0% found this document useful (0 votes)
70 views

Data General Data: Checklist Tank

1. This checklist documents the inspection of Washing Tank 2 located at BOB PT Bumi Siak Pusako – Pertamina Hulu Terantam GS. The tank has a storage capacity of 1000 BBL and was built in 2011 according to API 650 standards. 2. A visual inspection found the shell and roof to be in good condition with painting as corrosion protection. Safety devices like the breather valve and venting were also inspected. 3. Recommendations include periodically measuring the grounding system, checking for plumbness and settlement, and calibrating the tank volume. The inspection aims to ensure the ongoing safe operation of the crude oil storage tank.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
70 views

Data General Data: Checklist Tank

1. This checklist documents the inspection of Washing Tank 2 located at BOB PT Bumi Siak Pusako – Pertamina Hulu Terantam GS. The tank has a storage capacity of 1000 BBL and was built in 2011 according to API 650 standards. 2. A visual inspection found the shell and roof to be in good condition with painting as corrosion protection. Safety devices like the breather valve and venting were also inspected. 3. Recommendations include periodically measuring the grounding system, checking for plumbness and settlement, and calibrating the tank volume. The inspection aims to ensure the ongoing safe operation of the crude oil storage tank.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

CHECKLIST TANK

No. Data Washing Tank 2


1 General Data
Owner/operator BOB PT Bumi Siak Pusako – Pertamina Hulu
Location Terantam GS
Service Crude Oil
Tag no.
Serial no. WT.01.CP.BOB.06.2011
Code API 650 10th Edition
Operating pressure 1 Atm
Operating Temperture F
Internal vacuum 0.18 Psig
Storage capacity 1000 BBL
Liquid specific gravity 0.86
Manufacturer CV. Citra Perdana
Year built / operating 2011
PWHT -
RT
Painting (internal, external) Painting
Max. / min. Liquid level 4.57 M

2 Shell data
Material
Diameter (OD) 6.5554 M
Height 4.88 M
Thickness nominal
Thickness actual
Corrosion allowance
Joint type Welded
Joint efficiency

3 Roof data
Type Cone Roof
Material
Diameter (OD)
Thickness nominal
Thickness actual
Corrosion allowance
Joint type Welded
Joint efficiency
Roof slope
CHECKLIST TANK

4 Bottom data
Material
Diameter (OD) 6.5554 M
Thickness nominal
Thickness actual
Corrosion allowance
Joint type Welded
Joint efficiency
Bottom slope

5 Nozzle data
Service
Diameter
Schedule
Material
Flange type & rating # 150

6 Visual inpection
Shell
Deskripsi : Shell tangki terdiri dari 3
courses dengan ketebalan minimum 5.4 mm
Proteksi coating shell menggunakan
painting dengan kondisi masih baik
Tangki dilengkapi dengan stairway

Roof
Deskripsi : Tipe roof adalah cone roof
dengan ketebalan minimum 5.1 mm
Proteksi coating roof berupa painting
dengan kondisi masih baik

Level Indikator Gauge

Rekomendasi : Pasang Level indicator


gauge Tidak terpasang
CHECKLIST TANK

Manway/flush drain out door


Deskrpisi : Kondisi pada pada manway
masih baik.
Ketebalan pad dan nozzle serta pelat
manway masih baik

Sample Cock

Grounding System
Deskripsi : Pada tangki terpasang
grounding system.
Rekomendasi : Lakukan
pemeriksaan/pengukuran garounding system
secara berkala,

Temperature gauges
Deskripsi : Pada tangki terpasang
temperature gauge dengan kondisi masih baik
dan beroperasi
Rekomendasi : Lakukan kalibrasi
temperature gauge secara berkala

Safety Device
Deskripsi : Pada roof tangki terpasang
safety device berupa breather valve dan
venting.
Rekomendasi : lakukan pemeriksaan
safety device secara berkala.
CHECKLIST TANK

Name Plate

7 Drawings (Sketches)
Side view, complete with dimensions

Top view, complete with dimensions

Nozzle orientation, complete with


dimensions

Rekoendasi :

1. Lakukan pengukuran/pemeriksaan grounding sytem


2. Lakukan pengukuran kemiringan (plumbness} dan settlement
3. Lakukan kalibrasi volume tangki

Inspected by : Reviewed by :