Synchronizing Generators: Martin Leduc 1998
Synchronizing Generators: Martin Leduc 1998
The DEV Galena has four generator sets. Three running under normal operating
conditions. It is, on some occasion, necessary to service a running generator set.
This requires the engineer to bring on line the fourth generator, then taking the
desired generator off line. This is done as follows:
2) ME start. Prime engine with fuel by hand pump. Turn off engine block heater,
flick engine control switch to ‘on’ . Turn on air valve, and depress air control
valve. Engine should start. Check oil pressure, check for circulation of cooling
water (by feeling pipes). Close air valve. Repeat procedure for next two engines.
6) With the desired generator off-line, the engine may now be stoped using
toggle switch. The engine block heathers should be turned on at this point. A
final check should be made to the control panel to assure proper settings, even
production, and distribution from the generators. You are now ready to service
the desired generator.