02-F-02 APQP Timing Plan

This document outlines the timing and responsibilities for implementing an Advance Product Quality Planning (APQP) process. It includes a chart that lists the key APQP stages and activities, whether they are required, target start and end dates, and responsible team members. The stages include planning and defining requirements, product and process development, process design and development, and product and process validation. The goal is to develop a control plan and ensure product and process validation before the initial production date to maintain quality and customer satisfaction.

Uploaded by

shobhit2310
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views

02-F-02 APQP Timing Plan

This document outlines the timing and responsibilities for implementing an Advance Product Quality Planning (APQP) process. It includes a chart that lists the key APQP stages and activities, whether they are required, target start and end dates, and responsible team members. The stages include planning and defining requirements, product and process development, process design and development, and product and process validation. The goal is to develop a control plan and ensure product and process validation before the initial production date to maintain quality and customer satisfaction.

Uploaded by

shobhit2310
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

ADVANCE PRODUCT QUALITY PLANNING TIMING CHART

(Level III Requirements)

KEY DATE : MEETING DATE:


_____/______/_____ _____/______/_____

Project Information Tentative Target Dates CFT Leader

Part Number : ________________ Final Control Plan: ___/___/__ Name :_________________


& Model
Customer : ________________ Initial Samples : __/___/___ Designation : ____________

Product : ________________ First Production :___/___/___ Department : ___________

Cross Functional Team Members (Name / Title)

APQP Stage & Required Responsibility Target Dates Use Form /


Activities Yes No Start End Comments
Plan & Define the Programme
Customer input Requirements
Review
a) Voice of Customer 02-F-03
Market Research
Historical Warranty % Quality 02-F-04
Team Experience 02-F-03
b) Business Plan / Marketing Strategy 02-F-03
c) Product / Process Bench Mark Data 02-F-05
d) Product / Process Assumption 02-F-05
e) Product Reliability Study 02-F-03
f) Customer Inputs 03-F-01
g) Design Goals 02-F-06
h) Reliability & Quality Goals 02-F-07
i) Preliminary Bill of Materials 02-F-08
j) Preliminary Process Flow Diagram Process Flow
k) Preliminary Listing of Special 02-F-09
Characteristics
l) Product Assurance Plan 02-F-10

Product & Process Development and Verification


a) Design FMEA n.a
b) Design for Manufacturability & n.a
Assembly
c) Design Verification n.a
d) Design Reviews n.a
e) Prototype Control Plan n.a
f) Engineering Drawing 02-F-11
g) Engineering Specification 02-F-11
h) Materials Specification 02-F-12
i) Drawings & Specification Changes ECN
(ECN) 05-Fxx
j) New Equipment & Tooling Required 02-F-13
k) Special Product & Process 02-F-09
Characteristics
l) Gauges & Testing Equipment 02-F-13
m) Team Feasibility Commitment 02-F-14
Process Design &
Development
a) Packaging Standards Cust. Std.
b) Product / Process Quality System 02-F-15
Review
02-F-02 / Page 1 of 2
ADVANCE PRODUCT QUALITY PLANNING TIMING CHART

KEY DATE : REVISION DATE :


_____/______/_____ _____/______/_____

Project Information Target Dates CFT Leader

Part Number : ________________ Final Control Plan: ___/___/__ Name :_________________

Customer : ________________ Initial Samples : __/___/___ Designation : ____________

Product : ________________ First Production :___/___/___ Department : ___________

Cross Functional Team Members (Name / Title)

APP Stage & Required Responsibility Target Dates Use Form /


Activities Yes No Start End Comments
c) Process Flow Chart Process Flow
d) Floor Plan Layout As per Manual
e) Characteristics Matrix (Optional) If required
f) PFMEA FMEA
g) Pre-Launch Control Plan Intial CP
h) Process Instructions / Control Sheets Job Set up / PCS
i) MSA Plan 02-F-16
j) Ppk Study Plan 02-F-17
k) Packaging Specifications Pkg Spec / WI

Product & Process Validation


a) Production Trial Run All Process / Prod
Results, 300
samples
b) MSA Evaluation 02-F-16
c) Ppk Study 02-F-17
d) PPAP Submission PSW & PPAP
docs.
e) Production Validation Testing Cust Approval
f) Packaging Evaluation Cust Approval
g) Production Control Plan Final CP
h) Quality Planning & Summary Sign – 02-F-18
off
Feed Back Assessment & Corrective Action
a) Reduced Variation After Supplies
b) Customer satisfaction After Supplies
c) Delivery & Service After Supplies
COMMENTS

CFT SIGN OFF


NAME Title Approval / Signature Date

02-F-02 / Page 2 of 2