This document provides a bending schedule for reinforcement bars used in an LPG tank farm development project. It includes details of the section of work, bar mark, number of bars, total length, shape, and bending dimensions for various reinforcement sizes across multiple pieces of work. Reinforcement bar sizes include H8, H12, H16, and rebar dimensions are specified in accordance with BS4466:1989.

Uploaded by

orode franklyn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
436 views7 pages

01 Bar Schedule Pile Cap & Column

This document provides a bending schedule for reinforcement bars used in an LPG tank farm development project. It includes details of the section of work, bar mark, number of bars, total length, shape, and bending dimensions for various reinforcement sizes across multiple pieces of work. Reinforcement bar sizes include H8, H12, H16, and rebar dimensions are specified in accordance with BS4466:1989.

Uploaded by

orode franklyn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 7

Job No. Drawing No. Sheet No.

Rev

Crusteam Nigeria Limited


23-07-2018 0
BENDING SCHEDULE Revision A B C D
LPG Tank Farm Development Made by/ Date:FIO
Ijegun-Egba, Lagos Chd. by/Date: BE/24/07/2018
Number
N Total Length of Shape All bending dimensions are in accordance with BS4466:1989
Section of Work Mar Mark Total code
u in number each bar A B C D E/R
ADMINISTRATIVE meach mm Length
Type Size No. mm mm mm mm mm
BUILDING be (m)
r
SHEET 4 of
PCT 1 H1201 2 6 12 2544 30.528 61 600 600
gr
H1602 2 ou 10 20 2052 41.04 38 750 600 750
ps
PCT 2 H1203 10 6 60 2544 152.64 61 600 600
H1604 10 24 240 3236 776.64 38 750 1800 750
H1605 10 8 80 2036 162.88 38 750 600 750

PCT 3 H1606(a) 12 2 24 3315 79.56 38 750 1879 750


H1606(b) 12 2 24 3015 72.36 38 750 1579 750
H1606(c) 12 2 24 2715 65.16 38 750 1279 750
H1606(d) 12 2 24 2415 57.96 38 750 979 750
H1606(e) 12 2 24 2032 48.768 38 750 596 750
H1607 12 6 72 3298 237.46 38 750 1862 750
H1608 12 6 72 3336 240.19 38 750 1900 750
H1609 12 1 12 6478 77.736 99
H1610(a) 12 2 24 3202 76.848 38 750 1766 750
H1610(b) 12 2 24 3068 73.632 38 750 1632 750
H1610(c) 12 2 24 2918 70.032 38 750 1482 750
H1610(d) 12 2 24 2768 66.432 38 750 1332 750
H1610(e) 12 2 24 2618 62.832 38 750 1182 750
H1610(f) 12 2 24 2468 59.232 38 750 1032 750
H1610(g) 12 2 24 2318 55.632 38 750 882 750
H1610(h) 12 2 24 2168 52.032 38 750 732 750
H1610(i) 12 2 24 2018 48.432 38 750 582 750

CT1 H801A 22 32 704 736 518.14 61 160 160


H1611 22 4 88 3318 291.98 37 3300 50
H1612 22 4 88 4250 374 20 4250
H1613 22 4 88 2668 234.78 37 2500 200

PILE CAP AND COLUMN QUANTITY TAKE-OFF


UNIT
TOTAL
SIZE WEIGHT(kg/m) LENGTHT(m) TOTAL WEIGHT (kg) TOTAL WEIGHT (tons)
H8 0.395 518.14 204.665 0.2046653
H12 0.888 183.168 162.653 0.162653184
H16 1.579 3325.516 5250.990 5.250989764

TOTAL 5618.308 5.618308


VOLUME OF CONCRETE (Cu.m) 54.725
R = Round mild steel reinforcement BS 4449
Y = High yield reinforcement BS 4449 and BS 4461 Type 1 or 2 Ref. CP 110 Appendix E.
x = General abbreviations for other than R and Y.
R = Round mild steel reinforcement BS 4449
Y = High yield reinforcement BS 4449 and BS 4461 Type 1 or 2 Ref. CP 110 Appendix E.
x = General abbreviations for other than R and Y.
REV
DELTEC
Engineering Limited RC. 178520
Job No.

2018-xxx
Drawing No.

8,9, of 20
Sheet No.

8,9, of 20
0
Rev

BENDING SCHEDULE Revision A B C D


Tank Farm Development Made by/ Date: KN
Ijegun-Egba, Lagos Chd. by/Date: 5/3/2018
Location Number Total Length of Shape All bending dimensions are in accordance with BS4466:1989
Mar Mark inof number each bar code A B C D E/R
ADMINISTRATIV each
groups mm mm mm mm mm
Type Size No. mm
E BUILDING

SHEET 9
CONT'D
GBM 10&11 H827 2 20 40 1596 61 550 200
H1628 2 6 12 4790 38 200 4470 200

GBM 12 H811 1 35 35 2196 61 850 200


H1629 1 3 3 11360 37 300 11100
H1630 1 3 3 2135 37 300 1875
H1631 1 3 3 9420 37 300 9160
H1232 1 4 4 11975 20
H1634 1 3 3 4075 37 300 3185

GBM 13 H811 1 20 20 2196 61 850 200


H1628A 1 6 6 4990 38 300 4470 300
H1235 1 4 4 4470 20

GBM 14 H811 1 43 43 2196 61 850 200


H1629 1 3 3 11360 37 300 11100
H1631 1 3 3 9420 37 300 9160
H1233 1 4 4 11250 20
H1636 1 3 3 3860 37 300 3600
H1637 1 3 3 5785 37 300 5525
H1238 1 4 4 3455 20

GBM 15 H811 1 7 7 2196 61 850 200


H1639 1 6 6 2450 38 300 1930 300
H1240 1 4 4 1930 20

GBM 16 H801 1 28 28 2696 61 1100 200


H1641 1 6 6 6490 38 300 5970 300
H1242 1 6 6 5970 20

GBM 17 H801 1 29 29 2696 61 1100 200


H1643 1 6 6 6720 38 300 6200 300
H1244 1 6 6 6200 20

R = Round mild steel reinforcement BS 4449


Y = High yield reinforcement BS 4449 and BS 4461 Type 1 or 2 Ref. CP 110 Appendix E.
x = General abbreviations for other than R and Y.
R = Round mild steel reinforcement BS 4449
Y = High yield reinforcement BS 4449 and BS 4461 Type 1 or 2 Ref. CP 110 Appendix E.
x = General abbreviations for other than R and Y.
REV

You might also like