0% found this document useful (0 votes)
789 views

Stringing Procedure

Pipeline, stringing, procedure

Uploaded by

Andreas Schlager
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
789 views

Stringing Procedure

Pipeline, stringing, procedure

Uploaded by

Andreas Schlager
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 8
PT PERUSAHAANIGASNEGARA S54 IS TRIBUSI WILAYAH 1 | Renee | SBUDISTRIBUSL MAY PT. MENARA GADING PUTIN PIPE HAULING & STRINGING PROCEDURE Document Ne | Rev] i SBUT-TLD-L-CP-003 1 mec Sana | Af 7.6 .syreanceanenetanivene FPL SH AAR Ser | COD: (“a tammaan Wea wp 7 cobe2 [sts Came Woe feat ©0063 [) Sigs! econ tet noe C0054 [] Ponctnimsnettctinte DATE TA wh wio . Reviewepsy : wea eee PT. Perusahaan Gas Negara (Persero) Tbk. (PGN) PLTG Talang Duku Gas Distribution Project + Re-roprovaltorconsirucion | auyarato [fun | Veer Gling | 5 ‘Approval for Construction uy 6.10 | an | way PA Tete |e ni B Issued for Approval uy 1490 | un [way PRT kin | or A Issued for Review von 28,10] on [wey Poa Kit | go BY_[_cHKO | APvD | CHKD | ApvD Rev. DESCRIPTION DATE CONTRACTOR: Puc | PGN BD Pt. PeRusaHaaw Gas NEGARA he ‘SBU DISTRIBUS! WILAYAH 1 \\ y (Persero) Tbk. JAWA BAGIAN BARAT A. OT. MENARA GADING PUTIN ess 2eeet PIPE HAULING & STRINGING PROCEDURE : | Documeni No Rev. ] SBUI-TLO-L-CP-003 [1 Page 2 of 8 REVISION HISTORICAL SHEET Rev No Date Description” ° A. | Jun 26,10 | ‘issued for Review 8 | July 1430 | Issued for Approval | © | uly 16,10 | Approval for Construction 1_| July27.10 | Re-Approval for Construction 26 3.0 40 50 60 Q 70 af ae “i, BD Pr. PeRUSAHAAN GAS NEGARA 4 ‘SBU DISTRIBUSI WILAYAH 4 PIPE HAULING & STRINGING PROCEDURE Document No. | Rev. i SBUI-TLOL-CP.008 [4 Ee faders TABLE OF CONTENT. 1.0 INTRODUCTION... DEFINITION -.in CODES, STANDARD AND REFERENCES... METHODOLOGY. ; INSPECTION AND DOCUMENTATION... HEALTH, SAFETY.& ENVIRONMENT. ATTACHMENT... “|B prper ‘GW USAHAAN GAS NEGARA ! SBy DISTRIBUSI WILAYAH 1 {(Persero) Tbk. JAWA BAGIAN BARAT PT. MENARA GADING PUTIH PIPE HAULING & STRINGING PROCEDURE Document Na, Rev. ‘SBU4-TLD-L-CP.003 7 Page 4 of & 1.0. INTRODUCTION This procedure is follow a specitic method for Guidelines and inst/uctiorsto facilitate the proper haulage or transportation from temporaty pipe dumpistookpile to flow line: and trunk line permitted pipe route and South Sumatera, 2.0 DEFINITION PGN PMc MIGAS. THIRD PARTY CONTRACTOR PROJECT VENDOR / SUPPLIER to string or line-up the pipes, along the route for the pipeline of Perusahaan Gas Negara (Perséro). Tok: SBU Distnbusi Wilayati-t Jawa Bagian Barat - PLTG Talang Dukir Gas Distribution Project a ‘The following words if found elsewhere in this document shall have the meaning as follow: PT. Perusahaan Gas Negara (Persero, Tbk), the ul and owner ate end user PT. Emaennersi Kostruksindo selected by PGN as Project Management Consultancy Indonesian Government Body authorized for issuing permits and licenses for oil and gas facilities Authorized Inspection Company, who is approved, certified by and may be appointed to act on behalf of MIGAS. PT. Menara Gading Putih an Engineering, Procurement, and Construction Company selected by PGN to perform the Engineering detailed design, procurement.canstruction,pre- commisioning,commissioning and trial operation PLTG Talang Duku Gas Distribution Project ‘Supplier, fabricator and/or original equipment manufacturer awarded a purchase order by the CONTRACTOR and/or PGN to furnish material or equipment. 3.0 CODES, STANDARD AND REFERENCES ASMEB31.8 API Spec. SL. SBU-TLD-L-DG-003 16E/TD/6 1989 Gas Transmission and Distribution Piping Systems ‘Specification for Line Pipe Topography & Alignment Sheet Drawing Handing transport,and storage of steel pipe,bends,tees, valve & fiting ‘a “Y Pr. PERUSAHAAN GAS NEGARA | ] SBU DISTRIBUS! WILAYAH 1 a | DIS TRIBUS! WLAYAl La. PT. MENARA GADING PUTHH PIPE HAULING & STRINGING PROCEDURE Document Na, Rev. | T 7 ‘SBUI-TLD-L-CP.003. 1 Page 5 of 8 4.0 METHODOLOGY 4.1 General Provision oO aa Line pipe from the temporary slock pile is foaded on specific truck. and hauled to the pipe rouie where it is off loaded with érane or side boom and then string end along the pipe route: Loaded tastened and unloaded of line pipe shall be conducted in safety plan, Line. pipe’ shall be-hauled ‘and stringing accordance. with tie “placement plan based of tocation,thickness,typé of coating etc. ‘Safety procedure during pipe hauling and stringing shall comply PGN K3PL procedure. Procedure For Hauling and Stringing of Line Pipe The contractor shall be responsible for obtaining hauling permits and authorization from the telated authorities. All road, bridges and other transportation infrastructure being crossed shall be ensured that are capable of handling transportation loads and dimensions. ‘Only approved pipe end hooks and lift {iting line pipe. 1g but which will not damage bevels,shall be used for All booms,hooks,forks, supports,skirt and tie down for handling and storing the line pipe shall be properly padded to prevent damage to the pipe and coating. Lifting equipment with sufsicient capacity shall be used to maintain safe line pipe hauling and stringing activity,ffting equipment shall certified by authorized body ‘When storing or transporting coated pipe each joint shall be separated using approved non abrasive method so the coating will not be damage. Pipe shall not be stacked over 4 ( four ) tiers or three meters in height otherwise there is approved by PGN, Pre-Stringing Preparation Works The correct type and quantity of filing and stringing equipment will be avaitable for use in the unloading and line-up of pipes 12 inchi at the ROW (edge of the road) at the time the first loaded ‘ruck leaves from the pipe stock pile point, Before line pipe stringing activities commence, wood blocks, sand-soil bags in enough quantities are obtained and drop-off along edge of the road where stringing activity will be done at points approximately 12 meters apart. Pipeline route centre line shall be surveyed and staked prior to start of stringing activities. g> yy PT, PERUSAHAAN GAS NEGARA ‘SBU DISTRIBUSI WILAYAH 1 ® SE AWA BAOIANIGARAT | PT. MENARA GADING PUTIH PIPE HAULING & STRINGING PROCEDURE _ Document No, Rev. T ‘SBU1-TLD-L-CP-003 1 | Page 6 of 8 42 43 Line Pipe Stringing At arrival of the loaded truck at the section of thé ROW where stringing is to emanate, the pipes are unloaded piece by piece: arid iaid in a single pile on top of wood blocks padded with soil ot sand bags. This step is ‘done’ with.the truck travelling: forward and stopping to allow a single ‘thing of pipe line up. ‘The action is repeated for each trailer truck transporting line pips until the full Jength of the ROW ‘s lined with the required of pipe. The pipes will be strung or laid at a distance of three (3) until four (4) meters from the edge of the road that is to be dug later. For river or creek crossing the required line pipes will be unloaded and stock piled at the welding station nearby the crossing point where the crossing string or sinkers are fabricated before installation. As the stringing progresses the welding spread can move-in and commence the field welding connection works. Line pipe Stringing Using Truck Crane or Other Lifting Equipments Pipe skid is loaded with pipe by using crane truck or pi points along the ROW. up mobiles at the local pipe dump At pipe drop off point the skid is positioned. ‘Truck Crane or other liffing equipments is use to lift the pipe from the skid and lay the pipe along string line, Truck Crane or other lifting equipments is welded with liting ear (hook) at its back ‘The pipe is leash with nylon / sling belt is mounted on the lifting ear (hook) using with shackle Both ends of the pipe to be liled and laid shall be provided by tag line controlled by rigger to prevent unnecessary swing or movement of the pipe while being lied. The rigger will not be under the load. ‘The truck crane operator or other lifting equipments then lowers the pipe to be laid through arm-down movement until the pipe is laid on top of soil or sand bag before the pipe touches the sand or soil bag, the rigger will pull the tag line a bit but in opposite direction to bring the pipe to position, ‘When the pipe is laid, the riggers unleash the tag lines and the sling from the pipe. The steps and motions described are repeated after the pipe skid is pulled and positioned on the next point to be lined with pipe “lg —T } - PT PERUGAHAAN GAS SEGARA Seu DISTRIBUSIWILAYAH 1 | is ae | (Persero) Tok | JAWA BAGIAN BARAT ;ENARA GADING PUTIH PIPE HAULING & STRINGING PROCEDURE i Document No, | Rey, | ‘SBU1-TLD-L-CP-003 1 Page 7 of 8 5.0 INSPECTION AND DOCUMENTATION. The required: inspection: and documentation’s for these works shall be carried’ out as specified in Contractor Quafity Plan and Subcontractor Inspection and Test Pian, BA fling. toading and Stack arrangemient of the pipes shall be inspected to’ verify coripliance with safely requirement stated earlier. Laying or stringing of the pipe pieces stall be chéckéd-and the following ‘information for each piece of pipe laid in progressing order shall be recorded for traceability purpose on the line pipe stringing report. Unloaded and strung pipes shall be randomly checked for damaged to its coating and the pipe ‘material itself incurred during lifting, handling, unloading and stringing, Any damage shall be ‘marked and accordingly reported. 8) Section number of the pipeline b) Start and End KP. Point ©) Heat number and Pipe number 4) Length of each pipe or individual pipe No pipe shall be laid or strung directly on the ground and all strung pipes shall retain the protective covering of beveled ends until the time line-up and welding is to be started, All activity will be done shall be plan and reported to PGN/PMC for approval Inspection Reports, Records and other documents. ‘As a minimum the following document and records shall be prepared and submitted to Contractor. ‘+ Materia certificate for slings, shackles, fing hook and rings. ‘+ Inspection certificate for crane and other lifting equipment. + Dally line Pipe Stringing Report ‘+ Material and corrosion coating damage report or Inspection report. }D PT. PERUSAHAAN GAS NEGARA 9 ‘SBU DISTRIBUSI WILAYAH 1 § (Persero) Tok. JAWA BAGIAN BARAT . PT. MENARA GADING PUTIH PIPE HAULING & STRINGING PROCEDURE Document No. Rev. ‘SBU1-TLD-L-CP-003 4 Page 8 of 8 eG 6.0 HEALTH, SAFETY & ENVIRONMENT. All personnel involved in this activity shall follow the minimum safely requirement specified in the attached Risk Assessment Form, + Pemnit To work (PTW) shall be submit to RGN/PMC before activity + Good housekeeping practices shail be followed at all.times in sit © Toolbox talks will-be conducted regularly about safety and environmental matters related to activities carried out for this canal-crossing, Ee + Scrap and debris shall not be littered in working area. * Scrap and Debris shall be collected in a trash bin kept at convenient location, to enable equipment to collect and dispose later. * Stringing operation shall be planned so that a period as practicable to minimize the danger and disruption to personnel and livestock. + Proper cross over or diversion shall be provided wherever necessary to maintain the public and vehicle passages. * All lifting equipment, tools and tackles will be of sufficient capacity maintained in good condition, ‘+ Banks man shall control the vehicle and equipment movement at the place of stringing activity, ‘* Appropriate Personnel Protection Equipment (PPE) shall be provided to all workmen and supervisors. + Barricade shall be provided for excavated trench if it is going to be kept open for a long time. 7.0 ATTACHMENT 1. Pipe Stringing Report 2. Risk Assessment Form

You might also like