0% found this document useful (0 votes)
38 views

Task 2: Production Planning And: Control

The document provides instructions for a student task to create a 10 slide presentation as the owner of a furniture manufacturing company. The presentation should cover: the company's product, resources and target buyers, production facilities, rate and schedule, number of workers, quality control processes, and short, medium, and long term production planning.

Uploaded by

Iamzura Abdullah
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views

Task 2: Production Planning And: Control

The document provides instructions for a student task to create a 10 slide presentation as the owner of a furniture manufacturing company. The presentation should cover: the company's product, resources and target buyers, production facilities, rate and schedule, number of workers, quality control processes, and short, medium, and long term production planning.

Uploaded by

Iamzura Abdullah
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

GLOBAL INSTITUTE OF STUDIES

DIPLOMA OF MECHANICAL ENGINEERING


DME 3802
INDUSTRIAL ENGINEERING

Task 2: Production Planning and


Control
(10 marks)
• Say you are the owner of a furniture manufacturer
company. Do a presentation on your company’s production
planning and control based on the following criteria:
– Product of your company
– Your resources and your target buyers
– Facilities of your organization
– Production rate/schedule of your company
– Number of workers in your company
– Quality control
– Short, medium and long term planning

• Minimum slide: 10 slides

You might also like