0% found this document useful (0 votes)
234 views

Buildings& Civil Works

Public Works department is entrusted with construction of buildings and their maintenance and several related activities of various Government Departments like School Education, Health and Family Welfare, HOME (Courts / Transport / Prisons / Fire and Rescue), Revenue, Agriculture, Animal Husbandry, Dairying and Fisheries, Tourism and Culture, Employment and Training and Social Welfare and Nutritious Meal Programme etc.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
234 views

Buildings& Civil Works

Public Works department is entrusted with construction of buildings and their maintenance and several related activities of various Government Departments like School Education, Health and Family Welfare, HOME (Courts / Transport / Prisons / Fire and Rescue), Revenue, Agriculture, Animal Husbandry, Dairying and Fisheries, Tourism and Culture, Employment and Training and Social Welfare and Nutritious Meal Programme etc.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 31

Public Works Department

Buildings
Demand No. 39
Policy Note – 2009-2010

PREAMBLE

bghJ¥gâ¤Jiw gHikÍ«, bgUikÍ« bg‰w


JiwahF«.
150 M©L fhy Ú©l j‹ tuyh‰¿š,
Ϫj Jiw,
f£oa miz¡f£L¡fŸ,
bt£oa fhšthŒfŸ,
ghrd¥gFÂah¡»a ãy§fŸ,
vênyhL vG¥Ãa f£ol§fŸ
jäœehL, MªÂuh M»a khãy§fëš Ï‹W« rh‹W
T¿ ㉻wJ.
kiH bghêªjhY«, bghŒ¤jhY«, bghJ¥gâ M‰Wtš
Kjèš ã‰»‹w Jiw Ϫj¥ bghJ¥gâ¤JiwahF«.
jh‹ M‰¿a¥ gâfS¡bfšyh« Áfu« it¥gJnghš,
Ï¥bghGJ,
jäœehL r£lk‹w«,
jiyik¢ brayf«,
eÅd khãy üyf«
M»aitfS¡fhd f£ol§fŸ f£L»‹w kf¤jhd
bghW¥igÍ« Ϫj bghJ¥gâ¤Jiw V‰W ÏU¡»wJ.

2010-2011 M« M©L jäœehL muÁ‹ ã ãiy


m¿¡ifia òÂa r£lk‹w f£ol¤Âš go¡»‹w
ãiyia Ϫj Jiw cUth¡» jU« v‹w k»œ¢Áfukhd
brŒÂia Ï«khk‹w cW¥Ãd®fS¡F ϤJiw
bjçé¤J¡ bfhŸ»wJ.
2

1.0. GENERAL
“ca®tfyª ©ik mUikæª eh‹»‹
miktu© v‹Wiu¡F« üš”
“Science declares that a Building Fort must possess
Prescribed Height Breadth, Strength and Greatness”

The Public Works Department while constructing


Government buildings prepares Plans based on the
requirements of the user, design them for strength
and safety and construct the structure to withstand
natural calamities. In this respect, we keep in mind
the guiding principle stated in Thirukkural.
The Public Works Department hitherto incharge
of “Water Resources” and “Buildings” has since been
reorganised into two independent departments viz.
“Water Resources Department” and “Public Works
Department” in the interests of functional
specialisation and administrative convenience. This
has come into effect from 12.02.2008.

The Public Works Department is entrusted with


construction of buildings and their maintenance and
several related activities of various Government
Departments like School Education, Health & Family
Welfare, Home (Courts / Transport / Prisons / Fire &
Rescue), Revenue, Agriculture, Animal Husbandry,
Dairying and Fisheries, Tourism & Culture,
Employment & Training and Social Welfare &
Nutritious Meal Programme etc., This is besides the
construction and maintenance of its own department
3

buildings. One of the most important tasks of this

department is to understand the building


requirements of various departments and provide
them in the best possible architecture, designs,
functional convenience, etc., and also to evolve type
designs so as to have standardization in the
buildings.
PUBLIC
SCHOOL WORKS
SOCIAL EDUCATION
WELFARE &
NMP
HEALTH &
F.W.
EMPLOYMENT
& TRAINING
HOME
(COURTS)
BUILDING
HOME ACTIVITIES
(TRANSPORT)
REVENUE

TOURISM& HOME
CULTURE (FIRE &
RESCUE)
A.H.D.&
FISHERIES AGRI-
CULTURE

1.1. ORGANISATION NETWORK


To carryout the building activities for various
departments and at different locations in the State as
well the Public Works Department has a wide network
of establishments as indicated below:

One Chief Engineer as Head of the Department in


Chennai supported by speciality units like
4

‘Architecture’ headed by Chief Architect and


‘Designs’ headed by Superintending Engineer.
Eleven Circles and 41 Divisions headed by
Superintending Engineers and Executive
Engineers respectively.
Three Circles at Chennai, Salem and Madurai and
7 Divisions under the control of Superintending
Engineers and Executive Engineers respectively
to execute electrical works.
One Special Division headed by Executive
Engineer in Chennai for collection and
dissemination of updated technology and
information of latest building materials.
A Building Research Station headed by Executive
Engineer in Chennai for training the Engineers in
advanced technologies and innovations and for
carrying out research activities.

2.0. MAJOR ACTIVITIES


The Public Works Department performs the following
major activities and functions:
Planning, designing, construction and
maintenance of Government Buildings which
constitute the capital assets of the State.
Construction and maintenance of Monuments and
Memorials under purview of the Government.
Execution of Local Area Development Scheme
works sanctioned under MLAs’ and MPs’ Funds
as deposit works.
5

Execution of any calamity reconstruction works


like Emergency Tsunami Reconstruction Project
building works.
Renovation and restoration of Heritage buildings
Construction of buildings for Central Government
undertakings, State Universities, etc., as deposit
works.
Carrying out Research and Development in
construction materials and practices.
Valuation of buildings on the request of Vigilance
and Anti-corruption Department and Judiciary.
Assessing the structural stability of public
buildings and issuance of rent reasonableness
certificate for private buildings used by
Government departments.
Arrangements relating to the visits and
Government functions of VIPs and VVIPs etc.

3.0. PROPOSED OUTLAY 2009-2010


During the year 2009-2010, it is proposed to carryout
works to the tune of Rs. 968.32 Crore under Demand
No. 39 as below:
(Rs. in Crore)
(i) Capital Account
(Plan & Non Plan Schemes) .. 738.50
(ii) Revenue Account
(Maintenance and Establishment). .. 229.82
------------
Total .. 968.32
------------
6

In addition to this, the works pertaining to other


departments under remittance head, maintenance of
buildings pertaining to P.W.D. and other departments
are undertaken.

SECTOR - WISE OUTLAY

2009-2010

DEMAND NO.39

CAPITAL ACCOUNT

(Rs. in Crores)
Sl. B.E.
Name of Department Percentage
No 2009-2010
1 Public works 213.48 28.91%

2 Health 309.34 41.89%

3 Home 112.94 15.29%

4 Revenue 71.92 9.74%

6 Education 5.74 0.78%

5 Heritage Conservation 2.28 0.30%

7 Other works 22.80 3.09%

TOTAL 738.50 100.00%


7

SECTOR – WISE OUTLAY 2009 – 2010

CAPITAL ACCOUNT – DEMAND NO. 39

3.09%
0.30%
0.78%
9.74% Public works
28.91%
Health
Home
15.29%
Revenue
Education
Heritage Conservation
Other works

41.89%
8

4.0. DEPARTMENT-WISE SCHEMES


(2009-2010)
4.1. PUBLIC WORKS DEPARTMENT
4.1.1. CONSTRUCTION OF TAMIL NADU NEW
LEGISLATIVE ASSEMBLY COMPLEX
Pursuant to the announcement made by the Hon’ble
Chief Minister during the Golden Jubilee
Celebrations of “Kalaignar in Legislative
Assembly” on 12.05.2007, this Government
initiated action to construct the New Legislative
Assembly Complex in Omandurar Government
Estate, Chennai. The complex is in two components
as Block A, with a plinth area of 9,30,297 Sq.ft and
Block B with a plinth area of about 7,43,900 Sq.ft.
The Block A will house the Legislative Assembly,
Legislative Assembly Secretariat, the offices of His
Excellency the Governor, Hon’ble Chief Minister,
Hon’ble Ministers, Chief Secretary and certain core
departments. The Government has already
accorded Administrative Sanction for
Rs. 425.57 Crore for Block A and the work has also
begun. This is expected to be completed by
May 2010. The Block B will accommodate the
other 30 Secretariat departments for which
Administrative Sanction for Rs. 279.564 Crore has
been accorded. With the relocation of the entire
Secretariat along with Legislative Assembly, the new
complex is expected to provide better facilities to all
including the visiting public.
9

4.1.2. Pursuant to the 150th year celebration of Public


Works Department, Administrative Sanction has
been accorded for Rs. 67.50 lakhs for the
construction of Museum and Library Buildings at
Public Works Department campus in Chennai -
Tenders to be called for.
4.1.3. Administrative Sanction has been accorded for
Rs. 15.00 Crores for the construction of 126 Nos. of
quarters for Government staff at Thodhunter Nagar,
Saidapet, Chennai - Tenders for this work is under
scrutiny.

4.2. HEALTH & FAMILY WELFARE


DEPARTMENT
4.2.1. Medical College Works
Medical College Works, which were sanctioned
towards the end of 2008 -2009 are in the preliminary
stages such as obtaining Revised Administrative
Sanction and Technical Sanction, calling for tenders,
finalizing the agencies etc. These are:
Amount
Sl.
Works (Rs.in Status
No.
Crore)
1 New Medical College at 10.00 Tenders to be
Sivagangai called for

2 New Medical College at 10.00 Revised


Perambalur Administrative
Sanction awaited
10

3 Expansion of 250.00 Rough cost


Government General estimate sent to
Hospital, Chennai Director of
Medical
Education

The status of works which were sanctioned during


2007-2008 is as below:
WORKS COMMENCED
Amount
Sl.
Works (Rs. in Status
No.
Crore)
1 New Medical College at 41.01 Work in progress.
Villupuram (Phase I) Target: June 2010
2 New Medical College at 42.77 Work in progress.
Thiruvarur (Phase I) Target: June 2010
3 New Medical College at 47.58 Work in progress.
Dharmapuri. Target: April 2010
4 Expansion of Government 22.06 Finishing work is in
Rajaji Hospital at progress
Madurai. Target: Nov 2009
5 Additional building for 9.88 Work in progress.
Royapettah Government Target : Aug 2010
Hospital, Chennai
6 Additional buildings for 13.83 Work commenced.
the Institute of Child
Health and Hospital for
Women and Children,
Chennai
7 Additional building to 13.66 Agency settled, work
Government Dental commenced
College, Chennai
11

8 Hostel building at Kilpauk, 3.00 Work commenced


Chennai
9 Hostel for Nursing school 1.00 Work commenced
at Ooty

WORKS TO BE TAKEN UP
Amount
Sl.
Works (Rs. in Status
No.
Crore)
1 New Medical College at 58.70 Tender under
Villupuram (Phase II) scrutiny
2 New Medical College at 50.09 Tender under
Thiruvarur (Phase II) scrutiny
3 a. Additional building to 16.50 Tender under
Chengalpattu Medical scrutiny
College
b. Additional building to 5.00 Administrative
Tirunelveli Medical Sanction awaited
College
4 Hostel building at
following Medical
Colleges
a)Trichy 3.00 Work to be
commenced
b)Madurai 2.60 Tender under
scrutiny
c)Chengalpattu 2.60 Re-tender under
scrutiny
d)Tirunelveli 2.60 Administrative
Sanction awaited
12

e)Stanley at Chennai 2.30 Administrative


Sanction awaited
f)Dental College at 2.40 Administrative
Chennai Sanction awaited
5 Hostels for Nursing
Schools at following
places:-
a) Coimbatore 1.00 Re-tender called
for
b) Ramanathapuram 1.00 Administrative
Sanction awaited

4.2.2. Tamilnadu Health System Project (Phase – I)


Construction of 35 Hospital Buildings at a cost of
Rs.45.62 Crore in 5 Districts. 31 Hospital Buildings
completed and handed over, 4 nearing completion.

4.2.3. Tamilnadu Health System Project (Phase – II)


Tamilnadu Health System Project works in
191 Hospitals at a cost of Rs. 196.97 Crore,
47 works completed, 144 works in progress.

4.3. HOME DEPARTMENT


4.3.1. Judicial Department
Amount
Sl.
Work (Rs.in Status
No.
Crore)
1 Construction of 2.82 Completed
Combined Court
Building at Tambaram
13

2 Construction of 8.75 Completed


Combined Court
Building at Perambalur
3 Construction of 2.27 Completed
Combined Court
Building at Kodaikanal
4 Construction of Judicial 2.25 Completed
Magistrate Court at
Vedasandur in Dindigul
District
5 Construction of 3.97 Work is in progress.
Combined Court Target: January 2010
Building at Arani
6 Construction of 4.40 Work is in progress.
Combined Court Target: Dec 2009
Building at Gudiyatham
7 Construction of 3.83 Tender under scrutiny
Combined Court
Building at
Aruppukottai
8 Construction of 7.98 Tender under scrutiny
Combined Court
Building at Sivagangai
9 Construction of 10.02 Work commenced
Combined Court
Building at Cuddalore
10 Construction of 5.42 Price tender under
Combined Court scrutiny
Building at Erode
11 Construction of 2.40 Price tender under
Combined Court scrutiny
Building at Paramakudi
12 Construction of 10.00 Foundation work in
Combined Court progress
Building at Karur
14

13 Construction of 3.53 Price tender under


Combined Court scrutiny
Building at Aranthangi
14 Construction of 4.02 Work commenced
Combined Court
Building at
Poonamallee
15 Construction of 4.73 Tender under scrutiny
Combined Court
Building at Alandur
16 Construction of 9.97 Tender under scrutiny
Combined Court
Building at
Kumbakonam
17 Construction of 10.56 Work is in progress.
Combined Court Target: Nov 2010
Building at Namakkal
18 Construction of 8.88 Work to be started
Combined Court
Building at Thoothukudi

4.3.2. Prison Department - Modernisation of Prisons


Scheme
2004-2005:
Conversion of Sub jail to District jail at Attur,
Gobichettipalayam and Nagapattinam.
Repairs and Renovation of Prison building at
Palayamkottai and Trichy - Rs.5.52 Crore. Total
5 works. 2 works completed, 3 in progress.
15

2005-2006:
Conversion of Sub jail to District jail at
Virudhunagar and women's new Jail building in
Trichy (balance works), Repairs and Renovation,
Sanitation and water supply to Central Prisons at
Coimbatore, Salem, Palayamkottai, Cuddalore,
Trichy, Pudukkottai, Vellore - Rs.11.23 Crore.
Total 70 works, 66 completed, 4 in progress.
2006-2007:
Repairs, Renovation, Sanitation and water supply
to Prisons - Rs.3.553 Crore. Total 56 works,
53 completed, 3 in progress.

4.3.3. Fire & Rescue Department


2008-2009:
Fire Station buildings at 5 places such as
Sankarapuram, Thirukalukundram, Koothanallur,
Kudavasal and Ulundurpet at a cost of
Rs. 1.9663 Crore are to be commenced.

Fire Station buildings at 8 places such as


Thandarampattu, Omalur, Arani, Kuttalam,
Cumbum, Thiruthuraipoondi, Thuckalai and
Ottanchatram have been sanctioned for
Rs.2.00 Crore. Out of 8 works, 6 completed,
2 in progress.
16

4.3.4. Transport Department


2007-2008:
Testing Track to Regional Transport Office at
Nagapattinam & Tiruvarur for Rs.0.27 Crore.
completed. Testing track at Erode is in progress.
2008-2009:
Regional Transport office works at Cuddalore,
Nagapattinam, Krishnagiri, Sankari and Tenkasi at
a cost of Rs.7.135 Crore - Tender under scrutiny.
Unit office work at Sathyamangalam,
Chidambaram and Mayiladuthurai at a cost of
Rs. 1.865 Crore. Sathyamangalam – Work
commenced, Chidambaram – Site to be handed
over, Mayiladuthurai – Site to be handed over.
Testing track works at Krishnagiri, Sankari are to
be commenced and Testing track work at
Chidambaram, the site is to be handed over.

4.4. REVENUE DEPARTMENT


2007 – 2008:
Construction of Taluk Office at 11 places for
Rs.15.57 Crore, 5 works in Illupur, Gangavalli,
Thottiyam, Veerakeralampudur and Kulithalai
have been completed, 3 works in Paramakudi,
Kalkulam and Pandhalur are in progress, 2 works
in Kundha and Kariapatti are in tender stage and
for 1 work in Vazhapadi to be handed over.
17

Construction of new Collectorate building at


Salem sanctioned during 2007-08 for
Rs.25 Crore - Foundation work is in progress.
Construction of Quarters for District Revenue
Officer at 3 places, Rs.1.05 Crore, Krishnagiri –
Work completed, Nagapattinam – Foundation
work is in progress, Udhagamandalam – Tender
under scrutiny.
Construction of Quarters for Revenue Divisional
Officer at seven places, Rs.1.19 Crore - Dindigul,
Palani, Lalgudi, Tiruchendur – works completed,
Athur & Ramanathapuram – Roof laid,
Maduranthagam – Work to be commenced.

The following works are sanctioned during


2008 – 09:
Amount Status
Sl.
Work (Rs.in
No.
Crore)
1 Additional building to the 2.39 Work is in progress
Collectorate for
Dharmapuri

2 Collectorate for Ariyalur 12.88 Tender under scrutiny


District

3 New Collectorate 12.01 Tender under scrutiny


building at Trichy
18

4 Tahsildar Quarters–29 4.5119 Completed 1


Nos Finishing Work in
progress 8
Roof Level 2
Lintel Level 3
Foundation & 5
Basement Level
Tender Stage 5
Site yet to be 5
handed over
5 R.I. Quarters – 16 Nos 1.3115 Completed 1
Finishing Work in 1
progress
Roof Level 3
Lintel Level 2
Foundation & 6
Basement Level
Site yet to be 3
handed over
6 Taluk office building at 19.2116 Tender under 10
12 places scrutiny
Basement level 1
Usilampatti (Plan to 1
be approved by
CRA)
7 Revenue Divisional 2.16 Work in progress 2
Officer’s Office - 4 Nos Work to be 1
commenced
Tender Stage 1
19

4.5. SCHOOL EDUCATION DEPARTMENT


4.5.1. Construction of Modern State Library at
Chennai
The Government have accorded sanction for
Rs. 165.76 Crores for the Construction of
8 storied Asia’s 2nd Biggest Modern State Library at
Kotturpuram, Chennai. The Modern Library consists
of Library, Auditorium, Food Court and Sub-Station
with total Plinth Area of 34502 M2
i.e. 371379 sq.ft fully air-conditioned. Two floor roof
slab laid out of 8 floors in Library building and
Basement works completed in Auditorium Buildings.
Ground and 1st Floors completed in Food Court
Building. It is proposed to complete all the works by
May 2010.

4.5.2. NABARD Project


Phase – III to V: Infrastructural improvements like
construction of additional classrooms, laboratory,
toilet and drinking water facilities are being done to
Government High Schools and Government Higher
Secondary Schools in Tamilnadu through NABARD
assistance at a total cost of Rs. 315.98 Crore in
799 schools have been completed.
Phase – VI : 234 Schools – Rs.161.32 Crore –
218 Schools - Work completed, 7 Schools – Work in
progress, 7 Schools – Tender under scrutiny,
2 Schools – Work dropped.
20

Phase-VII: 16 Districts – Rs.131.69 Crore, Total


195 Schools, 103 - Completed and handed over,
34 - completed, 41 - Work in progress,
1 - Dropped, 16 – Tender under scrutiny.
Phase VIII: 8 Districts – Rs.63.36 Crore, Total
59 schools. Tender stage - 58 schools, 1 School –
Work commenced.
Phase IX: 22 Districts – Rs.410.743 Crore, Total
362 schools. 352 schools - Tender stage. 10 schools
– Work in progress.

4.5.3. Other Education Works


Men’s Hostel in Government Law College at Trichy –
Work dropped and Tirunelveli – Ground floor Roof
level– Rs.1.68 Crore.
State Institute of Educational Management and
Training (SIEMAT) at D.P.I.Campus, Chennai
Rs.2.50 Crore – Ground floor Roof level.
Construction of Chief Educational Office at
Dharmapuri (Part II Scheme) – Rs.1.35 Crore –
Re-tender to be called for.

4.6. TAMIL DEVELOPMENT, RELIGIOUS


ENDOWMENT AND INFORMATION
DEPARTMENT
Construction of second floor over the existing
building at Tamil Valarchi Valagam – Rs.0.50 Crore.
Work is in progress – Water Supply and Sanitary
Works are in progress.
21

4.7. SOCIAL DEFENCE DEPARTMENT


Construction of Home for Children at Attur in
Kancheepuram District and in Villupuram.
Administrative Sanction is awaited.

4.8. MLA’S OFFICE BUILDINGS


MLA Office Buildings – Rs.11.35 Crore, Total
234 works. 229 completed and handed over,
5 places site not handed over.

4.9. BACKWARD CLASSES, MOST


BACKWARD CLASSES AND MINORITIES
WELFARE DEPARTMENT
2005-2006:
416 BC / MBC Hostel Building (Phase IV)
Rs.131.04 Crore. 322 - completed, 22 - finishing
stage, 6 - in progress, 2 - tender stage, 10 - site
not handed over and 54 - Revised Administrative
Sanction awaited.
2007-2008:
50 BC Hostel Building – Rs.32.15 Crore.
6-completed, 5-nearing completion, 21-progress.
3–site not handed over, 7– Revised Administrative
Sanction awaited, 8–Tender stage.
2008-2009:
25 BC / MBC / DNC Hostel buildings –
Rs.13.685 Crore – 2 -Works in progress,
19–Tender stage, 4–Site not handed over.
22

4.10. TOURISM & CULTURE DEPARTMENT


Construction of Bus Stand @ Mamallapuram –
Rs.4.88 Crore. Revised Administrative Sanction is
under process.
Construction of Guest House at “Ponni Campus”
(Music College, Chennai) – Rs.0.406 Crore -
Basement level.
Construction of centre of Art & Culture at
Kancheepuram, Madurai & Tirunelveli –
Rs.2.25 Crore - Administrative Sanction is under
process.

4.11. ANIMAL HUSBANDRY, DAIRYING AND


FISHERIES DEPARTMENT
Veterinary units at 371 places – Rs.38.94 Crore was
sanctioned through NABARD assistance
371 - completed and handed over.
Veterinary units at 5 places for Rs.3.05 Crore
sanctioned 4 works in progress, 1 – Revised
Administrative Sanction to be obtained.

4.12. IRRIGATED AGRICULTURE MODERNI-


SATION AND WATER BODIES
RESTORATION AND MANAGEMENT
PROJECT (IAMWARM)
Multistoried building for Multi Disciplinary Project
Unit (M.D.P.U) in Agricultural Engineering
Department Campus at Nandanam, Chennai –
Rs.15.00 Crore – Short listing of Consultant /
Architect to be done based on Expression of
Interest (EOI).
23

4.13. TAMIL NADU STATE MARKETING CORPO-


RATION(TASMAC) BUILDING WORKS
4.13.1. Godown and office building for TASMAC.
Perambalur for Rs.1.40625 Crore – Completed
Theni for Rs.1.25 Crore – Work completed and
handed over.
A.Sengampalayam for Rs.1.425 Crore - Tender
under scrutiny.

4.14. COMMERCIAL TAXES & REGISTRATION


DEPARTMENT
4.14.1. Commercial Taxes Department
2005-2006:
Office building at Greams Road at Chennai –
Rs.5.50 Crore - Structurally completed. Electrical
work is in progress.
2006-2007:
Office building at Hosur Taluk in Dharmapuri
District – Rs.1.54 Crore - Structurally completed
and finishing work is in progress.
2007-2008:
Construction of Conference Hall and Training
Centre at Madurai – Rs.0.40 Crore - Finishing
work is in progress.
24

4.14.2. Registration Department


2005-2006:
Sub Registrar Office at Arni, Kayalpattinam,
Cuddalore, Sathyamangalam, Verkizhambi,
Cheyyur, Rameswaram, Thirupporur, Thiruvallur
& Mettupalayam – Rs.1.50 Crore. Total 10 works,
Completed - 9, 1 is in progress.
2006-2007:
Sub Registrar Office at Mimisal, Mannargudi,
Ananthapuram, Vikkiravandi, Idaikkal,
Veerasigamani, Gangaikondan, Udayarpalayam,
Ottanchatram, Vandavasi, Ramakrishnarajupettai,
Chengalpattu, Kalasappakkam and K.V.Kuppam –
Rs.2.25 Crore. Total 14 works, All works
completed and handed over.

4.15. EMERGENCY TSUNAMI RECON-


STRUCTION PROJECT
Repair, Renovation, Upgradation and
Reconstruction of buildings belonging to PWD,
Revenue, Animal Husbandry, Health and Education
Department affected by Tsunami – Rs.40.018 Crore
- Total work 340, Completed -334, Work in progress
- 2, Revised Administrative Sanction proposal is
under scrutiny-2, To be taken up–1, Court case–1.

4.16. HERITAGE BUILDINGS


Approval of estimate for following works is awaited
from Building Committee of Hon’ble High Court,
Chennai.
25

2007-2008:
Improvement to Metropolitan Magistrate Court
Building at Rajaji Salai for Rs.0.50 Crore -
Pending with Registrar High Court.
Improvement to District Campus, Trichy for
Rs.0.65 Crore – Pending with Registrar, High
Court.
Facade lighting to High Court campus for
Rs.0.50 Crore – Pending with Registrar, High
Court.
Rehabilitation of Chepauk Palace for
Rs.3.50 Crore – Work is in progress.
2008-2009:
Providing High Tension Transformer in Museum
campus, Chennai – Revised Administrative
Sanction for Rs.0.66 Crore is under consideration.
2009-2010:
Renovation of Chennai Museum main building
(Civil & Electrical) for Rs.2.20 Crore - Estimate
under preparation.
4.17. ARCHAEOLOGY DEPARTMENT
2007-2008:
Reclamation of 13 temples and enamel protection
notice board at 22 places for Rs.1.87 Crore. Out
of 13 temples, 5 completed, 4 in progress and
4-tenders to be called for. Reclamation of
Thirumalai Naickar Mahal at Madurai for
Rs.3.00 Crore - Work nearing completion.
26

4.18. MAJOR BUILDINGS UNDER EXECUTION


AND TO BE TAKEN UP
A list of major buildings work in progress and to be
taken up by this year are listed at Annexure I & II
respectively.

5.0. PART - II SCHEMES


5.1. 2007-2008
Additional Circuit House at Thanjavur for
Rs.1.00 Crore - Work is nearing completion.

5.2. 2008-2009
Out of 10 works, 9 works have been completed.
Additional Circuit House with five suites in Master
Plan Complex at Thoothukudi for Rs. 60.00 Lakhs
– Finishing work is in progress.

5.3. 2009-2010
The Standing Finance Committee has approved
the following 10 schemes for the year 2009 –
2010, under Part-II Schemes and orders will be
issued shortly.
1. Inspection Bungalow with 2 rooms at Elagiri
Hills in Vellore district for Rs. 40.00 Lakhs.
2. Additional circuit house with 4 suites at
Vellore in Vellore District for Rs. 55.00 Lakhs.
27

3. Purchase of Computers with UPS, Scanner,


Printers, etc. for Sections in Office of the
Chief Engineer (Buildings) in Building
Organisation, PWD for Rs. 15.00 lakhs.
4. Procurement of 13 Photo Copiers (Xerox
Machines) for Circle Offices of Building
Organisation for Rs. 7.00 lakhs.
5. Inspection Bungalow with 2 suites at
Kadaladi in Ramanathapuram District for
Rs. 23.00 lakhs.
6. Purchase of Computers with UPS, Scanner,
Printers etc. for Sections in Office of the
Director of Boilers, Chennai for
Rs. 5.51 lakhs.
7. Additional circuit house with 4 suites for
V.V.I.P.'s at Tirunelveli in Tirunelveli District
for Rs. 55.00 lakhs.
8. Inspection Bungalow with 2 suites at
Nagercoil in Kanyakumari District for
Rs. 23.00 lakhs.
9. Construction of Inspection Bungalow with 2
suites at Palani in Dindigul District for
Rs. 23.00 lakhs.
10. Assistant Engineers’ Quarters – 2 Nos. in
PWD Complex at Mettupalayam in
Coimbatore District for Rs.19.49 lakhs.

DURAIMURUGAN
MINISTER FOR PUBLIC WORKS AND LAW
28

ANNEXURE – I
Major Building works in progress

Estimate Probable
S. Amount date of
Name of Work
No. Rs.in completion
Crore
1 New Tamil Nadu Legislative 425.57 May 2010
Assembly Complex at
Omandurar Government
Estate, Chennai. (Block – A)
2 Modern State Library at 165.764 May 2010
Kotturpuram, Chennai
3 NABARD School works- 131.69 March 2010
(Phase VII) 16 Districts total
195 Schools
4 New Medical College at 47.58 June 2010
Dharmapuri
5 New Medical College at 42.77 June 2010
Thiruvarur (Phase-I)
6 New Medical College at 41.01 July 2010
Villupuram (Phase-I)
7 Construction of Combined 28.39 December
Court Buildings at Arani and 2009
Gudiyatham, Cuddalore and
Karur
8 New Collectorate building at 25.00 August 2010
Salem
29

9 Expansion of Govt. Rajaji 22.06 Nov 2009


Hospital at Madurai
10 Additional building for the 13.83 January
Institute of Child Health and 2011
Hospital for Women and
Children, Chennai
11 Additional building for 13.66 August 2010
Government Dental College,
Chennai
12 Additional building for 9.88 August 2010
Royapettah Government
Hospital, Chennai
13 Commercial Tax Office 5.50 June 2009
Building at Greams Road,
Chennai.
14 Tahsildar Quarters 29 Nos 4.5119 December
2009

Total 977.2159
30

ANNEXURE –II

Major Building works to be taken up

Estimate
S. Amount
Name of Work
No. Rs.in
Crore
1 NABARD School Works – (Phase –IX) 22 410.743
Districts – Total 362 schools
2 New Secretariat Complex for 30 279.564
Departments at Omandurar Government
Estate, Chennai. (Block – B)
3 Expansion of Govt. General Hospital at 250.00
Chennai
4 NABARD School works – (Phase VIII) 8 63.36
Districts, Total 59 Schools
5 New Medical College at Villupuram 58.70
(Phase-II)
6 Combined Court Buildings at Aruppukottai, 52.95
Sivagangai, Erode, Paramakudi,
Aranthangi, Poonamallee, Alandur,
Kumbakonam and Namakkal
7 New Medical College at Thiruvarur 50.09
(Phase –II)
8 Additional building to Chengalpattu and 21.50
Tirunelveli Medical Colleges.
9 Taluk office buildings at 12 places 19.216
31

10 Construction of 126 Nos. of staff quarters 15.00


in Thodhunter Nager, Saidapet, Chennai
11 IAMWARM – Multistoried building for 15.00
M.D.P.U in Agricultural Engineering Dept.,
Campus, Nandanam, Chennai
12 25 Backward Classes / Most Backward 13.685
Classes / De-Notified Community Student
Hostel Buildings.
13 New Collectorate for Ariyalur District 12.88
14 New Collectorate building at Trichy 12.01
15 New Medical College at Sivagangai 10.00
16 New Medical College at Perambalur 10.00
17 Regional Transport Office buildings at 7.135
Cuddalore, Nagapattinam, Krishnagiri,
Sankari and Tenkasi.
Total 1301.833