KT Section Topic Date Duration in Hours

The document outlines various training topics related to master data management, order processing, logistics, and billing in KT's SAP system. It lists 15 different topics that will be covered, including dealer launch processes, material and customer master fields, order imports, allocation processes, shipping instructions, packing criteria, tax invoicing, and dispatch completion. The total estimated training duration is 49 hours occurring from December 2014 through January 2015.

Uploaded by

vijayjeo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views2 pages

KT Section Topic Date Duration in Hours

The document outlines various training topics related to master data management, order processing, logistics, and billing in KT's SAP system. It lists 15 different topics that will be covered, including dealer launch processes, material and customer master fields, order imports, allocation processes, shipping instructions, packing criteria, tax invoicing, and dispatch completion. The total estimated training duration is 49 hours occurring from December 2014 through January 2015.

Uploaded by

vijayjeo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

KT

Duration
Section Topic in Hours Date
Master Data Management
Dealer launch process 2 15.12.2014
Existing Dealer Missing Parts and
Price Investigation 2 12.1.2015
Dealer Retransmission 1 12.1.2015
Transmission Discrepency analysis 1 12.1.2015
Material Master Fields Impact 2 20.1.2015
Customer master Fields Impact 2 20.1.2015

Order Processing
Dragon Order import 1 21.1.2015
Domestic Order Import (Dealer and
serial combination already used,
material not extended to sales area) 2 21.1.2015
User Activities prior to allocation
(delivery and credit block release) 2 21.1.2015
Allocation Job Stream details 2 21.1.2015

Various holds set at order level during


allocation and user actions for those. 1 22.1.2015
SCM interchangeability and
substitution setup 2 22.1.2015
Integration between SCM and ECC 2 22.1.2015

Logistics
Shipping Instruction to Yusen 1 21.1.2015
Picking from Yusen (Full Drop, Partial
Drop, No Drop) 1 21.1.2015
Packing from Yusen (Split delivery,
invalid case number, case used in last
3 months, packing qty mismatch,
delivery item deleted, picking not yet
completed) 8 27.1.2015
Shipment Creation criteria 1 27.1.2015
Activity Profiles in Shipment 2 28.1.2015
Tax Invoice process 1 28.1.2015

Dispatch completion (With dependancy


on shipment activity profile statuses) 1 28.1.2015
Domestic SA criteria 2 28.1.2015
Dragon SA 3 28.1.2015

Billing 3 29.1.2015