S A Scaffold Ta System

rt

Uploaded by

Shams Tabrez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views36 pages

S A Scaffold Ta System

rt

Uploaded by

Shams Tabrez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 36

SAUDIARAMCO’s

ScaffoldTagging
System
SAUDIARAMCO’s
ScaffoldTaggingSystem
Press a button below to go to a specific section of this presentation

Why Use a The Step by Step


Scaffold TaggingSys tem? Main Elements Guide

Entering Complete
Summary
Information Presentation

You can return to this page at the end of each section by pressing the Home Button

PRESS HERE PRESS HERE


To return to TO END SHOW
Home Page
WhyUsea Scaffold
TaggingSystem?
1

2 3
There have been 53 scaffold incidents,
including 5 fatalities, in SAUDIARAMCO PRESS HERE
between 1993 and 2001 To return to
Home Page

SAUDIARAMCO’s scaffold tagging system will


help prevent such incidents by indicating whether
or not a scaffold is safe for use

SAUDIARAMCO requires its use


(GI 8.001)

Afull understanding of the


system is therefore essential

Whyuse aScaffold TaggingSystem?


The
MainElements
1

2 3
Red Indicates the
ScaffoldTag scaffold has not
been inspected or
SCAFFTAG® Holder
S/N 1000123277 is not safe for use
(old SAMS # 21-000-406-000) (by anyone other
than scaffold
“DO NOT USE craftsmen)
SCAFFOLD”
message must
be visible

TheMain Elements
Indicates scaffold is
Green complete, has been
ScaffoldTag inspected, and is
SCAFFTAG® Insert TANK 105
safe for use at the
S/N 1000123290
a2
6
time of inspection
(old SAMS # 21-000-407-000) A. SULAIMAN A. SULAIMAN A. SULAIMAN A. SULAIMAN
Ahmed Sulaiman Ahmed Sulaiman Ahmed Sulaiman Ahmed Sulaiman
673-2400 673-2400 673-2400 673-2400
233100 233100 233100 233100

K. SALEH K. SALEH K. SALEH K. SALEH


GREEN scaffold tag
valid for a maximum
Khaled Saleh Khaled Saleh Khaled Saleh Khaled Saleh

Insert fits
673-2308 673-2308 673-2308 673-2308
431056 431056 431056 431056

into holder
2/14/02 2/28/02 3/14/02 3/28/02
of two weeks

TheMain Elements
Indicates scaffold has
been inspected and
may be used only by
workers wearing a
Yellow properly anchored
personal fall arrest
ScaffoldTag system, including a
SCAFFTAG® Insert full body harness and
S/N 1000123293 lanyard
(old SAMS # 21-000-408-000) TANK105
a
2 6

A. SULAIMAN
Ahmed Sulaiman
673-2400
K. SALEH
Khaled Saleh
673-2308
YELLOW scaffold tag
valid for two weeks
233100 431056

Insert fits 4 /10/02

into holder maximum

TheMain Elements
YELLOW ScaffoldTag

For any scaffold with platform(s) which


physically cannot be completely erected
• i.e., interference with equipment or
structure prevents installation of all
a
TANK 105
guardrails or planks
2 6

A. SULAIMAN K. SALEH
Ahmed Sulaiman Khaled Saleh
673-2400 673-2308

Use of YELLOW tag(s) does not


233100 431056

4 /10/02

permit intentional erection of


incomplete scaffolds

TheMain Elements
YELLOW ScaffoldTag

In no case shall a scaffold that is


missing members required for
structural stability (i.e., bearers,
a
2
TANK105

6
runners, posts, or braces) be tagged
A. SULAIMAN
Ahmed Sulaiman
673-2400
K. SALEH
Khaled Saleh
673-2308
with YELLOW or GREEN scaffold
233100 431056

4 /10/02
tag(s)

PRESS HERE
To return to
Home Page

TheMain Elements
Stepby Step Guideto Using
ScaffoldTagHolders andInserts
1

2 3
RED scaffold tag (holder) to be
built into scaffold, near each point
of access, by scaffold craftsmen

RED scaffold tag (holder) is attached


by putting scaffold tube through holder

Retain RED scaffold tag (holder)


with a coupler

Do not attach in any other way.Do not


use string, wire, cable ties, etc.

Only qualified scaffold craftsmen are


allowed on a scaffold with a RED
scaffold tag

Stepby Step
Supervisor of scaffold craftsmen must
inspect scaffold as soon as possible
after erection or alteration is complete

Supervisor of scaffold crew fills in and signs


“Scaffold Field Inspection Checklist”, using
either the:
• Applicable SA Form # 9614, 9615, 9616, 9617
or
• “Blue Book” Scaffold Field Inspection Checklist
(can be used only by Saudi Aramco certified
scaffold supervisors or scaffold inspectors)

Stepby Step
Scaffold Supervisor gives completed
checklist to Work Permit Issuer’s unit, who
keeps it until scaffold taken down

If Scaffold Supervisor decides scaffold is safe


to use, he will fill in and sign, as applicable,
• GREEN (“Passed Inspection”) or
• YELLOW (“Full Body Harness Required”)
scaffold tag(s)

Further on in this presentation, you will


be shown how to fill in these inserts

Stepby Step
IfScaffold EQUALTO orLESS THAN 6 meters
(20 feet)high oris NOTa “SpecialScaffold”:

Scaffold Supervisor signs GREEN or


YELLOW scaffold tag(s) and prints date
when next inspection is due

“Date of next inspection” must not


be more than 2 weeks ahead

Supervisor inserts the signed GREEN


or YELLOW tag(s) into the RED
holder(s)

Stepby Step
A“Special Scaffold” is defined in GI 8.001 as either:
• Ascaffold over 38 meters (125 feet) tall
• Atube and coupler scaffold which exceeds the maximum height
limits in Section 9.11 of the SaudiAramco Construction Safety
Manual (SACSM) or the Scaffold Safety Handbook (SSH)
• Ascaffold cantilevered by more than 3 meters (10 feet)
• Ascaffold (except bracket scaffolds) with a total platform area over
30 square meters (320 sq. ft.) which is supported by or hung from
an existing structure or building (roof, pipe rack, offshore platform,
etc.)
• Ascaffold supporting loads greater than 240 kg/sq.m. (50 psf),
including piping, equipment, masonry,new or existing structures, or
loads other than workers and their materials

Stepby Step
IfScaffold MORE THAN 6 meters
(20 feet)tall oris a“Special Scaffold”:
Scaffold Supervisor signs tag(s) and
leaves “Date of Next Inspection” blank
Supervisor gives the signed GREEN or
YELLOW tag(s) to a Scaffold Inspector
• Scaffold Inspector may be either a Saudi
Aramco or Contractor employee
• All Scaffold Inspectors and Scaffold
Supervisors MUST BE CERTIFIED by Saudi
Aramco by July 1, 2003
• Contact your Loss Prevention Area Office for
more information on required certification

Stepby Step
IfScaffold MORE THAN 6 meters
(20 feet)tall oris a“Special Scaffold”:

Scaffold Inspector inspects scaffold


As soon as possible after Scaffold
Supervisor’s inspection

Scaffold Inspector also fills in and signs


separate “Scaffold Field Inspection
Checklist”
Inspector gives this checklist to Work Permit
Issuer’s unit, who will keep it until scaffold is
taken down

Stepby Step
IfScaffold MORE THAN 6 meters
(20 feet)tall oris a“Special Scaffold”:

If Scaffold Inspector agrees that scaffold is


safe to use, he will:

Fill in and sign GREEN or YELLOW


scaffold tag(s)
• Previously given to him by Scaffold
Supervisor

Stepby Step
IfScaffold MORE THAN 6 meters
(20 feet)tall oris a“Special Scaffold”:

TheScaffold Inspectorwill:

Print “Date of Next Inspection”


on GREEN or YELLOW scaffold tag(s)

“Date of Next Inspection” shall not be


more than 2 weeks ahead
Insert the signed GREEN or
YELLOW tag(s) into the RED
holder(s)

Stepby Step
Atleast every two weeks:

Each scaffold must be re-


inspected by Scaffold Supervisor
(and Scaffold Inspector if
required), using the previous
procedure

PRESS HERE
To return to
Home Page

Stepby Step
Entering
Information
1

2 3
For writing on GREEN or YELLOW
scaffold tag inserts, use only
permanent marker pens
(S/N 1000123296)
(old SAMS # 21-000-409-000)

EnteringInformation
Scaffolds UNDER 6m (20 ft) Tall:

If scaffold is under 6m (20 ft) tall, only the


Supervisor of the scaffold craftsmen who
erected the scaffold needs to inspect scaffold
• Unless it’s a “Special Scaffold” as defined in GI 8.001

Scaffold Supervisor fills in and signs


GREEN or YELLOW scaffold tag(s) –
as applicable

When completed, Supervisor inserts


the GREEN or YELLOW scaffold
tag(s) in the RED holder(s)

EnteringInformation
If Scaffold UNDER 6m (20 ft) Tall:
First 2 weeks 2 weeks
inspection later later

TANK 105 Unique scaffold location or number


a
2 2
Load rating of scaffold (check one)
AHMED SULAIMAN AHMED SULAIMAN AHMED SULAIMAN
Totalnumber of planked levels (max.)
Ahmed Sulaiman
Maximum number of working levels
Ahmed Sulaiman Ahmed Sulaiman
673-2400 673-2400 673-2400
233100 233100 233100
Supervisor PRINTS his name
Supervisor’s actual signature
Supervisor enters his phone number

2/14/02 2/28/02 3/14/02


Supervisor enters his Saudi Aramco
certificate number (or badge number
until July 1, 2003)
Date of next inspection - to be entered
by Supervisor if scaffold less than 6m
(20 ft) tall and NOT a “Special scaffold”

EnteringInformation
Scaffolds OVER 6m (20 ft) Tall:

If scaffold is over 6m (20 ft) tall or a


“Special Scaffold”, the Scaffold Supervisor
AND a Scaffold Inspector each need to
inspect the scaffold (per GI 8.001)

Scaffold Supervisor fills in and signs top


part of GREEN or YELLOW scaffold tag(s)
– as applicable

When Supervisor is done, he gives tag(s)


to Scaffold Inspector
Inspector fills in the rest of each tag and
places in the RED holder(s)

EnteringInformation
If Scaffold OVER 6m (20 ft) Tall:
First
inspection

a
TANK 105 Supervisor enters all information on top part
2 6
of GREEN insert
• Same as for scaffolds less than 6m (20 ft) tall
AHMED SULAIMAN
Ahmed Sulaiman
• However, Supervisor does not enter “Date of
673-2400 Next Inspection”
233100
Inspector PRINTS his name
KHALED SALEH Inspector's actual signature
Khaled Saleh
673-2308 Inspector enters his phone number
431056

Inspector enters his Saudi Aramco


2/14/02
certificate number (or badge number
until July 1, 2003)
Date of next inspection - to be entered
by Inspector if scaffold MORE than
6m (20 ft) tall OR a “Special Scaffold”

EnteringInformation
If Scaffold OVER 6m (20 ft) Tall:
2 weeks
later

a
TANK 105
Supervisor enters all information on top part
2 6
of GREEN insert
• As was done during earlier inspections
AHMED SULAIMAN AHMED SULAIMAN

Ahmed Sulaiman Ahmed Sulaiman


673-2400 673-2400
233100 233100

Inspector enters information on lower


KHALED SALEH KHALED SALEH part of GREEN insert
Khaled Saleh
673-2308
Khaled Saleh
673-2308 • As was done during earlier inspections
431056 431056

2/14/02 2/28/02
“Date of Next Inspection” entered by
Inspector
• Must not be more than 2 weeks ahead

EnteringInformation
If Scaffold OVER 6m (20 ft) Tall:
2 weeks
later

a
TANK 105
Supervisor enters all information on top part
2 6
of GREEN insert
• As was done during earlier inspections
AHMED SULAIMAN AHMED SULAIMAN AHMED SULAIMAN
Ahmed Sulaiman Ahmed Sulaiman Ahmed Sulaiman
673-2400 673-2400 673-2400
233100 233100 233100
Inspector enters information on lower
KHALED SALEH KHALED SALEH RAUL TABANGO part of GREEN insert
Khaled Saleh
673-2308
Khaled Saleh
673-2308
Raul Tabango
682-0860 • As was done during earlier inspections
431056 431056 342765

2/14/02 2/28/02 3/14/02


“Date of Next Inspection” entered by
Inspector
• Must not be more than 2 weeks ahead
And so on, with re-inspection every 2 weeks

EnteringInformation
If Scaffold UNDER 6m (20 ft) Tall:
Supervisor enters unique scaffold location or #
Load rating of scaffold (check one)
Maximum number of working levels
Totalnumber of planked levels (max.)
Tank 106
Supervisor PRINTS his name a
2 2
Supervisor’s actual signature
AHMED SULAIMAN

Supervisor enters his phone number Ahmed Sulaiman


673-2100
233100
Supervisor enters his Saudi Aramco 2/14/02
certificate number (or badge number
until July 1, 2003)
“Date of Next Inspection” to be
entered by Supervisor, if scaffold less
than 6m (20 ft) tall or NOT “Special”

EnteringInformation
If Scaffold OVER 6m (20 ft) Tallor a
“Special Scaffold”:
Supervisor enters all information on top and
left part of YELLOW insert
• Same as for scaffolds less than 6m (20 ft) tall
• However, Supervisor does not enter “Date of
Next Inspection”
Tank 106
Inspector PRINTS his name a
2 6

Inspector's actual signature AHMED SULAIMAN KHALED SALEH


Ahmed Sulaiman Khaled Saleh
Inspector enters his phone number 6732100
233100
673-2108
431056

Inspector enters his Saudi Aramco 2/14/02

certificate number (or badge number


until July 1, 2003)
“Date of Next Inspection” to be
entered by Inspector, if scaffold
MORE than 6m (20 ft) tall or NOT
“Special”

EnteringInformation
Uponcompletion ofthe fourinspection
columnson GREEN scaffoldtag:

a 22
TANK 105
6 New GREEN tag(s) must be filled in
2

A. SULAIMAN A. SULAIMAN A. SULAIMAN A. SULAIMAN


Ahmed
AhmedSulaiman
Sulaiman Ahmed Sulaiman Ahmed Sulaiman Ahmed Sulaiman
673-2400 673-2400 673-2400 673-2400
673-2400
and inserted into the same RED holder(s)
233100 233100
• Using the previous procedure
233100 233100 233100

K. SALEH K. SALEH K. SALEH K. SALEH


Khaled Saleh Khaled Saleh Khaled Saleh Khaled Saleh
673-2308 673-2308 673-2308 673-2308
431056 431056 431056 431056

4 /10/02 2/28/02 3/14/02 3/28/02


2/14/02

Fully used GREEN tag(s) must be kept


on file until scaffold is taken down

EnteringInformation
YELLOW ScaffoldTag

After every bi-weekly re-inspection:


• New YELLOW scaffold tag(s) must
be filled in, and
• Inserted into the same RED holder(s)
a
2
TANK105

6
• Using the previous procedure
A. SULAIMAN K. SALEH
Ahmed Sulaiman Khaled Saleh
673-2400 673-2308

Fully used YELLOW scaffold tag(s)


233100 431056

4 /10/02

must be kept on file until scaffold is


taken down

PRESS HERE
To return to
Home Page

EnteringInformation
Summary
1

2 3
MAJOR BENEFITS OF SAUDI ARAMCO’S
SCAFFOLD TAGGINGSYSTEM
Saves lives
Provides compliance with contract requirements
Saves time
Easy to use
Weather resistant
Standardized company-wide system

3 MAIN ELEMENTS
High visibility “DO NOT USE SCAFFOLD” RED scaffold tag (holder)

GREEN “PASSEDINSPECTION” scaffold tag (insert)


YELLOW “FULL BODY HARNESS REQUIRED” scaffold tag (insert)

Summary
Foradditional informationon the
SaudiAramco scaffoldtagging
system,please contactyour Area
LossPrevention Office

PRESS HERE
To return to PRESS HERE
TO END SHOW
Home Page

Summary