Quotation - Transmission Towers

WVA Consulting Engineers submitted a quote to Fluentgrid Ltd for proof checking the structural design of transmission line towers. The scope of work includes proof checking the superstructure of various tower types made of steel, leg extensions, X-arms, steel stubs, and concrete foundations. The cost is $1250 per tower for design checking and $450 for foundations, to be paid within 1 week of submission. WVA will provide a letter of approval and a report with comments and calculations for each tower.

Uploaded by

RomyMohan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
360 views

Quotation - Transmission Towers

WVA Consulting Engineers submitted a quote to Fluentgrid Ltd for proof checking the structural design of transmission line towers. The scope of work includes proof checking the superstructure of various tower types made of steel, leg extensions, X-arms, steel stubs, and concrete foundations. The cost is $1250 per tower for design checking and $450 for foundations, to be paid within 1 week of submission. WVA will provide a letter of approval and a report with comments and calculations for each tower.

Uploaded by

RomyMohan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

WVA/EKM/QFP/16-17/0​1

03​rd​ July, 2016

To,
Mr. Varghese Poulose,
Fluentgrid Ltd,
Location to be added
Location to be added

Dear Sir,

Subject: ​Quotation for Structural Design Proof Checking of Transmission Line Towers.

Thank you for inviting us to quote for the project. We have the pleasure to submit herewith our
quote for your kind considerations as follows:

Scope of Work
Proof checking of structural design done for the structures listed below.
1) Superstructure of Type DA, DB, DC, DD & DDE transmission tower made of steel.
2) Leg extension (maximum 5 numbers) and X-arms of transmission tower.
3) Steel stub and concrete foundation for each transmission tower.

Cost & Duration


SI No. Description Cost in USD Duration
For one transmission tower (Any type), its leg
1 $ 1250 4 days
extensions and X-arms.
For steel stub and concrete foundation of one
2 $ 450 2 days
transmission tower.

Payment Terms
1 week after every submission.

Inputs & Deliverables


Design document and drawings corresponding to each transmission tower need to be given to us.
Our deliverables will be as listed below:
1) Letter of Approval for design of each transmission tower.
2) Report on proof checking done for each transmission towers with supporting calculations
and scanned copy of drawings with comments, if any.

We trust that our offer meets with your approval and look forward to your confirmation of
acceptance soon.

Yours Sincerely,

Romy Mohan,
Managing Partner,
WVA Consulting Engineers

WVA Consulting Engineers


2​nd​ Floor, Bethel Towers, Kolenchery 682311
Tel: +91-9745419909 | email: [email protected] | web: wvaengineers.com
WVA Consulting Engineers
2​nd​ Floor, Bethel Towers, Kolenchery 682311
Tel: +91-9745419909 | email: [email protected] | web: wvaengineers.com