The document provides information on concrete mixtures, rebar spacing, wood framing sizes, and scaffolding/staging materials. It includes tables with technical specifications like cement quantities in bags, sand volumes, rebar diameters and spacing, wood member dimensions, and quantities of framing materials needed for various scaffolding/staging setups. The tables contain precise measurements and specifications for concrete, rebar, wood, and scaffolding/staging construction elements.

Uploaded by

khalid alshamsi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views

SLDVR Structural Forms Scaffholding Calculator

The document provides information on concrete mixtures, rebar spacing, wood framing sizes, and scaffolding/staging materials. It includes tables with technical specifications like cement quantities in bags, sand volumes, rebar diameters and spacing, wood member dimensions, and quantities of framing materials needed for various scaffolding/staging setups. The tables contain precise measurements and specifications for concrete, rebar, wood, and scaffolding/staging construction elements.

Uploaded by

khalid alshamsi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 16

.00.

2 3 4 5 6 7 8 9

125
Mixture
Class Cement in bag Sand cu. M.
40 kg 50 kg
AA 12 9.5 0.50
A 9 7.0 0.50
B 7.5 6.0 0.50
C 6 5.0 0.50

Vertical
Spacing length of bars in meter Spacing Layer
cm Per. Block Per. Sq M
40 cm 0.235 2.93 2 layers
60 cm 0.171 2.13 3 layers
80 cm 0.128 1.6 4 layers

Kilograms per Square Met


H. Layer 25cm Tie.
V.spacing 40 H.Layer2 25cm 2 0.054
V.spacing 40 H.Layer2 30cm 3 0.039
V.spacing 40 H.Layer2 40cm 4 0.024
2 0.036
V.spacing 40 H.Layer3 25cm 3 0.026
V.spacing 40 H.Layer3 30cm 4 0.020
V.spacing 40 H.Layer3 40cm 2 0.027
3 0.020
V.spacing 40 H.Layer4 25cm 4 0.015
V.spacing 40 H.Layer4 30cm Tie
V.spacing 40 H.Layer4 40cm Tie

V.spacing 60 H.Layer2 25cm Tie


V.spacing 60 H.Layer2 30cm Tie
V.spacing 60 H.Layer2 40cm Tie
V.spacing 60 H.Layer3 25cm tie
V.spacing 60 H.Layer3 30cm tie
V.spacing 60 H.Layer3 40cm tie

V.spacing 60 H.Layer4 25cm Tie


V.spacing 60 H.Layer4 30cm Tie
V.spacing 60 H.Layer4 40cm Tie

V.spacing 80 H.Layer2 25cm Tie


V.spacing 80 H.Layer2 30cm Tie
V.spacing 80 H.Layer2 40cm Tie

V.spacing 80 H.Layer3 25cm tie


V.spacing 80 H.Layer3 30cm tie
V.spacing 80 H.Layer3 40cm tie

V.spacing 80 H.Layer4 25cm Tie


V.spacing 80 H.Layer4 30cm Tie
V.spacing 80 H.Layer4 40cm Tie
10 11 12 13 14 15 16 17
2"x2"
2"x3"
2"x4"

1815 40 kg
1452 50kg
Gravel cu.m.

1.0 Column slab


1.0 30.618 40kg 0 40kg
1.0 23.814 50kg 0 50kg
1.0

10 mm Ø
12 mm Ø
16 mm Ø
18 mm Ø
20 mm Ø
horizontal 25 mm Ø
pacing Layer
Per Block Per Sq. Meter
0.264 3.3
0.172 2.15
0.138 1.72

Kilograms per Square Meter


30 cm Tie. 40cm Tie
0.065 0.086
0.047 0.063 8 mm A
0.029 0.039 12 mm B
0.044 0.057 16 mm C
0.032 0.042 20 mm D
0.024 0.032 25 mm
0.033 0.044
0.024 0.032
0.018 0.024

V.spacing 60 H.Layer2 A
V.spacing 60 H.Layer3 B
V.spacing 60 H.Layer4 C
V.spacing 80 H.Layer2 D
V.spacing 80 H.Layer3
V.spacing 80 H.Layer4

Bars Spacing in CM Number of


steel bars per
square meter Column1 Column2 Column3
6.00 M 7.50 M 9.00 M 12.00 M
10 cm 4.369 3.337 2.772 2.022
12.5 cm 3.603 2.662 2.245 1.635
15 cm 3.221 2.296 1.921 1.382
17.5 cm 2.647 2.025 1.65 1.196
20 cm 2.36 1.775 1.461 1.056
22.5 cm 2.168 1.601 1.312 0.907
25 cm 1.977 1.466 1.217 0.862
Bars Spacing in CM Number of
steel bars per
square meter Column1 Column2 Column3
6.00 M 7.50 M 9.00 M 12.00 M
10 cm 3.764 2.937 2.421 1.769
12.5 cm 3.062 2.381 1.934 1.427
15 cm 2.584 2.004 1.636 1.197
17.5 cm 2.232 1.726 1.407 1.033
20 cm 1.98 1.528 1.258 0.914
22.5 cm 1.786 1.369 1.109 0.81
25 cm 1.627 1.25 1.014 0.736
18 19 20 21 22 23 24 25

Size of wood
Frame POST BEAM
6mm( 1/4) 12mm( 1/2) 6mm (1/4) 12mm (1/2)
2"x2" 29.67 20.33 25.06 18.66
2"x3" 44.5 30.5 37.6 28

2"x2" 6mm(1/4) 29.67 25.06


2"x3" 6mm(1/4) 44.5 37.6
2"x2" 12mm(1/2) 20.33 18.66
2"x3" 12mm(1/2) 30.5 28

1 2 3 4 5 6
scaffolding and staging
10X20X40 Column beam
15X20X40 vert hor brace vert hor
20X20X40 2"x2" 4.70 21.00 11.70 4.00 4.70
2"x3" 7.00 31.67 17.50 6.00 7.00
2"x4" 9.35 42.25 23.35 8.00 9.35
26

flooring

6.10
9.10
12.10
SLDVR STRUCTURAL ESTIMATION
VER. 3.50
Disclaimer: These estimates are user-provided and to be used as guides only. No claim is made to their accuracy nor to their 
FOR PERSONAL USE ONLY
COLUMN SLAB
SIZE H / # of Col. SIZE H / # of Col. Thickness
0.20 48.60 Width
0.35 1.0 Length

Mixture Class A 3.402 m³ Mixture Class


Cement 31 40kg bags Concrete
Sand 1.80 m³ Sand
Gravel 3.402 m³ Gravel
48.6
space of tie # of tie per space Check 48.6
0.05 3 0.15 1.9
0.10 8 0.8
0.18 265.9 46.7 lngth
# of Ties 287.9 1.028 lngth of one tie
# of 10mm 295.9171
TOTAL: 50.00 lngth

48.60 Height Of one Column Rebar


Length to
4 Number of vertical rebars per Column be used FORMS FOR COLUMNS
33 Total Number of vertical rebars 6 Plywood Form
FOOTING P=
1.00 Size 1210 # of columns
1.00 Size
0.20 Thickness
242 Total Volume of Footings Column Height:
No. Of Columns:
Class B 242
Cement 1815 40kg
Sand 121 m³
Gravel 242 m³ Plywood:
Rebar Length to
Size of one Footing Rebar Multiplier be used POST
0.85 10 6 1.6667
0
0

TOTAL 2
TABLE REFERENCE
Length
1 SIDE OF 1 SIDE OF BEBARS Per Tie
FOOTING BEBARS LENGTH FOOTING LENGTH Size of Coulmn (meter) Size of Column
0.40 0.25 2.35 2.20 0.20 x 0.25 0.828 0.45 x 0.50
0.45 0.30 2.40 2.25 0.20 x 0.30 0.928 0.45 x 0.55
0.50 0.35 1.40 1.25 0.20 x 0.35 1.028 0.45 x 0.60
0.55 0.40 1.45 1.30 0.20 x 0.40 1.128 0.50 x 0.55
0.60 0.45 1.50 1.35 0.20 x 0.45 1.228 0.50 x 0.60
0.65 0.50 1.55 1.40 0.20 x 0.50 1.328 0.55 x 0.60
0.70 0.55 1.60 1.45 0.20 x 0.55 1.428 0.25 x 0.25
0.75 0.60 1.65 1.50 0.20 x 0.60 1.528 0.30 x 0.30
0.80 0.65 1.70 1.55 0.25 x 0.30 1.028 0.35 x 0.35
0.85 0.70 1.75 1.60 0.20 x 0.35 1.128 0.40 x 0.40
0.90 0.75 1.80 1.65 0.25 x 0.40 1.228 0.45 x 0.45
0.95 0.80 1.85 1.70 0.20 x 0.45 1.328 0.50 x 0.50
1.00 0.85 3.00 1.75 0.20 x 0.50 1.428 0.55 x 0.55
1.05 0.90 1.95 1.80 0.20 x 0.55 1.528 0.60 x 0.60
1.10 0.95 2.00 1.85 0.20 x 0.60 1.628 30x40
1.15 1.00 2.05 1.90 20x20 0.72 15x25x40
1.20 1.05 2.10 1.95 20x15 0.62 35x60
1.25 1.10 2.15 2.00 15x30 0.82 30x35
1.30 1.15 2.20 2.05 25x25 0.92 35x55
1.35 1.20 2.25 2.10 15x40 1.02 45x30
2.30 2.15 25x35 1.12 30x60
15x15 0.52 35x65

0
o their accuracy nor to their completeness for all uses. Each estimate is provided as a basic guide or template for building upon. Prices may need upda

SLAB REINFORCEMENTS
Other
Volume other
Width 10.00
Length 5.00 Total
0.00 0.00 0.00 50.00 0.00 0.00 50.00 m²
Rebars Spacing: Lenth of Bar to be used:
A 0.00 m³ 1 way slab 25 cm 9.00 M
crete 0 40kg 1.014
- m³ Total # of Rebars 51 Lngth
el 0 m³

Rebars Spacing: Lenth of Bar to be used:


2 way slab 15 cm 6.00 M

3.221 1.014
Total # of Rebars 162 Lngth

RMS FOR COLUMNS FORMS FOR BEAMS SCAFFOLDING AND STAGING


Plywood Form COLUMNS BEAMS
P= 2 Sides length length
bottom No. of Clm #of Beam
0.20 m² 0.10 m² 0 meters 0

Beam
Length 2"x3" vertical 2"x3"
No. of Beams 1 7.00 Suport 6.00
0 m² 0 m² 0 bd. Ft 0
Horizontal 2"x2" Horizonta 2"x2"
Suport 21.00 l Suport 4.70
0 sheets Plywood: 0 sheets 0 bd. Ft 0

POST Diagonal 2"x2"


2"x2" 6mm( 1/4) 2"x3" 6mm (1/4) Braces 11.70
0 bd. Ft. 0 bd. Ft. 0 bd. Ft
Length Per
Tie (meter)
1.828
1.928
2.028
2.028
2.128
2.228
0.928
1.128
1.328
1.528
1.728
1.928
1.128
2.328
1.32
1.48
1.82
1.22
1.72
1.42
1.72
1.92
pon. Prices may need updating and quantities are estimated based on size of job.

CONCRETE WALLS

WALL Size hieght


width
Area 0 0 0 0 0 0 0 0 0
Deducted Area:
0.0 0 0 0 0 0 0 0 0
Total area 0.0
CHB 0
CHB Rebars MORTAR
Vertical Spaced at 60 cm Area: 0.0
Rebars: 0.00 Size Of CHB
Horizontal Spaced at 3 layers 10X20X40
Rebars: 0.00

TE
RE
Total rebars 0.00 lngth 10 mm Ø

NC
CO
Sand

SUMMARY
CONCRETE SLAB Column Beams Slab
Area Width Vert. Hor. Braces Vert. Hor.
lngth 2"x2" 0.0 0.0 0.0 0.0 0.0 0
meters multiplyier 1 2"x3" 0.0 0.0 0.0 0.0 0.0 0
0 m² 2"x4" 0.0 0.0 0.0 0.0 0.0 0
Plywood 0
Support 2"x3"
bd. Ft 9.10
0.0 bd. Ft
Plywood 0 sheets
bd. Ft
0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0

-
PLASTER
m² Area: 0 m² MORTAR & PLASTER TOTAL
Class Mixture Class Plaster Thickness Concrete Sand
A A 12 mm 0 bags 0 m³
0 0
TE

GS
RE

0 0
GS
E
BA
NC

T
RE

BA

0 0
CO

NC

0 m³ 0
CO

Sand 0 m³

FORMS
Column Beam Total

0 0 0 bd. Ft
0 0 0 bd. Ft
0 0 0 bd. Ft
0 0 0 Sheets
3.2
4.75
0.75
0.3
0 0

0 0
10.22
0.69
6.37 0.8
5.87 7.7 0.6
24.95 23.2 12.31
9.48 4 2*2 5 30
0.3
2.7
5.13
1.34
0.45
0.43

You might also like