Masonry: Ground Floor: Front
Masonry: Ground Floor: Front
Ground Floor:
Front
20m x 2.6m = 52sq.m – (3) 6.12sq.m – 2.25sq.m – 2(0.20m)(2.6m)
= 30.35sq. m
Right Side
9m x 2.6m = 23.40sq.m – 2(0.30m)(2.6m) + .15m(2.6m)
= 21.06sq.m
Left Side
Rear
20m x 2.6m = 52sq.m – 4(6.12sq.m) – [2(0.2m) – (0.3m)]2.6m
= 28.82sq.m
Interior Wall
Where:
1sq.m = 12.5 pieces of CHB
Total CHB for Ground Floor :
Front
= 44.96 sq. m
Right Side
= 38. 20sq.m
Left Side
= 37. 35sq.m
Rear
= 37. 08sq.m
Interior Wall
= 52. 32sq.m
= 37. 08sq.m + 37. 35sq.m + 38. 2sq.m + 44. 96sq.m + 24.6sq.m +52.32sq.m
= 234.51 sq.m
Where:
1sq.m = 12.5 pieces of CHB
Total CHB for Second Floor : 234.51 x 12. 5 = 2931.38 say 2932 CHB
= 1903 + 2932
Mortar plastering
According by Area Method:
LEFT SIDE:
RIGHT SIDE:
REAR:
INTERIOR WALLS:
= 2(1.5m x .40) + 2(3.0m x .40m) + (4.25m x .40) + (4.8m x 0.4m) + (7.5m x 0.4m) – 2(.40m x
.40m) – (.30m x .40m) = 9.78sq.m
= 35.42 sq.m
Where:
1 sq. m = 12.5 CHB
TOTAL CHB NEEDED:
Mortar:
According to Hundred Block Method: