Sample Report 1
Sample Report 1
ACKNOWLEDGEMENT 1
ABSTRACT 2
LIST OF FIGURES 3
LIST OF TABLES 4
CHAPTER 1 INTRODUCTION 5
1.1. Period of employment 5
1.2. Nature of appointment 5
1.3. Details of job location 5
1.4. Details of supervisor 6
1.5. Project involved 23
CHAPTER 2 BACKGROUND OF THE COMPANY 25
2.1. Corporate profile 25
2.2. Facilities 25
2.3. List of staffs 26
2.4. Organizational chart 28
2.5. Current list of projects 29
2.6. List of completed projects 33
2.7. Registration 43
2.8. Vision and Mission 43
CHAPTER 3 SUMMARY OF WEEKLY 44
CHAPTER 4 TECHNICAL REPORT 47
4.1. Project Background 47
4.2. Site location 48
4.3 Project site 48
4.4. Problem statement 50
4.5. Objective of the project 50
4.6. Scope of the project 50
4.7. Outcome of the project 51
4.8. Project constrains 51
4.9. Project needs 51
4.10. Design the project 52
CHAPTER 5 DISCUSSION AND RECOMMENDATIONS 56
CHAPTER 6 CONCLUSIONS 61
REFERENCES 62
APPENDICES 63
ACKNOWLEDGEMENT
Special thanks to my supervisor, Mr Noor Rizan Bin Sarmin as a General Manager and also
Head of Department of Civil and Structure, for the tolerance and valuable time sacrifice of his
busy schedule of work to guide me throughout this industrial training.
A big thanks to Mr Mohd Fazly Omar and Miss Azween Bt Md Yusof a Civil Engineer, and
Mrs Yuniza Mohd Fitri, a Project Engineer for the great experience throughout my training
period, because of their guidance, help and plenty of information about the civil and structure
and also infrastructure project.
To the entire staff of PZK Sdn Bhd who has given me a wonderful experience in work as a
team especially in a project that I have assigned during my training. Last but not least, my
gratitude to my dedicated lecturer, En Mohd Azuan Bin Tukiar as an Industrial Training
Coordinator of Faculty of Civil Engineering UiTM Pulau Pinang and Mrs Zuraisah Dollah as
my logbook supervisor for invaluable support.
1|Page
ABSTRACT
During the industrial training in PZK Sdn. Bhd., I have been arranged on the
department of civil and structure. Since the company is a consulting firm, most of the
work was for the design management which consist of work such as design by using
software Esteem 9 and Orion and manual design by doing spread sheet in Microsoft
Excel 2010, design checking and others that requires in design management. My main
task during this training is the design of the Masjid Cina that was still in the design
stage.
In addition, there are several times I will also visit the project site to monitor and
control the project Pusat Dakwah dan Tarbiah. I also need to prepare a report for the
project after the site visit. Other than that, I had attended meeting for the project in the
deflection liability period (DLP).
In the industrial training, I also need to do tender document for project Indah Water
Konsortium and also Medini development project. Other than that, I also do the Bill of
Quantities for the project Rancangan Bekalan Air Negeri Selangor Projek Mitigasi
Fasa 2.
Last but not least during this Industrial Training, it helps me to understand the job’s
need and increase my understanding to be more clear and wide in the civil engineering
field.
2|Page
LIST OF FIGURES
3|Page
LIST OF TABLES
4|Page
CHAPTER 1 INTRODUCTION
Employment period specified for this industrial training is nine weeks. The date
started from 7th July 2014 until 7th September 2014. Working hours of PZK Sdn. Bhd.
is 8.30 am to 5.30 pm, Monday to Friday. The lunch hour on Monday to Thursday is
at 1.00 p.m. to 2.00 p.m. While on Friday is 1.00 p.m. until 2.30 pm.
CONSULTING ENGINEERING
No 7B Wisma PZK,
Jalan Suarasa 8/3 Lake Valley,
Bandar Tun Hussein Onn,
43200 Cheras,
Selangor Darul Ehsan.
Tel : +603-9076 4869 / 70
Fax : +603-9074 9844
E-mail : [email protected]
5|Page
1.4. DETAILS OF SUPERVISOR
6|Page
8. Senarai Nama Projek/Kajian Yang Pernah Dilaksanakan :
Kerajaan/Swasta/Negara Tahun
Peranan/Jawatan
Luar (sekiranya Negara Projek/Projek
Bil. Nama Projek/Kajian Nama Pelanggan Di Dalam
Luar sila Semasa Nilai
Projek/Kajian
Nyatakan nama Negara) Projek
1. Cadangan Pembinaan Tadika Islam Kerajaan Majlis Agama 2013 Pengurus Projek /
di Jalan 1B, Taman Intan Baiduri, Islam Wilayah RM 2,000,000.00 Jurutera Kanan
Kepong 52100 Kuala Lumpur Persekutuan (Rekabentuk)
3. Cadangan Pembinaan 2 Blok 342 Swasta Udaland Holdings 2013 Pengurus Projek /
Unit Pangsapuri 28 Dan 30 Berhad RM 150,000,000.00 Jurutera Kanan
Tingkat Termasuk 6 Tingkat (Rekabentuk)
Podium Tempat Letak Kereta Dan
Kemudahan Serta Kemudahan
7|Page
Pengawal Di Atas Lot 31677 Fasa
3 Zon 14, Bandar Tun Hussein
Onn, Mukim Cheras, Daerah Hulu
Langat Selangor Darul Ehsan
8|Page
6. Cadangan Pembangunan Institusi Swasta Koperasi Belia 2011 Pengurus Projek
Pendidikan Agama Sekolah Islam Malaysia RM 14,000,000.00
Rendah Islam (SRI) dan Sekolah Berhad (KBI)
Menengah Islam (SMI) Bandar
Indera Mahkota, Kuantan, Di atas
Tanah Seluas 4 Ekar, Di Bandar
Indera Mahkota, Pahang Darul
Makmur
7. Projek Sistem Bekalan Air Untuk Swasta Perbadanan Aset 2011 Pengurus Projek /
projek Pembangunan Seremban Air Berhad RM 60,000,000.00 Jurutera Kanan
Barat-Selatan Negeri Sembilan (PAAB) (Rekabentuk)
Darul Khusus Pakej 2 :
Membekal dan Memasang Paip
Jenis 'M.S' Bergarispusat Nominal
1200mm, Tangki Sedutan,
Rumah Pam dan Kolam Imbangan
di Bandar Enstek hingga Kawasan
Bandar Sendayan.
9|Page
8. Design a New 25 Mld Saratok Kerajaan Kementerian 2011 Jurutera Kanan
Water Treatment Plant, Saratok, Kemajuan Luar RM 70,000,000.00 (Rekabentuk)
Sarawak Bandar dan
Wilayah
9. Membaikpulih dan Menaiktaraf Kerajaan Air Kelantan Sdn. 2011 Jurutera Kanan
Loji-Loji dan Tangki Air Negeri Bhd. (AKSB) RM 100,000,000.00 (Rekabentuk)
Kelantan
10. Design Works for the Upgrading Kerajaan Dewan 2011 Pengurus Projek /
of Connecting Road Between Bandaraya Kuala RM 17,000,000.00 Jurutera Kanan
Bandar Tasik Permaisuri and Salak Lumpur (Rekabentuk)
Selatan
11. Consultancy Services for the Swasta Petronas 2011 Pengurus Projek /
Construction of Blast Proof Penapisan Melaka RM 6,000,000.00 Jurutera Kanan
Building for Area 3A and 3B Sdn. Bhd. (Rekabentuk)
10 | P a g e
Personnel for PPMSB
12. Projek Bekalan Air Luar Bandar Kerajaan Kementerian 2011 Pengurus Projek /
(BALB) / Estet Tahun 2011, Kemajuan Luar RM 3,000,000.00 Jurutera Kanan
Negeri Selangor Bandar dan (Rekabentuk)
. Wilayah
13. Cadangan Membina dan Swasta Kolej Universiti 2011 Pengurus Projek
Menyiapkan Sebuah Stor Utama, Islam RM 1,000,000.00
Kolej Universiti Islam Antarabangsa
Antarabangsa Selangor (KUIS)
14. Cadangan Membina dan Swasta Bank Perusahaan 2010 Pengurus Projek
Menyiapkan 4 Unit Industri Teres Kecil dan RM 3,000,000.00
2 Tingkat (30' x 158'), 5 Unit Sederhana
Industri Teres 2 Tingkat (30' x Malaysia Berhad
112') 6 Unit Industri Teres 2 (SME Bank)
Tingkat (27' x 112') Di atas Lot PT
11 | P a g e
70839 (Lot Lama PT 10620)
Taman Perusahaan IKS, Seksyen
16 Bandar Baru Bangi, Mukim
Kajang, Daerah Hulu Langat
Selangor untuk Tet. Bank
Perusahaan Kecil dan Sederhana
Malaysia Berhad (SME Bank)
15. Projek Bekalan Air Luar Bandar Kerajaan Kementerian 2010 Pengurus Projek /
(BALB) Tahun 2010 Negeri Kemajuan Luar RM 3,000,000.00 Jurutera Kanan
Selangor Bandar dan (Rekabentuk)
Wilayah
Lembaga
16. Projek Naiktaraf Loji Air Sungai Kerajaan Kemajuan 2010 Pengurus Projek /
Cherul. Terengganu RM 15,000,000.00 Jurutera Kanan
Tengah (Rekabentuk)
(KETENGAH)
12 | P a g e
17. Design and Build Chengal Kerajaan Kementerian 2009 Pengurus Projek /
Lempong Secondary School, Pelajaran RM 23,000,000.00 Jurutera Kanan
Kuantan District, Pahang Darul Malaysia (Rekabentuk)
Makmur
18. Housing Scheme at Pelindung Swasta Uda Land (East) 2009 Pengurus Projek /
Heights, Phase 1, Mukim Kuala Sdn. Bhd. RM 12,000,000.00 Jurutera Kanan
Kuantan, Pahang Darul Makmur (Rekabentuk)
19. Slope Rehabilitation Works at Swasta Syarikat Bekalan 2009 Pengurus Projek /
Syabas Facilities Air Selangor Sdn. RM 2,000,000.00 Jurutera Kanan
Bhd. (SYABAS) (Rekabentuk)
20. Cadangan Pembinaan 4 Unit Kedai Swasta Yayasan Anak 2009 Pengurus Projek /
Pejabat 3 Tingkat Di atas Lot Yatim RM 3,000,000.00 Jurutera Kanan
PT16351 (HSD 69015), Bandar (YAYAKEM) (Rekabentuk
Semenyih, Daerah Hulu Langat,
13 | P a g e
Selangor Darul Ehsan.
21. Proposed Pipe Rehabilitation Swasta Ranhill Engineers 2009 Jurutera Kanan
Works For Year 2009 For The & Constructors RM 10,000,000.00 (Rekabentuk)
State Of Johor Sdn. Bhd.
23. Greater Kuantan Water Supply Kerajaan Jabatan Bekalan 2008 Pengurus Projek /
Project Air Pahang RM 14,000,000.00 Jurutera Kanan
- New Kobat Raw Water Pumping (Rekabentuk)
Station
Pakej 8 : Membekal, Memasang,
Mengujiterima dan Mentauliah
Pam Air Mentah Termasuk Kerja-
14 | P a g e
Kerja Elektrikal Serta Membina
dan Menyiapkan Sesebuah
Mukasauk Dan Kerja-Kerja
Berkaitan di Kg. Kobat, Pahang
Darul Makmur
24. Rancangan Bekalan Air Seberang Kerajaan Jabatan Bekalan 2008 Jurutera Kanan
Temerloh Air Pahang RM 35,000,000.00 (Rekabentuk)
Pakej 2 : Membina, Menyiapkan,
Menguji dan Mentauliahkan Kerja-
Kerja Sivil, Mekanikal, Elektrikal
Dan Yang Berkaitan Bagi
Melengkapkan Loji Air Seberang
Temerloh, Pahang Darul Makmur.
25. Rancangan Bekalan Air Seberang Kerajaan Jabatan Bekalan 2008 Jurutera Kanan
Temerloh Air Pahang RM 12,000,000.00 (Rekabentuk)
Pakej 4 : Membina, Menyiapkan,
Menguji dan Mentauliahkan Kerja-
15 | P a g e
Kerja Sivil, Mekanikal, Elektrikal
Dan Yang Berkaitan Untuk Muka
Sauk Loji Air Seberang Temerloh,
Pahang Darul Makmur
26. Hostel Bolcks University Inst. Kerajaan Jabatan Kerja 2008 Pengurus Projek /
Tech. MARA, Terengganu Branch, Raya, Kuala RM 20,000,000.00 Jurutera Kanan
Bukit Besi, Terengganu Lumpur (Rekabentuk)
16 | P a g e
Centre, Jerantut District, Pahang
Darul Makmur
29. Cadangan Membina 1 unit Banglo Swasta Tn. Hj. Abdul 2006 Pengurus Projek /
2.1/2 Tingkat Di Atas Lot Halim b. Ahmad RM 1,000,000.00 Jurutera Kanan
PT40248, No. 73, Jln Seri Putra (Rekabentuk)
8/1, Bandar Seri Putra Bangi
43000 Kajang, Selangor darul
Ehsan.
30. Projek Pembinaan Bangunan Kerajaan Jabatan Kerja 2006 Jurutera Kanan
Herbarium di Institut Penyelidikan Raya, Kuala RM 4,000,000.00 (Rekabentuk)
Malaysia (FRIM) Kepong, Lumpur
Selangor
31. Merekabentuk, Membina dan Kerajaan Jabatan Bekalan 2005 Jurutera Kanan
Menyiapkan Kerja Menaiktaraf Air Pahang RM 5,000,000.00 (Rekabentuk)
dan Lain-lain Kerja Berkaitan
17 | P a g e
untuk Loji Pembersih Air Di
Mempateh, Temerloh, Pahang
Darul Makmur
32. Upgrading of Jalan Haji Ahmad, Kerajaan Jabatan Kerja 1997-2005 Jurutera Kanan
Kuantan, Pahang Skop kerja : Raya, Pahang RM 40,000,000.00 (Rekabentuk)
33. Proposed Design For Rural Road Kerajaan Kementerian 2005 Jurutera Kanan
Construction From Kg. Relau To Pembangunan RM 10,000,000.00 (Rekabentuk)
Sg. Punti, Bandar Baharu, Kedah Luar Bandar /
Jabatan Kerja
Raya, Kedah
34. Design of Greater Kuantan Water Kerajaan Jabatan Bekalan 2004 Jurutera Kanan
Supply Phase III Air Pahang RM 2,000,000.00 (Rekabentuk)
18 | P a g e
35. Proposed Factory /Warehouse with Swasta Boustead Sissons 2002 Jurutera Kanan
3 Storey Office Block, Canteen Paints Sdn Bhd RM 10,000,000.00 (Rekabentuk)
and Ancillary Building at Nilai For
Boustead Sissons Paints Sdn. Bhd.
Cost
36. Proposed 7 Block Low Cost Swasta Mutiara Rini Sdn 2001 Jurutera Kanan
Apartment and 4 Block Medium Bhd RM 20,000,000.00 (Rekabentuk)
Cost Apartment at Mutiara
Damansara for Mutiara Rini Sdn.
Bhd.
37. Proposed Government Buildings Swasta Putrajaya Holding 1999 Jurutera Rekabentuk
(Block E2 & E3) Development Sdn Bhd RM 140,000,000.00
Parcel E, Precinct 1, Putrajaya for
Putrajaya Holdings Sdn. Bhd.
19 | P a g e
38. Proposed Institut Kemahiran Belia Kerajaan Kementerian 1998 Pengurus Projek /
Negara at Pagoh Muar Johor For Kerja Raya RM70,000,000.00 Jurutera Rekabentuk
Kementerian Belia dan Sukan.
39. Proposed Institut Kemahiran Belia Kerajaan Kementerian 1998 Jurutera Rekabentuk
Negara at Bachok Kelantan for Kerja Raya RM 60,000,000.00
Kementerian Belia dan Sukan
40. Proposed Housing Scheme at Parit Swasta Sime Darby Land 1997 Jurutera Rekabentuk
Buntar for Sime Darby Land RM 150,000,000.00
20 | P a g e
42. Proposed Design and Built Kerajaan Kementerian 1997 Pengurus Projek /
Sekolah Kebangsaan Batang Pendidikan RM 9,000,000.00 Jurutera Rekabentuk
Berjuntai for Kementerian Malaysia
Pendidikan Malaysia.
43. Proposed Design and Built Kerajaan Kementerian 1997 Jurutera Rekabentuk
Sekolah Kebangsaan Segambut Pendidikan RM 7,000,000.00
Makmur Kuala Lumpur for Malaysia
Kementerian Pendidikan Malaysia.
Kebangsaan Segambut Makmur
Kuala Lumpur for Kementerian
Pendidikan Malaysia.
21 | P a g e
45. Proposed Malaysian French Kerajaan Majlis Amanah 1994 Jurutera Rekabentuk
Institute at Bangi for Majlis Rakyar (MARA) RM 20,000,000.00
Amanah Rakyat (MARA)
9.Working experience :
22 | P a g e
1.5. PROJECT INVOLVED
a. Cadangan Merekabentuk Dan Membina Masjid Cina Di Atas Lot 1220, Jalan
Devis, Wilayah Perseketuan Kuala Lumpur
b. Projek Naiktaraf Loji Air Sungai Cherul Pakej 2: Membina, Menyiapkan, Menguji
Dan Mentauliah Kerja-Kerja Sivil, Mekanikal Dan Elektrikal Dan Yang Berkaitan
Bagi Melengkapkan Loji Air Sungai Cherul Kemaman, Terengganu Darul Iman.
c. Cadangan Membina Dan Menyiapkan Sebuah Rumah Banglo Dua Tingkat Di No.
16, Jalan Gunung Nuang, Bukit Bandaraya Shah Alam.
e. Rancangan Bekalan Air Negeri Selangor. Projek Mitigasi Fasa 2: Skim Rasa.
Projek Pengagihan Semula Kapasiti Rekabentuk Air Terawat Dari Loji Rawatan
Air Sg Selangor Fasa 3 (Ssp 3). Pakej 1 : Membekal & Memasang Paip Jenis
Keluli Lembut (Mild Steel) Bergaris Pusat 100mm & Kerja-Kerja Berkaitan Dari
Batu Arang Ke Bandar Tasik Puteri, Mukim Rawang, Daerah Gombak.
f. Projek Pembangunan Pusat Dakwah Dan Tarbiah Kg. Sungai Merab Tengah Di
Atas Sebahagian Lot 2996, Mukim Dengkil, Daerah Sepang, Selangor.
g. Loji Rawatan Air Sungai Labu, Kampung Lembah Paya Salak Tinggi, Sepang
Selangor.
h. Pakej 2: Kerja-Kerja Membekal Dan Memasang Paip Jenis Keluli Lembut (Mild
Steel, M.S) Bergarispusat Nominal 750 Mm, Membina Dan Menyiapkan Tangki
Imbangan Berkapasiti 30 Ml Serta Kerja-Kerja Sivil, Elektrikal Dan Yang
Berkaitan Di Tangki Imbangan Di Gadong, Seremban Negeri Sembilan Darul
Khusus.
24 | P a g e
CHAPTER 2 BACKGROUND OF THE COMPANY
PZK SDN. BHD., also known as Perunding Zakariah and Kemas is a consultancy
firm that are specializing in the civil and structural consultancy, water treatment plant
and water distribution system to building structures, industrial, management &
planning services. PZK is a 100% Bumiputera and start incorporated in 1995.
2.2. FACILITIES
25 | P a g e
2.3. LIST OF STAFFS
MANAGING DIRECTOR
Ir, ZAKARIAH KEMAS SALLEH Bsc. Civil Eng. (Salford, U.Kingdom) 32
Msc. Eng. (Newcastle Upon-Tyne, U.K)
EXECUTIVE DIRECTOR
Ir. KAMAL AZWAN ABBAS Bsc. Eng. (Plymouth, U.K) 30
ASSOCIATED DIRECTOR
Ir. MOHD NAZARI BIN HJ. JAFFAR Bsc. Eng (Hons) Mech, UTM 20
GENERAL MANAGER
NOOR RIZAN SARMIN Bsc. Eng. (Hons) in Civil , UTM 21
ENGINEERS
Ir. MOHAMAD BIN AWANG B. Eng (Hons) in Civil Eng. (UK) 26
AZRUL HAFIZ ABD AZIZ B. Eng (Hons) in Civil & Structural (UKM) 14
MOHD ROSLI AWANG B.Eng (Hons) Electrical 9
AHMAD ZHAFRI B. AHMAD @ AHMAD ZAKI B.Eng (Hons) Civil, UiTM 7
AZWEEN MD YUSOF B.Eng (Hons) Civil, UiTM 7
YUNIZA MOHD FITRI B.Eng (Hons) Civil, USM 7
MOHD FAZLY OMAR B.Eng (Hons) Civil & Environment, UKM 6
MIOR AHMAD AFZAL B. AHMAD MUSTAZA B.Eng (Hons) Mechanical, UiTM 4
MOHD ZULFADHLI JOHARI B.Eng (Hons) Civil, UTP 3
FAHMI AHMAD RASHIDI B.Eng (Hons) Mechanical, UNITEN 2
TECHNICAL ASSISTANTS
SALBIAH LEE Dip. Civil Eng, UiTM 19
MUNAWARAH HJ. MUHAMAD Dip. In Town & Regional Planning, UiTM 23
KAMALRUDDIN ABU BAKAR Dip. Mech. Eng, UTM 11
MOKHTAR JUSUH Dip. Civil. Eng (UTM) 24
26 | P a g e
MORIYAH BT DOL Dip. Drafting 21
ADMINISTRATION
HAMIDAH ABDUL RAHMAN SPM 16
NORAZLINA ZAKARIA SPM 27
MAZZURA MAMAD SPM 8
IMAM WAHYUDI SUHARDI SPM 4
ACCOUNT
SITI HAJAR ABDUL HADI Deg. In Mngt’ Technology (Finance) UTM 6
CLERKS
ROMZI ISMAIL SPM 16
27 | P a g e
2.4. ORGANIZATIONAL CHART
MANAGING DIRECTOR
Ir. ZAKARIAH KEMAS SALLEH
EXECUTIVE DIRECTOR
Ir. KAMAL AZWAN ABBAS BOARD OF
DIRECTOR DIRECTORS
Ir. SITI MUTRIKAH HJ. ABD
MOKHSIN
ASSOCIATED DIRECTOR
Ir. MOHD NAZARI B. HJ. JAFFAR
GENERAL MANAGER
NOOR RIZAN
SARMIN
ENGINEERS
ENGINEERS MOHD ZULFADHLI ENGINEERS
AZWEEN MD YUSOF JOHARI IR MOHAMAD B. AWANG
MOHD FAZLY MOKHTAR JUSOH AHMAD ZHAFRI B. AHMAD ZAKI
OMAR YUNIZA MUHAMMAD FITRI AZRUL HAFIZ ABD AZIZ
DRAFTING
MUNAWARAH MUHAMAD
KAMALRUDDIN B. ABU
BAKAR
MOKHTAR B. JUSOH
MORIYAH DOL
SALBIAH LEE
28 | P a g e
2.5. CURRENT LIST OF PROJECT
3 Design and Upgrade Thirteen (13) Water Treatment Air Kelantan Sdn. Bhd. RM59,000,000.00
Plant in the State of Kelantan Darul Naim
4 Projek Menaiktaraf Loji Air Sungai Cherul, Kemaman, Lembaga Kemajuan Terengganu RM4,510,999.00
Terengganu Pakej Tengah (KETENGAH) (RE-TENDER)
2 : Membina, Menyiapkan, Menguji dan Mentauliah
Kerja-Kerja Sivil, Mekanikal, Elektrik dan Yang Berkaitan
Bagi Melengkapkan Loji Air Sungai Cherul, Kemaman,
Terengganu
5 Design a New 25 Mld Saratok Water Treatment Plant, Jabatan Bekalan Air Pahang RM13,400,000.00
Saratok, Sarawak
29 | P a g e
6 Projek Sistem Bekalan Air Untuk projek Pembangunan Perbadanan Aset Air Berhad RM50,000,000.00
Seremban Barat-Selatan Negeri Sembilan Darul Khusus (PAAB)
Pakej 2 : Membekal dan Memasang Paip Jenis 'M.S'
Bergarispusat Nominal 1200mm, Tangki Sedutan,
Rumah Pam dan Kolam Imbangan di Bandar Enstek
hingga Kawasan Bandar Sendayan.
3 Design And Build Chengal Lempong Secondary School, Kementerian Pelajaran Malaysia RM21,391,600.00
Kuantan District Pahang Darul Makmur for the Ministry of
Education, Malaysia
4 Design On Electrical And ICT Works For UiTM Selangor Jabatan Kerja Raya, Kuala RM126,000,000.00
Branch, Sg. Buloh, Selangor Lumpur
5 Cadangan Perumahan Pelindung Heights (Fasa 1B), Udaland (East Sdn. Bhd.
Mukim Kuala Kuantan, Daerah Kuantan.
6 Cadangan Pembinaan 4 Unit Kedai Pejabat 3 Tingkat Di Yayasan Anak Yatim (YAYAKEM)
atas Lot PT16351 (HSD 69015), Bandar Semenyih, Daerah
Hulu Langat, Selangor Darul Ehsan.
30 | P a g e
7 Cadangan Membina dan Menyiapkan 4 Unit Industri Bank Perusahaan Kecil dan RM16,000,000.00
Teres 2 Tingkat (30' x 158'), 5 Unit Industri Teres 2 Tingkat Sederhana Malaysia Berhad (SME
(30' x 112') 6 Unit Industri Teres 2 Tingkat (27' x 112') Di Bank)
atas Lot PT 70839 (Lot Lama PT 10620) Taman
Perusahaan IKS, Seksyen 16 Bandar Baru Bangi, Mukim
Kajang, Daerah Hulu Langat Selangor untuk Tet. Bank
Perusahaan Kecil dan Sederhana Malaysia Berhad (SME
Bank)
8 Consultancy Services for the Construction of Blast Proof Petronas Penapisan (Melaka)
Building for Area 3A and 3B Personnel for PPMSB Sdn. Bhd.
12 Cadangan Membina Sebuah Masjid Di Bandar Sri Putra, Jabatan Agama Islam Selangor RM9,000,000.00
Bangi (JAIS)
31 | P a g e
ROAD AND BRIDGES
SEWERAGE
32 | P a g e
2.6. LIST OF COMPLETED PROJECTS
2 Design, Build and Finance of Chicha Water Supply ACPI Engineering / Air RM77,000,000.00 Completed 2003
Scheme, Kota Bharu, Kelantan Darul Naim Kelantan Sdn. Bhd.
3 Rancangan Bekalan Air Triang Jabatan Bekalan Air Pahang RM24,911,900.00 Completed 2000
Pakej 1 : Membina dan Menyiapkan Loji Air Baru
Triang dan Kerja-Kerja Lain Berkaitan di Triang, Bera,
Pahang
4 Rancangan Bekalan Air Triang Jabatan Bekalan Air Pahang RM498,800.00 Completed 2001
Pakej 1(a) : Membekal, Memasang dan
Mengujiterima Pam Air Mentah di Mukasauk
Sediada dan Kerja-Kerja Berkaitan di Triang, Bera,
Pahang
5 Rancangan Bekalan Air Triang Jabatan Bekalan Air Pahang RM1,685,698.00 Completed 2001
Pakej 2 : Membina dan Menyiapkan Tangki Air
Tetulang dan Kerja-Kerja Lain Berkaitan di Triang,
Bera, Pahang
33 | P a g e
6 Rancangan Bekalan Air Triang Jabatan Bekalan Air Pahang RM4,636,805.50 Completed 2002
Pakej 3 : Membekal dan Memasang Paip Jenis M.S.
250mm Dia dan Kerja-Kerja Lain Berkaitan di Triang,
Bera, Pahang
7 Rancangan Bekalan Air Triang Jabatan Bekalan Air Pahang RM3,415,970.00 Completed 2002
Pakej 4 : Membekal dan Memasang Paip Jenis M.S.
750mm Dia dan Kerja-Kerja Lain Berkaitan di Triang,
Bera, Pahang
8 Rancangan Bekalan Air Triang Jabatan Bekalan Air Pahang RM3,571,023.14 Completed 2005
Pakej 5 : Membekal dan Memasang Paip Jenis M.S.
750mm Dia dan Kerja-Kerja Lain Berkaitan di Triang,
Bera, Pahang
9 Rancangan Bekalan Air Seberang Temerloh, Jabatan Bekalan Air Pahang RM2,835,341.50 Completed 2005
Temerloh, Pahang
Pakej 1 : Membekal dan Memasang Paip Jenis Mild
Steel dan HDPE Bergaris Pusat Nominal 400mm dia.
Serta Kerja-Kerja Bersangkutan Dari Tangki Air Bukit
Angin ke Hospital Baru, Seberang Temerloh, Pahang
Darul Makmur
10 Rancangan Bekalan Air Seberang Temerloh, Jabatan Bekalan Air Pahang RM9,716,636.99 Completed 2005
Temerloh, Pahang
Pakej 9 : Sebuah Rumah Pam dan Kerja-Kerja
Berkaitan di Tapak Cadangan Loji Air Seberang
Temerloh, Temerloh, Pahang Darul Makmur
34 | P a g e
11 Rancangan Bekalan Air Seberang Temerloh, Jabatan Bekalan Air Pahang RM1,921,235.20 Completed 2005
Temerloh, Pahang
Pakej 10A : Cadangan Membekal dan Memasang
Paip Jenis MS Bergarispusat 400mm Dia. Bagi
Menggantikan Paip AC Sediada Serta Kerja-Kerja
Bersangkutan Dari Jambatan Sultan Abu Bakar ke
Simpang Pulai, Temerloh, Pahang Darul Makmur
12 Rancangan Bekalan Air Seberang Temerloh, Jabatan Bekalan Air Pahang RM2,020,512.00 Completed 2005
Temerloh, Pahang
Pakej 10B : Cadangan Membekal dan Memasang
Paip Jenis MS Bergarispusat 400mm Dia. Bagi
Menggantikan Paip AC Sediada Serta Kerja-Kerja
Bersangkutan Dari Simpang Kg. Paya Pulai ke Tangki
Air Batu 8, Temerloh, Pahang Darul Makmur
13 Rancangan Bekalan Air Greater Kuantan Fasa II Jabatan Bekalan Air Pahang RM13,336,248.00 Completed 1998
Pakej 4A : Membekal, Memasang dan Menguji
Terima Air Mentah Tambahan dan Kerja-Kerja
Berkaitan di Kg. Kobat, Kuantan, Pahang Darul
Makmur
14 Rancangan Bekalan Air Greater Kuantan Fasa II Jabatan Bekalan Air Pahang RM1,334,499.00 Completed 1998
Pakej 4A(i) : Membaikpulih, Memasang dan
Mengujiterima Pam Air Mentah ke Bukit Ubi dan
Kerja-Kerja Berkaitan di Kg. Kobat, Kuantan, Pahang
Darul Makmur.
15 Rancangan Bekalan Air Greater Kuantan Fasa II Jabatan Bekalan Air Pahang RM5,197,842.00 Completed 1998
Pakej 4A(ii) : Kerja-Kerja Membaikpulih Barrage
Gates dan Kerja-Kerja Berkaitan di Kg. Kobat,
Kuantan, Pahang Darul Makmur
35 | P a g e
16 Rancangan Bekalan Air Greater Kuantan Fasa II Jabatan Bekalan Air Pahang RM3,203,030.75 Completed 1998
Pakej 4D : Membina dan Menyiapkan Pusat
Kawalan serta Kerja-Kerja Berkaitan di Kg. Kobat,
Kuantan, Pahang Darul Makmur
17 Rancangan Bekalan Air Greater Kuantan Fasa II Jabatan Bekalan Air Pahang RM6,491,021.00 Completed 1998
Pakej 6B : Memasang Paip Keluli Lembut Bersaiz
900mm, 1200mm dan 1300mm dari Loji Air Semambu
ke Tangki Air Bukit Tg. Putus, Pahang Darul Makmur
18 Rancangan Bekalan Air Greater Kuantan Fasa II Jabatan Bekalan Air Pahang RM2,780,191.00 Completed 1998
Pakej 6C : Memasang Paip Keluli Lembut Bersaiz
1300mm dari Tangki Air Bukit Tg. Putus ke Rumah
Pam KM20, Kuantan, Pahang Darul Makmur
19 Rancangan Bekalan Air Greater Kuantan Fasa II Jabatan Bekalan Air Pahang RM4,488,480.00 Completed 1998
Pakej 6D : Membekal dan Memasang Paip 'Ductile
Iron' Bergarispusat Nominal 400mm dan 450mm Serta
Kerja-Kerja Bersangkutan dari Loji Air Lepar Hilir ke
Kolej Matrikulasi, Kuantan, Pahang Darul Makmur
20 Merekabentuk, Membina dan Menyiapkan Kerja Jabatan Bekalan Air Pahang RM7,205,000.00 Completed 2005
Menaiktaraf dan Lain-Lain Kerja Berkaitan Untuk Loji
Pembersih Air Di Mempateh, Temerloh, Pahang Darul
Makmur
21 Study, Design, Upgrading and Additional Water Universiti Teknologi Malaysia RM4,800,000.00 Completed 2000
Reticulation System for UTM Campus, Skudai, Johor
Darul Takzim
36 | P a g e
22 Projek Bekalan Air Chenor, Maran Jabatan Bekalan Air Pahang RM4,357,486.00 Completed 2000
Construction and Completion of Continuous
Microfiltration (CMF) Treatment Plant and Related
Works
23 Upgrading of Kg. New Zealand Water Treatment Jabatan Bekalan Air Pahang RM1,000,000.00 Completed
Plant, Pahang Darul Makmur
24 Upgrading of Bera Treatment Plant, Temerloh, Jabatan Bekalan Air Pahang RM1,000,000.00 Completed
Pahang
25 Membina dan Menyiapkan Projek Bekalan Air Luar Kementerian Pembangunan RM5,000,000.00 Completed 2002
Bandar (BALB) Secara Konsep Bersepadu Bagi Luar Bandar dan Wilayah
Negeri Perak (Pakej 1 - 2001/2002)
26 Membina dan Menyiapkan Projek Bekalan Air Luar Kementerian Pembangunan RM8,950,000.00 Completed 2002
Bandar (BALB) Secara Konsep Bersepadu Bagi Luar Bandar dan Wilayah
Negeri Perak (Pakej 2)
27 Membina dan Menyiapkan Projek Bekalan Air Luar Kementerian Pembangunan RM8,950,000.00 Completed 2003
Bandar (BALB) Secara Konsep Bersepadu Bagi Luar Bandar dan Wilayah
Negeri Perak (Pakej 2)
28 Projek Sistem Bekalan Air Untuk Pembangunan Syarikat Air Negeri Sembilan RM37,507,009.50 Completed 2011
Seremban Barat-Selatan Negeri Sembilan Darul Sdn. Bhd. (SAINS)
Khusus Pakej 1 : Membekal dan
Memasang Paip Jenis 'M.S' Bergarispusat Nominal
1200mm dan Keja-Kerja Bersangkutan Dari Bulatan
Bandar Nilai ke Tangki Sedutan Enstek Fasa II, Negeri
Sembilan Darul Khusus
37 | P a g e
29 Projek Menaiktaraf Loji Air Sungai Cherul, Kemaman, Lembaga Kemajuan RM7,530,206.26
Terengganu Terengganu Tengah
Pakej 1 : Membina, Menyiapkan, Menguji dan (KETENGAH)
Mentauliah Loji Air Sungai Cherul, Kemaman,
Terengganu
Completed 2011
30 Supervision of STATE OF KELANTAN NRW Program Air Kelantan Sdn. Bhd. RM130,000,000.00 Completed 2012
31 Rancangan Bekalan Air Seberang Temerloh Jabatan Bekalan Air Pahang RM38,500,000.00 Completed 2012
Pakej 2 : Membina, Menyiapkan, Menguji dan
Mentauliahkan Kerja-Kerja Sivil, Mekanikal, Elektrikal
Dan Yang Berkaitan Bagi Melengkapkan Loji Air
Seberang Temerloh, Pahang Darul Makmur
32 Rancangan Bekalan Air Seberang Temerloh Jabatan Bekalan Air Pahang RM15,000,000.00 Completed 2012
Pakej 3 : Cadangan Membekal, Memasang,
Menguji dan Mentauliah Paip AIr Mentah Jenis M.S.
Bergarispusat Nominal 700mm dan Paip Air Sisa Jenis
M.S. Bergarispusat Nominal 300mm serta Kerja-Kerja
Bersangkutan dari Muka Sauk ke Loji Air Seberang
Temerloh, Pahang Darul Makmur.
33 Rancangan Bekalan Air Seberang Temerloh Jabatan Bekalan Air Pahang RM13,400,000.00 Completed 2012
Pakej 4 : Membina, Menyiapkan, Menguji dan
Mentauliahkan Kerja-Kerja Sivil, Mekanikal, Elektrikal
Dan Yang Berkaitan Untuk Muka Sauk Loji Air
Seberang Temerloh, Pahang Darul Makmur
38 | P a g e
2 The Structural Analysis, Design, Drafting, Specification Jabatan Kerja Raya, RM3,000,000.00 Completed 2000
and Construction Supervision of Proposed Building Pahang
for Wild Life Conservation / Public Awareness - Kuala
Atok
3 The Structural Analysis, Design, Drafting, Specification Jabatan Kerja Raya, RM4,000,000.00 Completed 2000
and Construction Supervision of Proposed Building Pahang
for Wild Life Conservation / Public Awareness -
Lanchang
4 The Structural Analysis, Design, Drafting, Specification Jabatan Kerja Raya, RM3,000,000.00 Completed 2000
and Construction Supervision of Proposed Building Pahang
for Wild Life Conservation / Public Awareness -
Merapoh
5 UIA Medical Campus, Jalan Penjara, Kuantan, Jabatan Kerja Raya, RM23,000,000.00 Completed 2002
Pahang Darul Makmur Pahang
6 Cadangan Membina dan Menyiapkan Masjid Kolej Jabatan Kerja Raya, RM10,000,000.00 Completed 2005
Islam, Pahang Darul Makmur Pahang
7 Cadangan Membina dan Menyiapkan 21 Unit Perbadanan Kemajuan RM2,000,000.00 Completed 2005
Rumah Sesebuah Satu (1) Tingkat di Sebahagian Lot Negeri Selangor (PKNS)
193, Jalan Raja Musa, Daeraha Kuala Selangor,
Selangor Darul Ehsan
8 Projek Cadangan Tapak Perumahan Pegawai LKPP Property Sdn. Bhd. RM3,000,000.00 Completed 2001
Kerajaan Kg. Soi, Kuantan, Pahang Darul Makmur
9 Cadangan Kerja-Kerja Untuk Membina dan Yayasan Basmi Kemiskinan RM313,280.00 Completed 2005
Menyiapkan 4 Buah Asrama Setingkat di atas Lot Selangor
2871, Mukim Hulu Bernam, Daerah Hulu Selangor,
Selangor Darul Ehsan
39 | P a g e
10 Cadangan Membina 1 unit Banglo 2.1/2 Tingkat Di Tn. Hj. Abdul Halim b. RM400,000.00 Completed 2006
Atas Lot PT40248, No. 73, Jalan Seri Putra 8/1, Bandar Ahmad
Seri Putra, Bangi, 43000 Kajang, Selangor Darul Ehsan
11 Projek Pembinaan Bangunan Herbarium di Institut Jabatan Kerja Raya, Kuala RM6,000,000.00 Completed 2006
Penyelidikan Malaysia (FRIM) Kepong, Selangor Lumpur
12 Design and Build Kg. Raja Secondary School at Lot Kementerian Pelajaran RM9,000,000.00 Completed 2009
602, Kg. Raja, Mukim Hulu Telum, Cameron Highlands Malaysia
District, Pahang Darul Makmur for the Ministry of
Education, Malaysia
13 Upgrading Works to Enchance Security At The Drug Kementerian Keselamatan RM3,000,000.00 Completed 2009
Rehabilitation Centre, Jerantut District, Pahang Darul Dalam Negeri
Makmur for Ministry of Internal Affairs, Malaysia
14 Housing Scheme at Pelindung Heights, Phase 1, Uda Land (East) Sdn. Bhd. RM20,000,000.00 Completed 2009
Mukim Kuala Kuantan, Pahang Darul Makmur
15 Hostel Bolcks University Inst. Tech. MARA, Terengganu Jabatan Kerja Raya, Kuala RM28,000,000.00
Branch, Bukit Besi, Terengganu Lumpur Completed
16 Design Works For The Construction of Computer Universiti Teknologi Malaysia RM18,600,000.00
Science & Inform. Tech. Faculty Building for University
Tech. Malaysia, Johor Completed
Cadangan Merekabentuk, Membina dan Jabatan Perumahan RM2,093.228.00 Completed
Menyiapkan 47 Unit Rumah Teres Satu Tingkat Bagi Negara
Program Perumahan Rakyat 9PPR-Dimiliki), Di Bandar
Baru Jerantut, Fasa II, Jerantut, Pahang Darul
17 Makmur.
40 | P a g e
Cadangan Merekabentuk, Membina dan Jabatan Perumahan RM6,700.000.00 Completed
Menyiapkan 150 Unit Rumah Teres 1 Tingkat Bagi Negara
Program Perumahan Rakyat (PPR-Dimiliki), Di Kg.
18 Hijrah, Kuantan, Pahang Darul Makmur.
Cadangan Merekabentuk, Membina dan Jabatan Perumahan RM6,337,500.00 Completed
Menyiapkan 150 Unit Rumah Teres Bagi Program Negara
Perumahan Rumah Rakyat (PPR-Dimiliki), Di Kg. Sri
19 Jaya, Maran, Pahang Darul Makmur
Cadangan Merekabentuk, Membina dan Jabatan Perumahan RM7,155,000.00 Completed
Menyiapkan Rmah Kos Rendah Bagi Program Negara
Perumahan Rakyat (PPR-Dimiliki), Di Kampung Baru
20 Gambang, Kuantan, Pahang Darul Makmur.
Cadangan Merekabentuk, Membina dan Jabatan Perumahan RM3,664.754.90 Completed
Negara
Menyiapkan 100 Unit Rumah Teres 1 tingkat bagi
Program Perumahan Rakyat (PPR-Dimiliki), Di Kg. Ibol
21 Tunggal, Jerantut, Pahang Darul Makmur.
3 Design of New Kg. Bak-Bak Bridge, Maran, Pahang Jabatan Kerja Raya, RM8,000,000.00 Completed 1999
Pahang
4 Design of New Kg. Lada Bridge, Maran, Pahang Jabatan Kerja Raya, RM2,000.000.00 Completed 1997
Pahang
5 Upgrading of Jambatan Serangkam and Jalan Kg. Jabatan Kerja Raya, RM1,000,000.00 Completed 1997
Bak-Bak, Maran, Pahang Pahang
41 | P a g e
6 Upgrading of Jalan Sg. Musang KM 18 - KM 22, Jabatan Kerja Raya, RM5,690,000.00 Completed 2001
Kemaman, Terengganu Terengganu
7 Upgrading of Jalan Penjara and Jalan Makbar, Jabatan Kerja Raya, RM4,600,000.00 Completed 2002
Kuantan, Pahang Pahang
8 Upgrading of Jalan Binjai ke Paman Melalui Paya Jabatan Kerja Raya, RM8,000.000.00 Completed 2001
Seratus, Kemaman Terengganu
9 Design of Jalan Sg. Muntoh / Kg. Chennah Bridge, Jabatan Kerja Raya, Negeri RM1,700,000.00 Completed 1998
Daerah Jelebu, Negeri Sembilan Sembilan
SEWERAGE
42 | P a g e
2.7. REGISTRATION
e. Dewan Bandaraya.
Surat rujukan (27)dlm.DBKL/JPEKS/04-1/19JId.6
Vision
Missions
43 | P a g e
CHAPTER 3 SUMMARY OF WEEKLY
44 | P a g e
the spread sheet.
45 | P a g e
to get the certificate of making Good
Practice (CMGD) foe project UiTM
Bukit Besi.
iii. Examine material use at the site.
iv. Attend briefings for Esteem 9.
v. Attend tender briefing for Indah Water
Konsortium (IWK).
vi. Understand the raw water treatment
plant process.
vii. Design carbon plant using Esteem 9.
46 | P a g e
CHAPTER 4 TECHNICAL REPORT
The proposed construction of the Masjid Cina Muslim in the Wilayah Perseketuan
have been received by MAIWP in 2000 from the Yayasan/NGOS to be used as the
center of coordination of activities and the welfare of Chinese Muslims. The project
site on 4.6 acres (1.88 hectares) above Lot 1220, section 62, Jalan Davis, Kuala
Lumpur has been identified for the development of the proposed new construction
Chinese Mosque. This site is being proposed has been agreed by the Prime Minister,
Datuk Seri Najib Tun Razak to the construction of a Chinese Mosque complex, and
the Islamic culture. New construction of the mosque is to provide convenience and
comfort to carry out religious activities for the Muslim community in the surrounding
area.
Project Name : Cadangan Membina Masjid Cina Di Atas Lot 1220, Seksyen 62,
Jalan Davis, Kuala Lumpur.
Start Project : 21 September 2014
End Project : 2018
Project Value : RM 130,000,000.00
Project Stage : Design stage
47 | P a g e
4.2. SITE LOCATION
The site location located at Jalan Davis meeting at Jalan Kg. Pandan with Jalan
Changkat Tambi Dollah.
48 | P a g e
Figure 4.3: Location Picture
49 | P a g e
4.4. PROBLEM STATEMENT
a. The realization of the hopes and aspirations of the country's leadership in line with
the National Agenda of the country in which the concept proposed is going to be a
landmark of Kuala Lumpur City and the center of Islamic Da'wah activities and
tourist attractions.
b. To provide national recognition to the Chinese community that contributes to the
economy and development through Islamic Da'wah mosque design featuring
Chinese culture.
50 | P a g e
4.7. OUTCOME OF THE PROJECT
a. The development of Chinese Mosque with its commitment is also believed capable
of giving the benefit of the Muslim community in Malaysia in line with the
Government’s, ‘Rakyat Didahulukan Pencapaian Diutamakan”.
b. Increase understanding of new converts.
c. Convey the message that Islam is a universal religion.
d. Meet the needs of a place of worship for the surrounding area.
e. Added another icon/national tourism destinations
51 | P a g e
4.10 DESIGN THE PROJECT
This project is in design stage which is the second stage for project development. For
this project design stage, it has three type of design that are civil and structural design,
pipeline design and mechanical and electrical design. As a civil engineering student, I
have been assigned to design the civil and structural design for this Masjid Cina
project.
From the architectural drawing given, know that this building have three floor. Two
floors for the quarters and the basement is the parking lot. For the quarters each floor
have five unit of house that means the total of the quarters is 10 units. The important
thing when design is knows the usage of the design areas.
There are manual design and software design. First design is design using manual.
This mean, all the manual calculation need to design in the spreadsheet using
Microsoft Excel. This is because the spreadsheet will be easier because the
spreadsheet can be calculate in the big range and can solve all the formula by itself.
Other than that, the spreadsheet can be reuse by change the certain value which can be
said the time for manual design will be lesser.
The issue when design this project both for manual or software are in the industrial or
this company is still using British Standard while in the university is use Eurocode for
the design. There are differences for British Standard and Eurocode in the design.
52 | P a g e
The advantages of using Eurocode are:
a. Can include more shear links.
b. Reduce reinforcement requirements.
c. Saving the materials about 5% to 10% on the applied load to structure due to
reduce the formula:
Eurocode: 1.35gk + 1.5qk
British Standard: 1.4gk + 1.6qk
Although the manual calculation is in Eurocode, the certain value need to changed
follow the British Standard such as characteristic of steel, fyk which is for Eurocode is
500N/mm2 change to 460N/mm2. While for the characteristic for concrete, fck is
change to 35A N/mm2 which is the title aqua concrete better in resist the water.
Each of the elements needs to calculate from the design load until the deflection. For
this Masjid Cina project there will different at truss because the roof not use truss but
use slabs to design.
53 | P a g e
e. Design Shear Reinforcement
f. Deflection Check
g. Crack Check
Purpose of this manual design is actually to check the with the software ouput.
Software that is used for design this project is Orion and Esteem 9. After using the
software there will be output in the AutoCad file that are full with the detailing of the
structure.
Figure 4.7: The 3D output from the Orion Software for the Roof Layout
Figure 4.8: The 3D output from The Esteem 9 for the Roof Layout
54 | P a g e
Figue 4.9: The Structure of the Masjid Cina using Orion
55 | P a g e
CHAPTER 5 DISCUSSIONS & RECOMMENDATIONS
Every project in the world may have the problem at least one. For this Masjid Cina
project the problem mostly come from the existing utilities at the site. The three
problems for this design stage are existing monsoon drain, Indah Water Konsotium
(IWK) pipe and Syarikat Bekalan Air Selangor (SYABAS) pipe crossing the site.
56 | P a g e
Figure 5.2: The Existing Monsoon Drain at the Site Project
57 | P a g e
b. Existing SYABAS Water Pipe
There is a water pipe SYABAS at the existing project. Existing pipe is the pipe
type of Asbestos Cement (A. C) 200mm diameter.
The existing water pipe size 200mm type of Asbestos Cement (AC) within the
proposed project site is proposed to be moved in the Street outside the site. Water
pipe size is 200mm Mild Steel proposed for removal of the pipe. For new pipes
will be installed, the pipe 150mm diameter Mild Steel will be used. Total
estimated water use was 277000 liters per day.
58 | P a g e
Figure 5.6: The Existing IWK pipe
The existing IWK pipe intended to be moved on the road outside the site. Pipe
jacking method will be used for the removal of existing sewage pipe. The pipe
that will be used is the size 375mm and 525 mm types of Reinforced Concrete pipe
is connected to the existing 750mm. The new Sewage Pipe installation based on
hydraulic design and planning arrangements to design the network pipe culverts
accordance with Standard ' Malaysia M.S. 1228: 1991 Code of Practice for Design
and Installation of Sewerage Systems ' and based on ' Malaysian Sewerage
Industry Guidelines Third Edition Volume III '. The formula that will be used is
the Formula Manning's. For the installation of sewage pipes in the area of the
proposed site, 225mm-sized VCP pipes will be installed. Total estimated
Population is 2555 PE.
59 | P a g e
There are recommendations for this Masjid Cina project:
a. Change the cast insitu box culvert to precast box culvert because of cost
savings, speed up the construction and construction quality are easily
controlled.
b. Implement trafic impact assesment (TIA) to comply with the requirements of
the Local Authority.
c. Review the cost of road and drainage (ACDC and Traffic Light) to get a more
accurate estimate of costs and comply with the requirements of the Local
Authority.
60 | P a g e
CHAPTER 6 CONCLUSION
During 9 week of industrial training I have gain lot of experience. I have learned
managed and understand the way of project being done from the beginning until it
complete. The most things that I learned were about about design in the designing
stage. Other than that, I can well communicate with other people through the
presentation or meeting that I involved.
Furthermore I also was exposed to the real life of civil engineer. During the practical I
can understand more the theory that I learn during the lectures and can apply it when
do my work. I also can easily discuss with the staff if I had a problem during
completed my works. We also sometimes exchange the idea together during the
meeting and the staff sometimes uses my opinions. This makes me comfortable to
work with them.
As the conclusion, the Industrial Training have bring many benefits to me to learn not
only the theory but also the practical that are mostly difference from what I have
learned in the lectures.
61 | P a g e
REFERENCES
62 | P a g e