100% found this document useful (1 vote)
300 views1 page

Cep Changeover

This document provides the standard operating procedure for changing over condensate extraction pumps (CEPs) at a power plant. It is a 10-step process where CEP-B is started up after CEP-A, with careful monitoring of valve positions and hotwell level during the transition to avoid trips. CEP-A is then shut down and placed in standby once CEP-B is fully online and handling the load.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
300 views1 page

Cep Changeover

This document provides the standard operating procedure for changing over condensate extraction pumps (CEPs) at a power plant. It is a 10-step process where CEP-B is started up after CEP-A, with careful monitoring of valve positions and hotwell level during the transition to avoid trips. CEP-A is then shut down and placed in standby once CEP-B is fully online and handling the load.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

ADHUNIK POWER & NATURAL RESOURCES LIMITED

2 X 270 MW, PADAMPUR

SOP
DOC REF NO APNRL/IMS/SOP/OP/001/ REV 0 DATE OF ISSUE
RESPONSIBILITY MECHANICAL-OPERATION
PURPOSE CEP CHANGEOVER PAGE 0

CEP Changeover
Initial condition

CEP-A is running and CEP-B is in S/B.

Procedure
1. Withdraw CEP-B from S/B and close its discharge valve.

2. Check that all starting permissive are available. Put recirculation valve opening> 75 %
and ensure minimum flow > 240 TPH.

3. Open IBV (Internal Bypass valve) and start CEP-B.

4. Start CEP-B and give open command of its discharge valve within one minute.
(Within one minute if close limit of its discharge valve does not go then pump will trip
)

5. Wait until full open indication of its discharge valve is available.

6. During this period please keep close watch on hotwell level.

7. Now give close command of CEP-A discharge valve.

8. Wait till full close indication of CEP-A discharge valve is available.

9. Now give stop command to CEP-A

10. Select CEP-A S/B, its discharge valve will open automatically

PREPARED BY CHECKED BY REVIEWED BY APPROVED BY