Rab BBS

This document provides a budget plan for constructing a biogas power plant on Sungai Terlung River. It includes costs for various construction elements like cooling towers, sidewalks, collection boxes, and pits. The total estimated cost for all elements is over Rp. 300 million, involving work like excavation, reinforcement bar installation, formwork, and concrete pouring. Precise volumes, unit costs, and line item totals are provided for each construction component.

Uploaded by

Sudarman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
117 views

Rab BBS

This document provides a budget plan for constructing a biogas power plant on Sungai Terlung River. It includes costs for various construction elements like cooling towers, sidewalks, collection boxes, and pits. The total estimated cost for all elements is over Rp. 300 million, involving work like excavation, reinforcement bar installation, formwork, and concrete pouring. Precise volumes, unit costs, and line item totals are provided for each construction component.

Uploaded by

Sudarman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

RENCANA ANGGARAN BIAYA PELAKSANAAN

MEMBANGUN PEMBANGKIT LISTRIK TENAGA BIOGAS SUNGAI TERLUNG

NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA SAT. JUMLAH


A COOLING TOWER SLAB 2 UNIT
(PEKERJAAN GAMBAR D - C 03)
1
1 Pekerjaan pasang bowplank 50,9 M 16.500 839.850
3
2 Pekerjaan galian tanah 7,96 M 45.000 358.200
3 Pekerjaan penulangan besi Ø 10 mm 550 Kg 25.000 13.750.000
4 Pekerjaan penulangan besi Ø 12 mm 170 Kg 25.000 4.250.000
5 Kawat ikat 10 Kg 22.500 225.000
2
6 Pekerjaan bekisting 64,6 M 127.500 8.236.500
3
7 Pekerjaan lantai kerja 7 cm 3,49 M 1.250.000 4.362.500
3
8 Pekerjaan pengecoran 25,74 M 2.850.000 73.359.000
9 Pekerjaan floor lantai 5,55 M2 75.000 416.250
2
10 Pek. pemasangan besi wiremess sidewalk 21,32 M 185.000 3.944.200
11 Pekerjaan sidewalk 2,14 M3 1.250.000 2.675.000
112.416.500
B COOLING TOWER SIDEWALK
PEKERJAAN GAMBAR D - C 04
1
1 Pasang bekisting 37 M 16.500 610.500
2 Lantai kerja pondasi tapak T = 5 mm 3,94 M3 1.250.000 4.925.000
3 Pek. pemasangan besi electrowelded mesh 93 kg 25.000 2.325.000
4 Pengecoran beton 11,81 M3 2.850.000 33.658.500
41.519.000
C DISTRIBUTION BOX
PEKERJAAN GAMBAR D - C 05
1 Pekerjaan pasang bowplank 24,8 M1 16.500 409.200
2 Pekerjaan galian tanah 1,21 M3 46.000 55.660
3 Pekerjaan penulangan besi Ø 10 mm 85 Kg 25.000 2.125.000
4 Kawat ikat 5 Kg 25.000 125.000
2
5 Pekerjaan bekisting 26 M 127.500 3.315.000
3
6 Pekerjaan lantai kerja 7 cm 0,39 M 1.250.000 487.500
3
7 Pekerjaan pengecoran 3,65 M 2.850.000 10.402.500
2
8 Pekerjaan bongkaran bekisting 26 M 12.000 312.000
2
9 Pek.pembesian wiremess sidewalk 10,88 M 185.000 2.012.800
3
10 Pekerjaan sidewalk 1,63 M 1.250.000 2.037.500
11 Separator weir 1 Unit 1.850.000 1.850.000
12 Hope stub 3 Unit 605.000 1.815.000
24.947.160
D AGITATION PIT
PEKERJAAN GAMBAR D - C 07/08
1 Pekerjaan pasang bowplank 33,84 M1 16.500 558.360
3
2 Galian lobang pondasi 1,47 M 46.000 67.620
3 Pekerjaan penulangan besi Ø 12 mm 243 Kg 25.000 6.075.000
4 Pekerjaan penulangan besi Ø 10 mm 111 Kg 25.000 2.775.000
5 Kawat ikat 5 Kg 22.500 112.500
6 Pekerjaan bekisting 58,84 M2 127.500 7.502.100
7 Pekerjaan lantai kerja 7 cm 3,36 M3 1.250.000 4.200.000
3
8 Pekerjaan pondasi 0,51 M 2.850.000 1.453.500
3
9 Pekerjaan pengecoran 7,82 M 2.850.000 22.287.000
2
10 Pekerjaan bongkaran bekisting 54,18 M 12.000 650.160
2
11 Pek.pembesian wiremess sidewalk 47,92 M 185.000 8.865.200
3
12 Pekerjaan sidewalk (pengecoran) 7,19 M 1.250.000 8.987.500
63.533.940

E1 I.COLECTION BOX 1,2,3 (CB1,2,3)


PEKERJAAN GAMBAR D - C 06
1 Pekerjaan pasang bowplank 8 M1 16.500 132.000
3
2 Pekerjaan galian tanah 2,52 M 55.000 138.600
3 Pekerjaan penulangan besi Ø 10 mm 32 Kg 25.000 800.000
4 Kawat ikat 1 Kg 22.500 22.500
5 Pekerjaan bekisting 11,7 M2 127.500 1.491.750
6 Pekerjaan lantai kerja 7 cm 0,12 M3 1.250.000 150.000
3
7 Pekerjaan pengecoran 2 M 2.850.000 5.700.000
8 Pekerjaan bongkaran bekisting 11,7 M2 12.000 140.400
8.575.250
UNTUK 3 UNIT 3 8.575.250 25.725.750

E2 II.COLECTION BOX 4 (CB 4)


1 Pekerjaan pasang bowplank 10 M1 16.500 165.000
2 Pekerjaan galian tanah 6,38 M3 46.000 293.480
3 Pekerjaan penulangan besi Ø 10 mm 36 Kg 25.000 900.000
4 Kawat ikat 2 Kg 22.500 45.000
2
5 Pekerjaan bekisting 18,29 M 127.500 2.331.975
3
6 Pekerjaan lantai kerja 7 cm 0,23 M 1.250.000 287.500
3
7 Pekerjaan pengecoran 1,89 M 2.850.000 5.386.500
2
8 Pekerjaan bongkaran bekisting 18,3 M 12.000 219.600
9.629.055
F RECIRCULATION PIT
PEKERJAAN GAMBAR D - C 11
1 Pekerjaan pasang bowplank 26,4 M1 16.500 435.600
3
2 Pekerjaan galian tanah 2,1 M 46.000 96.600
3 Pekerjaan penulangan besi Ø 12 mm 139 Kg 25.000 3.475.000
4 Pekerjaan penulangan besi Ø 10 mm 107 Kg 25.000 2.675.000
5 Kawat ikat 2 Kg 22.500 45.000
6 Pekerjaan pondasi 0,51 M3 2.850.000 2.167.500
2
7 Pekerjaan bekisting 36,92 M 127.500 4.707.300
8 Pekerjaan lantai kerja 7 cm 2,2 M3 1.250.000 2.750.000
9 Pekerjaan pengecoran 4,83 M3 2.850.000 13.765.500
10 Pekerjaan bongkaran bekisting 41,56 M2 12.000 498.720
11 Pek.pembesian wiremess sidewalk 26,79 M2 185.000 4.956.150
3
12 Pekerjaan sidewalk (pengecoran) 2,679 M 1.250.000 3.348.750
38.921.120

G SLAB PUMP
PEKERJAAN GAMBAR D - C 13 (SLAB PUMP)
1 Pekerjaan galian tanah 0,3 M3 46.000 13.800
2 Pekerjaan lantai kerja 0,15 M3 1.250.000 187.500
2
3 Pekerjaan bekisting 0,48 M 127.500 61.200
4 Pekerjaan pembesian Ø 10 mm 13 Kg 25.000 325.000
3
5 Pekerjaan pengecoran 0,26 M 2.850.000 741.000
1.328.500
UNTUK 8 UNIT 8 UNIT 1.328.500 10.628.000
H DISCHARGE VALVE HEAD WALLS
PEKERJAAN GAMBAR D - C 11
1 Pekerjaan pasang bowplank 7 M1 16.500 115.500
3
2 Pekerjaan galian tanah 0,28 M 46.000 12.880
3 Pekerjaan penulangan besi Ø 10 mm 51 Kg 25.000 1.275.000
4 Kawat ikat 1 Kg 22.500 22.500
2
5 Pekerjaan bekisting 6,23 M 127.500 794.325
6 Pekerjaan lantai kerja 7 cm 0,11 M3 1.250.000 137.500
3
7 Pekerjaan pengecoran 0,55 M 2.850.000 1.567.500
8 Pekerjaan bongkaran bekisting 6,24 M2 12.000 74.880
9 Pekerjaan floor lantai 1,56 M2 75.000 117.000
4.117.085
UNTUK 10 UNIT 10 UNIT 4.117.085 41.170.850

I VALVE BOX VB 7
PEKERJAAN GAMBAR D - C 12
1 Pekerjaan pasang bowplank 14 M1 16.500 231.000
2 Pekerjaan galian tanah 0,83 M3 46.000 38.180
3 Pekerjaan penulangan besi Ø 10 mm 120 Kg 25.000 3.000.000
4 Kawat ikat 2 Kg 22.500 45.000
2
5 Pekerjaan bekisting 18,6 M 127.500 2.371.500
3
6 Pekerjaan lantai kerja 7 cm 0,39 M 1.250.000 487.500
3
7 Pekerjaan pengecoran 1,35 M 2.850.000 3.847.500
2
8 Pekerjaan bongkaran bekisting 18,6 M 12.000 223.200
10.243.880
J STRUCTURAL SLAB WET FILTER
PEKERJAAN GAMBAR D - C 14
1
1 Pekerjaan pasang bowplank 20 M 16.500 330.000
2 Pekerjaan galian tanah 4,95 M3 46.000 227.700
3 Pekerjaan penulangan besi Ø 10 mm 62 Kg 25.000 1.550.000
4 Pekerjaan penulangan besi Ø 16 mm 339 Kg 25.000 8.475.000
5 Pekerjaan penulangan besi Ø 25 mm 53,85 Kg 25.000 1.346.250
6 Kawat ikat 5 Kg 22.500 112.500
7 Pekerjaan bekisting 14,13 M2 127.500 1.801.575
3
8 Pekerjaan pondasi sloof 4,24 M 1.250.000 5.300.000
9 Pekerjaan pengecoran lantai 3,98 M3 2.850.000 11.343.000
10 Pekerjaan bongkaran bekisting 14,13 M2 12.000 169.560
30.655.585
K STRUCTURAL SLAB DRY FILTER
PEKERJAAN GAMBAR D - C 14
1 Pekerjaan perataan tanah 7,5 M3 46.000 345.000
2 Pekerjaan penulangan besi Ø 16 mm 356,05 Kg 25.000 8.901.250
3 Kawat ikat 5 Kg 22.500 112.500
4 Pekerjaan bekisting 7,54 M2 127.500 961.350
5 Pekerjaan pengecoran 7,49 M3 2.850.000 21.346.500
6 Pekerjaan bongkaran bekisting 7,54 M2 12.000 90.480
31.757.080
L STRUCTURAL SLAB BLOWER
PEKERJAAN GAMBAR D - C 18
1
1 Pekerjaan pasang bowplank 8 M 16.500 132.000
3
2 Pekerjaan galian tanah 0,68 M 46.000 31.280
3 Pekerjaan penulangan besi Ø 10 mm 21,07 Kg 25.000 526.750
4 Pekerjaan penulangan besi Ø 16 mm 3,96 Kg 25.000 99.000
5 Kawat ikat 1 Kg 22.500 22.500
2
6 Pekerjaan bekisting 2,78 M 127.500 354.450
3
7 Pekerjaan pengecoran lantai 1,04 M 2.850.000 2.964.000
4.129.980
UNTUK 2 UNIT 8.259.960
M CONVERED ZONE BLOWERS
PEKERJAAN GAMBAR D - C 16
1 Pekerjaan pasang bowplank 43 M1 16.500 709.500
2 Galian lobang pondasi 1,76 M3 46.000 80.960
3
3 Pekerjaan pondasi 0,72 M 4.250.000 3.060.000
4 Pekerjaan bekisting 7,92 M2 127.500 1.009.800
5 Pekerjaan lantai kerja pondasi 5 cm 0,1 M3 1.250.000 125.000
6 Pekerjaan sidewalk (pengecoran) 11 M3 2.850.000 31.350.000
7 Pekerjaan bongkaran bekisting 7,92 M2 12.000 95.040
8 Pek.pembesian wiremess sidewalk 77,72 M2 185.000 14.378.200
50.808.500

N PEKERJAAN GAMBAR D - C24 (STAIR ACCESS)


3
1 Stair tipe 1 - 2 UNIT 1 M 4.250.000 4.250.000
3
2 Stair tipe 2- 2 UNIT 2,6 M 4.250.000 11.050.000
3
3 Stair tipe 3 - 3 UNIT 2,7 M 4.250.000 11.475.000
3
4 Stair tipe 4 - 2 UNIT 1,2 M 4.250.000 5.100.000
3
5 Stair tipe 5 - 1 UNIT 1,7 M 4.250.000 7.225.000
3
6 Stair tipe 6 - 2 UNIT 2,2 M 4.250.000 9.350.000
48.450.000

O FLARE FOUNDATION
PEKERJAAN GAMBAR
1 Galian lobang pondasi 2,49 M3 46.500 115.785
3
2 Urugan kembali galian 1,62 M 15.000 24.300
3
3 Pekerjaan pondasi tapak 0,87 M 2.850.000 2.479.500
4 Pekerjaan bekisting sidewalk 8,25 M2 127.500 1.051.875
2
5 Pekerjaan pembesian sidewalk 4,73 M 165.000 780.450
6 Pekerjaan pengecoran beton sidewalk 0,89 M3 2.850.000 2.536.500
6.988.410

P AIR COMPRESSOR ROOM STRUCTURAL


PEKERJAAN GAMBAR D - C21
1 Pasang bekisting lantai beton 7,3 M1 16.500 120.450
2 Pekerjaan pengecoran lantai beton 0,52 M3 2.850.000 1.482.000
3 Pasang dinding bata 3,23 M2 150.000 484.500
4 Plesteran dinding bata 6,46 M2 55.000 355.300
5 Pekerjaan pengecoran penutup beton 0,23 M3 2.850.000 655.500
6 Pekerjaan pembesian sidewalk 6,3 M2 165.000 1.039.500
4.137.250
Q VALVE BOX -VB6 , VB8
PEKERJAAN GAMBAR D - C19
I. VALVE BOX VB6
3
1 Galian tanah 0,89 M 46.000 40.940
2
2 Pasang bekisting 11,24 M 125.000 1.405.000
3
3 Lantai kerja 0,13 M 1.250.000 162.500
4 Pengecoran beton 1,08 M3 3.125.000 3.375.000
2
5 Bongkar bekisting 11,24 M 12.000 134.880
2
6 Plesteran 5,62 M 55.000 309.100
5.427.420
II. VALVE BOX VB8
1 Galian tanah 0,86 M3 46.000 39.560
2
2 Pasang bekisting 9,64 M 125.000 1.205.000
3 Lantai kerja 0,13 M3 1.250.000 162.500
4 Pengecoran beton 1,12 M3 2.750.000 3.080.000
2
5 Bongkar bekisting 9,64 M 12.000 115.680
6 Plesteran 3,6 M2 55.000 198.000
4.800.740
TOTAL PEKERJAAAN VALVE BOX 10.228.160

R WATER TRAP
PEKERJAAN GAMBAR DC 22
3
1 Galian tanah 0,36 M 46.000 16.560
2
2 Pasang bekisting 2,88 M 125.000 360.000
2
3 Pasang wiremesh 1,45 M 165.000 239.250
3
4 Pengecoran beton 0,36 M 2.750.000 990.000
2
5 Bongkar bekisting 2,88 M 12.000 34.560
2
6 Plesteran 1,6 M 55.000 88.000
1.728.370
UNTUK 5 UNIT 8.641.850

S SAND TRAP
PEKERJAAN GAMBAR DC 27
1
1 Pasang bowplank 14 M 16.500 231.000
3
2 Galian tanah 3,21 M 46.000 147.660
3 Lantai kerja 0,19 M3 1.250.000 237.500
3
4 Lantai kerja side walk 0,45 M 1.250.000 562.500
5 Pasang bekisting 19,5 M2 82.500 1.608.750
6 Pasang bekisting side walk 10,2 M1 16.500 168.300
7 Pasang besi beton Ø 12 mm 133 Kg 25.000 3.325.000
8 Pasang wiremesh side walk 5,25 M2 165.000 866.250
9 Pengecoran beton 1,12 M3 2.750.000 3.080.000
10 Pekerjaan pengecoran beton sidewalk 0,72 M3 2.750.000 1.980.000
11 Bongkar bekisting 29,7 M2 12.000 356.400
12 Plesteran 9,67 M2 55.000 531.850
12.864.210

T BANTALAN PIPA (PIPE SUPPORT)


1 Type 1 (30x35x65) 162 Buah 177.000 28.674.000
2 Type 2 (15x50x50 cm) 10 Buah 130.000 1.300.000
29.974.000