Qa/Qc Check List Project Name: Project # Phase %: Reviewer Date

This QA/QC checklist summarizes the key items to be reviewed for a civil engineering project. It includes 8 sections covering general requirements, contractor access, existing site conditions, demolition, utilities, site drainage, earthworks, and concrete/paving. For each item, the reviewer is asked to verify requirements against reference documents such as specifications, drawings, and calculations and list applicable drawings. The goal is to ensure compliance with project and code requirements and coordination between civil drawings and other disciplines.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
117 views

Qa/Qc Check List Project Name: Project # Phase %: Reviewer Date

This QA/QC checklist summarizes the key items to be reviewed for a civil engineering project. It includes 8 sections covering general requirements, contractor access, existing site conditions, demolition, utilities, site drainage, earthworks, and concrete/paving. For each item, the reviewer is asked to verify requirements against reference documents such as specifications, drawings, and calculations and list applicable drawings. The goal is to ensure compliance with project and code requirements and coordination between civil drawings and other disciplines.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

QA/QC CHECK LIST

Project Name: Project #


Phase %:
Reviewer Date:

90% REFERENCE DOCUMENTS**


G. CIVIL 50%*
* Specification / Drawing / Memorandum

1. GENERAL:
a. Verify compliance with project requirements.
Reference specific requirements (which
X X
document?) and list drawing(s) that address the
requirements.

b. Check compliance with applicable codes. Reference


specific codes and list drawing(s) that address the X X
code requirements.
c. Check coordination of specifications, calculations
and drawing(s). List specific calculations and X X
drawing(s) that have been checked.
d. Verify cross-referencing. List drawing(s) that have
been checked. X X
e. Verify consistency with other disciplines, squad
X
checks. List corresponding drawing(s)
f. Include specification Division 2 checklist. State
X
location of checklist
g. Building & Safety plan check required. What is the
X
plan check stub number?
h. Verify that the index of drawing(s) on the covers .
sheet is correct and matches the plans. List X
drawing(s) that have been checked
i. Verify that the abbreviations used on the drawing(s)
are correct as shown on the Drawing Legends. List X
drawing(s) that have been checked.

2. CONTRACTOR ACCESS AND AREAS:

a. Show contractor laydown area. Which drawing(s)


X X
show this?
b. Show access to the site. Which drawing(s) show
this? X
3. EXISTING SITE CONDITIONS:
a. Field verify existing site conditions from survey
notes and check plans for consistency. List
X X
drawing(s), which have been checked.
b. Verify that all existing utilities are shown in the
plans. List applicable drawing(s) X X
c. Indicate existing elevations by writing (Existing) in
parenthesis. List drawings.
X X
d. Surveys – obtain latest copy from. List drawing(s)
with survey information X X

* % column indicates phase of project at which item is to be completed.


** in reference documents column, must indicate specific documents, such as drawing number, specifications section or design
memorandum. If item does not apply, indicate as such by using “N/A.”

Rev. 06/01/06
QA/QC CHECK LIST
Project Name: Project #
Phase %:
Reviewer Date:

90% REFERENCE DOCUMENTS**


G. CIVIL 50%*
* Specification / Drawing / Memorandum
e. Horizontal and vertical survey control monuments
must be shown on the drawing(s) List drawing(s)
X X
with survey information.
4. DEMOLITION:
a. Verify that demolition requirements are met.
Reference specific requirements (which document?)
and list drawing(s) that address the requirements. X X

b. Verify that disposal of materials is addressed. List


drawings with notes that address the disposal of
X
materials.
c. Verify that disposal of contaminated materials is
addressed. List drawings with notes that address the
X
disposal of contaminated materials
d. Demolition plans should show phasing of work
(salvage operations, demolition and disposal). List
X X
demolition drawings.
e. Care of existing utilities and electrical duct banks.
List drawing(s) with existing utilities. X
f. Show disposal of excavated earth on-site; off-site
make notes on plans or specs. List applicable
X
drawing(s).
g. Drawing(s) should indicate clearing and grubbing
limits. List civil and architectural drawing(s) that
have been checked X X

h. Verify that the site demolition work is coordinated


with the architectural site plan. List civil and X X
architectural drawing(s) that have been checked
5. UTILITIES:
a. Utilities and tie ins, use survey information and also
field verify by designer. List drawing(s) that have X X
been checked.

b. Verify that service meters are located where


determined by both the client and local X X
municipalities. List applicable drawing(s)
6. SITE DRAINAGE/SEWER DRAWING(S):

a. Account for drainage of all areas. List applicable


X X
drawing(s).

b. Verify that drawing(s) clearly indicate the size and


the length of the storm drain/sewer piping. List X X
applicable drawing(s).
c. Verify that clean out and drain invert elevations are X X

* % column indicates phase of project at which item is to be completed.


** in reference documents column, must indicate specific documents, such as drawing number, specifications section or design
memorandum. If item does not apply, indicate as such by using “N/A.”

Rev. 06/01/06
QA/QC CHECK LIST
Project Name: Project #
Phase %:
Reviewer Date:

90% REFERENCE DOCUMENTS**


G. CIVIL 50%*
* Specification / Drawing / Memorandum
indicated on the drawing(s) and accurate for
positive drainage. List applicable drawing(s).

d. Verify that details are provided for underwalk


drains. List applicable drawing(s) X X

e. Verify that site drainage is coordinated with building


X X
roof / overflow drains. List applicable drawing(s).
7. EARTHWORKS & GRATING:

a. Verify that the borrow and waster area, including


truck routes to the construction site is clearly
indicated on the drawing(s). List applicable X X
drawing(s)

b. Check the coordination between finish floor


elevations and finish grades. List applicable
X X
drawing(s)

c. Verify that original and proposed contours are


X X
shown on the drawing(s). List applicable drawing(s)
8. CONCRETE & PAVING:

a. Verify that pavement slopes (2% min). List


drawing(s), which have been checked. X X

b. Verify that pavement requirements are per Green


Book. List drawing(s), which have been checked X X

c. Exterior concrete with minimum 1% slope. List


applicable drawing(s) X X

d. Check the coordination of flatwork, curbs, gutters,


and swales between civil drawing(s) and
X X
architectural site plan. List applicable drawing(s)

* % column indicates phase of project at which item is to be completed.


** in reference documents column, must indicate specific documents, such as drawing number, specifications section or design
memorandum. If item does not apply, indicate as such by using “N/A.”

Rev. 06/01/06
QA/QC CHECK LIST
Project Name: Project #
Phase %:
Reviewer Date:

e. Verify that A/C Pavement is clearly indicated


and coordinated with the architectural site plan.
X X
List applicable drawing(s)

9. PIPING:

a. All buried valves with rising stems are


designed with adequate depth. List drawing(s)
X X
that have been checked

10. OTHER:
a. Checks that guard posts (bollards) are placed
to protect facilities. List drawings that show and
detail bollards X X

b. If caustics and acids drain into sewers, verify


with Bureau of Sanitation. List drawings and
BOS contact person X X

c. Provide thrust blocks for non-restrained pipes.


List applicable drawing(s).
X X
d. Verify that the building orientation is consistent
with architectural floor plans. List drawing(s)
X X
that have been checked.

e. Verify that details are shown for all scope of


work in the public right-of-way. List drawing(s)
that have been checked X X

f. Verify that all site fencing is shown and the


details are complete. List drawing(s) that show X
fencing.

g. Check that details are provided for all site


furnishings and that the site furnishings are
coordinated with the architectural site plan. List X
drawing(s) that have been checked.

h. Check coordination of equipment between


architectural, electrical and plumbing
X
drawing(s). List drawing(s) that have been
checked.

* % column indicates phase of project at which item is to be completed.


** in reference documents column, must indicate specific documents, such as drawing number, specifications section or design
memorandum. If item does not apply, indicate as such by using “N/A.”

Rev. 06/01/06

You might also like