This document provides information about the materials required for different components of a building project including: 1. Footings, columns, footing tie beams, wall footings, slabs on fill, and concrete blocks for the first floor. 2. Slabs, concrete blocks, second floor beams, and roof beams for the second floor. 3. The document lists each component, its dimensions, reinforcement bar sizes and lengths required. Total quantities of materials are calculated for each section based on the specifications provided.

Uploaded by

Louie Macni
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views

House Backup

This document provides information about the materials required for different components of a building project including: 1. Footings, columns, footing tie beams, wall footings, slabs on fill, and concrete blocks for the first floor. 2. Slabs, concrete blocks, second floor beams, and roof beams for the second floor. 3. The document lists each component, its dimensions, reinforcement bar sizes and lengths required. Total quantities of materials are calculated for each section based on the specifications provided.

Uploaded by

Louie Macni
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 40

PROJECT NAME:

FIRST FLOOR

FOOTINGS
Mark no. of F1 Ø m L/pc pcs RSB Qty
1.10% F-1 6 16mm 6.00 1.25 14 3.5 21

Legnth of RSB req.: 1.25 m/ pc


output per 6m of RSB: 6m/pc: 4.36 say 4.00 pcs

for 1: F-1: 14 pcs/ F-1 = 3.50 pcs of 6m of 16mmØ

COLUMNS ( footing - to -beam )


Mark no. of C1 Ø m L/pc pcs RSB Qty
1.10% C-1 3 16mm 6.00 8.15 8 12 36

Length of RSB req.: 8.15 m/ pc


output per 6m of RSB: 6m/pc: 1.49 say 1.50 pcs

for 1: C-1: 8 pcs/ F-1 = 12.00 pcs of 6m of 16mmØ

no. of C1 Ø m L/pc pcs RSB Qty


3 10mm 6.00 1.128 55 11 33

Length of RSB req.: 1.128 m/ pc


output per 6m of RSB: 6m/pc: 5.32 say 5.00 pcs

for 1: C-1: 55 pcs/ F-1 = 11.00 pcs of 6m of 16mmØ

Mark no. of C1 Ø m L/pc pcs RSB Qty


1.10% C-1 3 16mm 6.00 8.15 10 15.00 45

Length of RSB req.: 8.15 m/ pc


output per 6m of RSB: 6m/pc: 1.49 say 1.50 pcs

for 1: C-1: 10 pcs/ F-1 = 15.00 pcs of 6m of 10mmØ

no. of C1 Ø m L/pc pcs RSB Qty


3 10mm 6.00 1.128 55 11 33

Length of RSB req.: 1.128 m/ pc


output per 6m of RSB: 6m/pc: 5.32 say 5.00 pcs

for 1: C-1: 55 pcs/ F-1 = 11.00 pcs of 6m of 10mmØ

FOOTING TIE BEAM


Mark Length factor L/pc pcs Qty
PROJECT NAME:

FTB-1 24.4 1.10 : 24.40 6.00 27.00

Length of RSB req.: 24.40 m/ pc


output per 6m of RSB: 6m/pc: 4.47 say 4.50 pcs

for ftb: 6 pcs = 27.00 pcs of 6m of 10mmØ

WALL FOOTING
Mark Length factor L/pc pcs Qty
WF-1/ WF-2 9.1 1.10 : 9.10 3.00 - 6.00

Length of RSB req.: 9.10 m/ pc


output per 6m of RSB: 6m/pc: 1.67 say 2.00 pcs

for ftb: 3 pcs = 6.00 pcs of 6m of 10mmØ

SLAB ON FILL
Mark A B spacing sizes a b
1.10% SOF( interior) 4.20 8.00 0.6 10mm 12 12 24
1.10% SOF( exterior) 1.00 4.00 0.6 10mm 2 2 4
1.10% Septic Tank 3.60 1.50 0.6 10mm 2 2 4

CHB (100 mm x 200 x400 mm)


Mark a b spacing sizes a b
1.10% A-A 4.20 4.10 0.8 10mm 5 5 10
1.10% A-A 1.00 4.10 0.8 10mm 2 2 4
1.10% B-B 2.00 4.10 0.8 10mm 3 3 6
1.10% B-B 1.00 4.10 0.8 10mm 2 2 4
1.10% C-C 1.80 4.10 0.8 10mm 2 2 4
1.10% D-D 4.20 4.10 0.8 10mm 5 5 10
1.10% 1-1 4.00 4.10 0.8 10mm 5 5 10
1.10% 1-1 4.00 4.10 0.8 10mm 5 5 10
1.10% 2-2 1.30 4.10 0.8 10mm 2 2 4
1.10% 3-3 4.00 4.10 0.8 10mm 5 5 10
1.10% 3-3 4.00 4.10 0.8 10mm 5 5 10
1.10% 4-4 4.00 4.10 0.8 10mm 5 5 10
1.10% septic tank 11.70 1.80 0.8 10mm 6 6 12
1.10% lavatory 3.40 1.00 0.8 10mm 1 1 2
PROJECT NAME:

STAIRS
Mark Pieces factor a b c Qty
Landings 1 1.05 : 1.50 1.50 0.15 0.35
STAIR 6 1.10 : 1.50 3.91 0.2 7.74

2ND FLOOR

SLAB
Mark A B spacing sizes a b
1.10% Slab 1 4.20 4.00
1.10% Slab 2 3.70 4.00
1.10% front 2.70 0.80
1.10% sun breaker - 1.10
0

CHB (100 mm x 200 x400 mm)


Mark a b spacing sizes a b
1.10% B-B 5.20 3.00 0.8 10mm 4 4 8
1.10% C-C 5.20 3.00 0.8 10mm 4 4 8
1.10% D-D 4.20 3.00 0.8 10mm 4 4 8
1.10% E-E 4.20 3.00 0.8 10mm 4 4 8
1.10% 1-1 8.00 3.00 0.8 10mm 7 7 14
PROJECT NAME:

1.10% 2-2 4.00 3.00 0.8 10mm 4 4 8


1.10% 3-3 1.30 3.00 0.8 10mm 1 1 2
1.10% 4-4 8.00 3.00 0.8 10mm 7 7 14
1.10% 5-5 4.00 3.00 0.8 10mm 4 4 8
78

2ND FLOOR BEAMS


Mark location Ø Length of Ø L/pc pcs RSB Qty
A B C =B*C =A/B*C*1.10
1.10% B-2 (A-A) 16 6 2.7 7 18.9 4
1.10% B-1 (B-B) 16 6 4.2 8 33.6 7
1.10% CB-1 (B-B) 16 6 1 7 7 2
1.10% B-1 (C-C) 16 6 4.2 8 33.6 7
1.10% CB-1 (C-C) 16 6 1 7 7 2
1.10% B-2 (E-E) 16 6 4.2 7 29.4 6
1.10% B-2 (1-1) 16 6 4 7 28 6
1.10% B-2 (1-1) 16 6 4 7 28 6
1.10% CB-1 (2-2) 16 6 0.8 7 5.6 2
1.10% B-3 (2-2) 16 6 4 7 28 6
1.10% B-1 (2-2) 16 6 4 8 32 6
1.10% B-1 (3-3) 16 6 1.3 8 10.4 2
1.10% CB-1 (4-4) 16 6 0.8 7 5.6 2
1.10% B-1 (4-4) 16 6 4 8 32 6
1.10% B-2 (4-4) 16 6 4 7 28 6
1.10% B-2 (5-5) 16 6 4 7 28 6
76

no. of C1 Ø m L/pc pcs RSB Qty


3 10mm 6.00 1.128 55 11 33

Length of RSB req.: m/ pc


output per 6m of RSB: 6m/pc: say pcs

for 1: set: pcs/ F-1 = pcs of 6m of 10mmØ

ROOF BEAMS
PROJECT NAME:

Mark location factor a b length Qty


RB-1 (B-B) 1.10 : 0.35 0.20 4.2 0.32
CRB-1 (B-B) 1.10 : 0.35 0.20 1 0.08
RB-1 (C-C) 1.10 : 0.35 0.20 4.2 0.32
CRB-1 (C-C) 1.10 : 0.35 0.20 1 0.08
RB-2 (E-E) 1.10 : 0.35 0.20 4.2 0.32
RB-2 (1-1) 1.10 : 0.35 0.20 4 0.31
RB-2 (1-1) 1.10 : 0.35 0.20 4 0.31
RB-2 (2-2) 1.10 : 0.35 0.20 4 0.31
RB-1 (4-4) 1.10 : 0.35 0.20 4 0.31
RB-2 (4-4) 1.10 : 0.35 0.20 4 0.31
RB-2 (5-5) 1.10 : 0.35 0.20 4 0.31
2.98
factor
Class A: 9.00 Cement 0 bags say 0
RB-S 0.45 Sand 0 cu.m. say 0
RB-G 0.85 Gravel 0 cu.m. say 0

VOLUME 34.12 CU.M


50 Coco Lumber 0 BF
2.05 1/4" x 4" x 8' Plywood 0 PCS
1.52 Assorted Nails 0 KGS

=
PROJECT NAME:
10mm 16mm ties

21

36

33

45

33
27.00

6.00

24
4
4

10
4
6
4
4
10
10
10
4
10
10
10
12
2
237 102 0 0
₱250.00 ₱500.00 ₱500.00 ₱15.00
₱59,250.00 ₱51,000.00 ₱0.00 ₱0.00
₱110,250.00

CEMENT SAND GRAVEL CHB


78
0
0
0

78 0 0 0
₱250.00 ₱500.00 ₱500.00 ₱15.00
₱19,500.00 ₱0.00 ₱0.00 ₱0.00
₱19,500.00

₱19,500.00 ₱0.00 ₱0.00 ₱0.00


₱19,500.00
2ND FLOOR

CEMENT
SLAB
Mark factor a b c Qty
Slab 1 - 1.10 : 4.20 4.00 0.10 1.85
Slab 2 1.10 2.70 4.00 0.10 1.19
front - 1.10 : 2.70 0.80 0.10 0.24
right area - 1.10 : 1.00 4.00 0.10 0.44
sun breaker - 1.10 : 0
3.72
factor
Class A: 7.85 Cement 29.20 bags say 30 30
0.42 Sand 1.56 cu.m. say 1.57
0.84 Gravel 3.12 cu.m. say 3.13

SLAB 3.72 CU.M


39.19 Coco Lumber 146 BF
2.13 1/4" x 4" x 8' Plywood 8 PCS
1.49 Assorted Nails 6 KGS

CHB (100 mm x 200 x400 mm)


Mark factor a b c Qty
B-B 1.00 : 5.20 3.00 - 15.6
C-C 1.00 : 5.20 3.00 - 15.6
D-D 1.00 : 4.20 3.00 - 12.6
E-E 1.00 : 4.20 3.00 - 12.6
1-1 1.00 : 8.00 3.00 24
2-2 1.00 : 4.00 3.00 12
3-3 1.00 : 1.30 3.00 3.9
4-4 1.00 : 8.00 3.00 24
5-5 1.00 : 4.00 3.00 - 12
132.3
factor
Class C: 13 CHB 1,719.90 pcs say 1720

0.031 Cement 53.32 bags say 54 54


0.01 Sand 17.20 cu.m. say 17.20

WALL PLASTERING

Area side factor Area from CHB Qty


C-C 2 1.10 15.6 34.32
D-D 2 1.10 15.6 34.32
E-E 2 1.10 12.6 27.72
1-1 2 1.10 12.6 27.72
2-2 2 1.10 24 52.8
3-3 2 1.10 12 26.4
4-4 2 1.10 3.9 8.58
5-5 2 1.10 24 52.8
264.66
factor(dpwh)
Cement 0.113 29.91 say 30.00 30.00
Washed Sand 0.019 5.03 say 5.03

2ND FLOOR BEAMS


Mark location factor a b length Qty
B-2 (A-A) 1.10 : 0.40 0.20 2.7 0.24
B-1 (B-B) 1.10 : 0.40 0.20 4.2 0.37
CB-1 (B-B) 1.10 : 0.40 0.20 1 0.09
B-1 (C-C) 1.10 : 0.40 0.20 4.2 0.37
CB-1 (C-C) 1.10 : 0.40 0.20 1 0.09
B-2 (E-E) 1.10 : 0.40 0.20 4.2 0.37
B-2 (1-1) 1.10 : 0.40 0.20 4 0.35
B-2 (1-1) 1.10 : 0.40 0.20 4 0.35
CB-1 (2-2) 1.10 : 0.40 0.20 0.8 0.07
B-3 (2-2) 1.10 : 0.30 0.20 4 0.26
B-1 (2-2) 1.10 : 0.30 0.20 4 0.26
B-1 (3-3) 1.10 : 0.30 0.20 1.3 0.09
CB-1 (4-4) 1.10 : 0.40 0.20 0.8 0.07
B-1 (4-4) 1.10 : 0.40 0.20 4 0.35
B-2 (4-4) 1.10 : 0.40 0.20 4 0.35
B-2 (5-5) 1.10 : 0.40 0.20 4 0.35
4.03
factor
Class A: 7.85 Cement 31.6355 bags say 32 32
0.42 Sand 1.6926 cu.m. say 1.7
0.84 Gravel 3.3852 cu.m. say 3.39

VOLUME 4.03 CU.M


50 Coco Lumber 202 BF
2.05 1/4" x 4" x 8' Plywood 9 PCS
1.52 Assorted Nails 7 KGS
ROOF BEAMS
Mark location factor a b length Qty
RB-1 (B-B) 1.10 : 0.35 0.20 4.2 0.32
CRB-1 (B-B) 1.10 : 0.35 0.20 1 0.08
RB-1 (C-C) 1.10 : 0.35 0.20 4.2 0.32
CRB-1 (C-C) 1.10 : 0.35 0.20 1 0.08
RB-2 (E-E) 1.10 : 0.35 0.20 4.2 0.32
RB-2 (1-1) 1.10 : 0.35 0.20 4 0.31
RB-2 (1-1) 1.10 : 0.35 0.20 4 0.31
RB-2 (2-2) 1.10 : 0.35 0.20 4 0.31
RB-1 (4-4) 1.10 : 0.35 0.20 4 0.31
RB-2 (4-4) 1.10 : 0.35 0.20 4 0.31
RB-2 (5-5) 1.10 : 0.35 0.20 4 0.31
2.98
factor
Class A: 7.85 Cement 23.393 bags say 24 24
RB-S 0.42 Sand 1.2516 cu.m. say 1.26
RB-G 0.84 Gravel 2.5032 cu.m. say 2.51

VOLUME 34.12 CU.M


50 Coco Lumber 1706 BF
2.05 1/4" x 4" x 8' Plywood 70 PCS
1.52 Assorted Nails 52 KGS

170
x ₱250.00
₱42,500.00
=

₱98,250.00
SAND GRAVEL CHB

1.57
3.13

146
8
6

1,720.00

17.20
5.03

1.7
3.39

202
9
7
1.26
2.51

1706
70
52

26.76 9.03 1720 348 17 13


₱500.00 ₱500.00 ₱15.00 ₱47.00 ₱320.00 ₱58.00
₱13,380.00 ₱4,515.00 ₱25,800.00 ₱16,356.00 ₱5,440.00 ₱754.00
₱86,195.00 ₱22,550.00

₱32,595.00 ₱12,000.00 ₱55,755.00 ₱32,994.00 ₱10,880.00 ₱1,508.00


₱198,600.00 ₱45,382.00
PROJECT NAME:

FIRST FLOOR

FOOTINGS
Mark no. of F1 Ø m/RSB L/pc pcs RSB Qty
A B C D E F
F-1 6 16mm 6.00 1.25 14 3 18

COLUMNS ( footing - to -beam )


Mark no. of C1 Ø m L/pc pcs RSB Qty
A B C D E F
C-1 3 16mm 6.00 8.15 8 11 33

no. of C1 Ø m L/pc pcs RSB Qty


A B C D E F
3 10mm 6.00 1.128 55 11 33

Mark no. of C1 Ø m L/pc pcs RSB Qty


A B C D E F
C-1 3 16mm 6.00 8.15 10 14 42

no. of C1 Ø m L/pc pcs RSB Qty


A B C D E F
3 10mm 6.00 1.128 55 11 33

FOOTING TIE BEAM


Mark Length factor m L/pc pcs Qty
12mm
FTB-1 24.4 1.10 6.00 24.40 6.00 25 25.00

spacing Ø m L/pc pcs RSB Qty


A B C D E F
0.30 10mm 6.00 0.928 82 13 3

WALL FOOTING
Mark Length factor m L/pc pcs Qty
12mm
WF-1/ WF-2 9.1 1.10 6.00 9.10 3.00 5 5.00

spacing Ø m L/pc pcs RSB Qty


A B C D E F
0.30 10mm 6.00 0.25 31 7.75 2

SLAB ON FILL
Mark A B spacing sizes a b
SOF( interior) 4.20 8.00 0.6 10mm 12 12 24
SOF( exterior) 1.00 4.00 0.6 10mm 2 2 4
Septic Tank 3.60 1.50 0.6 10mm 2 2 4
32

CHB (100 mm x 200 x400 mm)


Mark a b spacing sizes a b
A-A 4.20 4.10 0.8 10mm 4 4 8
A-A 1.00 4.10 0.8 10mm 1 1 2
B-B 2.00 4.10 0.8 10mm 2 2 4
B-B 1.00 4.10 0.8 10mm 1 1 2
C-C 1.80 4.10 0.8 10mm 2 2 4
D-D 4.20 4.10 0.8 10mm 4 4 8
1-1 4.00 4.10 0.8 10mm 4 4 8
1-1 4.00 4.10 0.8 10mm 4 4 8
2-2 1.30 4.10 0.8 10mm 2 2 4
3-3 4.00 4.10 0.8 10mm 4 4 8
3-3 4.00 4.10 0.8 10mm 4 4 8
4-4 4.00 4.10 0.8 10mm 4 4 8
septic tank 11.70 1.80 0.8 10mm 5 5 10
lavatory 3.40 1.00 0.8 10mm 1 1 2
84
STAIRS
Mark Pieces factor a b c Qty
Landings 1 1.05 :
STAIR 6 1.10 :

2ND FLOOR

SLAB
Mark A B spacing sizes a b
Slab 1 4.20 4.00
Slab 2 3.70 4.00
front 2.70 0.80
sun breaker - 1.10
0

CHB (100 mm x 200 x400 mm)


Mark a b spacing sizes a b
B-B 5.20 3.00 0.8 10mm 4 4 8
C-C 5.20 3.00 0.8 10mm 4 4 8
D-D 4.20 3.00 0.8 10mm 3 3 6
E-E 4.20 3.00 0.8 10mm 3 3 6
1-1 8.00 3.00 0.8 10mm 5 5 10
2-2 4.00 3.00 0.8 10mm 3 3 6
3-3 1.30 3.00 0.8 10mm 1 1 2
4-4 8.00 3.00 0.8 10mm 5 5 10
5-5 4.00 3.00 0.8 10mm 3 3 6
62

2ND FLOOR BEAMS


Mark location Ø Length of Ø L/pc pcs RSB Qty
A B C =B*C =B*C/A
B-2 (A-A) 16 6 2.7 7 18.9 4
B-1 (B-B) 16 6 4.2 8 33.6 6
CB-1 (B-B) 16 6 1 7 7 2
B-1 (C-C) 16 6 4.2 8 33.6 6
CB-1 (C-C) 16 6 1 7 7 2
B-2 (E-E) 16 6 4.2 7 29.4 5
B-2 (1-1) 16 6 4 7 28 5
B-2 (1-1) 16 6 4 7 28 5
CB-1 (2-2) 16 6 0.8 7 5.6 1
B-3 (2-2) 16 6 4 7 28 5
B-1 (2-2) 16 6 4 8 32 6
B-1 (3-3) 16 6 1.3 8 10.4 2
CB-1 (4-4) 16 6 0.8 7 5.6 1
B-1 (4-4) 16 6 4 8 32 6
B-2 (4-4) 16 6 4 7 28 5
B-2 (5-5) 16 6 4 7 28 5
66

Length of
Mark location ties mm 10mm Qty
beam
A B 1@50 6@100 rest@175
B-2 (A-A) 1.128 2.7 2 12 8 5
B-1 (B-B) 1.128 4.2 4 24 10 8
CB-1 (B-B) 1.128 1 2 12 -2 3
B-1 (C-C) 1.128 4.2 4 24 10 8
CB-1 (C-C) 1.128 1 2 12 -2 3
B-2 (E-E) 1.128 4.2 2 12 17 6
B-2 (1-1) 1.128 4 2 12 16 6
B-2 (1-1) 1.128 4 2 12 16 6
CB-1 (2-2) 1.128 0.8 2 12 -3 3
B-3 (2-2) 0.928 4 2 12 16 5
B-1 (2-2) 1.128 4 2 12 16 6
B-1 (3-3) 1.128 1.3 2 12 0 3
CB-1 (4-4) 1.128 0.8 2 12 -3 3
B-1 (4-4) 1.128 4 2 12 16 6
B-2 (4-4) 1.128 4 2 12 16 6
B-2 (5-5) 1.128 2 12 -8 2
79
ROOF BEAMS
Mark location Ø Length of Ø L/pc pcs RSB Qty
A B C =B*C =B*C/A
RB-1 (B-B) 16 6 4.2 4.00 16.8 3
CRB-1 (B-B) 16 6 1 7.00 7 2
RB-1 (C-C) 16 6 4.2 4.00 16.8 3
CRB-1 (C-C) 16 6 1 7.00 7 2
RB-2 (E-E) 16 6 4.2 5.00 21 4
RB-2 (1-1) 16 6 4 5.00 20 4
RB-2 (1-1) 16 6 4 5.00 20 4
RB-2 (2-2) 16 6 4 5.00 20 4
RB-1 (4-4) 16 6 4 4.00 16 3
RB-2 (4-4) 16 6 4 5.00 20 4
RB-2 (5-5) 16 6 4 5.00 20 4
37

Length of
Mark location ties mm 10mm Qty
beam
A B 1@50 6@100 rest@175
RB-1 (B-B) 1.028 4.2 4 24 10 7
CRB-1 (B-B) 1.028 1 2 12 -2 3
RB-1 (C-C) 1.028 4.2 4 24 10 7
CRB-1 (C-C) 1.028 1 2 12 -2 3
RB-2 (E-E) 1.028 4.2 2 12 17 6
RB-2 (1-1) 1.028 4 2 12 16 6
RB-2 (1-1) 1.028 4 2 12 16 6
RB-2 (2-2) 1.028 4 2 12 16 6
RB-1 (4-4) 1.028 4 2 12 16 6
RB-2 (4-4) 1.028 4 2 12 16 6
RB-2 (5-5) 1.028 4 0 0 23 4
60
10mm 12mm 16mm

18

33

33

42

33

25.00

5.00

2
32

84
187 30 93

10mm 16mm

62
66

79
37

60

139 0 103
PROJECT NAME: 2 STOREY- 2 ROOM HOUSE

FIRST FLOOR
CEMENT
SOIL POISONING
RC PIPES

GRAVEL FILL
Mark factor a b c Qty
SOF( interior) - 1.10 : 4.20 8.00 0.1 3.7
SOF( exterior) - 1.10 : 1.00 4.00 0.1 0.44
Footings 6 1.10 : 1.40 1.40 0.1 1.29
5.43
FOOTINGS
Mark Pieces factor a b c Qty
F-1 6 1.10 : 1.40 1.40 0.35 4.53
factor
Class A: 9.00 Cement 40.77 bags say 41 41
0.45 Sand 2.0385 cu.m. say 2.04
0.85 Gravel 3.8505 cu.m. say 3.86

COLUMNS (up to 2nd floor )


Mark Pieces factor a b c Qty
C-1 6 1.10 : 0.20 0.40 7.55 3.99
factor
Class A: 9.00 Cement 35.91 bags say 36 36
0.45 Sand 1.7955 cu.m. say 1.8
0.85 Gravel 3.3915 cu.m. say 3.4

48.113 Coco Lumber 192 BF


2.177 1/4" x 4" x 8' Plywood 9 PCS
1.524 Assorted Nails 7 KGS

FTB & WALL FOOTING


Mark location factor a b length Qty
FTB (A-A) 1.10 : 0.20 0.30 4.2 0.28
WF-1 (A-A) 1.10 : 0.30 0.15 1 0.05
WF-1 (B-B) 1.10 : 0.30 0.15 1 0.05
WF-2 (C-C) 1.10 : 0.30 0.15 1.8 0.09
FTB (D-D) 1.10 : 0.20 0.30 4.2 0.28
FTB (1-1) 1.10 : 0.20 0.30 4 0.26
FTB (1-1) 1.10 : 0.20 0.30 4 0.26
WF-2 (2-2) 1.10 : 0.30 0.15 1.3 0.06
FTB (3-3) 1.10 : 0.20 0.30 4 0.26
FTB (3-3) 1.10 : 0.20 0.30 4 0.26
WF-1 (4-4) 1.10 : 0.30 0.15 4 0.2
septic tank 1.10 : 0.30 0.15 11.7 0.58
2.63
factor
Class A: 9.00 Cement 23.67 bags say 24 24
0.45 Sand 1.1835 cu.m. say 1.19
0.85 Gravel 2.2355 cu.m. say 2.24

FTB: 1.6 CU.M


50 Coco Lumber 80 BF
2.045 1/4" x 4" x 8' Plywood 4 PCS
1.534 Assorted Nails 3 KGS

SLAB ON FILL
Mark factor a b c Qty
SOF( interior) - 1.10 : 4.20 8.00 0.1 3.7
SOF( exterior) - 1.10 : 1.00 4.00 0.1 0.44
Septic Tank - 1.10 : 3.60 1.50 0.1 0.59
Sunbreaker - 1.10 : 0
4.73
factor
Class C: 9.00 Cement 42.57 bags say 43 43
0.45 Sand 2.1285 cu.m. say 2.13
0.85 Gravel 4.0205 cu.m. say 4.03

CHB (100 mm x 200 x400 mm)


location side factor a b c Qty
A-A 1 1.00 : 4.20 4.10 - 17.22
A-A 1 1.00 : 1.00 4.10 4.1
B-B 1 1.00 : 2.00 4.10 - 8.2
B-B 1 1.00 : 1.00 4.10 - 4.1
C-C 1 1.00 : 1.80 4.10 - 7.38
D-D 1 1.00 : 4.20 4.10 - 17.22
1-1 1 1.00 : 4.00 4.10 - 16.4
1-1 1 1.00 : 4.00 4.10 - 16.4
2-2 1 1.00 : 1.30 4.10 - 5.33
3-3 1 1.00 : 4.00 4.10 - 16.4
4-4 1 1.00 : 4.00 4.10 - 16.4
septic tank 1 1.00 : 11.70 1.80 - 21.06
lavatory 1 1.00 : 3.40 1.00 - 3.4
153.61
factor
Class C: 13 CHB 1,996.93 pcs say 1997

0.031 Cement 61.91 bags say 62 62


0.01 Sand 19.97 cu.m. say 19.97

WALL PLASTERING

Area side factor Area from CHB Qty


A-A 2 1.10 17.22 37.88
A-A 2 1.10 4.1 9.02
B-B 2 1.10 8.2 18.04
B-B 2 1.10 4.1 9.02
C-C 2 1.10 7.38 16.24
D-D 2 1.10 17.22 37.88
1-1 2 1.10 16.4 36.08
1-1 2 1.10 16.4 36.08
2-2 2 1.10 5.33 11.73
3-3 2 1.10 16.4 36.08
4-4 2 1.10 16.4 36.08
lavatory 2 1.10 3.4 7.48
291.61
factor
Cement 0.113 32.95 say 33.00 33.00
Washed Sand 0.019 5.54 say 5.55

STAIRS
Mark Pieces factor a b c Qty
Landings 1 1.05 : 1.50 1.50 0.15 0.35
STAIR 1.10 : 1.50 3.91 0.2 1.29
1.64
factor
Class A: 9.00 Cement 14.76 bags say 15 15
0.45 Sand 0.738 cu.m. say 0.74
0.85 Gravel 1.394 cu.m. say 1.4

VOLUME: 1.64 CU.M


50 Coco Lumber 82 BF
2.3 1/4" x 4" x 8' Plywood 4 PCS
1.61 Assorted Nails 3 KGS

254
x ₱250.00
₱63,500.00
=
2ND FLOOR

CEMENT
SLAB
Mark factor a b c Qty
Slab 1 - 1.10 : 4.20 4.00 0.10 1.85
Slab 2 1.10 2.70 4.00 0.10 1.19
front - 1.10 : 2.70 0.80 0.10 0.24
right area - 1.10 : 1.00 4.00 0.10 0.44
sun breaker - 1.10 : 0
3.72
factor
Class A: 9.00 Cement 33.48 bags say 34 34
0.45 Sand 1.67 cu.m. say 1.68
0.85 Gravel 3.16 cu.m. say 3.17

SLAB 3.72 CU.M


39.19 Coco Lumber 146 BF
2.13 1/4" x 4" x 8' Plywood 8 PCS
1.49 Assorted Nails 6 KGS

CHB (100 mm x 200 x400 mm)


Mark factor a b c Qty
B-B 1.00 : 5.20 3.00 - 15.6
C-C 1.00 : 5.20 3.00 - 15.6
D-D 1.00 : 4.20 3.00 - 12.6
E-E 1.00 : 4.20 3.00 - 12.6
1-1 1.00 : 8.00 3.00 24
2-2 1.00 : 4.00 3.00 12
3-3 1.00 : 1.30 3.00 3.9
4-4 1.00 : 8.00 3.00 24
5-5 1.00 : 4.00 3.00 - 12
132.3
factor
Class C: 13 CHB 1,719.90 pcs say 1720

0.031 Cement 53.32 bags say 54 54


0.01 Sand 17.20 cu.m. say 17.20
WALL PLASTERING

Area side factor Area from CHB Qty


C-C 2 1.10 15.6 34.32
D-D 2 1.10 15.6 34.32
E-E 2 1.10 12.6 27.72
1-1 2 1.10 12.6 27.72
2-2 2 1.10 24 52.8
3-3 2 1.10 12 26.4
4-4 2 1.10 3.9 8.58
5-5 2 1.10 24 52.8
264.66
factor(dpwh)
Cement 0.113 29.91 say 30.00 30.00
Washed Sand 0.019 5.03 say 5.03

2ND FLOOR BEAMS


Mark location factor a b length Qty
B-2 (A-A) 1.10 : 0.40 0.20 2.7 0.24
B-1 (B-B) 1.10 : 0.40 0.20 4.2 0.37
CB-1 (B-B) 1.10 : 0.40 0.20 1 0.09
B-1 (C-C) 1.10 : 0.40 0.20 4.2 0.37
CB-1 (C-C) 1.10 : 0.40 0.20 1 0.09
B-2 (E-E) 1.10 : 0.40 0.20 4.2 0.37
B-2 (1-1) 1.10 : 0.40 0.20 4 0.35
B-2 (1-1) 1.10 : 0.40 0.20 4 0.35
CB-1 (2-2) 1.10 : 0.40 0.20 0.8 0.07
B-3 (2-2) 1.10 : 0.30 0.20 4 0.26
B-1 (2-2) 1.10 : 0.30 0.20 4 0.26
B-1 (3-3) 1.10 : 0.30 0.20 1.3 0.09
CB-1 (4-4) 1.10 : 0.40 0.20 0.8 0.07
B-1 (4-4) 1.10 : 0.40 0.20 4 0.35
B-2 (4-4) 1.10 : 0.40 0.20 4 0.35
B-2 (5-5) 1.10 : 0.40 0.20 4 0.35
4.03
factor
Class A: 9.00 Cement 36.27 bags say 37 37
0.45 Sand 1.8135 cu.m. say 1.82
0.85 Gravel 3.4255 cu.m. say 3.43

VOLUME 4.03 CU.M


50 Coco Lumber 202 BF
2.05 1/4" x 4" x 8' Plywood 9 PCS
1.52 Assorted Nails 7 KGS

ROOF BEAMS
Mark location factor a b length Qty
RB-1 (B-B) 1.10 : 0.35 0.20 4.2 0.32
CRB-1 (B-B) 1.10 : 0.35 0.20 1 0.08
RB-1 (C-C) 1.10 : 0.35 0.20 4.2 0.32
CRB-1 (C-C) 1.10 : 0.35 0.20 1 0.08
RB-2 (E-E) 1.10 : 0.35 0.20 4.2 0.32
RB-2 (1-1) 1.10 : 0.35 0.20 4 0.31
RB-2 (1-1) 1.10 : 0.35 0.20 4 0.31
RB-2 (2-2) 1.10 : 0.35 0.20 4 0.31
RB-1 (4-4) 1.10 : 0.35 0.20 4 0.31
RB-2 (4-4) 1.10 : 0.35 0.20 4 0.31
RB-2 (5-5) 1.10 : 0.35 0.20 4 0.31
2.98
factor
Class A: 9.00 Cement 26.82 bags say 27 27
RB-S 0.45 Sand 1.341 cu.m. say 1.35
RB-G 0.85 Gravel 2.533 cu.m. say 2.54

VOLUME 34.12 CU.M


50 Coco Lumber 1706 BF
2.05 1/4" x 4" x 8' Plywood 70 PCS
1.52 Assorted Nails 52 KGS

182
x ₱250.00
₱45,500.00
=

₱109,000.00
SAND GRAVEL CHB LUMBER PLYWOOD NAILS

5.43

2.04
3.86

1.8
3.4

192
9
7
1.19
2.24

80
4
3

2.13
4.03

1,997.00

19.97
5.55

0.74
1.4

82
4
3

38.85 14.93 1997 354 17 13


₱500.00 ₱500.00 ₱15.00 ₱47.00 ₱320.00 ₱58.00
₱19,425.00 ₱7,465.00 ₱29,955.00 ₱16,638.00 ₱5,440.00 ₱754.00
₱120,345.00 ₱22,832.00

SAND GRAVEL CHB

1.68
3.17

146
8
6
1,720.00

17.20
5.03

1.82
3.43

202
9
7
1.35
2.54

1706
70
52

27.08 9.14 1720 348 17 13


₱500.00 ₱500.00 ₱15.00 ₱47.00 ₱320.00 ₱58.00
₱13,540.00 ₱4,570.00 ₱25,800.00 ₱16,356.00 ₱5,440.00 ₱754.00
₱89,410.00 ₱22,550.00

₱32,965.00 ₱12,035.00 ₱55,755.00 ₱32,994.00 ₱10,880.00 ₱1,508.00


₱209,755.00 ₱45,382.00