0% found this document useful (0 votes)
351 views

Cycle Time Calculation (2 Process Method)

This document outlines a process for calculating cycle time for a part using a 2 process method. It lists the part name and number, material, operation descriptions, tooling details like diameters and speeds, feed rate, number of cuts, cutting length, machining time, idle time and total time for each process. Remarks may also be included.

Uploaded by

suresh kumar
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
351 views

Cycle Time Calculation (2 Process Method)

This document outlines a process for calculating cycle time for a part using a 2 process method. It lists the part name and number, material, operation descriptions, tooling details like diameters and speeds, feed rate, number of cuts, cutting length, machining time, idle time and total time for each process. Remarks may also be included.

Uploaded by

suresh kumar
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

CYCLE TIME CALCULATION (2 PROCESS METHOD)

PART NAME
PART NUMBER
MATERIAL
SLNO OPERATION DESCRIPTION TOOL DIA 1 DIA 2 CUTTING SPEED RPM 1 RPM 2 MEAN RPM FEED NOF CUTS CUTTING LENGTH
OD)

MACHINING TIME IDLE TIME TOTAL TIME DESCRIPTION REMARKS

You might also like