Work Program For Roads
Work Program For Roads
GENERAL
Submissions of insuarance and bonds
Contractor,s mobilisation
Provide Enginer/ Employer facilities
Routine maintenance of existing roads
1.3.1 Surveying and Setting out of Centre Line km 49
SITE CLEARING
2.1.1 Clearing and grubbing m2 94925
2.1.2 - 2.1.10 Removal of trees & stumps no 214
Removal of existing structures
EARTH WORKS
3.1.1, 3.1.5 Roadway excavation in soil m3 11254
3.1.2-3.1.3 Roadway excavation in rock m 3
100
3.2.8, 3.2.11 Channel excavation in soil m 3
3041 7350?
3.2.9 - 3.2.10 Channel excavation in rock m 3
0
3.4.21, 3.4.22 Embankment construction in soil m 3
48396
3.4.24, 3.4.25 Embankment construction in boulders m 3
0
ROAD PAVEMENT
3.1.6 Edge widening and base correction m3 675
4.1.1 Sub base m 3
15805
4.1.3 Dense graded aggregate base m 3
29617 34300
4.2.4 Earthen shoulders m 3
12115 21560
4.3.8 Bituminous prime coat m 2
194629 19600
4.3.11 Tack coat m 2
194629 19600
4.4.12 Asphalt concrete in wearing course m 2
194629 19600
4.4.13 Asphalt concrete in binder course m 3
0
4.5.16 Concrete pavement gr 30 m 3
15
INCIDENTAL CONSTRUCTION
8.1.1 Grass sodding m2 32645
8.2.3 Rip rap protection m 3
0
Road marking
Traffic signs
49
94925
214
11254
100
3041
0
48396
0
675
15805
29617
12115
194629
194629
194629
0
15
90
58
608
321
1400000
32645
0