Csicol Manual

This weekly construction report provides equipment usage and work progress details for a highway construction project. It lists the types of equipment used each day of the week along with totals. Comments from the contractor note ongoing grading, gravel surfacing, and culvert installation work. Over 12% of excavation and 40-100% of culverts are reported as completed to date.

Uploaded by

HongVuthy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
192 views

Csicol Manual

This weekly construction report provides equipment usage and work progress details for a highway construction project. It lists the types of equipment used each day of the week along with totals. Comments from the contractor note ongoing grading, gravel surfacing, and culvert installation work. Over 12% of excavation and 40-100% of culverts are reported as completed to date.

Uploaded by

HongVuthy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

Type of Work

Contractor
Consultant Representative
Report# Week Ending
Other Projects in same Contract - File
WEEKLY CONSTRUCTION REPORT
Date
THURS
EQUIPMENT SUN OP. MON TUES WED FRI SAT OP.
OP. TOTALS
HRS OP. HRS OP. HRS OP. HRS OP. HRS HRS
HRS
REMARKS ON CONRACTOR'S PROGRESS, SITE OCCUPANCY, LANE CLOSURE AND WEATHER TO BE
RECORDED ON FORM A.07 (SITE OCCUPANCY AND LANE RENTAL WEEKLY REPORT BRIDGES AND CONSTRUCTION)

CONTRACTOR COMMENTS

Consultant: Date:

Revised December 2013


Project Region Dist.
Contract # WAC / Job No.
From
nding To
C.S. km To C.S. km
Total Length km

GRADING, GRAVEL SURFACING, BASE COURSE, SURFACING & SEAL COAT


TOTAL PROJECT TOTAL QUANTITIES PLACED % COMPLETED
TASK Km UNIT
Total
Initial Current This Fiscal One Week
This Week Project to To Date
Estimate Estimate Year Ago
Date
STARTING DATE: Estimated: Actual: Shut Down for Season
COMPLETION DATE: Estimated: Actual: Date:

Contractor Representative: Date:

AppendixA.06
Type of Work Grading, Bridges and Other Work

Contractor NAME

Consultant Representative NAME


Report# # Week Ending
Other Projects in same Contract - File
WEEKLY CONSTRUCTION REPORT
Date

EQUIPMENT SUN OP. MON TUES WED THURS FRI SAT OP.
TOTALS
HRS OP. HRS OP. HRS OP. HRS OP. HRS OP. HRS HRS
621 Scraper 6.0 8.0 12.0 8.0 5.0 39.0
621 Scraper 8.0 8.0
621 Scraper 0.0

SAMP
621 Scraper 0.0
627 Scraper 12.0 12.0 12.0 12.0 8.0 5.0 61.0
400 Rock Truck 12.0 12.0 12.0 12.0 12.0 5.0 65.0
400 Rock Truck 6.0 6.0 12.0 12.0 5.0 5.0 46.0
400 Rock Truck 6.0 5.0 5.0 16.0
D7 Dozer 8.0 8.0
D6 Dozer 12.0 12.0 12.0 12.0 7.0 5.0 60.0
D5 Dozer 6.0 12.0 12.0 5.0 35.0
330 Hoe 12.0 12.0 12.0 12.0 12.0 2.0 62.0
270 Hoe 12.0 12.0 12.0 12.0 12.0 3.0 63.0
140H Grader 12.0 10.0 8.0 8.0 4.0 42.0
14G Grader 12.0 12.0 12.0 12.0 12.0 5.0 65.0
815 Packer 12.0 12.0 12.0 12.0 12.0 5.0 65.0
Protec Packer 12.0 6.0 6.0 12.0 36.0
JD and sheepsfoot packer 12.0 12.0 12.0 12.0 12.0 5.0 65.0
Water Truck 0.0
REMARKS ON CONRACTOR'S PROGRESS, SITE OCCUPANCY, LANE CLOSURE AND WEATHER TO BE
RECORDED ON FORM A.07 (SITE OCCUPANCY AND LANE RENTAL WEEKLY REPORT BRIDGES AND CONSTRUCTION)

CONTRACTOR COMMENTS:

Consultant: Date:

Revised December 2013


Other Work Project Hwy XX:XX Region NAME Dist. NAME
Contract # CON00XXXXX WAC / Job No. WAC00XXXXX

From Hwy XX:XX


DATE To Hwy XX:XX

C.S. km To C.S. km
Total Length km

GRADING, GRAVEL SURFACING, BASE COURSE, SURFACING & SEAL COAT


TOTAL PROJECT TOTAL QUANTITIES PLACED %COMPLETED
TASK Km UNIT
Total
Initial Current This Fiscal One Week
This Week Project to To Date
Estimate Estimate Year Ago
Date

MPLE
Roadway
Common Excavation m3 233,100 233,100 5,000 18,000 35,000 12.9% 15.0%
Borrow Excavation m3 90,300 90,300 5,000 7,000 16,000 12.2% 17.7%

Culverts
600mm m 796 796 24 344 344 40.2% 43.2%
800 m 443 500 24 144 242 43.6% 48.4%
1200 m 49 98 0 98 98 100.0% 100.0%

BFXXXXX LS 1 1 0 1 1 100.0% 100.0%

BFXXXXX LS 1 1 0 1 1 100.0% 100.0%


STARTING DATE: Estimated: DATE Actual: DATE Shut Down for Season
COMPLETION DATE: Estimated: DATE Actual: DATE Date: DATE

Contractor Representative: Date:

AppendixA.06