Production Schedule

The production schedule outlines the stages of a project from June to December 2018, including concept development, crew selection, filming inside and outside structures from the 7th to 10th periods, post-production incorporating audio, graphics and design, and distribution to assessors Kim and Lyndon for feedback.

Uploaded by

Julio Alves
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
96 views

Production Schedule

The production schedule outlines the stages of a project from June to December 2018, including concept development, crew selection, filming inside and outside structures from the 7th to 10th periods, post-production incorporating audio, graphics and design, and distribution to assessors Kim and Lyndon for feedback.

Uploaded by

Julio Alves
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Production Schedule Start: June 2018

Stage 4th 5th 6th 7th 8th 9th 10th 11th 12th 13th 14th 15th Period

Concept
development
Crew and talent
search
Filming

Post-production

Final studio edit

Distribution

NOTES:

Filming:
7th and 8th inside house and shed
9th and 10th outside

Post-production:
Includes audio, motion graphics and design

Distribution:
Distributing to assessors Kim and Lyndon