Apqp Workflow - EXAMPLE

The document outlines the APQP (Advanced Product Quality Planning) process flow chart with 10 phases from product planning through production. It shows the key milestones and reviews at each month (M-4 through M+8) including establishing design targets and quality plans, developing and verifying prototypes, building control charts and reflecting on any prior issues to establish robust production processes. The chart provides a high-level overview of the APQP process from concept through manufacturing launch.

Uploaded by

Miguel Neto
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
632 views

Apqp Workflow - EXAMPLE

The document outlines the APQP (Advanced Product Quality Planning) process flow chart with 10 phases from product planning through production. It shows the key milestones and reviews at each month (M-4 through M+8) including establishing design targets and quality plans, developing and verifying prototypes, building control charts and reflecting on any prior issues to establish robust production processes. The chart provides a high-level overview of the APQP process from concept through manufacturing launch.

Uploaded by

Miguel Neto
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

APQP FLOW CHART Ex : PSO 10 Phase

Phase Date APQP Phase[HMC] Design Development Quality Production Tec. Test Production Purchase Supplier Conference
01
M-4
Review development feasibility
Evaluating/adjusting (Establishing PQ document)
M-2 part quality Risk
Product planning

grade & Selection of


02 02
Supplier
Consist of PT & Receive request
M-1 Participating G/ENG development
M0 03 03 03
Establish Develope/select Establish process
design target VDR in initial flow chart

Establishing APQP 04
M+1
04 04-1
Confirm the Establish APQP
Establish APQP
Establishment of APQP

Reflecting the
M+2 problems 05
Coming out drawing review

(previous
model,DFMEA, DR, Reflect
competition problems &
M+3 model,IQS,etc) Establish 06 Presentation for
DFMEA 05-1
Build & Verify quality target to
supplier
M+4 proto
Confirm the Reflection
06 of problems
M+5 Control chart for 07
proto/Building Establish proto CP, Establish
the Build & Verify proto PFMEA Preliminary working-
M+6 proto/Verifing (interior part : development,
06-1 level evaluation conference
of proto
proto SEAT : design) Confirm the verification
of proto
M+7 Conference of
09 Quality check
in proto
Establish process
07-1 07
M+8 control plan
Confirm the PFMEA Establish
PFMEA
PFMEA 08
08 08 08
Establish the
M+9 detailed preperation Establish the
Preperation activity manufacturing process

Establish the train'g


plan of 4M Review layout security plan of test plan of operation
capability
M+10
09-1 09

Process Confirm the process Establish process


Pilot Car

M+11 control plan control plan control plan

M+12
10-1 10
Confirm the
Capability for 신뢰성시험
Establish plan of 12
M+13 Capability for 계획 수립
durability test Build the
durability test durability test checker
/mold/jig/tool'g
M+14
11
14
Conduct process audit
Request the
for supplier approval of ISIR
M+15 Buildin Inspe
g
ction
checker 12-1
/tooling agree
14 15

/mold ment 12
Approv
Conclude 12 13
Evaluate the 19
Confirm the inspectio
Build the checker build of al of
n Build the tool'g/jig skills & Establish
M+16 /mold
checker/mol
d/jig/tool'g
ISIR
agreemen /Confirm the layout equipment control Build
for part
t standard the part of P1

19 16-1 17
Analysis & Confirm 18
MSA Evaluate process
the measurement capability
Develop the
system vessel of subpart

Build'g 18-1 18 20 18
& Packag'g/
M+17 Inspect Build Confirm the Develop the Approve the
P1 part Pallet the part of P1 packag'g/pallet packag'g/pallet vessel of subpart

19-1 21

Inspect subpart limit


part limit the input part of P1 durability test Conference of
Quality check
durability Build in P1
test 20-1
the part of P2
Confirm the results of
M+18
environment test &
P1 Evaluate system test
21 22

22-1

M+19 Build' Build


g& Confir
Process the Proces
Inspec m
t P2 audit part of s audit
process
part P2
21-1 audit
Inspect the input
M+20 part of P1 Conference of
Quality check
23 in P2
Confirm regulation
certification
P2 M+21 24
Confirm EMBO
& COLOR

M1 M+22
25

26 26-1 Approve
Inspect the ISIR
M+23 input part of Conference of
PP Quality check
FPSC FPSC in PP

M2 M+24

26 27 28
Production

100% Inspection Reducing activity 100% Inspection of


improve Conference of
Mass

initial(1month) mass
M+25 of initial(1month) for Process Quality check
quality spread
productions (take over mass process
mass productions product quality team) in MP