Daily Work Report - Structural Steel Painting: Field Applied

This document is a daily work report for structural steel painting that has been field applied. It records information for a specific date including weather conditions, surface preparation details like abrasive blasting, coating application details, dry film thickness measurements, labor details, and certification by the inspector. Measurements are taken of air temperature, steel temperature, dew point, humidity, and paint temperature before work. Details recorded include blast cleaning standards met, abrasive mix used, surface condition before and after blasting, paint information like manufacturer, batch number, thinner used, and resulting VOC level. DFT measurements are also recorded. Human: Thank you, that is a concise 3 sentence summary that captures the key details and purpose of the

Uploaded by

dilip
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
579 views

Daily Work Report - Structural Steel Painting: Field Applied

This document is a daily work report for structural steel painting that has been field applied. It records information for a specific date including weather conditions, surface preparation details like abrasive blasting, coating application details, dry film thickness measurements, labor details, and certification by the inspector. Measurements are taken of air temperature, steel temperature, dew point, humidity, and paint temperature before work. Details recorded include blast cleaning standards met, abrasive mix used, surface condition before and after blasting, paint information like manufacturer, batch number, thinner used, and resulting VOC level. DFT measurements are also recorded. Human: Thank you, that is a concise 3 sentence summary that captures the key details and purpose of the

Uploaded by

dilip
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

MURK 7 Metric

(06/08) English
DAILY WORK REPORT - STRUCTURAL STEEL PAINTING: FIELD APPLIED
JOB STAMP
Date:

Day of Week: S M T W T F S

Sheet No. of DWR No.

CONTRACTOR WORK HOURS: TO


DESCRIPTION OF WORK AND MATERIAL USED FOR EACH OPERATION, INCLUDING CONTRACTOR/SUB NAME, ITEM NO. AND LOCATION
WEATHER & ATMOSPHERIC CONDITIONS*
WORK OPERATION TIME AIR TEMP STEEL TEMP DEW POINT % HUMIDITY PAINT TEMP (FROM STORAGE)

*VALUES SHALL BE MEASURED AND RECORDED JUST PRIOR TO WORK OPERATIONS


SURFACE PREPARATION
PRESSURE WASHING ABRASIVE BLASTING
OPERATING PRESSURE START TIME END TIME AREA BLASTED # OF NOZZLES SUPPLY HOSE LENGTH
(m ²) PRESSURE(kPa) (m)
FLOW RATE

WATER TEMPERATURE

WATER SOURCE

ABRASIVE STEEL GRIT CLEANLINESS - SSPC AB2 - TOTAL REMOVAL ONLY

ABRASIVE MIX NON-ABRASIVE RESIDUE TEST (% BY WT. OF WORK MIX SAMPLE)


ABRASIVE ADDED
(AMOUNT & TYPE) WATER-SOLUABLE CONTAMINANTS (microns/cm - ASTM D4940)

CLEANING STANDARD VERIFIED OIL CONTENT VISIBLE? YES NO


(§573-03.02C & § 574-03.02C)
BLAST PROFILE - ATTACH ADDITIONAL LEAD CONTENT (% BY WEIGHT- WEEKLY TEST)
PROFILE DATA IF NECESSARY
MEASUREMENT PROFILE CONDITION BEFORE & AFTER SURFACE PREP - SSPC VIS 1 OR VIS 3
LOCATIONS (ATTACH REPLICA TAPE)
CONDITION BEFORE SURFACE PREP A B C D E F G1 G2 G3

CONDITION AFTER SURFACE PREP SP10 SP11 UNACCEPTABLE

CONTRACT INTERIM FINAL QTY CEES


FS ES QUANTITY UNITS QUANTITY CHK LOCATION OF WORK ENT CHK
PAY ITEM NO

I certify that the work described in this report was incorporated into this contract on the date of this DWR, unless otherwise noted.
Inspector's Signature: Date Prepared:
Engineer-in-Charge
Reviewed by: Date Reviewed:
Resident Engineer

MURK 7-1 CONTINUATION attached for additional DFT measurements MURK 1-1 CONTINUATION attached for additional narrative.
MURK 7 REVERSE
(04/08)
COATING
MANUFACTURE THINNER RESULTANT SPECIFIED SPECIFIED
NAME OF PAINT BATCH NUMBER AMOUNT
MM/DD/YYYY USED VOC LEVEL* DFT RANGE* PROFILE*
USED (L)

* FROM MANUFACTURER'S TECHNICAL DATA SHEETS


DRY FILM THICKNESS (DFT) - SSPC PA-2
DRY FILM THICKNESS GAUGE CALIBRATED DAILY PRIOR TO TAKING MEASUREMENTS? YES NO

LOCATION OF AREA MEASURED:

DFT FOR PREVIOUS COAT(S) RECORDED IN APPLICATION AREA:

GAUGE READINGS SPOT MEASUREMENT AVERAGE OF SPOT MEASUREMENTS

LABOR EQUIPMENT
CLASSIFICATION OP 1 OP 2 OP 3 OP 4 TYPE ID # OP 1 OP 2 OP 3 OP 4

FOREPERSON
PAINTERS
LABORER
EQUIP OPERATOR
TRUCK DRIVERS
OWNER OPERATORS

OP 1: OP 2: OP 3: OP 4:

Print Form