Process Flows
Process Flows
Open Individual Truck File Pre Strip Inspection Grasberg Disassembly Package chassis &
Work Order (PF2) components
Complete Inspection Report Form
Project Schedule (form 101) Complete Grasberg dispatch form (form
(PF1) 102)
Truck File Grasberg Disassembly KK CRC Disassembly KK CRC Assembly Grasberg Assembly
1. Open Work Order 1. Wash truck 1. Unload Containers 1. Set Chassis 1. Unload Containers 1. Parts Used - Listing 1. Perform 250 hour PM
2. Order Allocated/Core Parts 2. Check Steering Tapers 2. Unload Chassis 2. Fit Brake Components 2. Scope In & Out 2.
onto Fixture stands 2. Unload Chassis onto
fixture stands
3. Review Work Scope 3. Break Steering Tapers 3. Wash Chassis 3. Fit Steering 3. Individual Project Files 3.
Components Schedule Vs Performance
3. Install rear axle gp
4. Update Project Schedule 4. De-Gas Susp. Struts 4. Remove and Label Bonnets 4. Fit Chassis Wiring 4. DBS - Cost Analysis 4.
Start & Finish Dates Harnesses Actual Vs Budget
4. Install front struts and
5. Input Component PCR 5. Remove Dump Body 5. Remove and Label Radiator 5. Fit Hoist Valve 5. Inspection Sheets 5.
Hours wheel
and Cylinders
6. Pre-order parts base on 6. Remove and Label Engine 6. Test Sheets 6.
6. Drain Oils 6. Fit Brake Coolers
component hours and Torque converter
5. Install tires
7. Parts Listing 7. Remove RHS platform 7. Strip Truck Chassis and 7. Component Hours 7.
Label Components 7. Fit Grease Tank
PCR Schedule
and Injectors
8. Monitor availabity parts 8. Remove Cab 8. Provide Frame to SSB 6. Install Cab 8. CD Burn 8.
for Refurbishment 8. Fit Brake Lines
9. Parts Completed 9. Remove Cab Supports Assembly 7. Install fenders and Complete Truck File Close Truck File
9. Fit Steering Lines
platform
10. Remove Rear Tyres
10. Fit Hoist Lines
8. Install Fuel Tank
11. Block (with timber)
under cross tube 11. Fit BrakeCooling
Oil Lines
Transport
21. Prepare for Testing
Transport
Transport