓﻲ هﺬا اﻟﻜﺘﺎب ﻧﺪرس ﺣﺎﻟﺔ اﺳ ﺘﺨﺪام اﻟﺒﺮﻧ ﺎﻣﺞ ﻟ ﺸﺮآﺎت اﻟﻤﻘ ﺎوﻻت ﻓ ﺄن اﻟﺘﻘ ﺪﻳﻤﺎت
ﺗﻜﻮن ﻷي ﻣﻦ اﻵﺗﻲ :
Shop Drawings -١ﺗﻘﺪﻳﻤﺎت ﻟﻠﺮﺳﻮﻣﺎت اﻟﺘﻨﻔﻴﺬﻳﺔ
ﻟﻠﻌﺮض
-٢ﺗﻘﺪﻳﻤﺎت ﻟﺮﺳﻮﻣﺎت ﻣﺎ ﺑﻌﺪ اﻟﺘﻨﻔﻴﺬ As Built Drawings
-٣ﺗﻘﺪﻳﻤﺎت ﻟﻠﻤﻮاﺻﻔﺎت اﻟﻔﻨﻴﺔ ﻟﻠﻤﻮاد
-٤ﺗﻘﺪﻳﻤﺎت ﻟﻌﻴﻨﺎت اﻟﻤﻮاد اﻟﻤﻄﻠﻮﺑﺔ
-٥ﺗﻘﺪﻳﻤﺎت ﻟﺸﻬـﺎدات اﻟﻀﻤﺎن
-٦ﺗﻘﺪﻳﻤﺎت اﻋﺘﻤﺎد ﻣﻘﺎوﻟﻲ اﻟﺒﺎﻃﻦ أو اﻟﻤﻮردﻳﻦ
ﻓﻘﻂ
وﻟﻠﺘﻨﻈ ﻴﻢ ﻳ ﺘﻢ ﻋﻤ ﻞ ﺣ ﺰم ﻟﻠﺘﻘ ﺪﻳﻤﺎت Submittal Packagesﺑﺤﻴ ﺚ ﻳ ﺘﻢ ﺗﺠﻤﻴ ﻊ
ﺗﻘﺪﻳﻤﺎت اﻟﻌﻴﻨﺎت ﻣﻊ ﺑﻌﻀﻬﺎ اﻟﺒﻌﺾ وﺗﻘﺪﻳﻤﺎت اﻟﺮﺳﻮﻣﺎت ﻣﻊ ﺑﻌﻀﻬﺎ اﻟﺒﻌﺾ وهﻜﺬا ..
ﻣﻤﺎ ﻳﺴﻬﻞ ﻣﻦ ﻋﻤﻠﻴﺎت اﻟﻔﺮز واﻟﺒﺤﺚ وﺳﻨﺸﺮح اﻵن ﻃﺮﻳﻘﺔ ﻋﻤﻞ ﺣﺰم اﻟﺘﻘﺪﻳﻤﺎت
٦١
اﻟﺒﺎب اﻟﺜﺎﻟﺚ
ﻏـﻴـﺮ
ﻗﺒﻞ ان ﻧﺸﺮح ﻃﺮﻳﻘﺔ اﻧﺸﺎء اﻟﺤﺰم ﻻﺑﺪ ﻣﻦ ﺗﺤﺪﻳﺪ اﻧ ﻮاع اﻟﺤ ﺰم اﻟﻤﻄﻠﻮﺑ ﺔ ﻓﻤ ﺜﻼ ﻳﻤﻜ ﻦ
ﻋﻤ ﻞ ﺣﺰﻣ ﺔ ﻟﻠﺮﺳ ﻮﻣﺎت اﻟﺘﻨﻔﻴﺬﻳ ﺔ وﺣﺰﻣ ﺔ ﻟﻤ ﻮاد اﻟ ﺴﺒﺎآﺔ وﺣﺰﻣ ﺔ ﻟﻸﺑ ﻮاب واﻟ ﺸﺒﺎﺑﻴﻚ
وﺣﺰﻣﺔ ﻟﻤﻮاد اﻷﻋﻤﺎل اﻟﻜﻬﺮﺑﺎﺋﻴﺔ وهﻜﺬا ...
وﺑﻌﺪ ﺗﺤﺪﻳﺪ اﻟﺤﺰم ﻧﺘﺒﻊ اﻟﺨﻄﻮات اﻟﺘﺎﻟﻴﺔ :
ﻣﺴﻤﻮح
-ﻓ ﻲ اﻟﻤﺜ ﺎل Demoاﻟﻤﻮﺟ ﻮد ﺑﺎﻟﺒﺮﻧ ﺎﻣﺞ ﻧﻘ ﻮم ﺑﻔ ﺘﺢ ﻣﺠﻠ ﺪ Logﺛ ﻢ ﻧﻨﻘ ﺮ ﻧﻘ ﺮا
ﻣﺰدوﺟﺎ ﻋﻠﻰ ﻋﻨﺼﺮ Submittal Packagesآﻤﺎ ﺑﺎﻟﺸﻜﻞ ) ( ١ - ٣
ﻟﻠﻌﺮض
ﻓﻘﻂ
ﺷﻜﻞ ) ( ٢ – ٣
٦٢
اﻟﺘﻘﺪﻳﻤﺎت
وآﻤﺎ ﺗﺮى ﻓﻲ اﻟﻨﺎﻓﺬة ﻓ ﺈن اﻟﺤ ﺰم ﺗﻈﻬ ﺮ ﻣﺮﺗﺒ ﺔ ﻓ ﻲ ﺟ ﺪول وأﻣ ﺎم آ ﻞ ﺣﺰﻣ ﺔ اﻳﻘﻮﻧ ﺔ ﻣ ﻊ
ﻣﻼﺣﻈ ﺔ أن ﺗﻠ ﻚ اﻷﻳﻘﻮﻧ ﺔ ﻗ ﺪ ﺗﺄﺧ ﺬ واﺣ ﺪ ﻣ ﻦ اﻷﺷ ﻜﺎل اﻟﺜﻼﺛ ﺔ ﻃﺒﻘ ﺎ ﻟﺨﺎﺻ ﻴﺔ اﻷهﻤﻴ ﺔ
Priorityواﻟﺘﻲ ﺳﻨﺸﺮح ﺑﻌﺪ ﻗﻠﻴﻞ آﻴﻔﻴﺔ ﺗﺤﺪﻳﺪهﺎ – اﻟﺸﻜﻞ ) ( ٣ – ٣
ﻣﺴﻤﻮح
وﻟﻔ ﺘﺢ ﻧﺎﻓ ﺬة أي ﺣﺰﻣ ﺔ ﻣ ﻦ اﻟﺤ ﺰم ﻧﻨﻘ ﺮ ﻧﻘ ﺮا ﻣﺰدوﺟ ﺎ ﻋﻠ ﻰ اﻷﻳﻘﻮﻧ ﺔ اﻟﻤﺠ ﺎورة ﻷﺳ ﻢ
اﻟﺤﺰﻣ ﺔ أو ﻧﻘ ﻮم ﺑﺘﺤﺪﻳ ﺪ اﻟﺤﺰﻣ ﺔ ﺑﻤﺆﺷ ﺮ اﻟﻔ ﺄرة ﺛ ﻢ ﻧ ﻀﻐﻂ ﻋﻠ ﻰ زر Openﻓﺘﻈﻬ ﺮ
أﻣﺎﻣﻨﺎ ﻧﺎﻓﺬة ﺗﻠﻚ اﻟﺤﺰﻣﺔ
وﺑﻔﺮض أﻧﻨﺎ ﺳﻨﻘﻮم ﺑﻔﺘﺢ ﻧﺎﻓﺬة ﺣﺰﻣﺔ Earthworkاﻟﻤﻮﺟﻮدة ﺑﺎﻟﻤﺜﺎل -ﺷﻜﻞ )( ٤ -٣
ﻧﺴﺨﺔ
ﻟﻠﻌﺮض ﻣﻨﻄﻘﺔ ﺑﻴﺎﻧﺎت اﻟﺘﻘﺪﻳﻤﺎت اﻟﻤﻮﺟﻮدة ﺑﻬﺬﻩ اﻟﺤﺰﻣﺔ
٦٣
اﻟﺒﺎب اﻟﺜﺎﻟﺚ
ﻏـﻴـﺮ
وﺳﺘﺠﺪ اﻧﻪ ﻳﺘﻜﻮن ﻣﻦ ﺣﻘﻠﻴﻦ اﻷول ﻟﻠﺸﺮآﺔ واﻟﺜﺎﻧﻲ ﻟﻠﻤﻮﻇﻒ اﻟﻤﻮﺟﻮد ﺑﺘﻠﻚ اﻟﺸﺮآﺔ
Status:
اﻟﺤﺎﻟﺔ اﻟﺨﺎﺻﺔ ﺑﺎﻟﺤﺰﻣﺔ ) راﺟﻊ أآﻮاد اﻻﺟﺮاءات ﻓﻲ اﻟﺒﺎب اﻟﺜﺎﻧﻲ (
Priority :
درﺟﺔ اﻷهﻤﻴﺔ وهﻲ اﻣﺎ ) ﻗﺼﻮى – ﻋﺎدﻳﺔ – ﻣﻨﺨﻔﻀﺔ ( ،آﻤﺎ ﺑﺎﻟﺸﻜﻞ رﻗﻢ ) ( ٣ -٣
ﻣﺴﻤﻮح
Activity ID:
ﻣﻌﺮف اﻟﻨﺸﺎط وﻳﺴﺘﺨﺪم ﻟﺮﺑﻂ اﻟﺤﺰﻣﺔ ﺑﻨﺸﺎط ﻓﻲ اﻟﺠﺪول اﻟﺰﻣﻨﻲ ﻟﺒﺮﻧﺎﻣﺞ اﻟﺒﺮﻳﻤﺎﻓﻴﺮا
وﻓﻲ ﺣﺎﻟﺔ رﺑﻂ اﻟﻤﺸﺮوع ﻣﻊ ﺑﺮﻧﺎﻣﺞ اﻟﺒﺮﻳﻤﺎﻓﻴﺮ ﺳﺘﻈﻬﺮ ﺟﻤﻴﻊ اﻷﻧﺸﻄﺔ ﻓﻲ اﻟﻘﺎﺋﻤﺔ
اﻟﻤﻨﺴﺪﻟﺔ اﻣﺎ ﻓﻲ ﺣﺎﻟﺔ ﻋﺪم رﺑﻂ اﻟﻤﺸﺮوع ﺑﺠﺪول زﻣﻨﻲ ﺳﻨﺠﺪ ان هﺬا اﻟﺨﻴﺎر ﻏﻴﺮ ﻓﻌﺎل
ﺑﺎﻟﻄﺒﺎﻋﺔ
راﺟﻊ رﺑﻂ Expeditionﺑﺎﻟﺒﺮﻧﺎﻣﺞ اﻟﺰﻣﻨﻲ ل Primaveraﺻﻔﺤﺔ رﻗﻢ ٤٠
Received From:
ﻣﺮﺳﻞ ﻣﻦ ) اﻟﺸﺮآﺔ اﻟﻤﻮردة ﻣﺜﻼ (
ﻓﻘﻂ
Forwarded To:
ﺗﻤﺮﻳﺮ إﻟﻰ ) اﻟﺸﺮآﺔ اﻟﻤﻮردة ﺑﻌﺪ اﺗﺨﺎذ ﻗﺮار اﻹﻋﺘﻤﺎد (
Required Start :
اﻟﺘﺎرﻳﺦ اﻟﻤﻄﻠﻮب ﻟﻠﺒﺪء
Required Finish :
اﻟﺘﺎرﻳﺦ اﻟﻤﻄﻠﻮب ﻟﻠﻨﻬﻮ
٦٤
اﻟﺘﻘﺪﻳﻤﺎت
وﻓﻴﻤﺎ ﻳﻠﻲ اﻟﺤﻘﻮل اﻟﺨﺎﺻﺔ ﺑﻤﻠﺨﺺ أﻋﺪاد اﻟﺘﻘﺪﻳﻤﺎت واﻟﺘﻲ ﺗﻈﻬﺮ ﻓﻲ اﻟﻤﻨﻄﻘﺔ اﻟﺴﻔﻠﻰ
ﻏـﻴـﺮ
Total Items :
اﻟﻌﺪد اﻟﻜﻠﻲ ﻟﻠﺘﻘﺪﻳﻤﺎت اﻟﻤﻮﺟﻮدة ﻓﻲ هﺬﻩ اﻟﺤﺰﻣﺔ
Submitted :
ﻋﺪد اﻟﺘﻘﺪﻳﻤﺎت اﻟﺘﻲ ﺗﻢ إرﺳﺎﻟﻬﺎ
ﻣﺴﻤﻮح
Unapproved :
ﻋﺪد اﻟﺘﻘﺪﻳﻤﺎت اﻟﻐﻴﺮ ﻣﻮاﻓﻖ ﻋﻠﻴﻬﺎ
Approved :
ﻋﺪد اﻟﺘﻘﺪﻳﻤﺎت اﻟﺘﻲ ﺗﻢ اﻟﻤﻮاﻓﻘﺔ ﻋﻠﻴﻬﺎ
Complete :
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺒﺔ اﻟﻤﺌﻮﻳﺔ ﻹﻧﻬﺎء اﻟﺘﻘﺪﻳﻤﺎت وهﻲ ﺗﺴﺎوي ﻧﺴﺒﺔ اﻟﺘﻘﺪﻳﻤﺎت اﻟﻤﻮاﻓﻖ ﻋﻠﻴﻬﺎ إﻟﻰ اﺟﻤﺎﻟﻲ
اﻟﺘﻘﺪﻳﻤﺎت ﺑﻬﺬﻩ اﻟﺤﺰﻣﺔ
ﻧﺴﺨﺔ
)Approved (APP ٣ﺗﻘﺪﻳﻤﺎت ﺑﻜﻮد ﻣﻮاﻓﻘﺔ
١ﺗﻘﺪﻳﻢ ﺑﻜﻮد ﻣﻮاﻓﻘﺔ ﻣﻊ ﻣﻼﺣﻈﺎت )Approved as Noted (AAN
)New Item (NEW ٢ﺗﻘﺪﻳﻢ ﺑﻜﻮد ﺟﺪﻳﺪ
٦إﺟﻤﺎﻟﻲ اﻟﺘﻘﺪﻳﻤﺎت
ﻟﻠﻌﺮض
٤
= ٪ ٦٦ ﻧﺴﺒﺔ اﻹﻧﺠﺎز =
٦
وﺳﻨﺠﺪ ﻓﻲ اﺳﻔﻞ اﻟﻨﺎﻓﺬة زر Applyوهﻮ ﺧﺎص ﺑﺘﻄﺒﻴﻖ اﻟﺘﻌﺪﻳﻞ اﻟﺬي ﻧﺠﺮﻳﻪ ﻋﻠﻰ أي
أﻣﺎ ﻣﻜﻮﻧﺎت اﻟﺠﺰء اﻟﺴﻔﻠﻲ واﻟﺨﺎﺻﺔ ﺑﺎﻟﺘﻘﺪﻳﻤﺎت ﺳﻨﻘﻮم ﺑﺸﺮﺣﻬﺎ ﺑﺎﻟﺘﻔﺼﻴﻞ ﻓﻲ ﻗﺴﻢ
اﺿﺎﻓﺔ اﻟﺘﻘﺪﻳﻤﺎت ﻟﻠﻤﺸﺮوع
٦٥
اﻟﺒﺎب اﻟﺜﺎﻟﺚ
ﻏـﻴـﺮ
ﻹﺿﺎﻓﺔ ﺣﺰﻣﺔ ﺟﺪﻳﺪة ﻧﻀﻐﻂ ﻋﻠﻰ زر Addواﻟﺬي ﺑﺪورﻩ ﺳﻴﻔﺘﺢ ﻧﺎﻓﺬة ﺟﺪﻳﺪة ﺑﺪون
ﺑﻴﺎﻧﺎت آﻤﺎ ﺑﺎﻟﺸﻜﻞ ) ( ٥ -٣
آﻤﺎ ﻳﻤﻜﻦ اﺟﺮاء ﻧﻔﺲ اﻷﻣﺮ ﻣﻦ ﺧﻼل اﻟﻘﻮاﺋﻢ آﺎﻟﺘﺎﻟﻲ :
Edit Æ Add Item
ﻣﺴﻤﻮح
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ
ﻟﻠﻌﺮض
ﺷﻜﻞ ) ( ٥ -٣
-ﺛﻢ ﻧﻘﻮم ﺑﻮﺿﻊ ﻣﺆﺷﺮ اﻟﻔﺄرة داﺧﻞ ﺧﺎﻧﺔ Package Noﻓﻴﻈﻬﺮ اﻟﺴﻬﻢ ﺛﻢ ﻧﺒﺤﺚ
ﻓﻲ ارﻗﺎم اﻟﺤﺰم ﺣﺘﻰ ﻧﺘﺄآﺪ ﻣﻦ ﻋﺪم وﺟﻮد اﻟﺮﻗﻢ اﻟﺨﺎص ﺑﺎﻟﺤﺰﻣﺔ اﻟﺠﺪﻳﺪة ﻓﻲ أرﻗﺎم
اﻟﺤﺰم اﻷﺧﺮى وﺑﻌﺪ ذﻟﻚ ﻧﻘﻮم ﺑﻜﺘﺎﺑﺔ رﻗﻢ اﻟﺤﺰﻣﺔ ) ﻣﺜﻼ ( 9999
٦٦
اﻟﺘﻘﺪﻳﻤﺎت
ﻏـﻴـﺮ
ﺑﻌﺪ اﻧﺸﺎء اﻟﺤﺰﻣﺔ اﻟﺠﺪﻳﺪة ﻗﺪ ﻧﺤﺘ ﺎج إﻟ ﻰ ﺗﻌ ﺪﻳﻞ ﺑﻴﺎﻧﺘﻬ ﺎ ﻣﺜ ﻞ ﺗﻐﻴﻴ ﺮ اﻹﺳ ﻢ أو اﻟﻤ ﻮرد أو
اﻻﺳﺘ ﺸﺎري أو ﻣﻮﻋ ﺪ اﻟﺒ ﺪء اﻟﻤﻘﺘ ﺮح وﻏﻴ ﺮ ذﻟ ﻚ ﻣ ﻦ اﻟﺒﻴﺎﻧ ﺎت وﻟﻌﻤ ﻞ ذﻟ ﻚ ﻧﻘ ﻮم ﺑﻔ ﺘﺢ
اﻟﺤﺰﻣﺔ ﺛﻢ اﻟﻘﻴﺎم ﺑﺎﻟﺘﻐﻴﻴﺮات اﻟﻤﻄﻠﻮﺑﺔ ﻣﻊ اﻟﻌﻠﻢ اﻧﻪ ﻻﻳﻤﻜﻨﻨﺎ ﺗﻐﻴﻴﺮ رﻗﻢ اﻟﺤﺰﻣﺔ
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ
ﺷﻜﻞ )( ٦ – ٣
إﺿﺎﻓﺔ اﻟﺘﻘﺪﻳﻤﺎت
ﻟﻠﻌﺮض
ﺑﻌﺪ أن ﺗﻌﻠﻤﻨﺎ آﻴﻔﻴﺔ إﻧﺸﺎء ﺣﺰم اﻟﺘﻘﺪﻳﻤﺎت ﺳﻨﺘﻌﻠﻢ اﻵن ﻃﺮﻳﻘﺔ إﺿﺎﻓﺔ اﻟﺘﻘﺪﻳﻤﺎت إﻟﻰ ﺗﻠﻚ
اﻟﺤﺰم وﻳﻠﺰم اﻹﺷﺎرة أﻧﻨﺎ ﻳﻤﻜﻨﻨﺎ إﺿﺎﻓﺔ ﺗﻘﺪﻳﻤﺎت ﺑﺪون ﺣﺰم وﻟﻜﻦ ﻣﻦ اﻷﻓﻀﻞ رﺑﻂ
اﻟﺘﻘﺪﻳﻤﺎت ﺑﺤﺰم ﺣﺘﻰ ﻳﻜﻮن اﻟﻌﻤﻞ ﻣﻨﻈﻢ
وﻹﺿﺎﻓﺔ اﻟﺘﻘﺪﻳﻤﺎت إﻟﻰ اﻟﻤﺸﺮوع ﻳﺘﻢ ذﻟﻚ ﻣﻦ ﺧﻼل ﻃﺮﻳﻘﺘﻴﻦ وهﻤﺎ :
ﻓﻘﻂ
-١ﻣﻦ ﺧﻼل ﻓﺘﺢ اﻟﺤﺰﻣﺔ ﺛﻢ إﺿﺎﻓﺔ اﻟﺘﻘﺪﻳﻢ
-٢ﻣﻦ ﺧﻼل إﺿﺎﻓﺔ اﻟﺘﻘﺪﻳﻢ ﻣﺒﺎﺷﺮة ﻓﻲ وﺣﺪة Submittalsﻓﻲ ﻣﺠﻠﺪ Log
وآﻤﺎ ﺗﺮى ﻓﺈن اﻟﻄﺮﻳﻘﺔ اﻟﺜﺎﻧﻴﺔ ﻣﻨﺎﺳﺒﺔ ﺟﺪا ﻓﻲ ﺣﺎﻟﺔ إﺿﺎﻓﺔ ﺗﻘﺪﻳﻢ ﻏﻴﺮ ﻣﺮﺗﺒﻂ ﺑﺤﺰﻣﺔ
ﻣﻦ اﻟﺤﺰم اﻟﻤﻮﺟﻮدة ﺑﺎﻟﻤﺸﺮوع
٦٧
اﻟﺒﺎب اﻟﺜﺎﻟﺚ
ﻏـﻴـﺮ
ﺳﻨﻘﻮم ﺑﺸﺮح هﺬﻩ اﻟﻄﺮﻳﻘﺔ ﻣﻦ ﺧﻼل ﻣﺜﺎل ﻋﻤﻠﻲ ﺣﻴﺚ ﻧﻔﺘﺢ اﻟﺤﺰﻣﺔ اﻟﺴﺎﺑﻘﺔ إﻧﺸﺎؤهﺎ
) ( 9999 Ceramicﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ زر Addﻓﺘﻈﻬﺮ أﻣﺎﻣﻨﺎ اﻟﻨﺎﻓﺬة اﻟﺘﺎﻟﻴﺔ
ﻣﺴﻤﻮح
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ ﺷﻜﻞ )( ٧ – ٣
ﻓﻨﻼﺣﻆ أن اﻟﺒﺮﻧﺎﻣﺞ ﻗﺎم ﺑﺘﺮﻗﻴﻢ اﻟﺘﻘﺪﻳﻢ ﺗﻠﻘﺎﺋﻴﺎ ﺑﺮﻗﻢ 1ﻓﻲ ﺧﺎﻧﺔ Submittalواﻟﺬي
ﻟﻠﻌﺮض
ﺑﺪورﻩ ﺳﻴﺘﻐﻴﺮ ﻓﻲ آﻞ ﻣﺮة ﻧﻀﻴﻒ ﻓﻴﻬﺎ ﺗﻘﺪﻳﻢ ﺟﺪﻳﺪ ﻟﺘﻠﻚ اﻟﺤﺰﻣﺔ وﻳﻤﻜﻦ ان ﻧﻐﻴﺮ ﺗﻠﻚ
اﻟﻘﻴﻤﺔ آﻤﺎ ﻧﺮﻏﺐ
اﻣﺎ ﺧﺎﻧﺔ Numberذات ﺗﺮﻗﻴﻢ ﺗﻠﻘﺎﺋﻲ ﻣﺘﺘﺎﻟﻲ وآﺬﻟﻚ ﻳﻤﻜﻦ ﺗﻐﻴﻴﺮﻩ
ﺛﻢ ﻧﻘﻮم ﺑﺈدﺧﺎل اﻟﺒﻴﺎﻧﺎت اﻟﺘﺎﻟﻴﺔ :
Title : Kitchen wall Ceramic 30cm sample اﺳﻢ اﻟﺘﻘﺪﻳﻢ
ﻓﻘﻂ
Type :Pre-Construction اﻟﻨﻮع :ﻗﺒﻞ اﻟﺘﻨﻔﻴﺬ
)راﺟﻊ أﻧﻮاع اﻟﺘﻘﺪﻳﻤﺎت ﻓﻲ ﺑﺎب اﻟﻘﻮاﻣﻴﺲ ﺻﻔﺤﺔ ( ٥٢
Received From : Finish ﻣﻦ ﺷﺮآﺔ اﻟﺘﺸﻄﻴﺒﺎت اﻟﻤﺤﺪودة
Sent TO : Design إﻟﻰ اﻻﺳﺘﺸﺎري
Required Start : 04/02/2007 ﺗﺎرﻳﺦ اﻟﺒﺪء
Required Finish : 20/02/2007 ﺗﺎرﻳﺦ اﻟﻨﻬﻮ
ﻣﻊ ﻣﻼﺣﻈﺔ اﻧﻨﻲ آﺘﺒﺖ هﺬﻩ اﻟﺘﻮارﻳﺦ ﻋﻨﺪﻣﺎ آﺎن ﺗﺎرﻳﺦ ﺟﻬﺎزي هﻮ ٢٠٠٧/٢/٢٥م
٦٨
اﻟﺘﻘﺪﻳﻤﺎت
ﻏـﻴـﺮ
Held = 25/02/2007 – 04/02/2007 = 21 Days
ﻋﺪد أﻳﺎم اﻟﺘﺄﺧﻴﺮ ﻓﻲ اﻟﺘﻘﺪﻳﻢ
Overdue= 25/02/2007 – 20/02/2007 = 5 Days
وﻃﺒﻌﺎ ﻇﻬﺮت هﺬﻩ اﻟﺘﻮارﻳﺦ ﻷﻧﻨﺎ ﺣﺎﻟﺔ اﻟﺘﻘﺪﻳﻢ ﻣﺤﺪدة ﻋﻠﻰ UnSubmitted
ودﻋﻨﺎ ﻧﺤﺪد ﺣﺎﻟﺔ أﺧﺮى وهﻲ ﺣﺎﻟﺔ اﻟﻤﻮاﻓﻘﺔ Approvedوذﻟﻚ ﻣﻦ ﺧﻼل اﻟﻌﻮدة إﻟﻰ
ﻣﺴﻤﻮح
ﻧﺎﻓﺬة اﻟﺤﺰﻣﺔ ﻋﻦ ﻃﺮﻳﻖ اﻟﻀﻐﻂ ﻋﻠﻰ زر Okﻓﺘﻈﻬﺮ اﻟﻨﺎﻓﺬة آﻤﺎ ﺑﺎﻟﺸﻜﻞ )( ٨ -٣
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ
ﻟﻠﻌﺮض
ﺷﻜﻞ )( ٨ – ٣
ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ اﻟﻘﺎﺋﻤﺔ اﻟﻤﻨﺴﺪﻟﺔ ﻟﻠﺤﺎﻟﺔ Statusوﻧﺨﺘﺎر ﺣﺎﻟﺔ اﻟﻤﻮاﻓﻘﺔ Approved
ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ زر Applyوﻧﻔﺘﺢ اﻟﺘﻘﺪﻳﻢ رﻗﻢ 1ﻣﺮة أﺧﺮى ﻓﻨﻼﺣﻆ أن
Held = 0
Overdue=0
ﻓﻘﻂ
رﻗﻢ ﺁﺧﺮ ﻣﺮاﺟﻌﺔ Last Rev# 001
٦٩
اﻟﺒﺎب اﻟﺜﺎﻟﺚ
ﺛﻢ ﻧﻨﺘﻘﻞ اﻵن إﻟﻰ اﻟﻘﺴﻢ اﻟﺜﺎﻧﻲ وهﻮ ﻗﺴﻢ اﻟﺘﻮزﻳﻊ Distribution
ﻏـﻴـﺮ
وﻓﻴﻪ ﻳﺘﻢ اﺧﺘﻴﺎر اﻷﻃ ﺮاف اﻟ ﺬﻳﻦ ﺳ ﻴﺘﻢ إرﺳ ﺎل ﻧ ﺴﺨﺔ ﻣ ﻦ اﻟﺘﻘ ﺪﻳﻤﺎت إﻟ ﻴﻬﻢ وﺳ ﻨﻘﻮم اﻵن
ﺑﺈﺿﺎﻓﺔ اﻟﺸﺮآﺎت ﻋﻦ ﻃﺮﻳﻖ اﻟﻀﻐﻂ ﻋﻠﻰ زر Addﻓﺘﻈﻬﺮ اﻟﻨﺎﻓﺬة اﻟﺘﺎﻟﻴﺔ
ﻣﺴﻤﻮح
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ ﺷﻜﻞ )( ٩ – ٣
وآﻤﺎ ﺗﻼﺣﻆ ﻳﻤﻜﻦ اﺧﺘﻴﺎر ﻗﺎﺋﻤﺔ ﺗﻮزﻳﻊ ﻣﻌﺮﻓﺔ أو اﺧﺘﻴﺎر ﺷﺮآﺎت ﻣﻨﻔﺼﻠﺔ
ﻟﻠﻌﺮض
) راﺟﻊ إﻧﺸﺎء ﻗﻮاﺋﻢ اﻟﺘﻮزﻳﻊ ﺑﺎﻟﺒﺎب اﻷول ﺻﻔﺤﺔ ( ٣٨
-وﻓﻲ ﺣﺎﻟﺘﻨﺎ ﺳﻨﻘﻮم ﺑﺎﺧﺘﻴﺎر Companiesﺛﻢ ﻧﺨﺘﺎر ﺷﺮآﺔ Finish
-ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ زر Addﻓﻴﺘﻢ إدراج اﻟﺸﺮآﺔ ﻓﻲ اﻟﺠﺎﻧﺐ اﻷﻳﻤﻦ
-ﺛ ﻢ ﻧﺤ ﺪد رﻗ ﻢ اﻟﻤﺮاﺟﻌ ﺔ اﻟﻤﻄﻠ ﻮب إرﺳ ﺎﻟﻬﺎ ﻣ ﻦ ﺧﺎﻧ ﺔ Rev Noﺛ ﻢ ﻧﻜﺘ ﺐ ﻋ ﺪد
ﻓﻘﻂ
اﻟﻨﺴﺦ ﻓﻲ ﺧﺎﻧﺔ Copies
-وﻓﻲ ﺣﺎﻟﺔ وﺟﻮد ﻣﻼﺣﻈﺎت ﻧﻘﻮم ﺑﻜﺘﺎﺑﺘﻬﺎ ﻓﻲ ﺧﺎﻧﺔ Remarks
-ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ زر Nextﻓﺘﻈﻬ ﺮ اﻟﻨﺎﻓ ﺬة اﻟﺘﺎﻟﻴ ﺔ ﻣ ﻦ اﻟﻤﻌ ﺎﻟﺞ واﻟﺘ ﻲ ﺑﻬ ﺎ أﺳ ﻤﺎء
اﻟﺸﺮآﺎت اﻟﺘﻲ ﺗﻢ اﺧﺘﻴﺎرهﺎ آﻤﺎ ﺑﺎﻟﺸﻜﻞ )( ١٠ -٣
-ﻳﺘﻢ ﺗﺤﺪﻳﺪ ﺧﺎﻧﺔ Transmitﻓﻲ ﻟﺘﺤﺪﻳﺪ ﻣﺎ اذا آﺎﻧﺖ اﻟﻨﺴﺦ ارﺳﻠﺖ ام ﻟﻢ ﺗﺮﺳﻞ
-واﺧﻴﺮا ﻳﺘﻢ اﻟﻀﻐﻂ ﻋﻠﻰ زر Finish
٧٠
اﻟﺘﻘﺪﻳﻤﺎت
ﻏـﻴـﺮ
ﻣﺴﻤﻮح ﺷﻜﻞ )( ١٠ – ٣
ﺛﻢ ﻧﻨﺘﻘﻞ اﻵن إﻟﻰ اﻟﻘﺴﻢ اﻟﺜﺎﻟﺚ وهﻮ ﻗﺴﻢ اﻟﺠﺪوﻟﺔ اﻟﺰﻣﻨﻴﺔ Distribution
ﺑﺎﻟﻄﺒﺎﻋﺔ
وﺳ ﺘﻈﻬﺮ اﻟﻨﺎﻓ ﺬة آﻤ ﺎ ﺑﺎﻟ ﺸﻜﻞ ) ( ١١ -٣وﺑﻬ ﺎ ﻣﺠﻤﻮﻋ ﺔ ﻣ ﻦ اﻟﺨﺎﻧ ﺎت اﻟﺨﺎﺻ ﺔ ﺑ ﺮﺑﻂ
اﻟﺘﻘﺪﻳﻢ ﻣﻊ اﻟﺠﺪول اﻟﺰﻣﻨﻲ ﺑﺎﻟﺒﺮﻳﻤﺎﻓﻴﺮا
ﻧﺴﺨﺔ
ﻟﻠﻌﺮض
ﻓﻘﻂ ﺷﻜﻞ )( ١١ – ٣
وﺳﻮف ﻧﺸﺮح هﺬا اﻟﻤﻮﺿﻮع ﻓﻲ ﺑﺎب ﻣﺴﺘﻘﻞ وﻳﻤﻜﻦ ﺗﺨﻄ ﻲ ه ﺬا اﻟﻘ ﺴﻢ اﻵن إﻟ ﻰ اﻟﻘ ﺴﻢ
اﻟﺘﺎﻟﻲ وهﻮ ﻗﺴﻢ اﻟﺤﺎﻟﺔ Current Status
وﻓﻲ هﺬا اﻟﻘﺴﻢ ﺳﻨﺤﺪد اﻵﺗﻲ :
٧١
اﻟﺒﺎب اﻟﺜﺎﻟﺚ
Items In Submittal
ﻋﺪد اﻟﻮﺣﺪات ) اﻟﻌﻴﻨﺎت – اﻟﻠﻮﺣﺎت – اﻟﺨﻄﺎﺑﺎت – اﻟﺦ (...اﻟﻤﺮﻓﻘﺔ ﺑﺎﻟﺘﻘﺪﻳﻢ
ﻏـﻴـﺮ
وﻓﻲ ﺣﺎﻟﺘﻨﺎ ﺳﻨﻘﺪم ﻣﺜﻼ ٣ﻋﻴﻨﺎت ﻣﻦ اﻟﺴﻴﺮاﻣﻴﻚ
Source Abbreviation
اﻟﺸﺮآﺔ اﻟﺘﺎﺑﻊ ﻟﻬﺎ ﺗﻠﻚ اﻟﻮﺣﺪات ) ﻋﻴﻨﺎت – ﻟﻮﺣﺎت – اﻟﺦ (...
ﻓﻔﻲ ﺣﺎﻟﺘﻨﺎ ﺳﻨﺨﺘﺎر ﺷﺮآﺔ FINISHﺛﻢ ﻧﺨﺘﺎر اﻟﺸﺨﺺ اﻟﻤﺴﺌﻮل
Code
ﻣﺴﻤﻮح
اﻟﻜﻮد اﻟﺨﺎص ) ﻳﻤﻜﻦ ﺗﺤﺪﻳﺪ أآﻮاد ﺧﺎﺻﺔ ﺑﻚ (
Drawing
رﻗﻢ اﻟﻠﻮﺣﺔ اﻟﺘﺎﺑﻊ ﻟﻬﺎ هﺬا اﻟﺘﻘﺪﻳﻢ
Filed Date
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﺗﺎرﻳﺦ ادﺧﺎل ﺑﻴﺎﻧﺎت اﻟﺘﻘﺪﻳﻢ ﺳﻨﺨﺘﺎرﻓﻲ ﺣﺎﻟﺘﻨﺎ هﺬﻩ ﺗﺎرﻳﺦ ٢٠٠٧/٢/٢٥م
Filed By
اﻟﺸﺨﺺ اﻟﻘﺎﺋﻢ ﺑﺎدﺧﺎل ﺑﻴﺎﻧﺎت اﻟﺘﻘﺪﻳﻢ وﺳﻨﺨﺘﺎر ﻓﻲ ﺣﺎﻟﺘﻨﺎ اﻟﺴﻴﺪ Steve Johnson
Approved By/Date
ﺗﺤﺪﻳﺪ اﻟﺸﺨﺺ اﻟﺬي واﻓﻖ ﻋﻠﻰ اﻟﺘﻘﺪﻳﻢ وﺗﺎرﻳﺦ اﻟﻤﻮاﻓﻘﺔ
ﻧﺴﺨﺔ
ﺳﻨﺨﺘﺎر ﻓﻲ ﺣﺎﻟﺘﻨﺎ هﺬﻩ اﻻﺳﺘﺸﺎري George Laffertyوﺗﺎرﻳﺦ ٢٠٠٧/٢/٢٥م
وﻓﻲ اﻟﺠﺰء اﻟﺴﻔﻠﻲ ﻳﻘ ﻮم اﻟﺒﺮﻧ ﺎﻣﺞ ﺗﻠﻘﺎﺋﻴ ﺎ ﺑﻌ ﺮض ﺗ ﻮارﻳﺦ ارﺳ ﺎل وارﺗﺠ ﺎع اﻟﺘﻘ ﺪﻳﻤﺎت
وﻻ ﻳﺴﺘﻄﻴﻊ اﻟﻤﺴﺘﺨﺪم ﻣﻦ ﺗﺤﺮﻳﺮ هﺬﻩ اﻟﺤﻘﻮل
ﻟﻠﻌﺮض
ﻓﻘﻂ
ﺷﻜﻞ )( ١٢ – ٣
٧٢
اﻟﺘﻘﺪﻳﻤﺎت
ﻏـﻴـﺮ
ﻓﻲ هﺬﻩ اﻟﻄﺮﻳﻘﺔ ﻳﺘﻢ اﺿﺎﻓﺔ اﻟﺘﻘﺪﻳﻢ ﻣﻦ ﺧﻼل ﻓﺘﺢ وﺣﺪة Submittalsاﻟﻤﻮﺟﻮدة ﻓﻲ
ﻣﺠﻠﺪ Logﺑﺎﻟﻤﺸﺮوع ﻋﻦ ﻃﺮﻳﻖ اﻟﻨﻘﺮ اﻟﻤﺰدوج آﻤﺎ ﺑﺎﻟﺸﻜﻞ )( ١٣ – ٣
ﻣﺴﻤﻮح
ﺑﺎﻟﻄﺒﺎﻋﺔ ﺷﻜﻞ )( ١٣ – ٣
ﻧﺴﺨﺔ
ﻟﻠﻌﺮض
ﻓﻘﻂ
ﺷﻜﻞ )( ١٤ – ٣
٧٣
اﻟﺒﺎب اﻟﺜﺎﻟﺚ
وﻹﺿﺎﻓﺔ ﺗﻘﺪﻳﻢ ﻳﺘﻢ اﻟﻀﻐﻂ ﻋﻠﻰ زر Addﻓﺘﻈﻬﺮ ﻧﺎﻓﺬة إﺿﺎﻓﺔ اﻟﺘﻘﺪﻳﻢ اﻟﺘﺎﻟﻴﺔ
ﻏـﻴـﺮ
ﻣﺴﻤﻮح
ﺑﺎﻟﻄﺒﺎﻋﺔ ﺷﻜﻞ )( ١٥ – ٣
ﻧﺴﺨﺔ
وﻧﻼﺣ ﻆ هﻨ ﺎ أﻧ ﻪ ﻳﻤﻜ ﻦ أن ﻳ ﺘﻢ اﺧﺘﻴ ﺎر ﺣﺰﻣ ﺔ ﻣ ﻦ اﻟﺤ ﺰم ﻣ ﻦ ﺧ ﻼل اﻟﻨﻘ ﺮ ﻋﻠ ﻰ ﺧﺎﻧ ﺔ
Packageأو ﻳﺘﻢ ﺗﺮآﻬﺎ ﻓﺎرﻏﺔ ﻓﻲ ﺣﺎﻟﺔ اﻟﺮﻏﺒ ﺔ ﻓ ﻲ إﺿ ﺎﻓﺔ ﺗﻘ ﺪﻳﻢ ﻏﻴ ﺮ ﻣﻨ ﻀﻢ إﻟ ﻰ
ﺣﺰﻣﺔ ﻣﻦ اﻟﺤﺰم اﻟﺴﺎﺑﻖ إﻧﺸﺎؤهﺎ .
ﺛ ﻢ ﻳ ﺘﻢ ﺑﻌ ﺪ ذﻟ ﻚ اﺿ ﺎﻓﺔ رﻗ ﻢ ﻟﻠﺘﻘ ﺪﻳﻢ ﻋ ﻦ ﻃﺮﻳ ﻖ آﺘﺎﺑ ﺔ اﻟ ﺮﻗﻢ ﻓ ﻲ ﺧﺎﻧ ﺔ Submittal
وﻟﻠﺘﺄآﺪ ﻣﻦ ﻋﺪم ﺗﻜﺮار اﻟﺮﻗﻢ ﻳﻤﻜﻦ اﻟﻨﻘ ﺮ داﺧ ﻞ اﻟﺨﺎﻧ ﺔ ﻓﺘﻈﻬ ﺮ ﻗﺎﺋﻤ ﺔ ﻣﻨ ﺴﺪﻟﺔ ﺑﻬ ﺎ ﺟﻤﻴ ﻊ
ﻟﻠﻌﺮض
ارﻗﺎم اﻟﺘﻘﺪﻳﻤﺎت ﻓﻲ ﺗﻠﻚ اﻟﺤﺰﻣﺔ .
وﺑﻌﺪ ذﻟﻚ ﻳﺘﻢ ﺗﻜﻤﻠﺔ ﺑﻘﻴﺔ اﻟﺨﻄﻮات ﺑﻨﻔﺲ اﻟﻄﺮﻳﻘﺔ اﻟﺴﺎﺑﻘﺔ . ...
ﻓﻘﻂ
ﺑﻌ ﺪ اﺿ ﺎﻓﺔ اﻟﺘﻘ ﺪﻳﻤﺎت ﻟﻠﻤ ﺸﺮوع وﺗﺤﺪﻳ ﺪ اﻟﺘ ﻮارﻳﺦ ﻳﻤﻜ ﻦ ﻋ ﺮض اﻟﺠ ﺪول اﻟﺰﻣﻨ ﻲ
ﻟﻤﺨﻄﻂ اﻟﺘﻘﺪﻳﻤﺎت ﻟﻠﻤﺸﺮوع ﺑﺤﻴﺚ ﻳﻤﻜﻦ ﻣﺘﺎﺑﻌﺔ اﻟﺘﻘﺪﻳﻤﺎت ﻣﻦ ﺧﻼل اﻟﻀﻐﻂ ﻋﻠﻰ زر
View Bar Chartﻓﺘﻈﻬﺮ اﻟﻨﺎﻓﺬة اﻟﺘﺎﻟﻴﺔ – ﺷﻜﻞ ) ( ١٦- ٣
وهﻲ ﻣﻘﺴﻤﺔ إﻟﻰ ﻗﺴﻢ أﻳﺴﺮ ﺑﻪ أﺳﻤﺎء اﻟﺘﻘﺪﻳﻤﺎت وﻗﺴﻢ أﻳﻤﻦ ﺑﻪ اﻟﻤﺨﻄﻂ اﻟﺒﻴﺎﻧﻲ ﻣﻊ
ﻣﻼﺣﻈﺔ ان اﻟﻘﻀﻴﺐ اﻟﺰﻣﻨﻲ ﻳﻜﻮن ﺑﺎﺣﺪ ﻣﻦ اﻷﻟﻮان اﻟﺜﻼﺛﺔ
ﻟﻠﺘﻘﺪﻳﻤﺎت اﻟﻤﺴﺠﻠﺔ ﺑﺎﻟﺒﺮﻧﺎﻣﺞ واﻟﺘﻲ ﻟﻢ ﺗﺮﺳﻞ ﺑﻌﺪ أﺣﻤﺮ
أﺻﻔﺮ ﻟﻠﺘﻘﺪﻳﻤﺎت اﻟﺘﻲ أرﺳﻠﺖ وﺟﺎري ﻣﻌﺎﻟﺠﺘﻬﺎ
أﺧﻀﺮ ﻟﻠﺘﻘﺪﻳﻤﺎت اﻟﺘﻲ ﺗﻢ اﻟﻤﻮاﻓﻘﺔ ﻋﻠﻴﻬﺎ
٧٤
اﻟﺘﻘﺪﻳﻤﺎت
ﻏـﻴـﺮ
ﻣﺴﻤﻮح
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ
ﺷﻜﻞ )( ١٦ – ٣
ﻟﻠﻌﺮض
… Tools Æ Transmittal Queue
ﻓﺘﻈﻬﺮ اﻟﻨﺎﻓﺬة
ﻓﻘﻂ
٧٥
اﻟﺒﺎب اﻟﺜﺎﻟﺚ
وﺑﻬﺎ ﺟﻤﻴﻊ اﻟﺘﻘﺪﻳﻤﺎت اﻟﺠﺎهﺰة ﻟﻺرﺳﺎل ﺛﻢ ﻧﺨﺘﺎر اﻟﺘﻘﺪﻳﻢ اﻟﻤﻄﻠﻮب وﻧﻀﻐﻂ ﻋﻠﻰ اﻟﺰر
Transmittalsداﺧ ﻞ ﻣﺠﻠ ﺪ Createﻓﻴ ﺘﻢ إرﺳ ﺎل اﻟﺘﻘ ﺪﻳﻢ إﻟ ﻰ وﺣ ﺪة
Communicationsاﻟﺨﺎص ﺑﺎﻟﻤﺸﺮوع – ﺷﻜﻞ ) ( ١٨ -٣
ﻏـﻴـﺮ
وﻻ ﺗﻨﺴﻰ أن ﺗﺤﺪد اﻻﺧﺘﻴﺎر Print Transmittals during createﺣﺘﻰ ﻳﺘﻢ
ﻃﺒﺎﻋﺔ اﻟﺘﻘﺪﻳﻢ ﻋﻠﻰ اﻟﻄﺎﺑﻌﺔ ﻣﺒﺎﺷﺮة
وﻳﻤﻜﻦ ﺗﺠﻤﻴﻊ اﻟﺘﻘﺪﻳﻤﺎت اﻟﺨﺎﺻﺔ ﺑﺸﺮآﺔ ﻣﺎ ﻋﻦ ﻃﺮﻳﻖ ﺗﺤﺪﻳﺪ اﻻﺧﺘﻴﺎر
Combine Transmittals to the same contact
ﻣﺴﻤﻮح
ﺑﺎﻟﻄﺒﺎﻋﺔ ﺷﻜﻞ )( ١٨ – ٣
وﻓﻴﻤﺎ ﻳﻠﻲ ﺷﻜﻞ اﻟﺘﻘﺪﻳﻢ ﺑﻌﺪ ﻃﺒﺎﻋﺘﻪ
ﻧﺴﺨﺔ
ﻋﻨﻮان اﻟﺸﺮآﺔ اﻟﻤﺮﺳﻞ ﻟﻬﺎ
اﺳﻢ اﻟﻤﺸﺮوع
ﻋﻨﺎﻳﺔ :
ﻓﻘﻂ
ﺗﺨﺼﻴﺼﻬﺎ ﻓﻲ ﺑﺎب اﻟﻤﺮاﺳﻼت
٧٦
اﻟﺘﻘﺪﻳﻤﺎت
ﻏـﻴـﺮ
ﺑﻌﺪ إدﺧﺎل اﻟﺘﻘﺪﻳﻤﺎت إﻟﻰ ﺣﺰﻣﺔ ﻣﻦ اﻟﺤﺰم ﻗﺪ ﻧﺮﻏﺐ ﻓﻲ ﺗﻌﺪﻳﻞ ﺑﻴﺎﻧﺎﺗﻬﺎ ﻣﺮة واﺣﺪة ﻣﺜﻞ
ﺗﺨﺼﻴﺺ ﺣﺎﻟﺔ اﻟﻤﻮاﻓﻘﺔ Approvedﻟﻜﻞ اﻟﺘﻘﺪﻳﻤﺎت ﻓﻲ ﺗﻠﻚ اﻟﺤﺰﻣﺔ وﻟﻌﻤﻞ ذﻟﻚ
ﺳﻨﻔﺘﺮض أﻧﻨﺎ ﻓﻲ ﻣﺜﺎل Demoﺳﻨﻘﻮم ﺑﻔﺘﺢ ﺣﺰﻣﺔ Concrete Formwork
وﺳﻨﺠﺪ أﻧﻬﺎ ﺗﺘﻜﻮن ﻣﻦ ﺗﻘﺪﻳﻤﻴﻦ وهﻤﺎ
Concrete Formwork Shop drawing اﻟﺮﺳﻮﻣﺎت اﻟﺘﻨﻔﻴﺬﻳﺔ ﻟﻠﺸﺪة
ﻣﺴﻤﻮح
Concrete Formwork Calculations اﻟﺤﺴﺎﺑﺎت اﻹﻧﺸﺎﺋﻴﺔ ﻟﻠﺸﺪة
وﺳﻨﺠﺪ أن ﺣﺎﻟﺘﻬﻤﺎ هﻲ ﺟﺪﻳﺪ NEW
وأﻧﻨﺎ اﻵن ﻧﺮﻏﺐ ﻓﻲ ﺗﺤﻮﻳﻞ اﻟﺤﺎﻟﺔ إﻟﻰ Approved
ﺳﻨﻘﻮم اﻵن ﺑﺎﻟﻀﻐﻂ ﻋﻠﻰ زر Updateﻓﺘﻈﻬﺮ اﻟﻨﺎﻓﺬة اﻟﺘﺎﻟﻴﺔ – ﺷﻜﻞ ) ( ١٩ -٣
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ ﺷﻜﻞ )( ١٩ – ٣
ﻟﻠﻌﺮض
ﺛﻢ ﻧﺨﺘﺎر اﻟﺘﻘﺪﻳﻤﺎت اﻟﻤﻄﻠﻮﺑﺔ اﻣﺎ واﺣﺪة ﺗﻠﻮ اﻷﺧﺮى أو ﺑﺎﻷﻣﺮ Select All
ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ زر Nextﻟﻺﻧﺘﻘﺎل إﻟﻰ اﻟﺨﻄﻮة اﻟﺘﺎﻟﻴﺔ ﻣﻦ اﻟﻤﻌﺎﻟﺞ
ﻓﻘﻂ
ﺷﻜﻞ )( ٢٠ – ٣
٧٧
اﻟﺒﺎب اﻟﺜﺎﻟﺚ
ﻏـﻴـﺮ
ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ زر Nextﻟﻺﻧﺘﻘﺎل ﻟﻠﺨﻄﻮة اﻟﺘﺎﻟﻴﺔ – ﺷﻜﻞ ) ( ٢١ -٣
ﻣﺴﻤﻮح
ﺑﺎﻟﻄﺒﺎﻋﺔ ﺷﻜﻞ )( ٢١ – ٣
ﻧﺴﺨﺔ
وهﻨﺎ ﻳﻄﻠﺐ ﻣﻨﺎ اﻟﻤﻌﺎﻟﺞ ﺳﺆاﻟﻴﻦ
اﻷول هﻞ ﺗﺮﻏﺐ ﻓﻲ ﺗﺤﺪﻳﺚ ﺑﻴﺎﻧﺎت اﻟﺘﻘﺪﻳﻤﺎت اﻟﻤﻌﺘﻤﺪة ﻣﻦ ﻗﺒﻞ ؟
واﻻﻓﺘﺮاﺿﻲ هﻮ NOﻷن اﻟﺘﺤﺪﻳﺚ ﻏﺎﻟﺒﺎ ﻳﻜﻮن ﻟﺘﻘﺪﻳﻤﺎت ﻟﻢ ﺗﻌﺘﻤﺪ ﺑﻌﺪ
ﻟﻠﻌﺮض
اﻟﺜﺎﻧﻲ هﻞ ﺗﺮﻏﺐ ﺑﺈﺿﺎﻓﺔ ﻣﺮاﺟﻌﺎت ﺟﺪﻳﺪة ﻟﻠﺘﻘﺪﻳﻤﺎت اﻟﺠﺎري ﺗﺤﺪﻳﺜﻬﺎ ؟
واﻻﻓﺘﺮاﺿﻲ هﻮ Add new revisions
ﻓﻘﻂ
ﺷﻜﻞ )( ٢٢ – ٣
٧٨
اﻟﺘﻘﺪﻳﻤﺎت
ﻧﺴﺦ اﻟﺘﻘﺪﻳﻤﺎت
ﻏـﻴـﺮ
ﻋﻨﺪم ﻧﻌﻤﻞ ﻓﻲ ﻣﺸﺮوع آﺒﻴﺮ ﺳﻨﺠﺪ ان هﻨﺎك ﻋﺪد آﺒﻴﺮ ﻣﻦ اﻟﺘﻘﺪﻳﻤﺎت ﻣﻜﺮرة ﻣﻊ
اﺧﺘﻼف ﻓﻘﻂ ﻓﻲ ﺗﻮارﻳﺦ اﻟﺘﻘﺪﻳﻢ أو اﻟﺤﺎﻟﺔ وﺑﺪﻻ ﻣﻦ ادﺧﺎل ﺗﻠﻚ اﻟﺘﻘﺪﻳﻤﺎت ﻣﺮات ﻋﺪﻳﺪة
ﻧﻠﺠﺄ ﻟﻌﻤﻠﻴﺔ ﻧﺴﺦ اﻟﺘﻘﺪﻳﻢ ﻷي ﻋﺪد ﻣﻦ اﻟﻤﺮات ﺛﻢ ﻧﻘﻮم ﺑﺘﺤﺪﻳﺚ ﺑﻴﺎﻧﺎت اﻟﺘﻘﺪﻳﻢ
وﺑﺎﻟﻌﻮدة ﻟﻤﺜﺎﻟﻨﺎ وﺑﻔﺘﺢ ﺣﺰﻣﺔ Ceramicاﻟﺴﺎﺑﻖ إﻧﺸﺎؤهﺎ ﺳﻨﻘﻮم اﻵن ﺑﺘﺤﺪﻳﺪ ﺗﻘﺪﻳﻢ 1
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ
ﻟﻠﻌﺮض
ﺛﻢ ﻣﻦ ﻗﺎﺋﻤﺔ Tools Æ Generate Document … :
ﺷﻜﻞ )( ٢٣ – ٣
ﻓﻴﻈﻬﺮ ﻣﻌﺎﻟﺞ اﻟﻨﺴﺦ وﻧﺨﺘﺎر ﻋﺪد اﻟﻨﺴﺦ اﻟﻤﻄﻠﻮﺑﺔ وﻟﺘﻜﻦ ﻣﺜﻼ ٢
ﻓﻘﻂ
ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ زر Finishﻓﻴﻘﻮم اﻟﻤﻌﺎﻟﺞ ﺑﺈﻧﺸﺎء اﻟﻨﺴﺦ – ﺷﻜﻞ ) ( ٢٤ – ٣
٧٩
اﻟﺒﺎب اﻟﺜﺎﻟﺚ
ﻏـﻴـﺮ
ﻓﻴﻤﺎ ﻳﻠﻲ ﺷﻜﻞ ﻣﺒﺴﻂ ﻟﻤﺮاﺣﻞ اﻟﺘﻘﺪﻳﻢ
اﻟﺒﺪاﻳﺔ
ﻣﺴﻤﻮح
إﺿﺎﻓﺔ ﺗﻘﺪﻳﻢ ﺟﺪﻳﺪ إﻧﺸﺎء ﺣﺰﻣﺔ
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﺗﺴﺠﻴﻞ اﻟﻤﺮاﺟﻌﺎت واﻟﺘﻮارﻳﺦ
ﻧﺴﺨﺔ
إدﺧﺎل اﻟﺠﺪوﻟﺔ اﻟﺰﻣﻨﻴﺔ
ﻟﻠﻌﺮض
ﺗﺤﺪﻳﺪ ﺣﺎﻟﺔ اﻟﺘﻘﺪﻳﻢ ﺗﺤﺪﻳﺚ اﻟﺘﻘﺪﻳﻢ
٨٠
א א א ﻏـﻴـﺮ
אﻣﺴﻤﻮح
ﺑﺎﻟﻄﺒﺎﻋﺔ
Drawings Tracking
ﻧﺴﺨﺔ
ﻟﻠﻌﺮض
ﻓﻘﻂ
اﻟﺒﺎب اﻟﺮاﺑﻊ
ﻏـﻴـﺮ
ان اﻟﺮﺳﻮﻣﺎت اﻟﻬﻨﺪﺳﻴﺔ هﻲ روح أي ﻣﺸﺮوع هﻨﺪﺳﻲ ﻟﺬا ﻓﺈن ﻋﻤﻠﻴﺔ ﺗﻨﻈﻴﻢ اﻟﺮﺳﻮﻣﺎت
א
ﻣﺴﻤﻮح
وﻣﺮاﺟﻌﺘﻬﺎ وﻋﻤﻞ اﻟﺘﻌﺪﻳﻞ ﻋﻠﻴﻬﺎ هﻲ ﻣﻦ أهﻢ اﻟﻨﻘﺎط اﻟﺘﻲ ﺗﺸﻐﻞ ﺑﺎل أي ﻣﻬﻨﺪس ،وﻣﻦ
أﺟﻞ ذﻟﻚ ﻳﻬﺘﻢ ﺑﺮﻧﺎﻣﺞ Expeditionﺑﻤﻮﺿﻮع ﻣﺘﺎﺑﻌﺔ اﻟﺮﺳﻮﻣﺎت
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻣﺮاﺣﻞ إﻧﺘﺎج اﻟﻠﻮﺣﺎت اﻟﻬﻨﺪﺳﻴﺔ
ﺗﻤﺮ اﻟﻠﻮﺣﺔ ﺑﻌﺪة ﻣﺮاﺣﻞ ﻣﻨﺬ آﻮﻧﻬﺎ ﻓﻜﺮة ﻓﻲ ﻋﻘﻞ اﻟﻤﺼﻤﻢ إﻟﻰ أن ﺗﺼﻞ إﻟﻰ ﻳﺪ ﻣﻬﻨﺪس
اﻟﺘﻨﻔﻴﺬ ﺑﺎﻟﻤﻮﻗﻊ ،وﻳﺘﻢ ﺗﻀﻤﻴﻦ ﺗﻠﻚ اﻟﻤﺮاﺣﻞ اﻟﻔﺮﻋﻴﺔ ﻣﻦ ﺧﻼل ﻣﺮﺣﻠﺘﻴﻦ أﺳﺎﺳﻴﺘﻴﻦ وهﻤﺎ
-١ﻣﺮﺣﻠﺔ اﻟﺘﺼﻤﻴﻢ واﻟﻤﺮاﺟﻌﺔ
ﻧﺴﺨﺔ
-٢ﻣﺮﺣﻠﺔ ﺗﻮزﻳﻊ اﻟﻠﻮﺣﺎت
ﻓﻔ ﻲ اﻟﻤﺮﺣﻠ ﺔ اﻷوﻟ ﻰ ﻳﻘ ﻮم اﻟﻤﻌﻤ ﺎري ﺑﻌﻤ ﻞ اﻟﺮﺳ ﻮﻣﺎت اﻷوﻟﻴ ﺔ ﺛ ﻢ ﺑﺎﻟﺘﻨ ﺴﻴﻖ ﻣ ﻊ ﺑﻘﻴ ﺔ
اﻷﻗﺴﺎم اﻟﻬﻨﺪﺳﻴﺔ ) ﻣﺪﻧﻲ – ﻣﻴﻜﺎﻧﻴﻜﺎ – آﻬﺮﺑﺎء ( .. -ﻳﺘﻢ اﻟﺒﺪء ﺑﻤﺮﺣﻠﺔ اﻟﺘﺼﻤﻴﻢ ﺛﻢ ﺗ ﺄﺗﻲ
ﻣﺮﺣﻠ ﺔ ﻣﺮاﺟﻌ ﺔ اﻟﺘ ﺼﻤﻴﻢ ﺑﻤ ﺸﺎرآﺔ ﺟﻤﻴ ﻊ اﻷﻗ ﺴﺎم اﻟﻬﻨﺪﺳ ﻴﺔ ﺛ ﻢ أﺧﻴ ﺮا ﺗ ﺄﺗﻲ ﻣﺮﺣﻠ ﺔ
ﻟﻠﻌﺮض
اﻟﺮﺳﻮﻣﺎت اﻟﻨﻬﺎﺋﻴﺔ
وﺑﻌﺪ اﻻﻧﺘﻬﺎء ﻣﻦ اﻟﻠﻮﺣﺎت واﻟﻤﻮاﻓﻘ ﺔ ﻋﻠﻴﻬ ﺎ ﻟﻠﺘﻨﻔﻴ ﺬ ﻳ ﺘﻢ اﻟﻄ ﺮح واﻟﺘﺮﺳ ﻴﺔ ﻟﻠﻤ ﺸﺮوع ﺛ ﻢ
ﺗ ﺄﺗﻲ اﻟﻤﺮﺣ ـﻠﺔ اﻟﺜﺎﻧﻴ ﺔ واﻟﺘ ﻲ ﻳﻘ ـﻮم ﻓﻴﻬ ـﺎ اﻟﻤﻘ ـﺎول اﻟـﺮﺋﻴ ﺴﻲ ﺑﻌﻤ ﻞ اﻟﺮﺳ ﻮﻣﺎت اﻟﺘﻨﻔﻴﺬﻳ ﺔ
Shop Drawingsﻃﺒﻘﺎ ﻟﺮﺳﻮﻣﺎت اﻟﻌﻄ ﺎء Tender Drawingsﺛ ﻢ ﻳ ﺘﻢ إﻋﺘﻤ ﺎد
ﺗﻠﻚ اﻟﻠﻮﺣ ﺎت ﻣ ﻦ اﻻﺳﺘ ﺸﺎري ﺛ ﻢ ﻳ ﺘﻢ ﺑﻌ ﺪ ذﻟ ﻚ ﺗﻮزﻳ ﻊ اﻟﻠﻮﺣ ﺎت اﻟﻤﻌﺘﻤ ﺪة ﻋﻠ ﻰ ﻣﻘ ﺎوﻟﻲ
ﻓﻘﻂ
اﻟﺒﺎﻃﻦ ﻟﻠﺘﻨﻔﻴﺬ ﺑﻤﻮﺟﺒﻬﺎ
٨٢
ﻣﺘﺎﺑﻌﺔ اﻟﺮﺳﻮﻣﺎت
ﺗﺮﻗﻴﻢ اﻟﻠﻮﺣﺎت
ﻏـﻴـﺮ
ﻗﺒﻞ أن ﻧﺨﻮض ﻓﻲ ﺷ ﺮح آﻴﻔﻴ ﺔ اﻟﺘﻌﺎﻣ ﻞ ﻣ ﻊ اﻟﻠﻮﺣ ﺎت ﻣ ﻦ ﺧ ﻼل اﻟﺒﺮﻧ ﺎﻣﺞ ﻓﺈﻧﻨ ﺎ ﺳ ﻨﻘﻮم
ﺑ ﺬآﺮ ﻣﻮﺿ ﻮع ﻣﻬ ﻢ ﺟ ﺪا وه ﻮ آﻴﻔﻴ ﺔ ﺗ ﺮﻗﻴﻢ ) ﺗﻜﻮﻳ ﺪ اﻟﻠﻮﺣ ﺔ ( ﺣﺘ ﻰ ﻳﻜ ﻮن رﻗ ﻢ اﻟﻠﻮﺣ ﺔ
ﻣﻌﺒﺮا ﻋﻦ ﺑﻌﺾ اﻟﺒﻴﺎﻧﺎت اﻟﺮﺋﻴﺴﻴﺔ ﻣﺜﻞ
-اﺳﻢ اﻟﻤﺸﺮوع
ﻣﺴﻤﻮح
-اﺳﻢ اﻟﻤﺒﻨﻰ
-اﻟﻘﺴﻢ اﻟﺘﺎﺑﻊ ﻟﻪ اﻟﻠﻮﺣﺔ
وهﻜﺬا .. -اﻟﺪور
وﻳﻤﻜﻦ اﻻﺳﺘﻐﻨﺎء ﻋﻦ اﺳﻢ اﻟﻤﺸﺮوع وأﺳ ﻢ اﻟﻤﺒﻨ ﻰ ﻓ ﻲ اﻟﻤ ﺸﺎرﻳﻊ اﻟ ﺼﻐﻴﺮة اﻟﻤﻜﻮﻧ ﺔ ﻣ ﻦ
ﻣﺒﻨﻰ واﺣﺪ وﻓﻴﻤﺎ ﻳﻠﻲ أﻣﺜﻠﺔ ﻟﺘﺮﻗﻴﻢ ﺑﻌﺾ اﻟﻠﻮﺣﺎت
C T
ﺑﺎﻟﻄﺒﺎﻋﺔ
- A 2 - S T - 0 5 1
ﻣﺸﺮوع أﺑﺮاج اﻟﻘﺎهﺮة اﻟﺠﺪﻳﺪة – اﻟﻤﺒﻨﻰ ﻃﺮاز - A2اﻟﻘﺴﻢ اﻹﻧﺸﺎﺋﻲ – اﻟﻠﻮﺣﺔ رﻗﻢ ٥١
ﻟﻠﻌﺮض
ﺷﻜﻞ) ( ١ – ٤
وﻳﻤﻜ ﻦ اﺧﺘﻴ ﺎر أي ﻃﺮﻳﻘ ﺔ ﻟﻠﺘﻜﻮﻳ ﺪ وﻟﻜ ﻦ ﻳ ﺘﻢ اﻻﺗﻔ ﺎق ﺑ ﻴﻦ إﻃ ﺮاف اﻟﻤ ﺸﺮوع ) ﻣﻘ ﺎول
رﺋﻴﺴﻲ – ﻣﻘﺎوﻟﻲ اﻟﺒﺎﻃﻦ – اﻻﺳﺘﺸﺎري ( ﻋﻠﻰ هﺬﻩ اﻟﻄﺮﻳﻘﺔ
وﻣﻦ اﻟﻤﺸﻬﻮر ﻓﻲ اﺧﺘﺼﺎرات أﻗﺴﺎم اﻟﻠﻮﺣﺎت اﻵﺗﻲ
ﻓﻘﻂ
A Architecture ﻣﻌﻤﺎري
S Structural إﻧﺸﺎﺋﻲ
C Civil ﻣﺪﻧﻲ
E Electrical آﻬﺮﺑﺎء
M Mechanical ﻣﻴﻜﺎﻧﻴﻜﺎ
P Plumping ﺻﺤﻲ
FS ﻧﻈﻢ وﻗﺎﻳﺔ ﻣﻦ اﻟﺤﺮﻳﻖ Fire System
٨٣
اﻟﺒﺎب اﻟﺮاﺑﻊ
ﻏـﻴـﺮ
اﻟﻠﻮﺣﺎت اﻹﻧﺸﺎﺋﻴﺔ ﺗﺨﺺ ﻟﻮﺣﺎت اﻷﺑﻌﺎد اﻟﺨﺮﺳﺎﻧﻴﺔ وﺗﻔﺎﺻﻴﻞ اﻟﺘﺴﻠﻴﺢ ﻷي ﻋﻨﺼﺮ ﻓﻲ اﻟﻤﺒﻨﻰ ﺑﻴﻨﻤﺎ
اﻟﻠﻮﺣﺎت اﻟﻤﺪﻧﻴﺔ ﺗﺨﺺ ﻟﻮﺣﺎت اﻟﻄﺮق وﻟﻮﺣﺎت اﻟﻤﻮﻗﻊ اﻟﻌﺎم وﻟﻮﺣﺎت ﺧﻄﻮط اﻟﻤﻴﺎﻩ واﻟﺼﺮف اﻟﺤﻲ
ﻣﺴﻤﻮح
اﺳﺘﻌﺮاض ﺑﻴﺎﻧﺎت اﻟﻠﻮﺣﺎت
ﻋﻨﺪ ﻓﺘﺢ ﻣﺠﻠﺪ Logsوﻓﺘﺢ وﺣﺪة Drawingsﺗﻈﻬﺮ أﻣﺎﻣﻨﺎ اﻟﻨﺎﻓﺬة اﻟﺘﺎﻟﻴﺔ – اﻧﻈﺮ
إﻟﻰ اﻟﺸﻜﻞ ) ( ٢ – ٤
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ
ﻟﻠﻌﺮض
وﻓﻴﻬﺎ ﻗﺎﺋﻤﺔ ﺑﻜﻞ اﻟﻠﻮﺣﺎت اﻟﻤﻮﺟﻮدة ﺑﺎﻟﻤﺸﺮوع وﻇﻬﺮ ﺑﺎﻟﻘﺎﺋﻤﺔ ﻣﺠﻤﻮﻋﺔ ﻣﻦ اﻟﺘﻔﺎﺻﻴﻞ
ﻣﺜﻞ رﻗﻢ اﻟﻠﻮﺣﺔ – رﻗﻢ ﺁﺧﺮ إﺻﺪار – اﻟﻘﺴﻢ ...اﻟﺦ
ﺷﻜﻞ ) ( ٢ – ٤
ﻓﻘﻂ
وﻟﻌﺮض ﺑﻴﺎﻧﺎت أﺣﺪ اﻟﻠﻮﺣﺎت ﻧﻀﻊ ﻣﺆﺷﺮ اﻟﻔﺄرة ﻋﻠﻰ اﻟﺮﻣﺰ ) اﻷﻳﻘﻮﻧﺔ ( اﻟﻤﺠﺎور
ﻷﺳﻢ اﻟﻠﻮﺣﺔ ﺛﻢ ﻧﻨﻘﺮ ﻧﻘﺮا ﻣﺰدوﺟﺎ أو ﻧﻀﻐﻂ ﻋﻠﻰ زر Openﻓﺘﻈﻬﺮ اﻟﻨﺎﻓﺬة اﻟﺘﺎﻟﻴﺔ
آﻤﺎ ﺑﺎﻟﺸﻜﻞ رﻗﻢ ) ( ٣ – ٤
وﺳﻮف ﻧﺸﺮح آﻞ اﻷﺟﺰاء اﻟﻤﻮﺟﻮدة ﺑﺎﻟﻨﺎﻓﺬة ﻋﻨﺪﻣﺎ ﻧﻘﻮم ﺑﺸﺮح آﻴﻔﻴﺔ إﺿﺎﻓﺔ ﻟﻮﺣﺔ
ﺟﺪﻳﺪة ﻟﻠﻤﺸﺮوع
٨٤
ﻣﺘﺎﺑﻌﺔ اﻟﺮﺳﻮﻣﺎت
ﻏـﻴـﺮ
ﻣﺴﻤﻮح ﺷﻜﻞ ) ( ٣ – ٤
ﻧﺴﺨﺔ
-ﻧﻘﻮم ﺑﻔﺘﺢ ﻣﺠﻠﺪ Logsﺛﻢ ﻧﺘﻮﺟﻪ إﻟﻰ وﺣﺪة اﻟﺮﺳﻮﻣﺎت Drawings
-ﺑﻌﺪ ﻇﻬﻮر ﻧﺎﻓﺬة اﻟﺮﺳﻮﻣﺎت ﻧﻀﻐﻂ ﻋﻠﻰ زر Addﻓﺘﻈﻬﺮ اﻟﻨﺎﻓﺬة اﻟﺘﺎﻟﻴﺔ
ﻟﻠﻌﺮض
ﻓﻘﻂ
ﺷﻜﻞ ) ( ٤ – ٤
٨٥
اﻟﺒﺎب اﻟﺮاﺑﻊ
ﻏـﻴـﺮ
رﻗﻢ اﻟﻠﻮﺣﺔ وهﻮ ﺣﻘﻞ إﺟﺒﺎري ﻳﺠﺐ إدﺧﺎل ﺑﻴﺎﻧﺎﺗﻪ ،وﻳﻤﻜ ﻦ أن ﻳ ﺘﻢ اﻟﺘ ﺮﻗﻴﻢ ﺑ ﺄي ﻃﺮﻳﻘ ﺔ
آﻤﺎ ﺳﺒﻖ ﺷﺮﺣﻪ ﻓﻲ ﻃﺮق ﺗﺮﻗﻴﻢ اﻟﻠﻮﺣﺎت وﺳﻨﻜﺘﺐ ﻣﺜﻼ )(CT-A2-ST-055
Latest Rev
رﻗ ﻢ ﺁﺧ ﺮ ﻣﺮاﺟﻌ ﺔ وه ﻮ ﺣﻘ ﻞ ﻻ ﻳﻤﻜ ﻦ ﺗﺤﺮﻳ ﺮﻩ ﺑ ﻞ ﻳﻘ ﻮم اﻟﺒﺮﻧ ﺎﻣﺞ ﺑﻌ ﺮض رﻗ ﻢ ﺁﺧ ﺮ
ﻣﺴﻤﻮح
ﻣﺮاﺟﻌﺔ ﻃﺒﻘﺎ ﻟﺘﺒﻮﻳﺐ اﻟﻤﺮاﺟﻌﺎت Review
Discipline
اﻟﻘﺴﻢ اﻟﺘﺎﺑﻊ ﻟﻪ اﻟﻠﻮﺣﺔ وه ﻮ ﻳﻤﻜ ﻦ ان ﻳﻜ ﻮن ) ﻣﻌﻤ ﺎري – إﻧ ﺸﺎﺋﻲ – اﻟ ﺦ (..وﻳ ﺘﻢ ذﻟ ﻚ
ﻋﻦ ﻃﺮﻳﻖ اﻟﻨﻘﺮ ﺑﺎﻟﻤﺆﺷﺮ داﺧﻞ اﻟﺨﺎﻧﺔ ﻓﺘﻈﻬﺮ اﻟﻘﺎﺋﻤﺔ اﻟﻤﻨﺴﺪﻟﺔ آﻤﺎ ﺑﺎﻟﺸﻜﻞ )( ٥ – ٤
ﻧﺴﺨﺔ
وﺳﻨﺨﺘﺎر ﻗﺴﻢ اﻟﻠﻮﺣﺎت اﻹﻧﺸﺎﺋﻴﺔ Structural
)وﻟﻤﻌﺮﻓﺔ ﺑﻘﻴﺔ اﻷﻗﺴﺎم راﺟﻊ اﻟﻜﺘﺎب ﺻﻔﺤﺔ ( ٥٦
Area
ﻣﻨﻄﻘﺔ اﻟﻌﻤﻞ وهﻲ ﻣﺤﺪدة داﺧﻞ ﻗﺎﻣﻮس اﻟﻤﻨﺎﻃﻖ ﺑﺎﻟﺒﺮﻧﺎﻣﺞ )راﺟﻊ اﻟﻜﺘﺎب ﺻﻔﺤﺔ (٥٧
ﻟﻠﻌﺮض
وﺳﻨﺨﺘﺎر اﻟﺨﻴﺎر Aوهﻮ ﺧﺎص ﺑﻤﻨﻄﻘﺔ أﺳﻤﻬﺎ Aﻓﻲ اﻟﻤﺒﻨﻰ
وﻳﻤﻜﻦ ﺗﻐﻴﻴﺮ اﻟﻤﻨﺎﻃﻖ وإﺿﺎﻓﺔ ﻣﻨﺎﻃﻖ أﺧﺮى ﻣﻦ ﺧﻼل ﻗﺎﻣﻮس اﻟﻤﻨﺎﻃﻖ
Phase
ﻣﻮﻗﻒ اﻟﻠﻮﺣﺔ )اﻹﺻﺪار( وهﻮ آﻤﺎ ﺳﺒﻖ ﺷﺮﺣﺔ ﻓﻲ اﻟﻜﺘﺎب ) ﺻﻔﺤﺔ ( ٥٦إﻣﺎ أن
ﻓﻘﻂ
ﻳﻜﻮن إﺻﺪار ﻟﻠﻄﺮح أو إﺻﺪار ﻟﻠﺘﻨﻔﻴﺬ وهﻜﺬا ...
وﺳﻨﺨﺘﺎر إﺻﺪار ﻟﻠﻄﺮح IFB Issued for Bid
Progress
ﻧﺴﺒﺔ إآﻤﺎل اﻟﻠﻮﺣﺔ وﺳﻨﻜﺘﺐ ٪٥٠
Title
ﻋﻨﻮان اﻟﻠﻮﺣﺔ وﺳﻨﻜﺘﺐ Second Floor Upper Reinforcement
أي اﻟﺤﺪﻳﺪ اﻟﻌﻠﻮي ﻟﺴﻘﻒ اﻟﺪور اﻟﺜﺎﻧﻲ
٨٦
ﻣﺘﺎﺑﻌﺔ اﻟﺮﺳﻮﻣﺎت
ﻏـﻴـﺮ
وﻓﺎﺋﺪة هﺬا اﻟﺠﺰء أﻧﻪ ﻳﻤﻜﻦ ﻋﻤﻞ ﺣﺰم ﻟﺮﺳﻮﻣﺎت اﻟﻌﻄﺎء ﻟﻠﻤﻴﻜﺎﻧﻴﻜﺎ واﻟﻜﻬﺮﺑﺎء واﻟﻤﺪﻧﻲ
وهﻜﺬا ﺑﺤﻴﺚ ﻋﻨﺪ ﻋﻤﻞ ﻟﻮﺣﺔ ﺟﺪﻳﺪة ﻳﺘﻢ رﺑﻂ هﺬﻩ اﻟﻠﻮﺣﺔ ﺑﺎﻟﺤﺰﻣﺔ اﻟﺨﺎﺻﺔ ﺑﻬﺎ ﻣﻦ أﺟﻞ
ﺗﻨﻈﻴﻢ اﻟﻌﻤﻞ وﺗﺮﺗﻴﺒﻪ
File No
ﻣﺴﻤﻮح
رﻗﻢ ﻣﻠﻒ اﻟﻠﻮﺣﺔ وهﻮ ﺧﻴﺎر ﺗﺴﺘﺨﺪﻣﻪ ﺑﻌﺾ اﻟﺸﺮآﺎت ﻟﺘﻌﺮﻳﻒ ﻟﻮﺣﺎت اﻟﻤﺸﺎرﻳﻊ
وﺳﺘﺠﺪ أﻧﻪ ﻓﻲ ﻣﺜﺎل Demoﺗﻢ اﺧﺘﻴﺎر رﻗﻢ 3.5
Spec Section
ﻗﺴﻢ اﻟﻤﻮاﺻﻔﺎت وهﻮ ﻃﺒﻘﺎ ل Master Formatاﻟﺼﺎدر ﻋﻦ ﻣﻌﻬﺪ ﻣﻮاﺻﻔﺎت
اﻟﺘﺸﻴﻴﺪ اﻷﻣﺮﻳﻜﻴﺔ ) ( CSI
ﺑﺎﻟﻄﺒﺎﻋﺔ
وﺳﻨﺨﺘﺎر اﻟﻘﺴﻢ 03200 Concrete Reinforcement
)ﻟﻤﻌﺮﻓﺔ ﺑﻘﻴﺔ اﻷﻗﺴﺎم راﺟﻊ اﻟﻜﺘﺎب ﺻﻔﺤﺔ ( ٤٥
Designer
اﻟﻤﺼﻤﻢ وﺳﻨﺨﺘﺎر ﻣﻦ اﻟﻘﺎﺋﻤﺔ اﻟﻤﻨﺴﺪﻟﺔ ﺷﺮآﺔ DESIGNﺛﻢ اﻟﻤﻬﻨﺪس Chris A.
ﻧﺴﺨﺔ
Ball in Court
اﻟﺸﺨﺺ اﻟﻤﺴﺌﻮل وﺳﻨﺨﺘﺎر اﻟﻤﻬﻨﺪس Chris A.
Priority
درﺟﺔ اﻷهﻤﻴﺔ وﺳﻨﺨﺘﺎر Normal
Latest Rev Date
ﻟﻠﻌﺮض
ﺗﺎرﻳﺦ ﺁﺧﺮ ﻣﺮاﺟﻌﺔ وهﻲ ﺧﺎﻧﺔ ﺗﻌﺮض ﺗﺎرﻳﺦ ﺁﺧﺮ ﻣﺮاﺟﻌﺔ ﻃﺒﻘﺎ ﻟﺘﺒﻮﻳﺐ اﻟﻤﺮاﺟﻌﺎت
Reviewوﻻ ﻳﻤﻜﻦ ﺗﺤﺮﻳﺮ اﻟﺤﻘﻞ
وﺑﻌﺪ اﻻﻧﺘﻬﺎء ﻣﻦ إدﺧﺎل اﻟﺒﻴﺎﻧﺎت اﻟﺮﺋﻴﺴﻴﺔ ﺳﻨﻘﻮم ﺑﺎﺳﺘﻌﺮاض اﻟﺘﺒﻮﻳﺒﺎت اﻟﻤﻮﺟﻮدة ﻓﻲ
اﻟﻤﻨﻄﻘﺔ اﻟﺴﻔﻠﻴﺔ ﻣﻦ اﻟﻨﺎﻓﺬة وهﻲ
ﻓﻘﻂ
Current Status
ﺑﺎب اﻟﺤﺎﻟﺔ وهﻮ ﻟﻌﺮض ﻣﻮﻗﻒ اﻟﻠﻮﺣﺔ ﻣﻦ ﺣﻴﺚ
رﻗﻢ ﺁﺧﺮ ﻣﺮاﺟﻌﺔ Rev No
ﺗﺎرﻳﺦ إﺻﺪار ﺁﺧﺮ ﻣﺮاﺟﻌﺔ Date Issued
Date Receivedﺗﺎرﻳﺦ وﺻﻮل اﻟﻠﻮﺣﺔ ﻣﻦ اﻟﻤﺼﻤﻢ
ﺗﺎرﻳﺦ إرﺳﺎل اﻟﻠﻮﺣﺔ ﻟﻠﻤﺮاﺟﻌﺔ Date Sent
Date Requiredاﻟﺘﺎرﻳﺦ اﻟﻤﻄﻠﻮب ﻓﻴﻪ وﺻﻮل اﻟﻠﻮﺣﺔ ﻣﻦ اﻟﻤﺮاﺟﻊ
وﻟﻦ ﺗﺠﺪ أي ﺑﻴﺎﻧﺎت اﻵن ﻷﻧﻨﺎ أﺿﻔﻨﺎ ﻟﻮﺣﺔ ﺟﺪﻳﺪة وﻟﻢ ﻳﺘﻢ ﻋﻠﻴﻬﺎ أي ﻣﺮاﺟﻌﺎت
٨٧
اﻟﺒﺎب اﻟﺮاﺑﻊ
ﻏـﻴـﺮ
رﻗﻢ ﺗﻮزﻳﻊ ﺁﺧﺮ ﻣﺮاﺟﻌﺔ Rev No
ﺗﺎرﻳﺦ ﺗﻮزﻳﻊ إﺻﺪار ﺁﺧﺮ ﻣﺮاﺟﻌﺔ Date Issued
Date Receivedﺗﺎرﻳﺦ وﺻﻮل اﻟﻠﻮﺣﺔ ﻣﻦ اﻟﻤﺮاﺟﻊ
ﺗﺎرﻳﺦ إرﺳﺎل اﻟﻠﻮﺣﺔ ﻟﻠﺸﺮآﺎت وﻣﻘﺎوﻟﻲ اﻟﺒﺎﻃﻦ Date Sent
ﻣﺴﻤﻮح
وﺳﻮف ﻧﻘﻮم ﺑﺸﺮح ﺣﺎﻟﺔ اﻟﻤﺮاﺟﻌﺔ واﻟﺘﻮزﻳﻊ ﻓﻴﻤﺎ ﺑﻌﺪ
وﺳﻨﻨﺘﻘﻞ اﻵن إﻟﻰ اﻟﺘﺒﻮﻳﺐ اﻟﺜﺎﻧﻲ وهﻮ
Sets
اﻟﻤﺠﻤﻮﻋﺎت وﻳﻘﺼﺪ ﺑﻬﺎ ﺗﻌﺮﻳﻒ اﻟﻤﺠﻤﻮﻋﺎت اﻟﺘﻲ ﺗﻨﺘﻤﻲ إﻟﻴﻬﺎ هﺬﻩ اﻟﻠﻮﺣﺔ ﻓﻜﻤﺎ ﺗﻘﺪم ﻓﻲ
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﺑﺎب اﻟﺘﻘﺪﻳﻤﺎت ﻣﻦ أﻧﻪ ﻳﻔﻀﻞ ﻋﻤﻞ ﺣﺰم ﻟﻠﺘﻘﺪﻳﻤﺎت ﺣﺘﻰ ﻳﺘﻢ ﺗﻨﻈﻴﻢ ﻋﻤﻠﻴﺔ ﻣﺘﺎﺑﻌﺔ
اﻟﺘﻘﺪﻳﻤﺎت ﻓﺄﻧﻨﺎ آﺬﻟﻚ ﺳﻨﻘﻮم ﺑﻌﻤﻞ ﻣﺠﻤﻮﻋﺎت ﻟﻠﻮﺣﺎت ﺗﺴﻤﻰ Drawing Setsﻣﺜﻞ :
-ﻣﺠﻤﻮﻋﺔ رﺳﻮﻣﺎت اﻷﻋﻤﺎل اﻟﺘﺮاﺑﻴﺔ
-ﻣﺠﻤﻮﻋﺔ اﻟﺮﺳﻮﻣﺎت اﻹﻧﺸﺎﺋﻴﺔ
-ﻣﺠﻤﻮﻋﺔ رﺳﻮﻣﺎت اﻟﺼﺤﻲ
ﻧﺴﺨﺔ
وهﻜﺬا .. -ﻣﺠﻤﻮﻋﺔ رﺳﻮﻣﺎت اﻷﻋﻤﺎل اﻟﻜﻬﺮﺑﺎﺋﻴﺔ
ﻓﻤ ﺜﻼ ﻟﻮﺣ ﺔ اﻟﻤﻮﻗ ﻊ اﻟﻌ ﺎم ﻳﻤﻜ ﻦ وﺿ ﻌﻬﺎ ﻓ ﻲ ﻣﺠﻤﻮﻋ ﺔ اﻷﻋﻤ ﺎل اﻟﺘﺮاﺑﻴ ﺔ وﻣﺠﻤﻮﻋ ﺔ
اﻟﺨﺪﻣﺎت وﻣﺠﻤﻮﻋﺔ اﻟﻠﻮﺣﺎت اﻟﻤﺴﺎﺣﻴﺔ وهﻜﺬا ...وﺳﻨﺸﺮح اﻟﻤﺠﻤﻮﻋﺎت ﻻﺣﻘﺎ
واﻵن ﻧﻨﺘﻘﻞ إﻟﻰ اﻟﺘﺒﻮﻳﺐ اﻟﺜﺎﻟﺚ
Review
ﻟﻠﻌﺮض
اﻟﻤﺮاﺟﻌ ﺎت وﻓﻴ ﻪ ﻳ ﺘﻢ ﺗ ﺴﺠﻴﻞ دورة اﻟﻤﺮاﺟﻌ ﺎت ﻟﻠﻮﺣ ﺔ وﻻ ﺗﻘﻠ ﻖ أﺧ ﻲ اﻟﻤﻬﻨ ﺪس ﻓﺈﻧﻨ ﺎ
ﺳﻨﻘﻮم ﺑﺸﺮح ﻃﺮﻳﻘﺔ ﺗﻨﻈﻴﻢ اﻟﻤﺮاﺟﻌﺎت ﻟﻠﻮﺣﺔ ﺑﻌﺪ ﻗﻠﻴﻞ
واﻵن ﻧﻨﺘﻘﻞ ﻟﻠﺘﺒﻮﻳﺐ اﻟﺮاﺑﻊ
Distribution
ﻓﻘﻂ
اﻟﺘﻮزﻳﻊ وﻓﻴﻪ ﻳﺘﻢ ﺗﺤﺪﻳﺪ اﻷﺷﺨﺎص واﻟﺸﺮآﺎت اﻟﺘﻲ ﺳﻴﺘﻢ إرﺳﺎل إﻟﻴﻬﻢ اﻟﻠﻮﺣ ﺔ وذﻟ ﻚ ﻣ ﻦ
ﺧﻼل اﻟﻀﻐﻂ ﻋﻠﻰ زر Addﻓﻴﺒﺪأ اﻟﻤﻌﺎﻟﺞ ﺑﺎﻟﻈﻬﻮر آﻤﺎ ﺑﺎﻟﺸﻜﻞ ) ( ٦ – ٤
ﻓﻨﻘﻮم ﺑﺈدﺧﺎل رﻗﻢ اﻟﻤﺮاﺟﻌﺔ Rev No 001ﺛﻢ ﻋﻨﻮان اﻟﻤﺮاﺟﻌﺔ BID Version
أي ﻧ ﺴﺨﺔ اﻟﻄ ﺮح ﺛ ﻢ ﻧﻘ ﻮم ﺑ ﺈدراج ﺗ ﺎرﻳﺦ اﻹﺻ ﺪار 1/3/2007وﺳ ﻨﺠﺪ أن اﻟﺒﺮﻧ ﺎﻣﺞ
ﻳ ﺪرج ﺗ ﻮارﻳﺦ اﻟﻮﺻ ﻮل واﻹرﺳ ﺎل اﻟﻤﻮﺟ ﻮدة ﻋﻠ ﻰ اﻟﺠﻬ ﺎز وﻳﻤﻜ ﻦ ﺗﻐﻴﻴﺮه ﺎ ﺛ ﻢ ﻧﺤ ﺪد
ﻣﻮﻗﻒ اﻟﻠﻮﺣﺔ Phase IFBﺛﻢ ﻧﺠﻌﻞ Progress 100%
٨٨
ﻣﺘﺎﺑﻌﺔ اﻟﺮﺳﻮﻣﺎت
ﻏـﻴـﺮ
ﻣﺴﻤﻮح ﺷﻜﻞ ) ( ٦ – ٤
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ
ﻟﻠﻌﺮض
ﺷﻜﻞ ) ( ٧ – ٤
وﻳﻤﻜ ﻦ إﺧﺘﻴ ﺎر ﻗﺎﺋﻤ ﺔ ﺗﻮزﻳ ﻊ ﻣﺠﻬ ﺰة ﻣ ﻦ ﻗﺒ ﻞ أو اﺧﺘﻴ ﺎر ﺷ ﺮآﺎت ﻣﻨﻔ ﺼﻠﺔ وﺳ ﻨﻘﻮم
ﺑﺎﻟﻀﻐﻂ ﻋﻠﻰ ﺧﻴﺎر ﺷﺮآﺎت Companiesﺛﻢ ﻧﺤﺪد اﻟﺸﺮآﺎت اﻟﺘﺎﻟﻴﺔ
CPM ﺷﺮآﺔ إدارة اﻟﻤﺸﺮوﻋﺎت ﻟﻠﻤﺸﺮوع
STEEL ﺷﺮآﺔ Tri Stateﻟﻠﺤﺪﻳﺪ
ﻓﻘﻂ
ﺛﻢ ﻧﻀﻐﻂ Nextﻟﻼﻧﺘﻘﺎل ﻟﻠﺨﻄﻮة اﻟﺘﺎﻟﻴﺔ – ﺷﻜﻞ ) ( ٨ – ٤
وﻧﺤﺪد ﻋﺪد ﻧﺴﺦ اﻟﻠﻮﺣﺎت آﺎﻟﺘﺎﻟﻲ
اﻟﺸﺮآﺔ اﻷوﻟﻰ ٣ﻧﺴﺦ ﻣﻦ اﻟﻠﻮﺣﺎت
اﻟﺸﺮآﺔ اﻟﺜﺎﻧﻴﺔ ٢ﻧﺴﺨﺔ ﻣﻦ اﻟﻠﻮﺣﺎت
وﻧﺤ ﺪد ﻣﻘ ﺎس اﻟﻠﻮﺣ ﺎت ﻋ ﻦ ﻃﺮﻳ ﻖ اﻟﻨﻘ ﺮ داﺧ ﻞ ﺣﻘ ﻞ Paper Sizeﻓﺘﻈﻬ ﺮ اﻟﻨﺎﻓ ﺬة
اﻟﺘﺎﻟﻴﺔ – ﺷﻜﻞ ) ( ٩ – ٤ﺛﻢ ﻧﺨﺘﺎر اﻟﻤﻘﺎس A1ﻟﻜﻞ ﺷﺮآﺔ ﻣﻦ اﻟﺸﺮآﺎت
٨٩
اﻟﺒﺎب اﻟﺮاﺑﻊ
ﻏـﻴـﺮ
ﻣﺴﻤﻮح ﺷﻜﻞ ) ( ٨ – ٤
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻧﺴﺨﺔ ﺷﻜﻞ ) ( ٩ – ٤
وأﺧﻴﺮا وﺑﻌﺪ اﻻﻧﺘﻬ ﺎء ﻣ ﻦ ادﺧ ﺎل ﻣﻘﺎﺳ ﺎت اﻟﻠﻮﺣ ﺎت ﻧ ﻀﻐﻂ Finishﻓ ﻨﻼﺣﻆ ﻇﻬ ﻮر
ﻟﻠﻌﺮض
رﻗﻢ ﺗﻮزﻳﻊ اﻟﻠﻮﺣﺔ آﻤﺎ ﺑﺎﻟﺸﻜﻞ ) ( ١٠ – ٤
وﻟﻌﺮض اﻟﺸﺮآﺎت ﻳﺘﻢ وﺿﻊ ﻣﺆﺷ ﺮ اﻟﻔ ﺄرة ﻋﻠ ﻰ اﻷﻳﻘﻮﻧ ﺔ اﻟﻤﺠ ﺎورة ﻟ ﺮﻗﻢ 001ﺛ ﻢ ﻳ ﺘﻢ
اﻟﻀﻐﻂ ﻋﻠﻰ زر Openﻓﺘﻈﻬﺮ اﻟﻨﺎﻓﺬة اﻟﺘﺎﻟﻴﺔ وﺑﻬﺎ ﺑﻴﺎﻧﺎت اﻟﺘﻮزﻳﻊ – ﺷﻜﻞ ) ( ١١-٤
٩٠
ﻣﺘﺎﺑﻌﺔ اﻟﺮﺳﻮﻣﺎت
ﻏـﻴـﺮ
ﻣﺴﻤﻮح
ﺑﺎﻟﻄﺒﺎﻋﺔ ﺷﻜﻞ ) ( ١١ – ٤
ﻧﺴﺨﺔ
…Tools Æ Transmittal Queue
ﻟﻠﻌﺮض
ﻓﻘﻂ ﺷﻜﻞ ) ( ١٢ – ٤
٩١
اﻟﺒﺎب اﻟﺮاﺑﻊ
ﻏـﻴـﺮ
ﻣﺴﻤﻮح ﺷﻜﻞ ) ( ١٣ – ٤
ﺑﺎﻟﻄﺒﺎﻋﺔ
وﻹﻧﺸﺎء اﻟﻤﺮاﺳ ﻼت ﻧﺨﺘ ﺎر اﻷﻣ ﺮ Create Allﻟﻌﻤ ﻞ ﻣﺮاﺳ ﻼت ﻟﻠ ﺸﺮآﺘﻴﻦ أو ﻧﺨﺘ ﺎر
Createﻓﻘﻂ ﻟﻌﻤﻞ ﻣﺮاﺳﻠﺔ ﻟﺸﺮآﺔ واﺣﺪة ﻓﻘﻂ
ﻧﺴﺨﺔ
Print Transmittals during create
وﻓﻲ ﺣﺎﻟﺔ رﻏﺒﺔ ﺗﺠﻤﻴﻊ ﻋﺪد ﻣﻦ اﻟﻤﺮاﺳﻼت اﻟﺨﺎﺻﺔ ﺑﺸﺮآﺔ ﻓﻲ ﻣﺮاﺳﻠﺔ واﺣﺪة ﻧﺨﺘﺎر
Combine Transmittals to same contact
وﻓﻴﻤﺎ ﻳﻠﻲ ﺷﻜﻞ اﻟﻤﺮاﺳﻠﺔ ﻋﻨﺪ اﻟﻄﺒﺎﻋﺔ
ﻟﻠﻌﺮض
ﻓﻘﻂ
ﺷﻜﻞ ) ( ١٤ – ٤
٩٢
ﻣﺘﺎﺑﻌﺔ اﻟﺮﺳﻮﻣﺎت
ﻏـﻴـﺮ
اﻻﺳﻜﺘﺸﺎت أو اﻟﺮﺳﻮﻣﺎت اﻟﺘﺨﻄﻴﻄﻴﺔ واﻟﺘﻲ ﺗﺮﺗﺒﻂ ﺑﺎﻟﻠﻮﺣﺔ
ﻳﺘﻢ إدراج ﺑﻴﺎﻧﺎت اﻻﺳﻜﺘﺶ ﻋﻦ ﻃﺮﻳﻖ اﻟﻀﻐﻂ ﻋﻠﻰ زر Addﻓﻴﻈﻬﺮ اﻟﻤﻌﺎﻟﺞ آﻤﺎ
ﺑﺎﻟﺸﻜﻞ ) ( ١٥ – ٤
ﻣﺴﻤﻮح
ﺑﺎﻟﻄﺒﺎﻋﺔ ﺷﻜﻞ ) ( ١٥ – ٤
ﻧﺴﺨﺔ
ﺛﻢ ﻧﻀﻴﻒ اﻟﺒﻴﺎﻧﺎت اﻟﺘﺎﻟﻴﺔ ﻋﻠﻰ ﺳﺒﻴﻞ اﻟﻤﺜﺎل
Sketch No : SK-1 رﻗﻢ اﻻﺳﻜﺘﺶ
Title : Sketch of RFT ﻋﻨﻮان اﻻﺳﻜﺘﺶ
Designer : Design - Chris A اﻟﻤﺼﻤﻢ /اﻟﻤﻬﻨﺪس
ﻟﻠﻌﺮض
Sketch Date : 01/03/2007 ﺗﺎرﻳﺦ اﻻﺳﻜﺘﺶ
Sent Date : 05/03/2007 ﺗﺎرﻳﺦ اﻹرﺳﺎل
Revision No : 001 رﻗﻢ اﻟﻤﺮاﺟﻌﺔ
ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ اﻟﺰر Nextﻟﻼﻧﺘﻘﺎل ﻟﻠﺨﻄﻮة اﻟﺘﺎﻟﻴﺔ وهﻲ ﺧﻄﻮة إﺿﺎﻓﺔ اﻟﻤﺮاﺳﻼت
ﻓﻘﻂ
وﺳﻨﺨﺘﺎر ﺷﺮآﺔ STEEL
ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ زر Nextﻟﻼﻧﺘﻘﺎل ﻟﻠﺨﻄﻮة اﻟﺘﺎﻟﻴﺔ وهﻲ ﺗﺤﺪﻳﺪ ﻋﺪد ﻧﺴﺦ اﻻﺳﻜﺘﺸﺎت
وﻣﻘﺎس اﻻﺳﻜﺘﺶ وﺳﻨﺨﺘﺎر اﻟﻌﺪد 2واﻟﻤﻘﺎس A3
ﺛﻢ ﻧﻀﻐﻂ ﻋﻠﻰ Finishوﺑﺬا ﻳﻜﻮن ﻗﺪ وﺻﻠﻨﺎ إﻟﻰ ﺁﺧﺮ ﺧﻄﻮة ﻣﻦ ﺧﻄﻮات إدراج
ﺑﻴﺎﻧﺎت اﻟﻠﻮﺣﺔ واﻟﺘﻲ ﺳﺘﻈﻬﺮ ﻓﻲ ﻗﺎﺋﻤﺔ اﻟﻠﻮﺣﺎت ﻓﻲ ﻧﺎﻓﺬة Drawings
٩٣
ﻏـﻴـﺮ
ﻣﺴﻤﻮح
ﻟﻢ
ﺑﺎﻟﻄﺒﺎﻋﺔ
ﻳﻜﺘﻤﻞ
ﻧﺴﺨﺔ
ﺑﻌﺪ
ﻟﻠﻌﺮض
......
ﻓﻘﻂ