Mohamed Siddique and two other technicians carried out an internal inspection of concrete walls in a silo in Dhukan, Qatar on April 10, 2018. They arrived on site at 8:00, conducted a toolbox talk, and began arranging tools and lifting equipment until 9:30. From 10:00 to 14:30, they performed a visual and tactile inspection of the cement walls using hammers, taking pictures. They discussed the findings and documentation with the client from 14:30 to 15:30 before leaving the site at 15:45. The sole task completed for the day was an internal inspection of the concrete silo walls as requested by the client.

Uploaded by

nitharsun
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views

05.03.2018 Daily Repo

Mohamed Siddique and two other technicians carried out an internal inspection of concrete walls in a silo in Dhukan, Qatar on April 10, 2018. They arrived on site at 8:00, conducted a toolbox talk, and began arranging tools and lifting equipment until 9:30. From 10:00 to 14:30, they performed a visual and tactile inspection of the cement walls using hammers, taking pictures. They discussed the findings and documentation with the client from 14:30 to 15:30 before leaving the site at 15:45. The sole task completed for the day was an internal inspection of the concrete silo walls as requested by the client.

Uploaded by

nitharsun
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

DAILY REPORT FORM

Client Fives Date 4/10/2018


Project Title Carryout internal concrete wall inspectiGR Project No. IETQ-18-018
PROJECT GRQ-JRA-Fives-
Location Dhukan-Qatar GR JRA No. 2018-018-rev00
Report Compiled b Mohamed Siddique. M Clinet Permit N N/A

WORK TYPE Rope Access WAH Ground Work Other (list)


…………………………..

WORK SCOPE Carryout internal concrete wall inspection of silo


GR - PERSONNEL: List name (first name and initial as a minimum) and IRATA level. If more than 15 staff, generate personnel list on
Mohamed Siddique. M Arthur.Z Sathish Sekar
6.
GR 7. 8. 9.
PERSONNEL 10. 11. 12.
13. 14. 15.
Weather conditions (wind speed (knots); temperature (°C);06Knots,31°C/Clear
clear/ overcast)

Written or verbal toolbox talk held at start of todays YES NO


Arrival induction held for new staff on site, incl toolb YES NO
Accident / incident or near miss reported? YES NO
Any additional GR or client training of new or YES NO (if yes please list)
existing staff conducted today?
NOTE: All newly qualified L1, L2, L3, with 500 hrs or less, or 6 month experience or less, shall be closely monitored by L3
Supervisor. Please check the Project Staff Matrix and the technicians log books prior to start of project.

DAILY WORK SUMMARY


NOTE: Breakdown daily schedule into hourly format. To include work completed, standby time, any client comments

8:00 Reached Site


08:00 to 8:30 Getting Permission & Toolbox Talk
08:30 to 09:30 Arranging Tools & Materials lifting to location
10:00 to 14:30 visual and tactile inspection with hammer on cement wall,taking pictures
14:30 to 15:30 Reports discussion with client, along with pictures,clearing documentation,housekee
15:45 Leaving from site

TOTAL WORK SCOPE COMPLETED TODAY:carryout internal concrete wall inspection of silo as per clie

PROJECT SUMMARY
carryout internal concrete wall inspection of silo as per client requirements
Total project scope co

Ref dwg/ images attac YES NO % of scope completed N/A


Estimated days remaini Cumulative days worked 1

Remaining scope to co N/A

Proposed plan for tomo N/A


Notes Estimated Days Remaining:
LOGISTICS (future staff & equipment movements)
Nil
Global Remote Representative:
Name:Mohamed Siddique. Designation: IRATA -L3 Signature:MS Date: 10/04/2018
Client Representative:
Name : Redouane HaddaouSupervisor Signature:RH Date:10/04/2018

GR-OPS-DAR-F-006 rev00 01-May-16


GR-OPS-DAR-F-006 rev00 01-May-16