Sheet

This document contains a piling record form for a proposed mixed development project in Kota Kinabalu, Sabah. It provides details of a specific pile including its length, size, hammer type used, and penetration depth recorded in meters for every blow. The form also notes the total penetration depth achieved and any remarks about the piling work.

Uploaded by

KS Lee
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
132 views

Sheet

This document contains a piling record form for a proposed mixed development project in Kota Kinabalu, Sabah. It provides details of a specific pile including its length, size, hammer type used, and penetration depth recorded in meters for every blow. The form also notes the total penetration depth achieved and any remarks about the piling work.

Uploaded by

KS Lee
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

TANG PILING SDN BHD

PILING RECORD FORM

Proposed Piling Works for Mixed Development "Jesselton Residence", Kota Kinabalu, Sabah

Client: VINCI Construction Grands Projets Sdn. Bhd


Consultant: ZONE / BLOCK:
LOCATION: DATE:
PILE No:
Length:
Pile size: 415mm X 260mm H-Pile Operator:
Hammer Type: Hydraulic Hammer Welder:
Ram Weight: 7.00 - ton Recorder:
Drop Heigth: 600 mm

Penetration (m) No of blow Penetration (m) No of blow Penetration (m) No of blow


REMARKS
0.30 11.70 23.10 34.50 38.40
0.60 12.00 23.40 34.80 38.70
0.90 12.30 23.70 35.10 39.00
1.20 12.60 24.00 35.40 39.30
1.50 12.90 24.30 35.70 39.60
1.80 13.20 24.60 36.00 39.90
2.10 13.50 24.90 36.30 40.20
2.40 13.80 25.20 36.60 40.50
2.70 14.10 25.50 36.90 40.80
3.00 14.40 25.80 37.20 41.10
3.30 14.70 26.10 37.50 41.40
3.60 15.00 26.40 37.80 41.70
3.90 15.30 26.70 38.10 42.00
4.20 15.60 27.00 TOTAL PENETRATION:
4.50 15.90 27.30
4.80 16.20 27.60
5.10 16.50 27.90 SET: (mm)
5.40 16.80 28.20
5.70 17.10 28.50
6.00 17.40 28.80 SKETCH:
6.30 17.70 29.10
6.60 18.00 29.40
6.90 18.30 29.70
7.20 18.60 30.00
7.50 18.90 30.30
7.80 19.20 30.60
8.10 19.50 30.90
8.40 19.80 31.20
8.70 20.10 31.50
9.00 20.40 31.80
9.30 20.70 32.10
9.60 21.00 32.40 REMARKS:
9.90 21.30 32.70
10.20 21.60 33.00
10.50 21.90 33.30
10.80 22.20 33.60
11.10 22.50 33.90
11.40 22.80 34.20
Performed by: VINCI Construction Grands Projets Sdn. Bhd C&S Consultant's Representative

TANG PILING SDN BHD Name: Name:


Date: Date: Date: