S A Scaffold Ta System
S A Scaffold Ta System
ScaffoldTagging
System
SAUDIARAMCO’s
ScaffoldTaggingSystem
Press a button below to go to a specific section of this presentation
Entering Complete
Summary
Information Presentation
You can return to this page at the end of each section by pressing the Home Button
2 3
There have been 53 scaffold incidents,
including 5 fatalities, in SAUDIARAMCO PRESS HERE
between 1993 and 2001 To return to
Home Page
2 3
Red Indicates the
ScaffoldTag scaffold has not
been inspected or
SCAFFTAG® Holder
S/N 1000123277 is not safe for use
(old SAMS # 21-000-406-000) (by anyone other
than scaffold
“DO NOT USE craftsmen)
SCAFFOLD”
message must
be visible
TheMain Elements
Indicates scaffold is
Green complete, has been
ScaffoldTag inspected, and is
SCAFFTAG® Insert TANK 105
safe for use at the
S/N 1000123290
a2
6
time of inspection
(old SAMS # 21-000-407-000) A. SULAIMAN A. SULAIMAN A. SULAIMAN A. SULAIMAN
Ahmed Sulaiman Ahmed Sulaiman Ahmed Sulaiman Ahmed Sulaiman
673-2400 673-2400 673-2400 673-2400
233100 233100 233100 233100
Insert fits
673-2308 673-2308 673-2308 673-2308
431056 431056 431056 431056
into holder
2/14/02 2/28/02 3/14/02 3/28/02
of two weeks
TheMain Elements
Indicates scaffold has
been inspected and
may be used only by
workers wearing a
Yellow properly anchored
personal fall arrest
ScaffoldTag system, including a
SCAFFTAG® Insert full body harness and
S/N 1000123293 lanyard
(old SAMS # 21-000-408-000) TANK105
a
2 6
A. SULAIMAN
Ahmed Sulaiman
673-2400
K. SALEH
Khaled Saleh
673-2308
YELLOW scaffold tag
valid for two weeks
233100 431056
TheMain Elements
YELLOW ScaffoldTag
A. SULAIMAN K. SALEH
Ahmed Sulaiman Khaled Saleh
673-2400 673-2308
4 /10/02
TheMain Elements
YELLOW ScaffoldTag
6
runners, posts, or braces) be tagged
A. SULAIMAN
Ahmed Sulaiman
673-2400
K. SALEH
Khaled Saleh
673-2308
with YELLOW or GREEN scaffold
233100 431056
4 /10/02
tag(s)
PRESS HERE
To return to
Home Page
TheMain Elements
Stepby Step Guideto Using
ScaffoldTagHolders andInserts
1
2 3
RED scaffold tag (holder) to be
built into scaffold, near each point
of access, by scaffold craftsmen
Stepby Step
Supervisor of scaffold craftsmen must
inspect scaffold as soon as possible
after erection or alteration is complete
Stepby Step
Scaffold Supervisor gives completed
checklist to Work Permit Issuer’s unit, who
keeps it until scaffold taken down
Stepby Step
IfScaffold EQUALTO orLESS THAN 6 meters
(20 feet)high oris NOTa “SpecialScaffold”:
Stepby Step
A“Special Scaffold” is defined in GI 8.001 as either:
• Ascaffold over 38 meters (125 feet) tall
• Atube and coupler scaffold which exceeds the maximum height
limits in Section 9.11 of the SaudiAramco Construction Safety
Manual (SACSM) or the Scaffold Safety Handbook (SSH)
• Ascaffold cantilevered by more than 3 meters (10 feet)
• Ascaffold (except bracket scaffolds) with a total platform area over
30 square meters (320 sq. ft.) which is supported by or hung from
an existing structure or building (roof, pipe rack, offshore platform,
etc.)
• Ascaffold supporting loads greater than 240 kg/sq.m. (50 psf),
including piping, equipment, masonry,new or existing structures, or
loads other than workers and their materials
Stepby Step
IfScaffold MORE THAN 6 meters
(20 feet)tall oris a“Special Scaffold”:
Scaffold Supervisor signs tag(s) and
leaves “Date of Next Inspection” blank
Supervisor gives the signed GREEN or
YELLOW tag(s) to a Scaffold Inspector
• Scaffold Inspector may be either a Saudi
Aramco or Contractor employee
• All Scaffold Inspectors and Scaffold
Supervisors MUST BE CERTIFIED by Saudi
Aramco by July 1, 2003
• Contact your Loss Prevention Area Office for
more information on required certification
Stepby Step
IfScaffold MORE THAN 6 meters
(20 feet)tall oris a“Special Scaffold”:
Stepby Step
IfScaffold MORE THAN 6 meters
(20 feet)tall oris a“Special Scaffold”:
Stepby Step
IfScaffold MORE THAN 6 meters
(20 feet)tall oris a“Special Scaffold”:
TheScaffold Inspectorwill:
Stepby Step
Atleast every two weeks:
PRESS HERE
To return to
Home Page
Stepby Step
Entering
Information
1
2 3
For writing on GREEN or YELLOW
scaffold tag inserts, use only
permanent marker pens
(S/N 1000123296)
(old SAMS # 21-000-409-000)
EnteringInformation
Scaffolds UNDER 6m (20 ft) Tall:
EnteringInformation
If Scaffold UNDER 6m (20 ft) Tall:
First 2 weeks 2 weeks
inspection later later
EnteringInformation
Scaffolds OVER 6m (20 ft) Tall:
EnteringInformation
If Scaffold OVER 6m (20 ft) Tall:
First
inspection
a
TANK 105 Supervisor enters all information on top part
2 6
of GREEN insert
• Same as for scaffolds less than 6m (20 ft) tall
AHMED SULAIMAN
Ahmed Sulaiman
• However, Supervisor does not enter “Date of
673-2400 Next Inspection”
233100
Inspector PRINTS his name
KHALED SALEH Inspector's actual signature
Khaled Saleh
673-2308 Inspector enters his phone number
431056
EnteringInformation
If Scaffold OVER 6m (20 ft) Tall:
2 weeks
later
a
TANK 105
Supervisor enters all information on top part
2 6
of GREEN insert
• As was done during earlier inspections
AHMED SULAIMAN AHMED SULAIMAN
2/14/02 2/28/02
“Date of Next Inspection” entered by
Inspector
• Must not be more than 2 weeks ahead
EnteringInformation
If Scaffold OVER 6m (20 ft) Tall:
2 weeks
later
a
TANK 105
Supervisor enters all information on top part
2 6
of GREEN insert
• As was done during earlier inspections
AHMED SULAIMAN AHMED SULAIMAN AHMED SULAIMAN
Ahmed Sulaiman Ahmed Sulaiman Ahmed Sulaiman
673-2400 673-2400 673-2400
233100 233100 233100
Inspector enters information on lower
KHALED SALEH KHALED SALEH RAUL TABANGO part of GREEN insert
Khaled Saleh
673-2308
Khaled Saleh
673-2308
Raul Tabango
682-0860 • As was done during earlier inspections
431056 431056 342765
EnteringInformation
If Scaffold UNDER 6m (20 ft) Tall:
Supervisor enters unique scaffold location or #
Load rating of scaffold (check one)
Maximum number of working levels
Totalnumber of planked levels (max.)
Tank 106
Supervisor PRINTS his name a
2 2
Supervisor’s actual signature
AHMED SULAIMAN
EnteringInformation
If Scaffold OVER 6m (20 ft) Tallor a
“Special Scaffold”:
Supervisor enters all information on top and
left part of YELLOW insert
• Same as for scaffolds less than 6m (20 ft) tall
• However, Supervisor does not enter “Date of
Next Inspection”
Tank 106
Inspector PRINTS his name a
2 6
EnteringInformation
Uponcompletion ofthe fourinspection
columnson GREEN scaffoldtag:
a 22
TANK 105
6 New GREEN tag(s) must be filled in
2
EnteringInformation
YELLOW ScaffoldTag
6
• Using the previous procedure
A. SULAIMAN K. SALEH
Ahmed Sulaiman Khaled Saleh
673-2400 673-2308
4 /10/02
PRESS HERE
To return to
Home Page
EnteringInformation
Summary
1
2 3
MAJOR BENEFITS OF SAUDI ARAMCO’S
SCAFFOLD TAGGINGSYSTEM
Saves lives
Provides compliance with contract requirements
Saves time
Easy to use
Weather resistant
Standardized company-wide system
3 MAIN ELEMENTS
High visibility “DO NOT USE SCAFFOLD” RED scaffold tag (holder)
Summary
Foradditional informationon the
SaudiAramco scaffoldtagging
system,please contactyour Area
LossPrevention Office
PRESS HERE
To return to PRESS HERE
TO END SHOW
Home Page
Summary