0% found this document useful (0 votes)
476 views

PUSPT-10-CI-03-CS-001 - Calculation For Control Building Structure & Foundation Rev.c

Engineering Doc

Uploaded by

Mochammad Shokeh
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
476 views

PUSPT-10-CI-03-CS-001 - Calculation For Control Building Structure & Foundation Rev.c

Engineering Doc

Uploaded by

Mochammad Shokeh
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 43

CIVIL AND DESIGN CALCULATION

PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen CALCULATION FOR CONTROL Rev. : C


BUILDING STRUCTURE & Nomor halaman
PUSPT-10-CI-03-CS-001
FOUNDATION 1 dari 34

PEMBERI KERJA : PT. PERTAMINA EP


KONTRAKTOR : PT. MENARA GADING PUTIH
PT. EXCEL MITRA SOLUSINDO
NAMA PROYEK : PROYEK UPGRADING INSTRUMENTATION &
CONTROL FACILITIES SERTA SAFETY SYSTEM
SP - TAMBUN
LOKASI : TAMBUN - BEKASI
NOMOR KONTRAK : SP3MP NO. 0814/EPO300/2013-SO

C 4/12/13 34 Re-IFA YN AH AK
B 30/10/13 30 IFA YN AH AK
A 21/10/13 21 IFR YN AH AK
DIBUAT DIPERIKSA DISETUJUI DISETUJUI
REV. TGL HAL URAIAN
PT. MGP & PT. EMS PT. PERTAMINA EP
CIVIL AND DESIGN CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen CALCULATION FOR CONTROL Rev. : C


BUILDING STRUCTURE & Nomor halaman
PUSPT-10-CI-03-CS-001
FOUNDATION 2 dari 34

REVISION SHEET

NO. REV. DATE DESCRIPTION


A 21/10/13 Issued For Review
B 30/10/13 Issued For Approval
Perhitungan sagrod, Font height, Instrumentation
0 4/12/13 Re-Issued For Approval
Gambar plot plan, Zona Gempa
CIVIL AND DESIGN CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen CALCULATION Rev. : C


FOR CONTROL BUILDING Nomor halaman
PUSPT-10-CI-03-CS-001
STRUCTURE & FOUNDATION dari 34

DAFTAR ISI

1 GAMBARAN UMUM…………...……………………...……………………………………… 5
1.1 Tujuan……………………………………………………………………………………5
1.2 Kode, Standar dan Referensi……………………………………………………… 5
1.3 Satuan…………………………………………….………………………………… 5
1.4 Kualitas Material…………………………………………………………………… 5
1.5 Berat Jenis Material…………………………………………………………………….6

2 METODE ANALISIS…………………….………………………………………………………… 6
2.1 Kriteria Design…………………………………………….……………………………6
2.2 Beban Rencana……………………………………………...…………………………6
2.2.1 Beban Mati (D)……………………………………………………………… 6
2.2.2 Beban Hidup (L)………………………………………………………………6
2.2.3 Beban Angin (W)…………………………………………………………… 6
2.2.4 Beban Gempa (EQ)…………………………………………………………6
2.2.5 Kombinasi Beban……………………………………………………………6
2.3 Batas Lendutan…………………………………………..…………………………… 7

3 PERENCANAAN GORDING……………………………………………………………………10
3.1 Data Profil Baja……………………………………………………………………… 10
3.2 Section Property…………………………………………………………………..……11
3.3 Beban Pada Gording 11
3.3.1 Beban Mati (D)……………………………………………….…………… 11
3.3.2 Beban Hidup (L)………………………………………………..………… 11
3.4 Beban Terfaktor…………………………………..…………………………………… 11
3.5 Momen dan Gaya Geser Akibat Beban Terfaktor………………… 12
3.6 Momen Nominal Pengaruh Local Buckling………………………..… 12
3.7 Momen Nominal Pengaruh Lateral Buckling………………………. 13
3.8 Tahanan Momen Lentur…………………………………………………………. 14
3.9 Tahanan Geser…………………………………………………………………………14
3.10 Kontrol Interaksi Geser dan Lentur………………………………..…… 15
3.11 Tahanan Tarik Sagrod…………………………………………………………...… 15

4 ANALISIS STRUKTURAL DAN DESAIN…………………………..………………… 16


4.1 Data Struktural…………………………………………………………………………16
4.1.1 Beban Mati (D)……………………………………………………………… 16
4.1.2 Beban Hidup (L)………………………………………………………………16
4.1.3 Beban Angin (W)…………………………………………………………… 16
4.1.4 Beban Gempa (E)……………………………………………………………16
4.1.5 Material yang Digunakan……………………………………………… 16
4.2 Perhitungan Beban…………………………………………………………………….16
4.2.1 Beban Mati (D)……………………………………………………………… 16
4.2.2 Beban Hidup (L)………………………………………………………………18
4.2.3 Beban Gempa (E)……………………………………………………………19
4.3 Hasil Analisis……………………………………………………………………………23
4.3.1 Cek Tegangan………………………………………………………………… 23
4.3.2 Cek Lendutan…………………………………………………………………24
4.3.3 Reaksi Perletakan……………………………………………………………25
4.3.4 Perhitungan Tulangan Balok (Tie beam)…………….………………………………………
25
4.3.5 Hitung Rasio Penulangan yang Diperlukan……………………… 26
CIVIL AND DESIGN CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen CALCULATION Rev. : C


FOR CONTROL BUILDING Nomor halaman
PUSPT-10-CI-03-CS-001
STRUCTURE & FOUNDATION dari 34

5 PERHITUNGAN PONDASI………………………………...………………………………… 27
5.1 Input Data……………………………………...……………………………………… 27
5.2 Check of Soil Reaction "qa"…………...……………………………………… 27
5.3 Desain Footing …………………………………..…………………………………… 29
5.3.1 Design Soil Reaction "qus"………………….…………………… 29
5.3.2 Required Re-bar due to Bending Moment……………... 29
5.3.3 Check of Shear Stress……………………………………………...… 30
5.3.4 Check of Punching Shear…………………………………………… 30
5.4 Sketch……………………………………………………………………………………… 30
5.5 Pedestal…………………………………………………………………………………… 30

6 PERHITUNGAN ANGKUR DAN BASE PLATE……………………………………………………………………..


31
6.1 Eksentrisitas Beban…………………………………………………………………….31
6.2 Tahanan Tumpuan Beton………………………………………………………………32
6.3 Kontrol Dimensi Plat Tumpuan…………………………………………………… 32
6.4 Gaya Tarik Pada Angkur Baut……………………………………………………… 33
6.5 Gaya Geser Pada Angkur Baut…………………………………………………… 33
6.6 Gaya Tumpu Pada Angkur Baut…………………………………………………… 33
6.7 Kombinasi Geser dan Tarik………………………………………………………… 34
6.8 Kontrol Panjang Angkur Baut……………………………………………………… 34
CIVIL AND DESIGN CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen CALCULATION Rev. : C


FOR CONTROL BUILDING Nomor halaman
PUSPT-10-CI-03-CS-001
STRUCTURE & FOUNDATION dari 34

1. GAMBARAN UMUM

1.1 Tujuan
Dokumen ini memperlihatkan perhitungan strukutur baja dan pondasi untuk bangunan
"Control Room" pada proyek Upgrading Instrumentation & Control Facilities Serta Safety SP
Tambun
1.2 Kode, Standar , dan Referensi
1. PPI, "Peraturan Pembebanan untuk Gedung"
2. SNI 03-1727, "Pedoman Perencanaan Pembebanan untuk Rumah dan Gedung,
2002"
3. SNI 03-1729, "Pedoman Perencanaan Bangunan Baja untuk Gedung, 2002"
4. Uniform Building Code, UBC 1997 Volume 2
5 AISC-ASD, "Manual of Steel Construction: Allowable Stress Design 9th edition"
7 SNI 03-1729, "Pedoman Perencanaan Beton Bertulang dan Struktur Dinding
Bertulang untuk Rumah dan Gedung, 2002"
8. ACI 318-02 " Building Code Requirements for Structural Concrete and Commentary "
9 ANSI/ASCE 7-05 "Minimum Design Loads for Building and Other Structures"

1.3 Satuan
Seluruh satuan yang digunakan adalah SI, kecuali disebutkan lain

1.4 Kualitas Material


No. Material Description Value Unit
1. Baja Struktur ASTM A36
or JIS G3101 Grade SS 400
fu ultimate tensile strength 400 MPa
fy yield strength 240 MPa
fb allowable bending strength = 0.66 x fy 158 MPa
ft allowable tensile strength = 0.6 x fy 144 MPa
fv allowable shear strength = 0.4 x fy 96 MPa
E elastic modulus 200000 MPa
2. Bolt ASTM A-325
ftb allowable tensile stress 300 MPa
fvb allowable shear stress 124 MPa
3. Anchor Bolt ASTM A-307
fta allowable tensile stress 137.3 MPa
fva allowable shear stress 68.6 MPa
4. Welding AWS D1.1,
E70 Series
fuw ultimate welding strength 480 MPa
fvw allowable shear stress (0.3 fuw) 144 MPa
5. Concrete
fc' compressive strength at 28 days 28 MPa
6. Leveling concrete
fc' compressive strength at 28 days 14.0 MPa
7. Deformed bar ASTM A615
grade 60 or JIS G3112
SD 390
bar fy yield strength 400 MPa
8. Plain bar ASTM A615
grade 40 or JIS G3112
SD 235 or BJTP 24
fy yield strength 240 MPa
CIVIL AND DESIGN CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen CALCULATION Rev. : C


FOR CONTROL BUILDING Nomor halaman
PUSPT-10-CI-03-CS-001
STRUCTURE & FOUNDATION dari 34

1.5 Berat Jenis Material


No. Material Symbol Value Unit Remarks
1 Beton Bertulang γc 2400 kg/m 3

2 Beton γc 2200 kg/m3


3 Baja γs 7850 kg/m3
4 Tanah γso 1700 kg/m3
5 Air γL 1000 kg/m3

2. METODE ANALISIS

2.1 Kriteria Desain


- Pembebanan kombinasi tidak berfaktor digunakan untuk memeriksa rasio tegangan tiap member
dan lendutan.
- Struktur baja akan dirancang dengan menggunakan metode Allowable Stress Design
(AISC-ASD).
- Perhitungan beban gempa berdasarkan SNI 1726 2002 .
- Perhitungan beban angin berdasarkan PPI.
- Berat sendiri struktur harus ditingkatkan dengan faktor 1.2 untuk mengakomodasi baut
dan plat buhul.
- Berat kabel instrumen ditentukan berdasarkan data instrumen.
- Listrik dan berat kabel Instrumen ditentukan berdasarkan data listrik dan instrumen.
- Expansion joint harus ditempatkan untuk batang yang bebas dari bracing dan pipa
ditekuk.
- Analisis Struktur akan dilakukan oleh STAAD PRO.
- Detail sambungan akan mengacu pada gambar sambungan standar.
- PUSPT-10-CI-01-DW-003 Control Room Foundation Plan Section and Detail
- PUSPT-10-CI-01-DW-002 Control Room Architecture Plan, Elevation and Section

2.2 Beban Rencana


2.2.1. Beban Mati (D)
2.2.2. Beban Hidup (L)
2.2.3. Beban Angin (W)
2.2.4. Beban Gempa (EQ)
2.2.5. Kombinasi Beban
Kombinasi Beban Tidak Berfaktor
Kombinasi berikut merupakan beban tidak berfaktor yang digunakan untuk
Struktur Desain Baja
11 D
12 D + L
13 D + 0.75 L
14 D + W (X+100)
15 D + W (X-100)
16 D + W (Z+100)
17 D + W (Z-100)
18 D + 0.7 EQ (X+100)
19 D + 0.7 EQ (X-100)
20 D + 0.7 EQ (Z+100)
21 D + 0.7 EQ (Z-100)
22 D + 0.75 W (X+100) + 0.75 L
23 D + 0.75 W (X-100) + 0.75 L
24 D + 0.75 W (Z+100) + 0.75 L
25 D + 0.75 W (Z-100) + 0.75 L
26 D + 0.525 EQ (X+100) + 0.75L
27 D + 0.525 EQ (X-100) + 0.75L
CIVIL AND DESIGN CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen CALCULATION Rev. : C


FOR CONTROL BUILDING Nomor halaman
PUSPT-10-CI-03-CS-001
STRUCTURE & FOUNDATION dari 34

28 D + 0.525 EQ (Z+100) + 0.75L


CIVIL AND DESIGN CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen CALCULATION Rev. : C


FOR CONTROL BUILDING Nomor halaman
PUSPT-10-CI-03-CS-001
STRUCTURE & FOUNDATION dari 34

29 D + 0.525 EQ (Z-100) + 0.75L


30 0.6D
31 0.6D + W (X+100)
32 0.6D + W (X-100)
33 0.6D + W (Z+100)
34 0.6D + W (Z-100)
35 0.6D + 0.7EQ (X+100)
36 0.6D + 0.7EQ (X-100)
37 0.6D + 0.7EQ (Z+100)
38 0.6D + 0.7EQ (Z-100)

Kombinasi Beban Berfaktor


Kombinasi Berikut merupakan beban berfaktor yang digunakan untuk
Struktur Desain Beton
39 1.4 D
40 1.4 D + 1.7 L
41 1.05 D + 1.28 L + 1.28 EQ (X+100)
42 1.05 D + 1.28 L + 1.28 EQ (X-100)
43 1.05 D + 1.28 L + 1.28 EQ (Z+100)
44 1.05 D + 1.28 L + 1.28 EQ (Z-100)
45 0.9 D + 1.43 EQ (X+100)
46 0.9 D + 1.43 EQ (X-100)
47 0.9 D + 1.43 EQ (Z+100)
48 0.9 D + 1.43 EQ (Z-100)

2.3. Batas Lendutan


a.Batas lendutan vertikal untuk struktur baja harus mengikuti spesifikasi berikut :
- Komponen Struktur Balok : L/240

b. Batas lendutan horizontal :


- Baja Struktur : H/250

dimana : L = Panjang teoritis dari balok


H = Tinggi bangunan
CIVIL AND DESIGN CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen CALCULATION Rev. : C


FOR CONTROL BUILDING Nomor halaman
PUSPT-10-CI-03-CS-001
STRUCTURE & FOUNDATION dari 34

Gambar Plot Plan Pondasi

Gambar Tampak

Tampak Samping
CIVIL AND DESIGN CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen CALCULATION Rev. : C


FOR CONTROL BUILDING Nomor halaman
PUSPT-10-CI-03-CS-001
STRUCTURE & FOUNDATION dari 34

Tampak Depan
CIVIL AND DESIGN
CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen CALCULATION FOR CONTROL Rev. : C


BUILDING STRUCTURE & Nomor halaman
PUSPT-10-CI-03-CS-001 FOUNDATION dari 34

3. Perencanaan Gording

Tegangan leleh baja (yield stress), fy = 240 MPa


Tegangan tarik putus (ultimate stress), fu = 370 MPa
Tegangan sisa (residual stress), fr = 70 MPa
Modulus elastik baja (modulus of elasticity), E = 200000 MPa
Angka Poisson (Poisson's ratio), u= 0.3
3.1 DATA PROFIL BAJA
Lip Channel : C 150.65.20.3,2
ht = 150 mm
b= 65 mm
a= 20 mm
t= 3.2 mm
A = 957.1 mm2
Ix = 3320000 mm4
Iy = 541000 mm4
Sx = 44300 mm3
Sy = 12200 mm3
rx = 58.9 mm
ry = 23.7 mm
c= 21.1
Berat profil, w= 7.51 kg/m

GO
RD
IN SAGROD
G

O D
GR GORDING
SA

Faktor reduksi kekuatan untuk lentur, fb = 0.90


Faktor reduksi kekuatan untuk geser, ff = 0.75
Diameter sagrod, d= 10 mm
Jarak (miring) antara gording, s= 1045 mm
Panjang gording (jarak antara rafter), L1 = 5500 mm
Jarak antara sagrod (jarak dukungan lateral gording), L2 = 1850 mm
Sudut miring atap, a= 15 °
CIVIL AND DESIGN
CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen CALCULATION FOR CONTROL Rev. : C


BUILDING STRUCTURE & Nomor halaman
PUSPT-10-CI-03-CS-001 FOUNDATION dari 34

3.2 Section Property


G = E / [ 2 * (1 + u) ] = 76923.0769 MPa
h = ht - t = 146.80 mm
J = 2 * 1/3 * b * t + 1/3 * (ht - 2 * t) * t + 2/3 * ( a - t ) * t3 = 3355.44 mm4
3 3

Iw = Iy * h2 / 4 = 2.915E+09 mm6
X1 = p / Sx * √ [ E * G * J * A / 2 ] = 11146.23 MPa
X2 = 4 * [ Sx / (G * J) ]2 * Iw / Iy = 0.00063 mm2/N2
Zx = 1 / 4 * ht * t2 + a * t * ( ht - a ) + t * ( b - 2 * t ) * ( ht - t ) = 36232 mm3
Zy = ht*t*(c - t / 2) + 2*a*t*(b - c - t / 2) + t * (c - t)2 + t * (b - t - c)2 = 21100 mm3

G = modulus geser, Zx = modulus penampang plastis thd. sb. x,


J = Konstanta puntir torsi, Zy = modulus penampang plastis thd. sb. y,
Iw = konstanta putir lengkung, X1 = koefisien momen tekuk torsi lateral,
h = tinggi bersih badan, X2 = koefisien momen tekuk torsi lateral,

3.3 BEBAN PADA GORDING

3.3.1 BEBAN MATI (DEAD LOAD)

No Material Berat Satuan Lebar Q


(m) (N/m)
1 Berat sendiri gording 75.1 N/m 75.1
2 Atap baja (span deck) 150 N/m 2
1.0 156.8
Total beban mati, QDL = 231.9 N/m

3.3.2 BEBAN HIDUP (LIVE LOAD)

Beban hidup akibat beban air hujan diperhitungkan setara dengan beban genangan air
setebal 1 inc = 25 mm. qhujan = 0.025 * 10 = 0.25 kN/m2
Jarak antara gording, s= 1.045 m
Beban air hujan, qhujan * s * 103 = 261 N/m
Beban hidup merata akibat air hujan, QLL = 261 N/m
Beban hidup terpusat akibat beban pekerja, PLL = 1000 N

3.4 BEBAN TERFAKTOR


CIVIL AND DESIGN
CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen CALCULATION FOR CONTROL Rev. : C


BUILDING STRUCTURE & Nomor halaman
PUSPT-10-CI-03-CS-001 FOUNDATION dari 34
CIVIL AND DESIGN
CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen CALCULATION FOR CONTROL Rev. : C


BUILDING STRUCTURE & Nomor halaman
PUSPT-10-CI-03-CS-001 FOUNDATION dari 34

Beban merata, Qu = 1.2 * QDL + 1.6 * QLL = 696.22 N/m


Beban terpusat, Pu = 1.6 * PLL = 1600.00 N
Sudut miring atap, a= 0.26 rad
Beban merata terhadap sumbu x, Qux = Qu * cos a *10-3 = 0.6725 N/mm
Beban merata terhadap sumbu y, Quy = Qu * sin a *10-3 = 0.1802 N/mm
Beban terpusat terhadap sumbu x, Pux = Pu * cos a = 1545.48 N
Beban terpusat terhadap sumbu y, Puy = Pu * sin a = 414.11 N

3.5 MOMEN DAN GAYA GESER AKIBAT BEBAN TERFAKTOR

Panjang bentang gording terhadap sumbu x, Lx = L1 = 5500 mm


Panjang bentang gording terhadap sumbu y, Ly = L2 = 1850 mm
Momen akibat beban terfaktor terhadap sumbu x,
Mux = 1/10 * Qux * Lx2 + 1/8 * Pux * Lx = 3096821 Nm
Momen pada 1/4 bentang, MA = 2322616 Nm
Momen di tengah bentang, MB = 3096821 Nm
Momen pada 3/4 bentang, MC = 2322616 Nm
Momen akibat beban terfaktor terhadap sumbu y,
Muy = 1/10 * Quy * Ly2 + 1/8 * Puy * Ly = 157435 Nmm
Gaya geser akibat beban terfaktor terhadap sumbu x,
Vux = Qux * Lx + Pux = 5244 N
Gaya geser akibat beban terfaktor terhadap sumbu y,
Vuy = Quy * Ly + Puy = 747 N

3.6 MOMEN NOMINAL PENGARUH LOCAL BUCKLING

Pengaruh tekuk lokal (local buckling) pada sayap :


Kelangsingan penampang sayap, l=b/t = 20.313
Batas kelangsingan maksimum untuk penampang compact,
lp = 170 / √ fy = 10.973
Batas kelangsingan maksimum untuk penampang non-compact,
lr = 370 / √ ( fy - fr ) = 28.378
Momen plastis terhadap sumbu x, Mpx = fy * Zx = 8695665 Nmm
Momen plastis terhadap sumbu y, Mpy = fy * Zy = 5064115 Nmm
Momen batas tekuk terhadap sumbu x, Mrx = Sx * ( fy - fr ) = 7531000 Nmm
Momen batas tekuk terhadap sumbu y, Mry = Sy * ( fy - fr ) = 2074000 Nmm
Momen nominal penampang untuk :
a. Penampang compact, l £ lp
→ Mn = Mp
b. Penampang non-compact, lp < l £ lr
→ Mn = Mp - (Mp - Mr) * ( l - lp) / ( lr - lp)
c. Penampang langsing, l > lr
CIVIL AND DESIGN
CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen CALCULATION FOR CONTROL Rev. : C


BUILDING STRUCTURE & Nomor halaman
PUSPT-10-CI-03-CS-001 FOUNDATION dari 34

→ Mn = Mr * ( lr / l )2
CIVIL AND DESIGN
CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen CALCULATION FOR CONTROL Rev. : C


BUILDING STRUCTURE & Nomor halaman
PUSPT-10-CI-03-CS-001 FOUNDATION dari 34

l > lp dan l < lr


Berdasarkan nilai kelangsingan sayap, maka termasuk penampang non-compact
Momen nominal penampang terhadap sumbu x dihitung sebagai berikut :
compact : Mn = Mp = - Nmm
non-compact : Mn = Mp - (Mp - Mr) * ( l - lp) / ( lr - lp) = 8070711 Nmm
langsing : Mn = Mr * ( lr / l )2 = - Nmm
Momen nominal terhadap sumbu x penamnon-compact Mnx = 8070711 Nmm
Momen nominal penampang terhadap sumbu y dihitung sebagai berikut :
compact : Mn = Mp = - Nmm
non-compact : Mn = Mp - (Mp - Mr) * ( l - lp) / ( lr - lp) = 3459632 Nmm
langsing : Mn = Mr * ( lr / l )2 = - Nmm
Momen nominal terhadap sumbu y penamnon-compact Mny = 3459632 Nmm

3.7 MOMEN NOMINAL PENGARUH LATERAL BUCKLING


Momen nominal komponen struktur dengan pengaruh tekuk lateral, untuk :
a. Bentang pendek : L £ Lp
→ Mn = Mp = fy * Zx
b. Bentang sedang : Lp £ L £ Lr
→ Mn = Cb * [ Mr + ( Mp - Mr ) * ( Lr - L ) / ( Lr - Lp ) ] £ Mp
c. Bentang panjang : L > Lr
→ Mn = Cb * p / L*√ [ E * Iy * G * J + ( p * E / L )2 * Iy * Iw ] £ Mp
Panjang bentang maksimum balok yang mampu menahan momen plastis,
Lp = 1.76 * ry * √ ( E / fy ) = 1204 mm
Tegangan leleh dikurangi tegangan sisa, fL = f y - f r = 170 MPa
Panjang bentang minimum balok yang tahanannya ditentukan oleh momen kritis tekuk
torsi lateral, Lr = ry * X1 / fL * √ [ 1 + √ ( 1 + X2 * fL2 ) ] = 3610 mm
Koefisien momen tekuk torsi lateral,
Cb = 12.5 * Mux / ( 2.5*Mux + 3*MA + 4*MB + 3*MC ) = 1.14
Momen plastis terhadap sumbu x, M px
= f y
* Z x
= 8695665 Nmm
Momen plastis terhadap sumbu y, M py
= f y
* Z y
= 5064115 Nmm
Momen batas tekuk terhadap sumbu x, M rx
= S x
* ( f y
- f r
) = 7531000 Nmm
Momen batas tekuk terhadap sumbu y, M ry
= S y
* ( f y
- f r
) = 2074000 Nmm
Panjang bentang terhadap sumbu y (jarak dukungan lateral), L = L 2
= 1850 mm
L > L p dan L < Lr

® Termasuk kategori : bentang sedang


Momen nominal terhadap sumbu x dihitung sebagai berikut :
Mnx = Mpx = fy * Zx = - Nmm
Mnx = Cb * [ Mrx + ( Mpx - Mrx ) * ( Lr - L ) / ( Lr - Lp ) ] = 9526203 Nmm
Mnx = Cb * p / L*√ [ E * Iy * G * J + ( p * E / L )2 * Iy * Iw ] = - Nmm
Momen nominal thd. sb. x untuk : bentang sedang Mnx = 9526203 Nmm
Mnx > Mpx
CIVIL AND DESIGN
CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen CALCULATION FOR CONTROL Rev. : C


BUILDING STRUCTURE & Nomor halaman
PUSPT-10-CI-03-CS-001 FOUNDATION dari 34

Momen nominal terhadap sumbu x yang digunakan, Mnx = 8695665 Nmm


Momen nominal terhadap sumbu y dihitung sebagai berikut :
Mny = Mpy = fy * Zy = - Nmm
Mny = Cb * [ Mry + ( Mpy - Mry ) * ( Lr - L ) / ( Lr - Lp ) ] = 4842662 Nmm
Mny = Cb * p / L*√ [ E * Iy * G * J + ( p * E / L )2 * Iy * Iw ] = - Nmm
Momen nominal thd. sb. y untuk : bentang sedang Mny = 4842662 Nmm
Mny < Mpy
Momen nominal terhadap sumbu x yang digunakan, Mny = 4842662 Nmm

3.8 TAHANAN MOMEN LENTUR

Momen nominal terhadap sumbu x :


Berdasarkan pengaruh local buckling, Mnx = 8070711 Nmm
Berdasarkan pengaruh lateral buckling, Mnx = 8695665 Nmm
Momen nominal terhadap sumbu x (terkecil) yg menentukan, Mnx = 8070711 Nmm
Tahanan momen lentur terhadap sumbu x, ® fb * Mnx = 7263640 Nmm
Momen nominal terhadap sumbu y :
Berdasarkan pengaruh local buckling, Mny = 3459632 Nmm
Berdasarkan pengaruh lateral buckling, Mny = 4842662 Nmm
Momen nominal terhadap sumbu y (terkecil) yg menentukan, Mny = 3459632 Nmm
Tahanan momen lentur terhadap sumbu y, ® fb * Mny = 3113669 Nmm
Momen akibat beban terfaktor terhadap sumbu x, Mux = 3096821 Nmm
Momen akibat beban terfaktor terhadap sumbu y, Muy = 157435 Nmm
Mux / ( fb * Mnx ) = 0.4263
Muy / ( fb * Mny ) = 0.0506
Syarat yg harus dipenuhi : Mux / ( fb * Mnx ) + Muy / ( fb * Mny ) ≤ 1.0
Mux / ( fb * Mnx ) + Muy / ( fb * Mny ) = 0.4769 < 1.0 AMAN (OK)

3.9 TAHANAN GESER

Ketebalan plat badan tanpa pengaku harus memenuhi syarat,


h/t £ 6.36 * Ö ( E / fy )
45.88 < 183.60 ® Plat badan memenuhi syarat (OK)

Gaya geser akibat beban terfaktor terhadap sumbu x, Vux = 5244 N


Luas penampang badan, Aw = t * ht = 480 mm2
Tahanan gaya geser nominal thd.sb. x, Vnx = 0.60 * fy * Aw = 69120 N
Tahanan gaya geser terhadap sumbu x, ® ff * Vnx = 51840 N
Gaya geser akibat beban terfaktor terhadap sumbu y, Vuy = 747 N
Luas penampang sayap, Af = 2 * b * t = 416 mm2
Tahanan gaya geser nominal thd.sb. y, Vny = 0.60 * fy * Af = 59904 N
Tahanan gaya geser terhadap sumbu x, ® ff * Vny = 44928 N
CIVIL AND DESIGN
CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen CALCULATION FOR CONTROL Rev. : C


BUILDING STRUCTURE & Nomor halaman
PUSPT-10-CI-03-CS-001 FOUNDATION dari 34

Vux / ( ff * Vnx ) = 0.1012


Vuy / ( ff * Vny ) = 0.0166
CIVIL AND DESIGN
CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen CALCULATION FOR CONTROL Rev. : C


BUILDING STRUCTURE & Nomor halaman
PUSPT-10-CI-03-CS-001 FOUNDATION dari 34

Syarat yang harus dipenuhi :


Vux / ( ff * Vnx ) + Vuy / ( ff * Vny ) £ 1.0
Vux / ( ff * Vnx ) + Vuy / ( ff * Vny ) = 0.1178 < 1.0 AMAN (OK)

3.10 KONTROL INTERAKSI GESER DAN LENTUR

Sayarat yang harus dipenuhi untuk interakasi geser dan lentur :


Mu / ( fb * Mn ) + 0.625 * Vu / ( ff * Vn ) £ 1.375

Mu / ( fb * Mn ) =Mux / ( fb * Mnx ) + Muy / ( fb * Mny ) = 0.4769


Vu / ( ff * Vn ) = Vux / ( ff * Vnx ) + Vuy / ( ff * Vny ) = 0.1178
Mu / ( fb * Mn ) + 0.625 * Vu / ( ff * Vn ) = 0.5505
0.5505 < 1.375 ® AMAN (OK)

3.11 TAHANAN TARIK SAGROD

Beban merata terfaktor pada gording, Quy = 0.1802 N/mm


Beban terpusat terfaktor pada gording, Puy = 414.11 N/m
Panjang sagrod (jarak antara gording), Ly = L2 = 1850 m
Gaya tarik pada sagrod akibat beban terfaktor,
Tu = Quy * Ly + Puy = 747 N
Tegangan leleh baja, fy = 240 MPa
Tegangan tarik putus, fu = 370 MPa
Diameter sagrod, d= 10 mm
Luas penampang brutto sagrod, Ag = p / 4 * d2 = 78.54 mm2
Luas penampang efektif sagrod, Ae = 0.90 * Ag = 70.69 mm2

Tahanan tarik sagrod berdasarkan luas penampang brutto,


f * Tn = 0.90 * Ag * fy = 16965 N
Tahanan tarik sagrod berdasarkan luas penampang efektif,
f * Tn = 0.75 * Ae * fu = 19615 N
Tahanan tarik sagrod (terkecil) yang digunakan, ® f * Tn = 16965 N
Syarat yg harus dipenuhi : Tu £ f * Tn
747 < 16965 ® AMAN (OK)
CIVIL AND DESIGN CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen Rev. : C


CALCULATION FOR CONTROL BUILDING
Nomor halaman
PUSPT-10-CI-03-CS-001 STRUCTURE & FOUNDATION
dari 34

4. ANALISIS STRUKTURAL DAN DESAIN

Faktor berikut yang menjadi pertimbangan dalam desain struktur baja

4.1 Data Struktural


4.1.1 Beban Hidup (D)
a. Berat sendiri
b. Beban Atap → (gording, sagrod dan sambungan) = 8 kg/m2
→ (metal sheet) = 12 kg/m2
c. Beban Dinding → (Batu Bata) = 250 kg/m2

4.1.2 Beban Hidup (L)


a. Beban Hujan = 20 kg/m2
b. Beban Orang = 100 kg/m2

4.1.3 Beban Angin (W)


a. Beban Angin = 25 kg/m2
Tata Cara Perencanaan Pembebanan untuk Rumah dan Gedung (SNI 03-1727-1989-F).

4.1.4 Beban Gempa ( E )


Struktur direncanakan untuk dapat menahan gaya gempa yang berupa gaya lateral statik
ekuivalen berdasarkan peraturan SNI 03-1726-2002

4.1.5 Material yang Digunakan


No. Member Dimension Material
1 Kolom SH 300x150x6.5x9 Steel
2 Rafter SH 250x125x6x9 Steel
3 Balok SH 200x100x5.5x8 Steel
4 Gording C 150x65x20x3.2 Steel
5 Balok Rec. 300 x 450 Concrete

4.2 Perhitungan Beban


4.2.1 Beban Mati ( DL )
a. Semua berat sendiri struktur baja harus dihitung dengan STAAD. Pro 2007
CIVIL AND DESIGN CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen Rev. : C


CALCULATION FOR CONTROL BUILDING
Nomor halaman
PUSPT-10-CI-03-CS-001 STRUCTURE & FOUNDATION
dari 34

b. Beban Atap
Roof Load
Member Load 1 = 20 kg/m2 x 5.5 m = 110 kg/m

Member Load 2 = 20 kg/m2 x 2.75 m = 55 kg/m

c. Beban Dinding
Member Load 3 = 250 kg/m2 x 3.8 m = 950 kg/m
CIVIL AND DESIGN CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen Rev. : C


CALCULATION FOR CONTROL BUILDING
Nomor halaman
PUSPT-10-CI-03-CS-001 STRUCTURE & FOUNDATION
dari 34

Total = 1115 kg/m


CIVIL AND DESIGN CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen Rev. : C


CALCULATION FOR CONTROL BUILDING
Nomor halaman
PUSPT-10-CI-03-CS-001 STRUCTURE & FOUNDATION
dari 34

4.2.2 Beban Hidup ( LL )


a. Beban Hujan
Member Load 1 = 20 kg/m2 x 5.5 m = 110 kg/m

Member Load 2 = 20 kg/m2 x 2.75 m = 55 kg/m

b. Beban Orang
Nodal Load = 100 kg x 6 nodal = 600 kg/m
CIVIL AND DESIGN CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen Rev. : C


CALCULATION FOR CONTROL BUILDING
Nomor halaman
PUSPT-10-CI-03-CS-001 STRUCTURE & FOUNDATION
dari 34

Total = 765 kg/m


CIVIL AND DESIGN CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen Rev. : C


CALCULATION FOR CONTROL BUILDING
Nomor halaman
PUSPT-10-CI-03-CS-001 STRUCTURE & FOUNDATION
dari 34

4.2.3 Beban Gempa ( E )

Beban gempa dihitung berdasarkan SNI SNI 03-1726-2002 dengan menggunakan metode statik ekivalen

Tabel 1. Faktor Keutamaan I untuk berbagai kategori gedung dan bangunan

Faktor keutamaan I = 1.4


CIVIL AND DESIGN CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen Rev. : C


CALCULATION FOR CONTROL BUILDING
Nomor halaman
PUSPT-10-CI-03-CS-001 STRUCTURE & FOUNDATION
dari 34

Tabel 2. Faktor daktilitas maksimum, faktor reduksi gempa maksimum, faktor tahanan lebih struktur dan faktor
tahanan lebih total beberapa jenis sistem dan subsistem struktur gedung

Table 3.Zona Gempa

Faktor Reduksi: R = 4.5


CIVIL AND DESIGN CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen Rev. : C


CALCULATION FOR CONTROL BUILDING
Nomor halaman
PUSPT-10-CI-03-CS-001 STRUCTURE & FOUNDATION
dari 34

Tabel 3. Koefisien Respon Gempa

T= 0.18 x (3.80)0.75
= 0.49
C= 0.67

Tabel 4. ζ yang membatasi waktu getar alami Fundamental struktur gedung


CIVIL AND DESIGN CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen Rev. : C


CALCULATION FOR CONTROL BUILDING
Nomor halaman
PUSPT-10-CI-03-CS-001 STRUCTURE & FOUNDATION
dari 34

Koefisien ζ : 0.18
CIVIL AND DESIGN CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen Rev. : C


CALCULATION FOR CONTROL BUILDING
Nomor halaman
PUSPT-10-CI-03-CS-001 STRUCTURE & FOUNDATION
dari 34

Gambar 1. Peta Zona Gempa


Zona Gempa 3
CIVIL AND DESIGN CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen Rev. : C


CALCULATION FOR CONTROL BUILDING
Nomor halaman
PUSPT-10-CI-03-CS-001 STRUCTURE & FOUNDATION
dari 34

- Perhitungan Gaya Gempa


C·I
V = · Wt
R
V = Total rencana gaya gempa dasar ( ton )
C = Koefisien Gempa = 0.67 (tabel.4)
I = Faktor Keutamaan = 1.40 (tabel.1)
R = Faktor Daktilitas = 4.50 (tabel.2)
Wt = Berat Struktur Baja = #REF! kg

V = #REF! kg
Wi · Zi
Fi = ·V
Σ Wi · Zi

Height Elev. Weight Wi · Zi Wi · Zi Fi= Wi · Zi * V


Node
(m) Zi (m) Wi (kg) (kg.m) Σ (Wi.zi) Σ (Wi·Zi)
1 3.80 3.80 #REF! #REF! #REF! #REF!
3 3.80 3.80 #REF! #REF! #REF! #REF!
7 3.80 3.80 #REF! #REF! #REF! #REF!
9 3.80 3.80 #REF! #REF! #REF! #REF!
10 3.80 3.80 #REF! #REF! #REF! #REF!
11 3.80 3.80 #REF! #REF! #REF! #REF!
∑ 3.80 #REF! #REF! #REF!

4.3 Hasil Analisis


4.3.1 Cek Tegangan
Dari hasil perhitungan didapat rasio tegangan yang terjadi di bawah 1.0
CIVIL AND DESIGN CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen Rev. : C


CALCULATION FOR CONTROL BUILDING
Nomor halaman
PUSPT-10-CI-03-CS-001 STRUCTURE & FOUNDATION
dari 34

Node Member Rasio


14 SH 300X150X6.5 0.841
16 SH 300X150X6.5 0.848
17 SH 300X150X6.5 0.909
18 SH 300X150X6.5 0.793
19 SH 300X150X6.5 0.794
20 SH 300X150X6.5 0.911
22 SH 200X100X5.5 0.406
23 SH 200X100X5.5 0.406
26 SH 200X100X5.5 0.406
27 SH 200X100X5.5 0.406
28 SH 150X75X5 0.072
29 SH 250X125X6 0.253
30 SH 250X125X6 0.243
31 SH 150X75X5 0.072
32 SH 150X75X5 0.137
33 SH 250X125X6 0.436
34 SH 250X125X6 0.427
35 SH 150X75X5 0.137
36 SH 150X75X5 0.072
37 SH 250X125X6 0.243
38 SH 250X125X6 0.242
39 SH 150X75X5 0.072

4.3.2 Cek Lendutan


Horizontal Vertical Horizontal
Node L/C
x (mm) y (mm) z (mm)
29 12 D + L 0.434 -1.159 -0.028
39 12 D + L 0.058 -5.254 -0.037
18 12 D + L 0.283 -0.123 0.129
17 12 D + L 0.343 -0.121 -0.394
10 12 D + L 0.059 -0.065 0.012
11 12 D + L 0.043 -0.067 -0.056
3 12 D + L 0.062 -0.037 0.029
1 12 D + L 0.054 -0.039 -0.094
7 12 D + L 0.002 -0.035 -0.029
37 12 D + L 0.041 -0.761 -0.008

5.254 mm < lendutan yang diijinkan ( L / 240 )


< 5500 mm / 240 = 22.9 mm ( OK )
CIVIL AND DESIGN CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen Rev. : C


CALCULATION FOR CONTROL BUILDING
Nomor halaman
PUSPT-10-CI-03-CS-001 STRUCTURE & FOUNDATION
dari 34

4.3.3 Reaksi Perletakan


Node L/C Fx kg Fy kg Fz kg Mx N-m Mz N-m
1 12 D + L 0 10357.244 -108.098 80017.388 37219.440
3 12 D + L 0 9620.119 108.098 -71764.531 35567.706
7 12 D + L 0 8713.135 -108.098 54270.560 -37093.666
9 12 D + L 0 8713.136 108.098 -54270.557 -37093.666
10 12 D + L 0 14082.431 177.331 -62435.959 21325.330
11 12 D + L 0 14790.532 -177.331 70393.748 19002.760

4.3.4 Perhitungan Tulangan Balok (Tie Beam)


Input Data
fy = 400 Mpa
fc' = 28 MPa
β1 = 0.85
Mu = 4.29E+04 N-m 42857272 Nmm (Perhitungan StaadPro)
CIVIL AND DESIGN CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen Rev. : C


CALCULATION FOR CONTROL BUILDING
Nomor halaman
PUSPT-10-CI-03-CS-001 STRUCTURE & FOUNDATION
dari 34

B (Lebar Balok) = 300 mm


H (Tinggi Balok) = 400 mm

Tebal selimut beton direncanakan = 40 mm


Diameter sengkang direncangakan = 10 mm (Ø10)
Tulangan utama direncanakan = 16 mm (Ø16)

ØMn ≥ Mu

Mn = Mu/Ø
= 50420320 Nmm

a = tebal selimut beton


b = diameter sengkang / begel
c = setengah diameter tulangan utama
d = h-a-b-c
= 342 mm
Rn = Mn / (B x d2)
= 1.4369
m = fy / ( 0.85 x fc' )
= 16.807

4.3.5 Hitung Rasio Penulangan yang Diperlukan

= 0.0037 = 0.3708 %

ρmin = 1.4/fy
= 0.0035 %

ρmax = 0.75xρb = 0.75 x ( 0.85 x fc' x β1 x 600 ) / (fy * (600 + fy))


= 0.0228
= 2.2759 %

ρmin < ρ < ρmax


0.0035 < 0.3708 < 2.276

As = ρxbxd
ρmin 359.1 = 380.42 mm2 = ρmax 233505
Luas penampang Ø 16 = 201.06 mm2

Concrete Design

Tulangan Utama
Pakai 3 - Ø 16 = 603.186 mm2
CIVIL AND DESIGN CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen Rev. : C


CALCULATION FOR CONTROL BUILDING
Nomor halaman
PUSPT-10-CI-03-CS-001 STRUCTURE & FOUNDATION
dari 34

603.19 > 380.42 ( memenuhi )


mm2 mm2
CIVIL AND DESIGN
CALCULATION PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen CALCULATION Rev. : C


FOR CONTROL BUILDING Nomor halaman
PUSPT-10-CI-03-CS-001
STRUCTURE & FOUNDATION dari 34

5 Perhitungan Pondasi
5.1 Input Data

Beban : a. Beban Tetap b. Beban Sementara


P P = Axial Load
Mx ( tanpa berat sendiri )
(Mz) = 14.79 ton P= 21.48 ton
Vx
(Vz Vx = Shear ( x - direction )
) = 0 ton Vx = 0.00 ton
Vz = Shear ( z - direction )
= 0.18 ton Vz = 0.51 ton
Mx = Moment ( x - direction )
Df H = 0.80 ton. m Mx = 0.93 ton.m
Mz = Moment ( z - direction )
= 0.37 ton.m Mz = 0.27 ton.m

B (L)

Perkiraan Ukuran Pondasi


b

Data Ukuran pondasi :


h
H= 140 cm
Df = 100 cm
B= 150 cm
L= 150 cm
hf = 30 cm
d= 22.5 cm
b= 45 cm
H Df h= 45 cm

d hf

c1
Geser pons :

b1 b1 = b + d = 67.5 cm
b2 = h + d = 67.5 cm
c1 = b/2 + d = 45 cm
c2 = h/2 + d = 45 cm
L b2

z c2

5.2 Check of Soil Reaction "qa"


Beban Rencana :
a) Beban Vertikal (P)

Perm. : P tot = P + Wf = 19525.0 kg


Temp. : P tot = P + Wf = 26217.6 kg
Dimana,Wf = 4734.45 Kg
Wp + Wb + Ws
Wp = Berat Pedestal = 534.6 Kg
CIVIL AND DESIGN
CALCULATION PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen CALCULATION Rev. : C


FOR CONTROL BUILDING Nomor halaman
PUSPT-10-CI-03-CS-001
STRUCTURE & FOUNDATION dari 34

Wb = Berat footing = 1620 Kg


Ws = Berat tanah di atas footing = 2579.85 Kg
CIVIL AND DESIGN
CALCULATION PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen CALCULATION Rev. : C


FOR CONTROL BUILDING Nomor halaman
PUSPT-10-CI-03-CS-001
STRUCTURE & FOUNDATION dari 34

b) Beban akibat gaya horizontal (M)


Tetap : Sementara :
Mx1 = Vx . H Mx1 = Vx . H
= 0 kg m = 0 kg m
Mz1 = Vz . H Mz1 = Vz . H
= 248.2634 kg m = 711.497 kg m ex (ez)
c) Eksentrisitas (e)
- Perm. : Mx.tot = Mx1 + Mx = 800.1739 kg m ex = 4.0982 cm P tot

Mz.tot = Mz1 + Mz = 620.4578 kg m ez = 3.1778 cm


- Temp. : Mx.tot = Mx1 + Mx = 934.7416 kg m ex = 3.5653 cm
Mz.tot = Mz1 + Mz = 977.5354 kg m ez = 3.7285 cm
Xn > B (L)
d) Hitung "qa" :
qa = a2 P tot
B.L
Nilai " a " tergantung " e " kondisi berikut :

a = 1 + factor x + factor z

Dimana : ex(ez) < B(L)/6, factor x (z) = 6 ex(ez)/ B (L) Xn < B (L)
ex(ez) > B(L)/6, factor x (z) = 2/ [3{0.5-ex(ez)/ B (L)}]

untuk kasus ini:


- Tetap ex < B/6 Faktor x = 0.16
ez < L/6 Faktor z = 0.13 Xn = Neutral Axis

- Sementara ex < B/6 Faktor x = 0.14


ez < L/6 Faktor z = 0.15
e) Tegangan tanah yang diijinkan "qa" : (ASUMSI)
- Tetap - Sementara
qa = 1.20 kg/cm2 qa = 1.56 kg/cm2
f) Tegangan Tanah "qa" :
a
- Tetap - Sementara
qa = a P tot = 1.12 kg/cm2 P tot
B*L
qa = a B*L
= 1.51 kg/cm2
a< a q OK !
a a < a a q OK !
= 1.291 = 1.292

Tetap : Sementara :
Overturning Moment ( OM ) : Mx tot = 800.174 kg m Mx tot = 934.74 kg m
Mz tot = 620.458 kg m Mz tot = 977.54 kg m
9
Resistant Moment ( RM ) : Ptot.B/2 = 14644 kg m Ptot . B/2 = 19663 kg m
Ptot.L/2 = 14644 kg m Ptot . L/2 = 19663 kg m

Beban Tetap : RM / OM = Ptot . B = 18.3 > 2.0


2 . Mx tot
Ptot . L = 23.6 > 2.0
2 . Mz tot
Beban Sementara : RM / OM = Ptot . B = 21.0 > 1.5
2 . Mx tot
Ptot . L = 20.1 > 1.5
2 . Mz tot
CIVIL AND DESIGN
CALCULATION PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen CALCULATION Rev. : C


FOR CONTROL BUILDING Nomor halaman
PUSPT-10-CI-03-CS-001
STRUCTURE & FOUNDATION dari 34

5.3 Desain Footing


5.3.1 Design Soil Reaction "qus"
qa max = 1.505 kg/cm2
1.6 * (qa max - Wf)
qus = = 2.072 kg/cm2
B.L

5.3.2 Required Re-bar due to Bending Moment


a. Desain Momen :
Mux = qus . L . ( B - b )2 /8 = 4282.4 kg m
Muz = qus . B . ( L - h )2 /8 = 4282.4 kg m

b. Rasio Besi :
fy = 4000 kg/cm2
fc' = 350 kg/cm2
m= fy = 13.4 ; Ø = 0.9
0.85 fc'

- Arah - X :
Rn = Mux = 6.3 kg/ cm2
ø L d 2

ρ req = 1 1 - 1 - 2 m Rn
= 0.0016 < ρ min
m fy

ρ min = 1.4 = 0.0035


fy ρ min = 0.0021
ρ r = 1.33 * ρ req = 0.0021
ρo = 0.0021

As = ρ o * L * d = 7.1 cm2
D= 16 mm Ab = 2.01 cm2
n = A s / Ab = 4
Spacing, s = 452 mm ; ambil yang terkecil.
Jarak Batas : S maks. = 2d = 225 mm Jarak s = 225 mm
ambil : D 16 @ 200

- Arah - Z :
Rn = Muz = 6.3 kg/ cm2
ø B d 2

ρ req = 1 1 - 1 - 2 m Rn
= 0.0016 < r min
m fy
ρ min = 1.4 = 0.0035
fy ρ min = 0.0021
ρ r = 1.33 * r req = 0.0021
ρo = 0.0021
CIVIL AND DESIGN
CALCULATION PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen CALCULATION Rev. : C


FOR CONTROL BUILDING Nomor halaman
PUSPT-10-CI-03-CS-001
STRUCTURE & FOUNDATION dari 34

As = ρ o * L * d = 7.1 cm2
D= 16 mm Ab = 2.01 cm2
n = A s / Ab = 4
spacing, s = 452 mm ; ambil yang terkecil.
Jarak Batas : S maks. = 2 d = 225 mm Jarak s = 225 mm

ambil : D 16 @ 200
5.3.3 Check of Shear Stress
Vux = qus * ( B/2 - c1) / d = 2.76 kg/cm2 <
ø (0.53 vfc') = 8.4 kg/cm2
Vuz = qus * ( L/2 - c2) / d = 2.76 kg/cm 2
<
Ok !!
5.3.4 Check of Punching Shear
Vup = qus * ( B*L - b1*b2) = 6.12 kg/cm2 < ø (1.06 vfc') = 17 kg/cm2
2 * ( b1 + b2 ) * d
Ok !!

5.4 Sketch :

D 16 @ 200 D 16 @ 200

5.5 Pedestal :
Cek kebutuhan :
Pedestal Length 110
Ratio = = = 2.44 < 2.5 Short Column
Width of pedestal = 45
Tulangan yang diperlukan :

ρo= 0.01 As = ρ o Ag = 20.25 cm2

Dipakai 12 D-16 As = 24.13 cm2 Ok!

Sketch :
CIVIL AND DESIGN CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen CALCULATION FOR CONTROL Rev. : C


BUILDING STRUCTURE & Nomor halaman
PUSPT-10-CI-03-CS-001
FOUNDATION dari 34

6 PERHITUNGAN ANGKUR DAN BASE PLATE

BEBAN KOLOM DATA BEBAN KOLOM


Gaya aksial akibat beban terfaktor, Pu = 12174.281 N
Momen akibat beban terfaktor, Mu = 13171382 Nmm
Gaya geser akibat beban terfaktor, Vu = 5999.677 N
PLAT TUMPUAN (BASE PLATE) DATA PLAT TUMPUAN
Tegangan leleh baja, fy = 240 MPa
Tegangan tarik putus plat, fup = 370 MPa
Lebar plat tumpuan, B= 350 mm
Panjang plat tumpuan, L= 230 mm
Tebal plat tumpuan, t= 19 mm
KOLOM PEDESTRAL DATA KOLOM BETON
Kuat tekan beton, fc' = 28 MPa
Lebar penampang kolom, I= 450 mm
Panjang penampang kolom, J= 450 mm
DIMENSI KOLOM BAJA DATA KOLOM BAJA
Profil baja : WF 300.150.6.5.9
Tinggi total, ht = 300 mm
Lebar sayap, bf = 150 mm
Tebal badan, tw = 6.5 mm
Tebal sayap, tf = 9 mm
ANGKUR BAUT DATA ANGKUR BAUT
Jenis angkur baut, Tipe : A-325
Tegangan tarik putus angkur baut, fub = 825 MPa
Tegangan leleh angkur baut, fy = 400 MPa
Diameter angkur baut, d= 20 mm
Jumlah angkur baut pada sisi tarik, nt = 2 bh
Jumlah angkur baut pada sisi tekan, nc = 2 bh
Jarak baut terhadap pusat penampang kolom, f= 115 mm
Panjang angkur baut yang tertanam di beton, La = 500 mm

6.1 EKSENTRISITAS BEBAN


Eksentrisitas beban,
e = Mu / Pu = 1081.90 mm
L/6= 38.33 mm
e >L/6 (OK)

h = ht - tf = 291 mm
et = f + h / 2 = 261 mm
ec = f - h / 2 = -30.5 mm

Jumlah angkur baut total,


n = n t + nc = 4 bh
CIVIL AND DESIGN CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen CALCULATION FOR CONTROL Rev. : C


BUILDING STRUCTURE & Nomor halaman
PUSPT-10-CI-03-CS-001
FOUNDATION dari 34

6.2 TAHANAN TUMPU BETON

Gaya tarik pada angkur baut, Pt = Pu * ec / et = -1425 N


Gaya tekan total pada plat tumpuan, Puc = Pu + Pt = 10749 N
Panjang bidang tegangan tekan beton, Y=3*(L-h)/2= -91.50 mm
Luas plat tumpuan baja, A1 = B * L = 80500 mm2
Luas penampang kolom pedestral, A2 = I * J = 202500 mm2
Tegangan tumpu nominal, fcn = 0.85 * fc' * √ ( A2 / A1 ) = 37.748 MPa
fcn = 1.70 * fc' = 47.600 MPa
Tegangan tumpu nominal beton yg digunakan, fcn = 37.748 MPa
Faktor reduksi kekuatan tekan beton, ø= 0.65
Tegangan tumpu beton yg diijinkan, ø * fcn = 24.536 MPa
Tegangan tumpu maksimum yang terjadi pada beton,
fcu = 2 * Puc / ( Y * B ) = -0.671 MPa
Syarat yang harus dipenuhi :
fcu ≤ ø * fcn
-0.671 < 24.536 AMAN (OK)

6.3 KONTROL DIMENSI PLAT TUMPUAN

Lebar minimum plat tumpuan yang diperlukan,


Bp min = Puc / ( 0.5 * ø * fcn * Y ) = -10 mm
Lebar plat yang digunakan, B= 350 mm
Syarat yang harus dipenuhi :
Bp min < B
-10 < 350 AMAN (OK)
Panjang bagian plat tumpuan jepit bebas,
a = ( L - 0.95 * ht ) / 2 = -27.5 mm
fcu1 = ( 1 - a / Y ) * fcu = -0.470 MPa
Modulus penampang plastis plat, Z = 1/4 * B * t = 31587.5 mm3
2

Momen yang terjadi pada plat akibat beban terfaktor,


Mup = 1/2 * B * fcu1 * a2 + 1/3 * B * ( fcu - fcu1 ) * a2 = -79940 Nmm
Faktor reduksi kekuatan lentur, øb = 0.90
Tahanan momen nominal plat, Mn = fy * Z = 7581000 Nmm
Tahanan momen plat, øb * Mn = 6822900 Nmm
Syarat yang harus dipenuhi :
Mup < øb * M n
-79940 < 6822900 AMAN (OK)
CIVIL AND DESIGN CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen CALCULATION FOR CONTROL Rev. : C


BUILDING STRUCTURE & Nomor halaman
PUSPT-10-CI-03-CS-001
FOUNDATION dari 34

6.4 GAYA TARIK PADA ANGKUR BAUT

Gaya tarik pada angkur baut, Tu1 = Pt / nt = -713 N


Tegangan tarik putus angkur baut, fub = 825 MPa
Luas penampang angkur baut, Ab = p / 4 * d 2 = 314 mm2
Faktor reduksi kekuatan tarik, øt =0.90
Tahanan tarik nominal angkur baut, Tn = 0.75 * Ab * fub = 194386 N
Tahanan tarik angkur baut, øt * Tn = 174947 N
Syarat yang harus dipenuhi :
Tu1 < øt * T n
-713 < 174947 AMAN (OK)

6.5 GAYA GESER PADA ANGKUR BAUT

Gaya geser pada angkur baut, Vu1 = Vu / n = 1500 N


Tegangan tarik putus baut, fub = 825 MPa
Jumlah penampang geser, m= 1
Faktor pengaruh ulir pada bidang geser, ρ1 = 0.4
Luas penampang baut, Ab = p / 4 * d 2 = 314 mm2
Faktor reduksi kekuatan geser, øf = 0.75
Tahanan geser nominal, Vn = r1 * m * Ab * fub = 103673 N
Tahanan geser angkur baut, øf * Vn = 77754 N
Syarat yang harus dipenuhi :
Vu1 < øf * V n
1500 < 77754 AMAN (OK)

6.6 GAYA TUMPU PADA ANGKUR BAUT

Gaya tumpu pada angkur baut, Ru1 = Vu1 = 1500 N


Diameter baut, d= 20 mm
Tebal plat tumpu, t= 19 mm
Tegangan tarik putus plat, fup = 370 MPa
Tahanan tumpu nominal, Rn = 2.4 * d * t * fup = 337440 N
Tahanan tumpu, øf * Rn = 253080 N
Syarat yang harus dipenuhi :
Ru1 < øf * Rn
1500 < 253080 AMAN (OK)
CIVIL AND DESIGN CALCULATION
PT. Menara Gading Putih PT. Excel Mitra Solusindo

Nomor Dokumen CALCULATION FOR CONTROL Rev. : C


BUILDING STRUCTURE & Nomor halaman
PUSPT-10-CI-03-CS-001
FOUNDATION dari 34

6.7 KOMBINASI GESER DAN TARIK

Konstanta tegangan untuk baut mutu tinggi, f1 = 807 MPa


f2 = 621 MPa
Faktor pengaruh ulir pada bidang geser, ρ2 = 1.9
Tegangan geser akibat beban terfaktor, fuv = Vu / ( n * Ab ) = 4.77 MPa
Kuat geser angkur baut, øf * ρ1 * m * fub = 247.50 MPa

Syarat yang harus dipenuhi :


fuv = Vu / ( n * Ab ) < øf * ρ1 * m * fub
4.77 < 247.50 AMAN (OK)
Gaya tarik akibat beban terfaktor, Tu1 = -713 N
Tahanan tarik angkur baut, øf * Tn = øf * f1 * Ab = 190145 N
Syarat yang harus dipenuhi :
Tu1 < øf * f1 * Ab
-713 < 190145 AMAN (OK)
Kuat tarik angkur baut, ft = 0.75 * fub = 618.75 MPa
Batas tegangan kombinasi, f1 - ρ2 * fuv = 797.93 MPa
f2 = 621.00 MPa
Syarat yang harus dipenuhi :
ft < f1 - ρ2 * fuv
618.75 < 797.93 AMAN (OK)
Syarat yang harus dipenuhi :
ft < ρ2
618.75 < 621.00 AMAN (OK)

6.8 KONTROL PANJANG ANGKUR BAUT

Panjang angkur tanam yang digunakan, La = 500 mm


Kuat tekan beton, fc' = 28
Tegangan leleh baja, fy = 400
Diameter angkur baut, d= 20
Panjang angkur tanam minimum yang diperlukan,
Lmin = fy / ( 4 * Ö fc' ) * d = 378 mm
Syarat yang harus dipenuhi :
Lmin < La
378 < 500 AMAN (OK)