SCHP53RD01 PDF
SCHP53RD01 PDF
LEGEND
NEW 42Ø DOM BCWS EXTENDS FROM EXISTING
IV
IV - ISOLATING VALVE
NRV TP - TEST POINT
NRV - NON RETURN VALVE
LSV - LOCK SHIELD VALVE
FC - FLEXIBLE CONNECTION
67Ø IND BCWS 67Ø IND BCWS CS - COMMISSIONING SET
STR - STRAINER
DC - DRAIN COCK
IV IV AAV - AUTOMATIC AIR VENT
IV DRV - DOUBLE REGULATING VALVE
NRV IV NRV
NRV SV - SAFETY VALVE
NEW BCWS TO BULK HARVESTED NRV BULK DOMESTIC COLD
M M M 08-MCW-MET-01 NC - NORMALLY CLOSED
SERVE NEW CHW RAINWATER 08-DCW-MET-02 WATER STORAGE TANK
BULK HARVESTED
IV RAINWATER STORAGE M 08-MCW-MET-03 EXISTING INDUSTRIAL COLD WATER (3m x 3m x 1.5m) NO - NORMALLY OPEN
SYSTEM STORAGE TANK IV PRV IV
IV IV
PS - PRESSURE SWITCH
67Ø IND BCWS
CV CV WLS
AV CV AV AV CV
M PRV M IV IV
WLS WLS
AV WLS WLS IV IV IV IV IV IV IV
CV AV AV CV
AV H/L H/L BULK INDUSTRIAL
WLS WLS P PRESSURE GAUGE
DIVISION
M M
54Ø BCWS
COLD WATER H/L H/L
DIVISION
W/P W/P STORAGE TANK
T TEMPERATURE GAUGE
IV IV IV T T
(3m x 2m x 1.5m) W/P W/P
HLP P LLP T T VALVE
H/L OFF 25% H/L OFF 25% HLP P LLP L/L L/L P
P P P
P P
DC
L/L ON 10% L/L ON 10% IV DC
L/L L/L COMMISSIONING SET
DC
DC
IV DC
O/F O/F
P
IV DC DC IV
P
FC FC IV IV IV
O/F O/F CONTROL VALVE
DC
DC
IV IV IV
IV
IV
IV SCV SCV SCV IV DC DC IV
SCV SCV SCV
STAND-BY
PT PT PT
08-HRW-ST-02 PT PT PT
ASIST
DUTY
ASSIST
ASSIST
DUTY
IV 08-DCW-BS-01 M PUMP
08-HRW-ST-01 IV 08-ICW-ST-01 PT PT PT
PT PT PT IV IV IV
IV IV IV DC
08-DCW-ST-01
P
P PHASE 3 BCWS/HCW SERVICE
DC
FC FC
IV PHASE 3 HWS SERVICE
IV IV IV IV IV IV
IV 08-HWR-MET-02
M 08-ICW-BS-01 EXISTING SERVICE
IV IV IV IV IV IV M 08-HWR-MET-01 IV IV IV IV
IV IV IV
HRW - HARVESTED RAIN WATER
08-CHW-PU-01 RISER R35/36 HCW - HARVESTED COLD WATER
LEVEL 08 RISER R24 RISER R30 LEVEL 08 ICW - INDUSTRIAL WATER
IBCWS - INDUSTRIAL BOOSTED COLD WATER SUPPLY
RISER R37 BCWS - BOOSTED COLD WATER SUPPLY
67Ø IBCWS
IND BCWS
54Ø BCWS
HWS-F - HOT WATER SERVICE - FLOW
HCW
BETWEEN 22Ø IND BCWS
RISER G
RISER H
RISERS E & C RISER K RISER N RISER P RISER T HWS-R - HOT WATER SERVICE - RETURN
CS IV
15Ø IND HWS-R IND HWS-F - INDUSTRIAL HOT WATER SERVICE - FLOW
PRV IV
RISER V RISER Y IV CS
28Ø IND HWS-F 15Ø DOM HWS-R 15Ø DOM HWS-R IND HWS-R - INDUSTRIAL HOT WATER SERVICE - RETURN
CS IV 22Ø DOM HWS-F
IV PRV
22Ø DOM HWS-F
FOR CONTINUATION
15Ø DOM HWS-R
FOR CONTINUATION PRV IV IV PRV REFER TO DRAWING No.
IV PRV
28Ø DOM HWS-F 22Ø BCWS 22Ø BCWS
35Ø IND BCWS REFER TO DRAWING No. PRV IV 15Ø HCW
IV PRV
15Ø HCW MENG-SCH-P53-RD02 IV CS
IV PRV
FOR CONTINUATION 28Ø BCWS FOR CONTINUATION
IV CS MENG-SCH-P53-RD02 22Ø HCW
PRV IV IV PRV
REFER TO DRAWING No.
67Ø IBCWS
42Ø BCWS
IV PRV
15Ø HWS-R
22Ø HWS-F
IV PRV
IV PRV
28Ø DOM BCWS
MENGE-SCH-M-50-14 FOR CONTINUATION MENGE-SCH-M-50-14
IV CS REFER TO DRAWING No.
LEVEL 07 MENG-SCH-P53-RD02 LEVEL 07
IV CS
28Ø IND BCWS FOR CONTINUATION
CS IV IV PRV
FOR CONTINUATION 15Ø DOM HWS-R 15Ø IND HWS R IV CS
IV PRV FOR CONTINUATION 28Ø DOM HWS-F
PRV IV
28Ø IND HWS F L to R: IV PRV
15Ø DOM HWS-R FOR CONTINUATION IV PRV REFER TO DRAWING No.
15Ø DOM BCWS
REFER TO DRAWING No. REFER TO DRAWING No.
15Ø DOM HWS-R
28Ø DOM HWS-F
PRV IV
IV PRV
28Ø BCWS
MENGE-SCH-M-50-14 28Ø HWS-F 22Ø BCWS
22Ø HWS-R
35Ø HWS-F
IV CS 22Ø IND HWS F 15Ø HCW L to R: IV PRV IV
PRV IV
LEVEL 05 15Ø IND HWS R
PRV IV
IND HWS-F 22Ø LEVEL 05
CS IV
15Ø DOM HWS-R IND HWS-R 22Ø IV
PRV IV L to R: 22Ø BCWS
FOR CONTINUATION 22Ø DOM HWS-F IV PRV FOR CONTINUATION IV PRV PRV IV
28Ø DOM HWS-R
42Ø DOM HWS-F
CS
28Ø IND HWS-R
22Ø BCWS IV
42Ø IND HWS-F
22Ø HWS-R
LEVEL 04 LEVEL 04
35Ø HWS-F
22Ø HWS F
PRV
PRV IV RISER R47/R47A RISER R48
22Ø DOM HWS-F
22Ø BCWS IV IV
IV IV IV IV PRV IV
CS 22Ø HCW
28Ø
15Ø
54Ø BCWS
42Ø IND HWS-F
54Ø IND BCWS
CS IV
15Ø DOM HWS-R 22Ø BCWS 22Ø BCWS
FOR CONTINUATION 22Ø DOM HWS-F
PRV IV IV PRV FOR CONTINUATION
22Ø HCW
REFER TO DRAWING No. PRV IV IV CS REFER TO DRAWING No.
IV PRV 22Ø BCWS 15Ø HWS R 15Ø DOM HWS-R
35Ø DOM BCWS MENG-SCH-P53-RD02 PRV IV IV PRV MENG-SCH-P53-RD02
IV PRV 22Ø HCW 15Ø HWS F 22Ø DOM HWS-F
35Ø DOM HWS F
IV CS 22Ø DOM HWS R FOR CONTINUATION
IV PRV 35Ø IND BCWS REFER TO DRAWING No. 22Ø IND HWS F
IV PRV 35Ø IND HWS F MENGE-SCH-M-50-114 RISER R24 RISER R30 RISER R53
22Ø IND HWS-R
35Ø IND HWS-F
LEVEL 02 LEVEL 02
42Ø 54Ø 67Ø
15Ø DOM HWS R
28Ø DOM HWS F
35Ø DOM BCWS
IV PRV MENGE-SCH-M-50-14 HL HL HL HL
PRV IV 28Ø IND. BCWS SWP
IV PRV SOF SOF SOF SOF
CS IV 15Ø IND. HWS-R SWP
IV CS FOR CONTINUATION PRV IV 28Ø IND. HWS-F IV PRV
IV PRV REFER TO DRAWING No. IV 28Ø SOFTENED BCWS IV
IV PRV
IV CS
MENGE-SCH-M-50-114 PRV IV 28Ø BCWS
CS IV IV PRV LL LL LL LL
15Ø HWS-R
PRV DC IV IV DC DC IV IV DC IV IV
IV 28Ø HWS-F IV PRV
IV IV
NRV NRV 108Ø BOOSTED DOMESTIC COLD WATER SERVICE
IV
P
IV PRV INDUSTRIAL COLD IV IV STR IV 108Ø BCWS IV IV P
COLD WATER
WATER BREAK NRV ALL SERVICES RUN
IND HWS-F&R AND DOMESTIC BCWS SV
BREAK TANKS AND
TANKS AND WITHIN SERVICE TRENCH
AND HWS-F&R TO EXTEND FROM IV BOOSTER SET PACKAGED BOOSTER PUMP SET
BOOSTER SET
EXISTING PIPEWORK TO IV DUTY/STANDBY IV IV IV IV IV
NEW BCWS / IND BCWS SERVICES EXTEND FROM COMPOSITES LAB. CS
EXISTING TO SERVE 1 No. WHB AND 1 No. SINK IV IV
IV NRV NRV
P
IV STR IV 54Ø BCWS IV IV P
LEVEL 01 NRV
LEVEL 01 RD AS INSTALLED 11/05/2017
RISER R13/R13A PRV IV
DRV 35Ø IND HWS-R 42Ø IND HWS-R Revision Description Date
PRV IV 54Ø IND HWS-F 67Ø IND HWS-F
PRV IV IV
TO
DRV IV
PLANTROOM
PRV IV
DRV
IV IV IV
PRV PRV PRV DRV
IV
IV
NEW BCWS TO
IV IV SERVE NEW HTG
CS SYSTEM
IV
IV
PRESSURISATION
UNITS
Project
RISER R37 AMP - PHASE 3 MENG1101C
Title
MECHANICAL AND ENGINEERING BUILDING
DOMESTIC WATER SERVICES SCHEMATIC
LEVEL 00 LEVEL 00
SHEET 1 OF 2
AH TDJ SCHP53RD01
Drawing Number Revision Scale
NTS@A0
MENGSCH/P53/RD01 RD Date
14.06.2016