LSP Material Status Updated On 18-03-2018: Partial Qty Delivered Partially Delivered

The document provides an updated status as of 18-03-2018 of various materials for an LSP project. It lists 24 items by ID number, title, current status, expected delivery date if applicable, and any relevant remarks. The statuses include approved, partially delivered, awaiting delivery or approval, and items not yet submitted. Delivery dates range from 5-Mar to 20-Mar. Some items note work was stopped, material has been submitted, or FAT testing is planned.

Uploaded by

Sunil Bhat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
81 views2 pages

LSP Material Status Updated On 18-03-2018: Partial Qty Delivered Partially Delivered

The document provides an updated status as of 18-03-2018 of various materials for an LSP project. It lists 24 items by ID number, title, current status, expected delivery date if applicable, and any relevant remarks. The statuses include approved, partially delivered, awaiting delivery or approval, and items not yet submitted. Delivery dates range from 5-Mar to 20-Mar. Some items note work was stopped, material has been submitted, or FAT testing is planned.

Uploaded by

Sunil Bhat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

LSP MATERIAL STATUS UPDATED ON 18-03-2018

Si No ID Title Status THRDNSHB Remarks

1 - Light Supports Approved Delivered

2 107 Light Fixtures Approved Delivered

3 106 Passive Infrared Movement Sensor (PIR) Approved Delivered

4 176 Fire Resistant Approved Partial Qty Delivered work stopped due to non availiblity

5 108 Wiring Devices (including Switches & Sockets) Approved Partially delivered

6 181 Heavy duty socket outlet with plug Approved 3/7/2018/not delivered Awaiting Delivery

7 279 Isolator Approved Partial Qty Delivered

8 280 Cable gland, lugs & accessories Approved 20-Mar-18 Based on cable approval

9 278 Cable tray & accessories Approved 8-Mar-18 Previously committed on 20.02.2018

10 109 LV Distribution Boards for small power & lighting 7-Mar-18


Under Dewa Review, Rev.0
MFC has been received from L &T. FAT
11 179 Distribution board for fire pumps Submitted Dated on , Awaiting 7-Mar-18
Planned 15/03/18 Notification
Approval
12 179 Distribution board for Aspiration System 7-Mar-18

13 87 DC Cables 15-Mar-18 At port.

14 HVAC Power cable Material Submitted

15 Control Cable Material Submitted


LSP MATERIAL STATUS UPDATED ON 18-03-2018

Si No ID Title Status THRDNSHB Remarks

16 111 GI Conduit & Accessories Approved 90% Delivered

17 175 PVC Conduits & Accessories Approved Delivered

18 107 High Bay Lights Approved Delivered

19 277 Flexible Metallic Conduit & accessories Approved Delivered

20 110 Wires & cables for for small power & lighting Approved 90% Delivered

21 110 Brown Wire Approved 5-Mar-18

22 176 Heat Resistant Cable Approved 70% Delivered

23 276 GI trunking & accessories Approved Delivered

24 281 Junction box / enclosure Not Yet Submitted Not Yet Submitted Submission Date