Hazop Assignment Full
Hazop Assignment Full
Group No: 12
Date Start Time Finish Time
April 28th 2018 11AM
Pressure
Temperature
Less of Feed Flow
Other than Out of electricity
Pressure
Electric Motor Stirring More of Temperature
Pressure
Secretary
Mai Phuong Quynh Le
Possible Causes
Malfunction of valve V1
Valve V1 is closed
High monomer flow
Valve 1 is widely opened
valve V1 is widely opened
Feed line is overheated
Valve V1 is significantly closed
The operations have errors
Valve V2 is closed
Valve V3 is closed
Valve V3 is widely open
Valve V3 is closed
Thermocouple failure
Equipment failure
Power failure
Equipment failure
Power failure
Equipment failure
Power failure
Equipment failure
Power failure
Other Participating Team Members
Huynh Tram Anh Nguyen
Le Hong An Nguyen
Le Thien Ho
Nam Anh Cao
The Nhut Nguyen
Consequences/ Concern
No product discharged
No feed to reactor
Monomer poors out of product discharged line
Overfill of monomer feeds inside the reactor, potentials of explosions
and fire
Possible reactor malfunction due to over pressured
The reaction speed increases à lower cooling duty required
There are fewer reaction occurred à Low efficiency
The whole system is discontinued
No product discharged
Product from reactor is overflowed cause high pressure and may lead
to an explosion
High volume of product flow
The reactor may be malfunctioned, which cause the increase of pressur
The failure of thermocouple cause the temperature cannot be
measured correctly and the flow of cooling water is enable controled
Low volume of product
Impurity of products
Reaction conversion is decreased
Set up independent temparature measurement and temperature indicator alarm on the reactor
vessel
Set up Backup power generator
Monitor pressure relief valve
Set up Backup power generator
Regularly maintain the Electric Motor
Set up Backup power generator
Regularly maintain the Electric Motor
Set up Backup power generator