0% found this document useful (0 votes)
32 views

1 Testing Document: Production Order

This document provides instructions for using new features in a production order system. Key points include: 1. Production orders can now define vendor GST registration numbers. Updating artwork will propagate packing items through production stages. 2. Consumption and output journals allow tracking materials and production. Consumption entries link items to production orders and lots. Output entries track production runs by machine, employee, time, costs and scrap. 3. A bulk consumption feature suggests item quantities based on output journals, allowing bulk material inputs to be linked to production orders.

Uploaded by

Manan Shah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views

1 Testing Document: Production Order

This document provides instructions for using new features in a production order system. Key points include: 1. Production orders can now define vendor GST registration numbers. Updating artwork will propagate packing items through production stages. 2. Consumption and output journals allow tracking materials and production. Consumption entries link items to production orders and lots. Output entries track production runs by machine, employee, time, costs and scrap. 3. A bulk consumption feature suggests item quantities based on output journals, allowing bulk material inputs to be linked to production orders.

Uploaded by

Manan Shah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 11

1 Testing Document: Production Order

Contents
1 Testing Document: Production Order................................................................................1
1.1 Release Production order........................................................................................... 2
1.2 Consumption Journal................................................................................................. 4
1.3 Output Journal........................................................................................................... 6
1.4 Bulk Consumption................................................................................................... 10

1.1Purchase order

Go to: Departments -> Purchase -> Order Processing -> Purchase Orders
 Create New Production order for Make to Stock Purpose.
 Here new feature added for define GST Registration no. Vendor order Adderess wise.
 After this click on Update artwork To component sytem will update all packing items
as per define production stages.

1.2Consumption Journal

Go to: Departments -> Manufacturing -> Execution -> Consumption Journal


 After creating production order user need to go Consumption journal page for making
consumption entries prodcution order wise her user user need to select Production
order on Order No. Filed.
 After define order No. User need to select Order line no. system wil show selected
order no. lines.
 Production Order Components here user need to define which item need to consume.
On Quantity filed user need to define consumption quantity.
 Define lot for selected item need to consume.
 Post Consumption line after define all required details.
1.3Output Journal

Go to: Departments -> Manufacturing -> Execution -> Output Journal

 For Making Output entries user need to go on Output Journal page.


 Here user need to define Posting date for making define material process date.
 Selcted order no. from list, After selecting order no. user need to selected produce
item from Item No. filed.
 Operation no. here user need to define Machine no. to define on which machine
process are done.

 In MRK process blow inspection process done by employees, so here functionlity


develope for selcting employee on output journla page.
 Here user need to define process start time & End time.
 Unit cost this filed value come from employee master.
 Here user can select scrap item as per define on Produce SFG of FG item card page.
After define scrap quantity user need to post Putput Journal Line.

 If Produce item have lot no. then user to define lot no.
 On Production order’s action tab user can check Item Ledger Entries.
1.4Bulk Consumption

GO to: Departments -> Manufacturing -> Execution -> Bulk Consumption


 On Bulk Consumption page user select item and applied date fileter.
 As per date filter system will suggest output journal lines. Here system suggest
consumption quantity of item, user can change suggested item quantity.
 In MRK chemical are consumed on bulk bases, By this functionality user can enter
bulk consumption item and production order wise.

====================================->END<-
=====================================

You might also like